Search NASA⌕ Search

SEARCH · Search NASA

Results for “network scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Space applications of artificial intelligence; Proceedings of the Annual Goddard Conference, Greenbelt, MD, May 16, 17, 1989

Theoretical and implementation aspects of AI systems for space applications are discussed in reviews and reports. Sections are devoted to planning and scheduling, fault isolation and diagnosis, data management, modeling and simulation, and development tools and methods. Particular attention is given to a situated reasoning architecture for space repair and replace tasks, parallel plan execution with self-processing networks, the electrical diagnostics expert system for Spacelab life-sciences experiments, diagnostic tolerance for missing sensor data, the integration of perception and reasoning in fast neural modules, a connectionist model for dynamic control, and applications of fuzzy sets to the development of rule-based expert systems.

Rash, James L.↗

The IUE Science Operations Ground System

The International Ultraviolet Explorer (IUE) Science Operations System provides full realtime operations capabilities and support to the operations staff and astronomer users. The components of this very diverse and extremely flexible hardware and software system have played a major role in maintaining the scientific efficiency and productivity of the IUE. The software provides the staff and user with all the tools necessary for pre-visit and real-time planning and operations analysis for any day of the year. Examples of such tools include the effects of spacecraft constraints on target availability, maneuver times between targets, availability of guide stars, target identification, coordinate transforms, e-mail transfer of Observatory forms and messages, and quick-look analysis of image data. Most of this extensive software package can also be accessed remotely by individual users for information, scheduling of shifts, pre-visit planning, and actual observing program execution. Astronomers, with a modest investment in hardware and software, may establish remote observing sites. We currently have over 20 such sites in our remote observers' network.

Pitts, Ronald E.↗

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler↗

Network-Aware and Welfare-Maximizing Dynamic Pricing for Energy Sharing

The proliferation of behind-the-meter (BTM) distributed energy resources (DER) within the electrical distribution network presents significant supply and demand flexibilities, but also introduces operational challenges such as voltage spikes and reverse power flows. In response, this paper proposes a network-aware dynamic pricing framework tailored for energy-sharing coalitions that aggregate small, but ubiquitous, BTM DER downstream of a distribution system operator's (DSO) revenue meter that adopts a generic net energy metering (NEM) tariff. By formulating a Stackelberg game between the energy-sharing market leader and its prosumers, we show that the dynamic pricing policy induces the prosumers toward a network-safe operation and decentrally maximizes the energysharing social welfare. The dynamic pricing mechanism involves a combination of a locational ex-ante dynamic price and an ex-post allocation, both of which are functions of the energy sharing's BTM DER. The ex-post allocation is proportionate to the price differential between the DSO NEM price and the energy-sharing locational price. Simulation results using real DER data and the IEEE 13-bus test systems illustrate the dynamic nature of network-aware pricing at each bus, and its impact on voltage.

aggregates↗

Refocusing an Employee Engagement Organization to Improve Participation, Member Benefits, and Impact - 19036

