Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Spacecraft factory-to-pad testing concept

It is noted that the concept of factory-to-pad testing is based on the shipment of a flight-ready spacecraft to the launch base and can be achieved by thorough and comprehensive factory testing of the spacecraft. The principal objectives and results of this approach are shown to be significant cost reductions, increased test effectiveness, and fewer flight problems. Key elements for this concept's success are discussed, including factory-to-pad commonality of support equipment, test requirements and procedures, test teams, and computer programs. Applications of this approach in the space-shuttle era are considered, and a preliminary factory-to-pad concept for the Large Space Telescope spacecraft is presented.

Jones, R. H.↗

Payload/GSE/data system interface: Users guide for the VPF (Vertical Processing Facility)

Payload/GSE/data system interface users guide for the Vertical Processing Facility is presented. The purpose of the document is three fold. First, the simulated Payload and Ground Support Equipment (GSE) Data System Interface, which is also known as the payload T-0 (T-Zero) System is described. This simulated system is located with the Cargo Integration Test Equipment (CITE) in the Vertical Processing Facility (VPF) that is located in the KSC Industrial Area. The actual Payload T-0 System consists of the Orbiter, Mobile Launch Platforms (MLPs), and Launch Complex (LC) 39A and B. This is referred to as the Pad Payload T-0 System (Refer to KSC-DL-116 for Pad Payload T-0 System description). Secondly, information is provided to the payload customer of differences between this simulated system and the actual system. Thirdly, a reference guide of the VPF Payload T-0 System for both KSC and payload customer personnel is provided.

Source record↗

A New Comprehensive Lightning Instrumentation System for Pad 39B at the Kennedy Space Center, Florida

A new comprehensive lightning instrumentation system has been designed for Launch Complex 39B at the Kennedy Space Center, Florida. This new instrumentation system includes the synchronized recording of six high-speed video cameras, currents through the nine downconductors of the new lightning protection system, four B-dot, 3-axis measurement stations, and five D-dot stations composed of two antennas each. The instrumentation system is composed of centralized transient recorders and digitizers that located close to the sensors in the field. The sensors and transient recorders communicate via optical fiber. The transient recorders are triggered by the B-dot sensors, the E-dot sensors, or the current through the downlead conductors. The high-speed cameras are triggered by the transient recorders when the latter perceives a qualified trigger.

Mata, Carlos T.↗

Analysis of nuclear waste disposal in space, phase 3. Volume 2: Technical report

The options, reference definitions and/or requirements currently envisioned for the total nuclear waste disposal in space mission are summarized. The waste form evaluation and selection process is documented along with the physical characteristics of the iron nickel-base cermet matrix chosen for disposal of commercial and defense wastes. Safety aspects of radioisotope thermal generators, the general purpose heat source, and the Lewis Research Center concept for space disposal are assessed as well as the on-pad catastrophic accident environments for the uprated space shuttle and the heavy lift launch vehicle. The radionuclides that contribute most to long-term risk of terrestrial disposal were determined and the effects of resuspension of fallout particles from an accidental release of waste material were studied. Health effects are considered. Payload breakup and rescue technology are discussed as well as expected requirements for licensing, supporting research and technology, and safety testing.

Rice, E. E.↗

Mission safety evaluation report for STS-39, postflight edition

After a delay of approximately 2 months due to a rollback from the pad to replace the External Tank door lug housing, Space Shuttle Discovery was launched from NASA-Kennedy at 7:33 a.m. Eastern Daylight Time on 28 April 1991. STS-39 was the first unclassified DoD Shuttle mission. On 28 April, countdown proceeded normally through the T-20 minute hold. No significant problems were encountered except for the Operations Sequence-2 recorder starting unexpectedly; it was stopped by an uplink command. Discovery landed on KSC runway 15 at 2:55 p.m. EDT on 6 May 1991. This was the second time in 6 months that the Space Shuttle was diverted to KSC for landing because of high winds at Edwards AFB, Calif. This was also the 7th of 40 Shuttle missions to land at KSC in the history of the Space Shuttle Program. The Main Landing Gear outer right tire shredded 3 of the 16 cords due to either an uneven landing or a maximum force breaking test during rollout. Contributing factors to the tire cord shredding were the development of last minute crosswinds and reluctance of the ground controllers to distract the Shuttle pilots with warnings of the low flight path. As a corrective action, communication procedures will be modified for future flights.

