Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Aftertreatment protocols for catalyst characterization and performance evaluation: low-temperature oxidation, storage, three-way, and NH3-SCR catalyst test protocols

A set of standardized and realistic aftertreatment catalyst test protocols have been developed by the Advanced Combustion and Emission Control Technical Team in support of the U.S.DRIVE Partnership. The protocols are intended to accelerate the pace of aftertreatment catalyst innovation by enabling the accurate evaluation and comparison of aftertreatment catalyst performance data from various testing and research facilities to maximize the impact of discovery-phase research occurring across the nation. The protocols address a need identified by the Partnership’s industry partners for consistent and accurate metrics for aftertreatment catalyst evaluation and comparison. The protocols consist of a set of standardized requirements and test procedures that sufficiently capture the performance capability of a catalyst technology in a manner that is adaptable in various laboratories. The protocols provide a detailed description of the necessary reactor system, the steps for achieving a desired aged state of the catalyst, all necessary sample pretreatment to be performed prior to testing, and realistic test conditions for evaluating performance. This article details four low-temperature catalyst test protocols applicable to (1) oxidation catalysts, (2) passive storage (and release) catalysts, (3) three-way catalysts, and (4) NH3-SCR catalysts. The catalyst test protocol descriptions are presented in five (5) sections: protocol general guidelines and the four individual catalyst test protocol descriptions. The general guidelines plus the individual protocol description forms the complete low-temperature catalyst test protocol for the application.

Emission control, Three-way catalyst, oxidation, S↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Volume 1: Executive summary

The feasibility of replacing the Space Transportation System (STS) Solid Rocket Boosters (SRBs) with Liquid Rocket Boosters (LRBs) was studied. Feasibility required acceptable technical risk, program costs, and a program plan which supports STS requirements. Three major goals were identified to direct booster design and operation: increased STS safety and reliability; STS/LRB integration with minimum impact; and increased STS performance. Two booster engine designs were studied. The first engine design was a turbopump-fed engine with state-of-the-art design, and the second was a pressure-fed engine which might provide a lower cost alternative to the pump-fed concept. Both booster concepts were carried through to completion of conceptual design and all system impacts and program costs were identified. Applications for LRB use in the Advanced Launch System (ALS) program were studied using the pump-fed LRB baseline concept and variations on the baseline concept. Support for the Pressure-Fed Booster Test Bed (PFBTB) included test program planning and costs and technical support.

Source record↗

Book Out! An Inventory Story

The NASA Glenn Library is a science and engineering research library providing the most current books, journals, CD-ROM's and documents to support the study of aeronautics, space propulsion and power, communications technology, materials and structures and microgravity science. The GRC technical library also supports the research and development efforts of all scientists and engineers on site via full text electronic files, literature searching, technical reports, etc. As an intern in the NASA Glenn Library, I attempt to support these objectives through efficiently and effectively fulfilling the assignment that was given to me. The assignment that was relegated to me was to catalog National Advisory Committee for Aeronautics, NASA Technical Documents into NASA Galaxie. This process consists of holdings being added to existing Galaxie records, upgrades and editing done to the bibliographic records when needed, adding URL's into Galaxie when they were missing from the record. NASA ASAP and Digidoc was used to locate URL's of PDF's that were not in Galaxie. A spreadsheet of documents with no URL's were maintained. Also, a subject channel of web, fill-text, paid and free, journal and other subject specific pages were developed and expanded fiom current content of intranet pages. To expand upon the second half of my assignment, I was given the project of taking inventory of the library s book collection. I kept record of the books that were not accounted for on a master list I was given to work fiom and submitted them for correction and addition. I also made sure the books were placed in the appropriate order and made corrections to any discrepancies that existed between the master list and what was on the shelf. Upon completion of this assignment, I will have verified that 21,113 books were in the correct location, order and have the correct corresponding serial number and barcode. In conclusion, as of this date I have input around 750 documents into NASA Galaxie, inputting about half of the NASA Technical Documents into the system. The rest of my tenure in this program will consist of finishing the other half of the reports. In regard to the second assignment, I still have about three-quarters of the collection to record and correct.