Washington River Protection Solutions, LLC (WRPS) provides its employees with programs and opportunities to develop professional skills and to network. Among these is an employee engagement organization called 'WRPSpeed'. WRPSpeed was founded in 2009 initially to support new employees, specifically early-career employees and those new to the Columbia Basin area surrounding the Hanford Site. It was, and remains today, an opt-in program, meaning that in order to join, employees must request to become a member; the only requirement to join is to be a WRPS employee. WRPSpeed has historically offered presentations on professional development topics along with various events and activities supporting professional networking, such as after-work-hours events and community sports teams. Since its creation, WRPSpeed has experienced an ebb and flow of interest, participation, and success. Beginning in early 2017, existing members of the WRPSpeed board examined the stagnant growth trend of the organization and determined change was needed in order to truly accomplish the mission and goals visualized by the board and by WRPS management. These changes culminated in the establishment of a new board position, Marketing and Branding, which allowed WRPSpeed to refocus their messaging and image expressed to the WRPS employee base at large. The primary objectives of the new Marketing and Branding board position were 1) to communicate the identity of WRPSpeed, 2) to communicate the benefits of participation to the WRPS employee base, and 3) to grow WRPSpeed's presence as an active community steward. During the previous years of operation, its brand had developed two main audience perception problems: a perception of exclusivity, which limited membership growth; and a lack of recognition and awareness. Though initially founded as a group for new and early-career employees, the board recognized the benefits of offering all employees the opportunity to participate. This allows more people to engage in the organization and experience the benefits, and also offers the membership and program a more robust network of professional and personal experiences and connections. Concurrent with the launch of Marketing and Branding, the WRPSpeed board reviewed their current functions and activities to determine opportunities for improvement and scale-up. The goal of this internal review was to ensure the benefits offered and advertised by WRPSpeed were high quality, valuable, and engaging. It was up to Marketing and Branding to develop strategies for the success of these efforts and reach all parties in the expanded membership. A marketing communications strategy was developed to establish a revitalized WRPSpeed image and clearly project that new image to a wider audience. The first step was to rewrite the mission statement for the organization, which established, in writing, its primary pillars: community stewardship, professional networking, and professional development. With a new mission statement and the WRPSpeed board in concurrence with - and coached on - the new image, the Marketing and Branding team launched its rebranding campaign. The campaign included a refreshed logo and theme, a new monthly newsletter for existing membership, increased and consistently stylized communications about events, a revitalized organization web page, and a ramp-up schedule for large-scale, multimedia communications to the entire company. From July 2017, when they began, to June 2018, the Marketing and Branding efforts have garnered a 20% increase in membership overall. Additionally, members surveyed in May 2018 showed 49% of respondents had been participating in WRPSpeed between 0 and 12 months; 13% responded '1-2 years'; and 38% responded '2+ years'. These results confirm an upward trend in membership, and attendance records show an increase in new people attending events. Also, parallel increases in number and quality of activities and increases in networking with employee groups from other local companies such as Bechtel National, Inc. and AECOM have improved member satisfaction and positive word of mouth among the employee population. As with any organization, employee engagement-and-retention groups like WRPSpeed face the challenges of staying relevant and beneficial to existing members while continuing to grow their program and impact. However, employee engagement organizations also have the unique opportunity to connect employees across the company and to provide them opportunities otherwise unavailable via other programs. Often these groups also have the flexibility to tailor the offerings, events, and activities to suit the specific needs and aspirations of the employees. With this exceptional position, it is important to continue to strive to offer high quality, significant, and useful benefits to the employees and, thus, the company. The strategies and campaigns employed to revitalize WRPSpeed have proven exceptionally effective in-house and are useful to other employee groups as templates for their own improvement and as opportunities for benchmarking. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Galaxy platform for accessible, reproducible, and collaborative data analyses: 2024 update

Galaxy (https://galaxyproject.org) is deployed globally, predominantly through free-to-use services, supporting user-driven research that broadens in scope each year. Users are attracted to public Galaxy services by platform stability, tool and reference dataset diversity, training, support and integration, which enables complex, reproducible, shareable data analysis. Applying the principles of user experience design (UXD), has driven improvements in accessibility, tool discoverability through Galaxy Labs/subdomains, and a redesigned Galaxy ToolShed. Galaxy tool capabilities are progressing in two strategic directions: integrating general purpose graphical processing units (GPGPU) access for cutting-edge methods, and licensed tool support. Engagement with global research consortia is being increased by developing more workflows in Galaxy and by resourcing the public Galaxy services to run them. The Galaxy Training Network (GTN) portfolio has grown in both size, and accessibility, through learning paths and direct integration with Galaxy tools that feature in training courses. Code development continues in line with the Galaxy Project roadmap, with improvements to job scheduling and the user interface. Environmental impact assessment is also helping engage users and developers, reminding them of their role in sustainability, by displaying estimated CO 2 emissions generated by each Galaxy job.

97 MATHEMATICS AND COMPUTING↗

Cloud Services Enable Efficient AI-Guided Simulation Workflows across Heterogeneous Resources

Applications which fuse machine learning and simulation are rarely best served by a single computing resource. Highly parallel simulation codes are best deployed on super- computers, while AI tasks used to decide which simulations to perform may be best suited to specialized accelerators. Here we present a Function-as-a-Service (FaaS) system for executing complex, distributed computational campaigns that achieves performance parity with conventional workflow systems without the complexities of secure network connections between compute providers. One innovation enabling high performance is a subsystem that directly moves task data between sites, separate from the cloud-hosted FaaS system used to distribute task instructions. We also introduce a flexible scheduling system that allows us access factor of 2 trade offs between the amount of resources required to solve a problem at each compute site. We anticipate that this system will upgrade multi-site applications from demonstration projects to routine practice in computational science.

