Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Historic Context, Character-Defining Elements, And Photographic Record For A 26.45-Mile Segment Of The 138-Kilovolt Power Transmission System, Areas 3, 5, 6, And 23, Nevada National Security Site, Nye County, Nevada

The subject of this report is the 138-kilovolt (kV) power transmission line on the Nevada National Security Site (NNSS) (see Figure 1). The NNSS, formerly the Nevada Test Site (NTS), was the main continental nuclear test site for the United States between 1951 and 1992. Known as the battleground of the Cold War, the NNSS hosted a total of 928 nuclear tests during that period. It also served as the location of numerous scientific advancements in the fields of rocketry, big-hole drilling, nuclear waste management, and defense. From its construction in the 1960s through the present day, the 138 kV line has provided electrical power to the numerous buildings, facilities, experiments, and tests on the NNSS. The Department of Energy (DOE), in consultation with the Nevada State Historic Preservation Officer (SHPO), has determined that it may contribute to the character and significance of the Mercury Historic District (MHD) on the NNSS, as well as other historic districts that have not been recorded or evaluated yet. The purpose of this report is to fulfill two of the stipulations in the Memorandum of Agreement DEGM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site (MOA). The MOA was executed as part of the DOE’s obligations under Section 106 of the National Historic Preservation Act (NHPA) to mitigate the adverse effects of two undertakings on historic properties. In particular, this report fulfills MOA Stipulations III.C.1-3, which state that the Department of Energy (DOE) will prepare the following: A historic context for the 138 kV transmission line and identification of the line’s characterdefining elements; High-quality digital images of the 26.45-mile segment of the 138 kV transmission line that is subject to the two undertakings for which the MOA was executed; and Photograph catalogs and map keys showing photograph viewpoints and directions.

54 ENVIRONMENTAL SCIENCES↗

Nuclear Testing and the Joint Task Force System

During the 1940s, 50s, and early 60s, the United States conducted eight nuclear test operations in the far reaches of the Pacific Ocean. These operations were possible only because of a military command and control organization, the joint task force. Commanded by the Army Navy, and Air Force on a rotating basis, each of the seven JTFs provided the means by which the thousands of ships, planes, material, and personnel were moved over thousands of miles of ocean. The first task force, JTF-1, was created to test the destructive effects of the Fat Man bomb on Naval vessels at Bikini Atoll in the summer of 1946. Commanded by Vice Admiral William “Spike” Blandy, JTF-1 was a purely military operation supported by the MED. Never meant to be a permanent organization, JTF-1 was dissolved soon after completing its mission.

99 GENERAL AND MISCELLANEOUS↗

Wastewater Surveillance for Poliovirus in Selected Jurisdictions, United States, 2022–2023

Wastewater testing can inform public health action as a component of polio outbreak response. During 2022-2023, a total of 7 US jurisdictions (5 states and 2 cities) participated in prospective or retrospective testing of wastewater for poliovirus after a paralytic polio case was identified in New York state. Two distinct vaccine-derived poliovirus type 2 viruses were detected in wastewater from New York state and New York City during 2022, representing 2 separate importation events. Of those viruses, 1 resulted in persistent community transmission in multiple New York counties and 1 paralytic case. No poliovirus was detected in the other participating jurisdictions (Connecticut, New Jersey, Michigan, and Illinois and Chicago, IL). The value of routine wastewater surveillance for poliovirus apart from an outbreak is unclear. However, these results highlight the ongoing risk for poliovirus importations into the United States and the need to identify undervaccinated communities and increase vaccination coverage to prevent paralytic polio.