Panait, Claudia M.↗

An Integrated Framework for Risk Assessment of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration

This report documents the activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the framework provides a means to address relevant technical issues by: (1) defining a risk-informed analysis process for DI&C upgrade, that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies on nuclear power plant (NPPs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors and Technical Considerations for a Computerized Operator Support System Prototype

A prototype computerized operator support system (COSS) has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment. A COSS demonstration scenario has been developed for the prototype involving the Chemical & Volume Control System (CVCS) of the PWR simulator. It involves a primary coolant leak outside of containment that would require tripping the reactor if not mitigated in a very short timeframe. The COSS prototype presents a series of operator screens that provide the needed information and soft controls to successfully mitigate the event.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Requirements for Application of Operator Support Technology across Multiple Plant Systems

Argonne National Laboratory (ANL) and Idaho National Laboratory (INL) are jointly developing and evaluating operator aids to: (i) facilitate more timely response to plant faults and grid disturbances; (ii) achieve better management of plant upsets and improved operator performance; and (iii) ultimately improve nuclear plant safety, production, and cost management. The overall objective of the collaborative effort in this third and final year of the project was to conduct human performance tests using nuclear plant operators in the Human Systems Simulation Laboratory (HSSL) control room at INL to assess the value of a computerized operator support system (COSS) as an aid to the operator. This report describes the work performed by ANL. A companion report describes the work performed by INL and the results of the human performance tests.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical guidance and analytic services in support of SEASAT-A

The design of a high resolution radar for altimetry and ocean wave height estimation was studied. From basic principles, it is shown that a short pulse wide beam radar is the most appropriate and recommended technique for measuring both altitude and ocean wave height. To achieve a topographic resolution of + or - 10 cm RMS at 5.0 meter RMS wave heights, as required for SEASAT-A, it is recommended that the altimeter design include an onboard adaptive processor. The resulting design, which assumes a maximum likelihood estimation (MLE) processor, is shown to satisfy all performance requirements. A design summary is given for the recommended radar altimeter, which includes a full deramp STRETCH pulse compression technique followed by an analog filter bank to separate range returns as well as the assumed MLE processor. The feedback loop implementation of the MLE on a digital computer was examined in detail, and computer size, estimation accuracies, and bias due to range sidelobes are given for the MLE with typical SEASAT-A parameters. The standard deviation of the altitude estimate was developed and evaluated for several adaptive and nonadaptive split-gate trackers. Split-gate tracker biases due to range sidelobes and transmitter noise are examined. An approximate closed form solution for the altimeter power return is derived and evaluated. The feasibility of utilizing the basic radar altimeter design for the measurement of ocean wave spectra was examined.

Brooks, W. L.↗

Technical assessment of Mir-1 life support hardware for the international space station

NASA has been progressively learning the design and performance of the Russian life support systems utilized in their Mir space station. In 1992, a plan was implemented to assess the benefits of the Mir-1 life support systems to the Freedom program. Three primary tasks focused on: evaluating the operational Mir-1 support technologies and understanding if specific Russian systems could be directly utilized on the American space station and if Russian technology design information could prove useful in improving the current design of the planned American life support equipment; evaluating the ongoing Russian life support technology development activities to determine areas of potential long-term application to the U.S. space station; and utilizing the expertise of their space station life support systems to evaluate the benefits to the current U.S. space station program which included the integration of the Russian Mir-1 designs with the U.S. designs to support a crew of six.