Hardie, Kenneth O.↗

STS-26/Discovery Preparations for Launch

This NASA Kennedy Space Center two-part video release is comprised of footage covering STS-26 launch preparations from the arrival of the Tracking and Data Relay Satellite (TDRS) at the Orbiter Processing Facility (OPF) to the lift and mate of the external tanks. The STS-26 flight crew include: Frederick H. (Rick) Hauck, mission commander; Richard O. Covey, pilot; John M. (Mike) Lounge, mission specialist; David C. Hilmers, mission specialist; and George D. (Pinky) Nelson, mission specialist. The primary payload of STS-26 is the TDRS while the secondary payloads include the Physical Vapor Transport of Organic Solids (PVTOS); Protein Crystal Growth (PCG); Infrared Communications Flight Experiment (IRCFE); Aggregation of Red Blood Cells (ARC); Isoelectric Focusing Experiment (IFE); Mesoscale Lightning Experiment (MLE); Phase Partitioning Experiment (PPE); Earth-Limb Radiance Experiment (ELRAD); Automated Directional Solidification Furnace (ADSF) and two Shuttle Student Involvement Program (SSIP) experiments. Launch preparation footage includes flight crew arrival at KSC, rollout of Discovery to Pad B, OV-103 Discovery power-up, main engine unpacking and installation, solid rocket boosters' arrival prep and stacking, and aft skirt to aft segment mating.

Source record↗

Orion MPCV GN and C End-to-End Phasing Tests

End-to-end integration tests are critical risk reduction efforts for any complex vehicle. Phasing tests are an end-to-end integrated test that validates system directional phasing (polarity) from sensor measurement through software algorithms to end effector response. Phasing tests are typically performed on a fully integrated and assembled flight vehicle where sensors are stimulated by moving the vehicle and the effectors are observed for proper polarity. Orion Multi-Purpose Crew Vehicle (MPCV) Pad Abort 1 (PA-1) Phasing Test was conducted from inertial measurement to Launch Abort System (LAS). Orion Exploration Flight Test 1 (EFT-1) has two end-to-end phasing tests planned. The first test from inertial measurement to Crew Module (CM) reaction control system thrusters uses navigation and flight control system software algorithms to process commands. The second test from inertial measurement to CM S-Band Phased Array Antenna (PAA) uses navigation and communication system software algorithms to process commands. Future Orion flights include Ascent Abort Flight Test 2 (AA-2) and Exploration Mission 1 (EM-1). These flights will include additional or updated sensors, software algorithms and effectors. This paper will explore the implementation of end-to-end phasing tests on a flight vehicle which has many constraints, trade-offs and compromises. Orion PA-1 Phasing Test was conducted at White Sands Missile Range (WSMR) from March 4-6, 2010. This test decreased the risk of mission failure by demonstrating proper flight control system polarity. Demonstration was achieved by stimulating the primary navigation sensor, processing sensor data to commands and viewing propulsion response. PA-1 primary navigation sensor was a Space Integrated Inertial Navigation System (INS) and Global Positioning System (GPS) (SIGI) which has onboard processing, INS (3 accelerometers and 3 rate gyros) and no GPS receiver. SIGI data was processed by GN&C software into thrust magnitude and direction commands. The processing changes through three phases of powered flight: pitchover, downrange and reorientation. The primary inputs to GN&C are attitude position, attitude rates, angle of attack (AOA) and angle of sideslip (AOS). Pitch and yaw attitude and attitude rate responses were verified by using a flight spare SIGI mounted to a 2-axis rate table. AOA and AOS responses were verified by using a data recorded from SIGI movements on a robotic arm located at NASA Johnson Space Center. The data was consolidated and used in an open-loop data input to the SIGI. Propulsion was the Launch Abort System (LAS) Attitude Control Motor (ACM) which consisted of a solid motor with 8 nozzles. Each nozzle has active thrust control by varying throat area with a pintle. LAS ACM pintles are observable through optically transparent nozzle covers. SIGI movements on robot arm, SIGI rate table movements and LAS ACM pintle responses were video recorded as test artifacts for analysis and evaluation. The PA-1 Phasing Test design was determined based on test performance requirements, operational restrictions and EGSE capabilities. This development progressed during different stages. For convenience these development stages are initial, working group, tiger team, Engineering Review Team (ERT) and final.