60 APPLIED LIFE SCIENCES↗

Experimental and Numerical Analysis of Additively Manufactured Inconel 718 Coupons With Lattice Structure

Abstract In the present paper, two lattice geometries suitable for near surface and double wall cooling were developed and tested. The first type of unit cell consisted of six ligaments of 0.5 mm diameter joined at a common vertex near the middle. The second type of unit cell was derived from the first type by adding four mutually perpendicular ligaments in the middle plane. Two lattice configurations, referred to as L1 and L2, respectively, were obtained by repeating the corresponding unit cell in streamwise and spanwise directions in an inline fashion. Test coupons consisting of these lattice geometries embedded inside rectangular cooling channel with dimensions of 2.54 mm height, 38.07 mm width, and 38.1 mm in length were fabricated using Inconel 718 powder and selective laser sintering (SLS) process. The heat transfer and pressure drop performance was then evaluated using steady-state tests with constant wall temperature boundary condition and for channel Reynolds number ranging from 2800 to 15,000. The lattices depicted a higher heat transfer compared with a smooth channel and both the heat transfer and pressure drop increased with a decrease in the porosity from L1 to L2. Steady-state conjugate numerical results revealed formation of prominent vortical structures in the inter-unit cell spaces, which diverted the flow toward the top end wall and created an asymmetric heat transfer between the two end walls. In conclusion, these lattice structures provided an augmented heat transfer while favorably redistributing the coolant within channel.

Engineering↗

Immunity Study: Port Impedance Measurement of PMU and PCI testing under EMP

Phasor Measurement Units (PMUs) are critical for the Wide Area Measurement System (WAMS), especially for real-time grid monitoring, disturbance location, and situation awareness. Once they are damaged, the stable operation of the power system will be affected directly and greatly. Therefore, it is urgent and necessary to study their immunity to electromagnetic pulse (EMP) events. In this paper, an effective impedance measurement scheme is proposed for port impedance measurement of PMU. The equivalent non-uniform transmission line model is established to eliminate the impact of the fixture in the de-embedding process. Then circuit of pulsed current generator is established to generate damping sinusoid and double exponential wave applied to the port. Finally, by using measured impedance as a load of the generator, the voltage and current responses of different ports are calculated in the pulsed current injection (PCI) testing simulation. Results show that common-mode impedance is large and differential mode impedance is small. The critical condition will appear in the common mode for voltage and differential mode for current.

Zhang, Liang↗

Unseen Winds: Harnessing High-Altitude Winds in the Southeast USA

This project aims to identify potential sites in the United States for further testing and development of airborne wind energy systems (AWES). Through industry questionnaires and interviews with AWES companies, the study assesses existing test sites' capabilities and gaps, leading to a three-tiered test site strategy: short-duration prototype demonstrations, long-duration technical assessments and power validations, and airspace interaction and deconfliction studies. Notably, the southeastern United States presents significant potential for AWES due to its lack of traditional wind turbines, which is attributed to low wind speeds at lower altitudes. However, wind conditions improve significantly at higher altitudes, making this region a promising candidate for AWES deployment. The project considers factors such as wind resources, infrastructure proximity, social acceptance, and environmental impacts to recommend sites that can support the unique needs of AWES manufacturers and facilitate their commercialization. Early findings suggest rural communities with low grid resiliency could benefit economically and technologically from hosting AWES test sites, especially with operator training centers and potential for long-term skilled employment in future disaster relief and other applications.

17 WIND ENERGY↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

CNS 10-160B RH Cask Operations Manual (Rev. 0)

This manual delineates the requirements for Washington TRU Solutions personnel (or Central Characterization Project [CCP] mobile oading unit personnel) to perform the preshipment leakage rate testing of the CNS 10-160B cask. This manual implements the pressure-decay method of the pressure change leak test discipline.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Marine & hydrokinetic technology development.

