Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Disruption Tolerant Networking Flight Validation Experiment on NASA's EPOXI Mission

In October and November of 2008, the Jet Propulsion Laboratory installed and tested essential elements of Delay/Disruption Tolerant Networking (DTN) technology on the Deep Impact spacecraft. This experiment, called Deep Impact Network Experiment (DINET), was performed in close cooperation with the EPOXI project which has responsibility for the spacecraft. During DINET some 300 images were transmitted from the JPL nodes to the spacecraft. Then they were automatically forwarded from the spacecraft back to the JPL nodes, exercising DTN's bundle origination, transmission, acquisition, dynamic route computation, congestion control, prioritization, custody transfer, and automatic retransmission procedures, both on the spacecraft and on the ground, over a period of 27 days. All transmitted bundles were successfully received, without corruption. The DINET experiment demonstrated DTN readiness for operational use in space missions. This activity was part of a larger NASA space DTN development program to mature DTN to flight readiness for a wide variety of mission types by the end of 2011. This paper describes the DTN protocols, the flight demo implementation, validation metrics which were created for the experiment, and validation results.

DTN↗

Shielding and activity estimator for template-based nuclide identification methods

According to one embodiment, a method for estimating an activity of one or more radio-nuclides includes receiving one or more templates, the one or more templates corresponding to one or more radio-nuclides which contribute to a probable solution, receiving one or more weighting factors, each weighting factor representing a contribution of one radio-nuclide to the probable solution, computing an effective areal density for each of the one more radio-nuclides, computing an effective atomic number (Z) for each of the one more radio-nuclides, computing an effective metric for each of the one or more radio-nuclides, and computing an estimated activity for each of the one or more radio-nuclides. In other embodiments, computer program products, systems, and other methods are presented for estimating an activity of one or more radio-nuclides.

97 MATHEMATICS AND COMPUTING↗

Lithium Ion Cell Development for Photovoltaic Energy Storage Applications

The overall project goal is to reduce the cost of home and neighborhood photovoltaic storage systems by reducing the single largest cost component the energy storage cells. Solar power is accepted as an environmentally advantaged renewable power source. Its deployment in small communities and integrated into the grid, requires a safe, reliable and low cost energy storage system. The incumbent technology of lead acid cells is large, toxic to produce and dispose of, and offer limited life even with significant maintenance. The ideal PV storage battery would have the safety and low cost of lead acid but the performance of lithium ion chemistry. Present lithium ion batteries have the desired performance but cost and safety remain the two key implementation barriers. The purpose of this project is to develop new lithium ion cells that can meet PVES cost and safety requirements using A123Systems phosphate-based cathode chemistries in commercial PHEV cell formats. The cost target is a cell design for a home or neighborhood scale at <$25/kWh. This DOE program is the continuation and expansion of an initial MPSC (Michigan Public Service Commission) program towards this goal. This program further pushes the initial limits of some aspects of the original program even lower cost anode and cathode actives implemented at even higher electrode loadings, and as well explores new avenues of cost reduction via new materials specifically our higher voltage cathode. The challenge in our materials development is to achieve parity in the performance metrics of cycle life and high temperature storage, and to produce quality materials at the production scale. Our new cathode material, M1X, has a higher voltage and so requires electrolyte reformulation to meet the high temperature storage requirements. The challenge of thick electrode systems is to maintain adequate adhesion and cycle life. The composite separator has been proven in systems having standard loading electrodes; the challenge with this material will be to maintain proven performance when this composite is coated onto a thicker electrode; as well the high temperature storage must meet application requirements. One continuing program challenge was the lack of specific performance variables for this PV application and so the low power requirements of PHEV/EV transportation markets were again used.

14 SOLAR ENERGY↗

Constructing vulnerabilty and protective measures indices for the enhanced critical infrastructure protection program.