Neumann, Brian C.↗

Space Launch System: SLS Real Time Rollout Monitoring for MPCV

The NASA Space Launch System (SLS) rocket, Orion spacecraft, and Mobile Launcher (ML) are transported to Pad 39B from the Vehicle Assembly Building on a large, tracked vehicle known as the Crawler Transporter (CT). The CT is a holdover from the Apollo and Space Shuttle programs but has been extensively upgraded to accommodate the SLS. The Dynamic Rollout Test (DRT) on March 17, 2022 marked the first full rollout of the SLS and ML. Analysis indicated that loads and vibrations would be well below design limits, but out of an abundance of caution it was decided to monitor the response in real time during the rollout to assure that loads remained within predicted limits. This first rollout was outfitted with extensive test instrumentation such as accelerometers, pressure sensors, and strain gauges. This instrumentation remained in place following the integrated vehicle modal test and was being used for additional Operational Modal Analysis (OMA) during the rollout in addition to the real-time monitoring. This presentation discusses the specific loads and accelerations monitored during the rollout, how and why those responses were chosen, and how the system was implemented. Finally, a post-rollout loads reconstruction is used to assess the process and the analysis tools used for the rollout analysis.

SLS↗

STS-37: TCDT Pad B Atlantis GRO (2 of 3)

Live footage shows the remaining two crewmembers of STS-37, Mission Specialists Jerry L. Ross, and Jay Apt, entering the White Room, putting on their life preservation vest, and then entering the launch vehicle. Video playbacks, of the crew during the earlier stage of the Terminal Countdown and Demonstration Test, and the processing of the primary payload (Gamma Ray Observatory) are shown. Scenes showing the arrival of Ross at Kennedy Space Center in the T-38 aircraft, the crew on the launch complex during familiarization activities, and training with the M113 vehicle are presented. Also shown are some beautiful panoramic views of the shuttle on the pad. This is tape 2 of 3. Tape 1 has a report # of NONP-NASA-VT-2000013416, and tape 3 has a report # of NONP-NASA-VT-2000013418.

Source record↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.

Jones, Daniel S.↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.

Jones, Daniel S.↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The National Aeronautics and Space Administration Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This report provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles

Jones, Daniel S.↗

A Review of the MLAS Parachute Systems

The NASA Engineering and Safety Center (NESC) is developing the Max Launch Abort System (MLAS) as a risk-mitigation design should problems arise with the baseline Orion spacecraft launch abort design. The Max in MLAS is dedicated to Max Faget, the renowned NASA spacecraft designer. The MLAS flight test vehicle consists of boost skirt, coast skirt and the MLAS fairing which houses a full scale boilerplate Orion Crew Module (CM). The objective of the flight test is to prove that the CM can be released from the MLAS fairing during pad abort conditions without detrimental recontact between the CM and fairing, achieving performance similar to the Orion launch abort system. The boost and coast skirts provide the necessary thrust and stability to achieve the flight test conditions and are released prior to the test -- much like the Little Joe booster was used in the Apollo Launch Escape System tests. To achieve the test objective, two parachutes are deployed from the fairing to reorient the CM/fairing to a heatshield first orientation. The parachutes then provide the force necessary to reduce the total angle of attack and body angular rates required for safe release of the CM from the fairing. A secondary test objective after CM release from the fairing is to investigate the removal of the CM forward bay cover (FBC) with CM drogue parachutes for the purpose of attempting to synchronously deploying a set of CM main parachutes. Although multiple parachute deployments are used in the MLAS flight test vehicle to complete its objective, there are only two parachute types employed in the flight test. Five of the nine parachutes used for MLAS are 27.6 ft D(sub 0) ribbon parachutes, and the remaining four are standard G-12 cargo parachutes. This paper presents an overview of the 27.6 ft D(sub 0) ribbon parachute system employed on the MLAS flight test vehicle for coast skirt separation, fairing reorientation, and as drogue parachutes for the CM after separation from the fairing. Discussion will include: the process used to select this design, previously proven as a spin/stall recovery parachute; descriptions of all components of the parachute system; the minor modifications necessary to adapt the parachute to the MLAS program; the techniques used to analyze the parachute for the multiple roles it performs; a discussion of the rigging techniques used to interface the parachute system to the vehicle; and a brief description of how the evolution of the program affected parachute usage and analysis. An overview of the Objective system, rationale for the MLAS approach and the future of the program will also be presented. We hope to have flight test results to report at the time of the Conference Presentation.