Mitchell, K. L.↗

Solar Irradiance and Thermospheric Airglow Rocket Experiments

This report describes work done in support of the Solar Irradiance and Thermospheric Air-glow Rocket Experiments at the University of Colorado for NASA grant NAG5-5021 under the direction of Dr. Stanley C. Solomon. (The overall rocket program is directed by Dr. Thomas N. Woods, formerly at the National Center for Atmospheric Research, and now also at the University of Colorado, for NASA grant NAG5-5141.) Grant NAG5-5021 provided assistance to the overall program through analysis of airglow and solar data, support of two graduate students, laboratory technical services, and field support. The general goals of the rocket program were to measure the solar extreme ultraviolet spectral irradiance, measure the terrestrial far-ultraviolet airglow, and analyze their relationship at various levels of solar activity, including near solar minimum. These have been met, as shown below. In addition, we have used the attenuation of solar radiation as the rocket descends through the thermosphere to measure density changes. This work demonstrates the maturity of the observational and modeling methods connecting energetic solar photon fluxes and airglow emissions through the processes of photoionization and photoelectron production and loss. Without a simultaneous photoelectron measurement, some aspects of this relationship remain obscure, and there are still questions pertaining to cascade contributions to molecular and atomic airglow emissions. However, by removing the solar irradiance as an "adjustable parameter" in the analysis, significant progress has been made toward understanding the relationship of far-ultraviolet airglow emissions to the solar and atmospheric conditions that control them.

Solomon, Stanley C.↗

Lockheed Martin Skunk Works Single Stage to Orbit/Reusable Launch Vehicle

Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. This portion of the report is comprised of a status report of Lockheed Martin's contribution to the program. The following is a summary of the Lockheed Martin Centers involved and work reviewed under their portion of the agreement: (1) Lockheed Martin Skunk Works - Vehicle Development, Operations Development, X-33 and RLV Systems Engineering, Manufacturing, Ground Operations, Reliability, Maintainability/Testability, Supportability, & Special Analysis Team, and X-33 Flight Assurance; (2) Lockheed Martin Technical Operations - Launch Support Systems, Ground Support Equipment, Flight Test Operations, and RLV Operations Development Support; (3) Lockheed Martin Space Operations - TAEM and A/L Guidance and Flight Control Design, Evaluation of Vehicle Configuration, TAEM and A/L Dispersion Analysis, Modeling and Simulations, Frequency Domain Analysis, Verification and Validation Activities, and Ancillary Support; (4) Lockheed Martin Astronautics-Denver - Systems Engineering, X-33 Development; (5) Sanders - A Lockheed Martin Company - Vehicle Health Management Subsystem Progress, GSS Progress; and (6) Lockheed Martin Michoud Space Systems - X-33 Liquid Oxygen (LOX) Tank, Key Challenges, Lessons Learned, X-33/RLV Composite Technology, Reusable Cyrogenic Insulation (RCI) and Vehicle Health Monitoring, Main Propulsion Systems (MPS), Structural Testing, X-33 System Integration and Analysis, and Cyrogenic Systems Operations.

Source record↗

Integrating regulatory, programmatic and technical needs for modeling tools to support decision-making - 15219

The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater Remediation, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM provides a modeling work-flow to support decision-making for site restoration, tank closure and waste management activities. Potential users involved in regulatory applications (e.g., performance and risk assessments and other activities supporting regulatory decisions) are a key target group for the tool-set. Decision-making in these applications often requires consideration of multiple perspectives, including: regulators and the public, oversight and project management personnel, as well as practitioners involved in conducting the calculations, each with different interests. From its inception, a key objective of the ASCEM project has been to actively seek input from these different user perspectives to help guide development. ASCEM formed a User Steering Committee (USC) with membership representing interests from management/staff at DOE Site Contractors, DOE-HQ and Field offices and Regulators (State and Federal). The project also provides opportunities for input from the broader user community through participation in meetings of the Performance and Risk Assessment (P and RA) Community of Practice (CoP), routine briefings and participation in meetings of the Low-Level Waste Disposal Facility Federal Review Group, and direct interactions with users involved in regulatory applications. Interactions with users involved in regulatory applications have influenced the requirements for the tool-sets and are reflected in capabilities that have been and are being implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Basis for DOE Standard 3013 Equivalency Supporting Reduced Temperature Stabilization of Oxalate-Derived Plutonium Dioxide Produced by the HB-Line Facility at Savannah River Site

This report documents the technical basis for determining that stabilizing highpurity PuO 2 derived from oxalate precipitation at the SRS HB-Line facility at a minimum of 625 °C for at least four hours in an oxidizing atmosphere is equivalent to stabilizing at a minimum of 950 °C for at least two hours as regards meeting the objectives of stabilization defined by DOE-STD-3013 if the material is handled in a way to prevent excessive absorption of water.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