Ward, Logan↗

Apollo Soyuz test project press kit: USA-USSR

The goals and program of the mission are described. Operations from preflight crew training through splashdown are included. Spacecraft and launch vehicle configurations are given. The 27 joint and unilateral experiments to be performed are described. A flight plan and a schedule of activities is included, together with brief crew biographies. The ground support system is discussed; it includes control centers in Houston and Moscow, and an ATS satellite to relay ground-air-ground communications. The global tracking network and the television transmission system are also described.

Source record↗

ERDA-NASA wind energy project ready to involve users

The NASA contribution to the Wind Energy Project is discussed. NASA is responsible for the following: (1) identification of cost-effective configurations and sizes of wind-conversion systems, (2) the development of technology needed to produce these systems, (3) the design of wind-conversion systems that are compatible with user requirements, particularly utility networks, and (4) technology transfer obtained from the program to stimulate rapid commercial application of wind systems. Various elements of the NASA program are outlined, including industry-built user operation, the evaluation phase, the proposed plan and schedule for site selection and user involvement, supporting research and technology (e.g., energy storage), and component and subsystem technology development.

Thomas, R.↗

Systems, devices and methods for communicating data with unmanned aerial vehicles using underlay broadcast channel

An unmanned aerial vehicle (UAV) and base station are disclosed that communicate within a first cell via schedule requests to set up transmission of up-link data. The UAV additionally communicates up-link data via a grant-free underlay broadcast channel to one or more neighboring base stations of the terrestrial cellular network. Transmitters, receivers, related methods are also disclosed for modulation and demodulation of the transmission packets.

Moradi, Hussein↗

Planning Space Shuttle's maiden voyage

NASA's first Space Shuttle, Columbia, whose technological advances include a space laboratory, navigational and communication satellites, and planetary explorers, is examined, and the first few flights, scheduled for 1980, are described. The Shuttle employs an all-digital, all-electronic, computer-operated avionics system. The onboard data processing and software subsystem, encompassing five computers (four online and one backup), a data-bus network, bus terminals, and software, is analyzed in detail. Attention is given to the basic structure of the Orbiter (37.19 m in length and 23.77 m wingspan), its main engines, and the payload and cargo capacities (29,500 kg). A two-step program that could increase the power and duration of spaceflights is presented. The first step is the creation of a power extension package, using solar arrays, generating electricity to extend the basic five-day flight to 20 days, while the second step uses the same design to create a 25-kW power model capable of providing energy for a 50-day flight. Plans for construction of a manned space construction base and a larger power platform of 250 kW are also presented.

Malkin, M. S.↗

Optimization of the computational load of a hypercube supercomputer onboard a mobile robot

A combinatorial optimization methodology is developed, which enables the efficient use of hypercube multiprocessors onboard mobile intelligent robots dedicated to time-critical missions. The methodology is implemented in terms of large-scale concurrent algorithms based either on fast simulated annealing, or on nonlinear asynchronous neural networks. In particular, analytic expressions are given for the effect of single-neuron perturbations on the systems' configuration energy. Compact neuromorphic data structures are used to model effects such as precedence constraints, processor idling times, and task-schedule overlaps. Results for a typical robot-dynamics benchmark are presented.

Barhen, Jacob↗

One for All: Maintaining a Single Schedule Database for Large Development Projects

Efficiently maintaining and controlling a single schedule database in an Integrated Product Team environment is a significant challenge. It's accomplished effectively with the right combination of tools, skills, strategy, creativity, and teamwork. We'll share our lessons learned maintaining a 20,000 plus task network on a 36 month project.

Hilscher, R.↗

Maneuver Reconstruction, Tracking Scheduling, and Bias Estimation in the Near Rectilinear Halo Orbit (NRHO)

NASA’s Gateway program will build a crew-tended station in an Earth-Moon Near Rectilinear Halo Orbit (NRHO) to support deep space missions to the lunar surface and heliocentric space. The station in the NRHO will be tracked by the Deep Space Network (DSN) with 2-way radiometric tracking data to produce an estimated state that is utilized to target Orbit Maintenance Maneuvers (OMMs). However, the tracking data is corrupted with measurement noise and range bias, which results in state estimation error and OMM execution error. This paper reports on analysis performed to improve the geometry of the tracking data problem with the inclusion of cross-hemispheric partner sites and explores the performance impact of handovers between partner sites and DSN sites. The OMM execution error is estimated directly using a Batch Least Squares (BLS) process, and the range bias estimation is analyzed among both original DSN sites and a combined DSN + partner sites scenario.