The Wind and Water Power Program supports the development of marine and hydrokinetic devices, which capture energy from waves, tides, ocean currents, the natural flow of water in rivers, and marine thermal gradients, without building new dams or diversions. The program works closely with industry and the Department of Energy's national laboratories to advance the development and testing of marine and hydrokinetic devices. In 2008, the program funded projects to develop and test point absorber, oscillating wave column, and tidal turbine technologies. The program also funds component design, such as techniques for manufacturing and installing coldwater pipes critical for ocean thermal energy conversion (OTEC) systems. Rigorous device testing is necessary to validate and optimize prototypes before beginning full-scale demonstration and deployment. The program supports device testing by providing technology developers with information on testing facilities. Technology developers require access to facilities capable of simulating open-water conditions in order to refine and validate device operability. The program has identified more than 20 tank testing operators in the United States with capabilities suited to the marine and hydrokinetic technology industry. This information is available to the public in the program's Hydrodynamic Testing Facilities Database. The program also supports the development of open-water, grid-connected testing facilities, as well as resource assessments that will improve simulations done in dry-dock and closed-water testing facilities. The program has established two university-led National Marine Renewable Energy Centers to be used for device testing. These centers are located on coasts and will have open-water testing berths, allowing researchers to investigate marine and estuary conditions. Optimal array design, development, modeling and testing are needed to maximize efficiency and electricity generation at marine and hydrokinetic power plants while mitigating nearby and distant impacts. Activities may include laboratory and computational modeling of mooring design or research on device spacing. The geographies, resources, technologies, and even nomenclature of the U.S. marine and hydrokinetic technology industry have yet to be fully understood or defined. The program characterizes and assesses marine and hydrokinetic devices, and then organizes the collected information into a comprehensive and searchable Web-based database, the Marine and Hydrokinetic Technology Database. The database, which reflects intergovernmental and international collaboration, provides industry with one of the most comprehensive and up-to-date public resources on marine and hydrokinetic devices.

13 HYDRO ENERGY↗

Testing of Optimized Bubbler Configuration for HLW Melter

The principal objective of this work was to determine the glass production rate increase and ancillary effects of adding more bubbler outlets to the current WTP HLW melter baseline. This was accomplished through testing on the HLW Pilot Melter (DM1200) at VSL. The DM1200 unit was selected for these tests since it was used previously with several HLW waste streams including the four tank wastes proposed for initial processing at Hanford. This melter system was also used for the development and optimization of the present baseline WTP HLW bubbler configuration for the WTP HLW melter, as well as for MACT testing for both HLW and LAW. Specific objectives of these tests were to: Conduct DM1200 melter testing with the baseline WTP bubbling configuration and as augmented with additional bubblers. Conduct DM1200 melter testing to differentiate the effects of total bubbler air flow and bubbler distribution on glass production rate and cold cap formation. Collect melter operating data including processing rate, temperatures at a variety of locations within the melter plenum space, melt pool temperature, glass melt density, and melter pressure with the baseline WTP bubbling configuration and as augmented with additional bubblers. Collect melter exhaust samples to compare particulate carryover for different bubbler configurations. Analyze all collected data to determine the effects of adding more bubblers to the WTP HLW melter to inform decisions regarding future lid re-designs. The work used a high aluminum HLW stream composition defined by ORP, for which an appropriate simulant and high waste loading glass formulation were developed and have been previously processed on the DM1200.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada, For the Period July 2007-June 2008

This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110 for the period July 2007 through June 2008. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, perimeter fence, and use restriction (UR) warning signs was good. However, settling was observed that exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW021 (Nevada Division of Environmental Protection, 2005). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Two areas of settling and cracks were observed on the south and east edges of the cover during the September 2007 inspection that exceeded the action level and required repair. The areas were repaired in October 2007. Additional settling and cracks were observed along the east side of the cover during the December 2007 inspection that exceeded the action level, and the area was repaired in January 2008. Significant animal burrows were also observed during the March 2008 inspection, and small mammal trapping and relocation was performed in April 2008. The semiannual subsidence surveys were performed in September 2007 and March 2008. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.02 m [-0.08 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring overall on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing well. Time Domain Reflectometry (TDR) data show regular changes in the shallow subsurface with significant rain events; however, major changes in volumetric moisture content (VMC) appear to be limited to 1.8 m (6 ft) below ground surface or shallower, depending on the location on the cover. At 2.4 m (8 ft) below the cover surface, TDR data show soil moisture content remained between 9 and 15 percent VMC, depending on the TDR location. The west portion of the cover tends to reflect a lower moisture content and less variability in annual fluctuations in moisture content at this depth. Results of soil moisture monitoring of the cover indicate that VMC at the compliance level (at 2.4 m [8 ft] below the cover surface) is approaching a steady state. If the moisture content at this level remains consistent with recent years, then a recommendation may be made for establishing compliance levels for future monitoring.