Taylor, Anthony P.↗

NASTRAN structural model for the large 64-meter antenna pedestal. Part 2: Improved model

Static analysis and a computer structural model for the large 64-m antenna pedestal are developed using the MSC version of the NASTRAN program. This improved pedestal model includes the launch areas and the actual pressure pattern of the oil under the hydrostatic bearing pad. The results obtained from the new improved model have indicated that the deflections due to pad loads are in good agreement with field measurements. The top surface deflection of the pedestal obtained from the NASTRAN model is used as an input to the oil film computer program to determine the minimum oil film thickness under the pad.

Chian, C. T.↗

STS-37 The Payload bay door closing at PCR Pad B

The primary objective of the STS-37 mission was to deploy the Gamma Ray Observatory. The mission was launched at 9:22:44 am on April 5, 1991, onboard the space shuttle Atlantis. This videotape shows the payload bay doors being closed. Included are views of the Gamma Ray Observatory in the payload bay, and the clean room operations in the Payload Changeout Room (PCR).

Source record↗

Monitoring Direct Effects of Delta, Atlas, and Titan Launches from Cape Canaveral Air Station

Launches of Delta, Atlas, and Titan rockets from Cape Canaveral Air Station (CCAS) have potential environmental effects that could arise from direct impacts of the launch exhaust (e.g., blast, heat), deposition of exhaust products of the solid rocket motors (hydrogen chloride, aluminum oxide), or other effects such as noise. Here we: 1) review previous reports, environmental assessments, and environmental impact statements for Delta, Atlas, and Titan vehicles and pad areas to clarity the magnitude of potential impacts; 2) summarize observed effects of 15 Delta, 22 Atlas, and 8 Titan launches; and 3) develop a spatial database of the distribution of effects from individual launches and cumulative effects of launches. The review of previous studies indicated that impacts from these launches can occur from the launch exhaust heat, deposition of exhaust products from the solid rocket motors, and noise. The principal effluents from solid rocket motors are hydrogen chloride (HCl), aluminum oxide (Al2O3), water (H2O), hydrogen (H2), carbon monoxide (CO), and carbon dioxide (CO2). The exhaust plume interacts with the launch complex structure and water deluge system to generate a launch cloud. Fall out or rain out of material from this cloud can produce localized effects from acid or particulate deposition. Delta, Atlas, and Titan launch vehicles differ in the number and size of solid rocket boosters and in the amount of deluge water used. All are smaller and use less water than the Space Shuttle. Acid deposition can cause damage to plants and animals exposed to it, acidify surface water and soil, and cause long-term changes to community composition and structure from repeated exposure. The magnitude of these effects depends on the intensity and frequency of acid deposition.

Schmalzer, Paul A.↗

STS-101 Meal - Suit Up - Depart O&C Launch - On Orbit - Landing - Crew Depart

The STS-101 Space Shuttle Atlantis Assembly Flight International Space Station (ISS) -2A-2a mission begins with Commander Jim Halsell, and mission specialists Jeff Williams and Yuri Usachev talking briefly to the media. Pilot Scott Horowitz, and Mission Specialists Susan Helms, James Voss, and Mary Ellen Weber are shown arriving later to take crew photos. Footage of the entire STS-101 crew is shown getting suited and departing the Operations and Checkout (O&C) Building. Views of the actual launch of the Space Shuttle Atlantis are presented from the vehicle assembly building (VAB), PAD-A, Tower 1, Universal Camera Sites (UCS) 15 and 23 and Press sites. Jeff Williams and James Voss are shown on orbit performing a single space walk to complete maintenance to the International Space Station. A nighttime touchdown of the Space Shuttle Atlantis is also presented.

Source record↗