Clark P Newman↗

CASSIUS: The Cassini Uplink Scheduler

The Cassini Uplink Scheduler (CASSIUS) is cross-platform software used to generate a radiation sequence plan for commands being sent to the Cassini spacecraft. Because signals must travel through varying amounts of Earth's atmosphere, several different modes of constant telemetry rates have been devised. These modes guarantee that the spacecraft and the Deep Space Network agree with respect to the data transmission rate. However, the memory readout of a command will be lost if it occurs on a telemetry mode boundary. Given a list of spacecraft message files as well as the available telemetry modes, CASSIUS can find an uplink sequence that ensures safe transmission of each file. In addition, it can predict when the two on-board solid state recorders will swap. CASSIUS prevents data corruption by making sure that commands are not planned for memory readout during telemetry rate changes or a solid state recorder swap.

Cassini mission↗

Frontier Job-Centric Telemetry Dataset

Comprehensive analysis of high-performance computing (HPC) systems requires linking workload execution to system behavior. This kind of analysis is vital for diagnosing performance issues, managing capacity, detecting anomalous workloads, and understanding how applications interact with system hardware. This job-centric telemetry dataset unifies scheduler job records with node-level measurements, enabling direct association between workloads and their corresponding power, thermal, and performance characteristics. It contains sanitized, scheduler related metadata for 152,400 individual jobs that ran on the Frontier supercomputer and ended on selected days throughout 2024 and 2025, a subpopulation of ~6.8% of the total number of allocated jobs with non-zero run time on the system over that same period. Each is linked with files that contain telemetry time series records of the power utilization and temperature behavior of its allocated nodes and their processors during the run time of the job. Where available, a portion of the job files also contain network performance time series. Jobs are sampled from select days that reflect normal levels of user activity and possess job size distributions with large numbers of leadership class jobs (>20% of Frontier nodes). Jobs in this dataset attempt to best represent successful user workflows.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Para-aortic Lymphadenectomy for Gynecologic Cancers: Introducing the “Trans-Retro-Peritoneal (TRP) Single-Port Access”

Background: In gynecological surgery to date, two distinct types of endoscopic accesses have been used to perform para-aortic lymphadenectomies: transperitoneal and extraperitoneal, each with advantages and disadvantages.{sup 1} We propose to develop a new mini-invasive access to perform an endoscopic extraperitoneal para-aortic lymphadenectomy via a single-port umbilical device that, to our knowledge, has never been described. Methods: This innovative approach combines both an extraperitoneal and intraperitoneal procedure via the same umbilical incision using one single trocar. A 3–4 cm trans-umbilical incision is performed and a three-channel single-port device (Gelpoint Mini°; Applied Medical, Rancho Santa Margarita, CA, USA) is introduced in the peritoneal cavity. After peritoneal exploration, the peritoneum overlying the aorta bifurcation is grabbed, raised to the umbilicus, opened, and the single-port device is then re-introduced into the retroperitoneal space. Results: The intervention has been successful in three patients with locally advanced cervical cancer (two International Federation of Gynecology and Obstetrics [FIGO] stage IB2, and one FIGO stage IVA) scheduled for concomitant radiochemotherapy after exclusion of any suspicious lymph nodes by 18F-fluorodeoxyglucose-positron emission tomography (FDG-PET), according to our standards of practice based on the European Society of Gynaecological Oncology (ESGO) and National Comprehensive Cancer Network (NCCN) guidelines.{sup 2,3} Due to the type of cancer, lymphadenectomy was limited to the infra-mesenteric nodes,{sup 2,4} although the dissection went up to the left renal vein in each case. We retrieved 13, 20, and 25 lymph nodes. No complications occurred. Conclusions: We describe a promising technique that combines all the advantages of the two previously described accesses without their disadvantages, and with the cosmetic benefit of one almost invisible single trans-umbilical scar.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

High Reliability Engine Control Demonstrated for Aircraft Engines

For a dual redundant-control system, which is typical for short-haul aircraft, if a failure is detected in a control sensor, the engine control is transferred to a safety mode and an advisory is issued for immediate maintenance action to replace the failed sensor. The safety mode typically results in severely degraded engine performance. The goal of the High Reliability Engine Control (HREC) program was to demonstrate that the neural-network-based sensor validation technology can safely operate an engine by using the nominal closed-loop control during and after sensor failures. With this technology, engine performance could be maintained, and the sensor could be replaced as a conveniently scheduled maintenance action.

Guo, Ten-Huei↗