54 ENVIRONMENTAL SCIENCES↗

The SuperCam Instrument Suite on the Mars 2020 Rover: Science Objectives and Mast-Unit Description

On the NASA 2020 rover mission to Jezero crater, the remote determination of the texture, mineralogy and chemistry of rocks is essential to quickly and thoroughly characterize an area and to optimize the selection of samples for return to Earth. As part of the Perseverance payload, SuperCam is a suite of five techniques that provide critical and complementary observations via Laser-Induced Breakdown Spectroscopy (LIBS), Time-Resolved Raman and Luminescence (TRR/L), visible and near-infrared spectroscopy (VISIR), high-resolution color imaging (RMI), and acoustic recording (MIC). SuperCam operates at remote distances, primarily 2–7 m, while providing data at sub-mm to mm scales. We report on SuperCam’s science objectives in the context of the Mars 2020 mission goals and ways the different techniques can address these questions. The instrument is made up of three separate subsystems: the Mast Unit is designed and built in France; the Body Unit is provided by the United States; the calibration target holder is contributed by Spain, and the targets themselves by the entire science team. This publication focuses on the design, development, and tests of the Mast Unit; companion papers describe the other units. The goal of this work is to provide an understanding of the technical choices made, the constraints that were imposed, and ultimately the validated performance of the flight model as it leaves Earth, and it will serve as the foundation for Mars operations and future processing of the data.

47 OTHER INSTRUMENTATION↗

Light-emitting device test systems

Light-emitting devices, such as LEDs, are tested using a photometric unit. The photometric unit, which may be an integrating sphere, can measure flux, color, or other properties of the devices. The photometric unit may have a single port or both an inlet and outlet. Light loss through the port, inlet, or outlet can be reduced or calibrated for. These testing systems can provide increased reliability, improved throughput, and/or improved measurement accuracy.

36 MATERIALS SCIENCE↗

Phase I Flow and Transport Model Document for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nye County, Nevada, Revision 1 with ROTCs 1 and 2

The Underground Test Area (UGTA) Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, in the northeast part of the Nevada National Security Site (NNSS) requires environmental corrective action activities to assess contamination resulting from underground nuclear testing. These activities are necessary to comply with the UGTA corrective action strategy (referred to as the UGTA strategy). The corrective action investigation phase of the UGTA strategy requires the development of groundwater flow and contaminant transport models whose purpose is to identify the lateral and vertical extent of contaminant migration over the next 1,000 years. In particular, the goal is to calculate the contaminant boundary, which is defined as a probabilistic model-forecast perimeter and a lower hydrostratigraphic unit (HSU) boundary that delineate the possible extent of radionuclide-contaminated groundwater from underground nuclear testing. Because of structural uncertainty in the contaminant boundary, a range of potential contaminant boundaries was forecast, resulting in an ensemble of contaminant boundaries. The contaminant boundary extent is determined by the volume of groundwater that has at least a 5 percent chance of exceeding the radiological standards of the Safe Drinking Water Act (SDWA) (CFR, 2012).

54 ENVIRONMENTAL SCIENCES↗

Pulse-echo phased array ultrasonic inspection of pultruded rod stitched efficient unitized structure (PRSEUS)

A PRSEUS test article was subjected to controlled impact on the skin face followed by static and cyclic axial compressions. Phased array ultrasonic inspection was conducted before impact, and after each of the test conditions. A linear phased array probe with a manual X-Y scanner was used for interrogation. Ultrasound showed a delamination between the skin and stringer flange adjacent to the impact. As designed, the stitching in the flange arrested the lateral flaw formation. Subsequent ultrasonic data showed no delamination growth due to continued loading.

42 ENGINEERING↗