The US Department of Homeland Security (DHS) has directed its Protective Security Advisors (PSAs) to form partnerships with the owners and operators of assets most essential to the Nation's well being - a subclass of critical infrastructure and key resources (CIKR) - and to conduct site visits for these and other high-risk assets as part of the Enhanced Critical Infrastructure Protection (ECIP) Program. During each such visit, the PSA documents information about the facility's current CIKR protection posture and overall security awareness. The primary goals for ECIP site visits (DHS 2009) are to: (1) inform facility owners and operators of the importance of their facilities as an identified high-priority CIKR and the need to be vigilant in light of the ever-present threat of terrorism; (2) identify protective measures currently in place at these facilities, provide comparisons of CIKR protection postures across like assets, and track the implementation of new protective measures; and (3) enhance existing relationships among facility owners and operators; DHS; and various Federal, State, local tribal, and territorial partners. PSAs conduct ECIP visits to assess overall site security; educate facility owners and operators about security; help owners and operators identify gaps and potential improvements; and promote communication and information sharing among facility owners and operators, DHS, State governments, and other security partners. Information collected during ECIP visits is used to develop metrics; conduct sector-by-sector and cross-sector vulnerability comparisons; identify security gaps and trends across CIKR sectors and subsectors; establish sector baseline security survey results; and track progress toward improving CIKR security through activities, programs, outreach, and training (Snyder 2009). The data being collected are used in a framework consistent with the National Infrastructure Protection Plan (NIPP) risk criteria (DHS 2009). The NIPP framework incorporates consequence, threat, and vulnerability components and addresses all hazards. The analysis of the vulnerability data needs to be reproducible, support risk analysis, and go beyond protection. It also needs to address important security/vulnerability topics, such as physical security, cyber security, systems analysis, and dependencies and interdependencies. This report provides an overview of the approach being developed to estimate vulnerability and provide vulnerability comparisons for sectors and subsectors. the information will be used to assist DHS in analyzing existing protective measures and vulnerability at facilities, to identify potential ways to reduce vulnerabilities, and to assist in preparing sector risk estimates. The owner/operator receives an analysis of the data collected for a specific asset, showing a comparison between the facility's protection posture/vulnerability index and those of DHS sector/subsector sites visited. This comparison gives the owner/operator an indication of the asset's security strengths and weaknesses that may be contributing factors to its vulnerability and protection posture. The information provided to the owner/operator shows how the asset compares to other similar assets within the asset's sector or subsector. A 'dashboard' display is used to illustrate the results in a convenient format. The dashboard allows the owner/operator to analyze the implementation of additional protective measures and to illustrate how such actions would impact the asset's Protective Measures Index (PMI) or Vulnerability Index (VI).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Retrospective Analysis of Inflight Exercise Loading and Physiological Outcomes

Astronauts perform exercise throughout their missions to counter the health declines that occur as a result of long-term exposure to weightlessness. Although all astronauts perform exercise during their missions, the specific prescriptions, and thus the mechanical loading, differs among individuals. For example, inflight ground reaction force data indicate that subject-specific differences exist in foot forces created when exercising on the second-generation treadmill (T2) [1]. The current exercise devices allow astronauts to complete prescriptions at higher intensities, resulting in greater benefits with increased efficiency. Although physiological outcomes have improved, the specific factors related to the increased benefits are unknown. In-flight exercise hardware collect data that allows for exploratory analyses to determine if specific performance factors relate to physiological outcomes. These analyses are vital for understanding which components of exercise are most critical for optimal human health and performance. The relationship between exercise performance variables and physiological changes during flight has yet to be fully investigated. Identifying the critical performance variables that relate to improved physiological outcomes is vital for creating current and future exercise prescriptions to optimize astronaut health. The specific aims of this project are: 1) To quantify the exercise-related mechanical loading experienced by crewmembers on T2 and ARED during their mission on ISS; 2) To explore relationships between exercise loading variables, bone, and muscle health changes during the mission; 3) To determine if specific mechanical loading variables are more critical than others in protecting physiology; 4) To develop methodology for operational use in monitoring accumulated training loads during crew exercise programs. This retrospective analysis, which is currently in progress, is being conducted using data from astronauts that have flown long-duration missions onboard the ISS and have had access to exercise on the T2 and the Advanced Resistive Exercise Device (ARED). The specific exercise prescriptions vary for each astronaut. General exercise summary metrics will be developed to quantify exercise intensities, volumes, and durations for each subject. Where available, ground reaction force data will be used to quantify mechanical loading experienced by each astronaut. These inflight exercise metrics will be investigated relative to changes in pre- to post-flight bone and muscle health to identify which specific variables are related with improved or degraded physiological outcomes. The information generated from this analysis will fill gaps related to typical bone loading characterization, exercise performance capability, exercise volume and efficiency, and importance of exercise hardware. In addition, methods for quantification of exercise loading for use in monitoring the exercise programs during future space missions will be explored with the intent to inform exercise scientists and trainers as to the critical aspects of inflight exercise prescriptions.

Ploutz-Snyder, L. L.↗

Establishment of a Rating Program for Pre- and Post-Fabricated Windows

This document was prepared to support the Smart Buildings-Material Testing and Rating Centres (SB-2) activity of the Asia-Pacific Economic Cooperation (APEC) Energy Smart Communities Initiative (ESCI). The ESCI was put forward by APEC Leaders at the 2010 meeting in Japan. APEC is the premier forum for facilitating economic growth, cooperation, trade and investment in the Asia-Pacific region. This document addresses the testing and certification of building products and equipment to support building energy codes, focusing specifically on energy-efficient factory-built windows. It sets forth a proposed structure for an APEC economy to establish a testing, rating, certification, and labeling program for efficient factory-built windows. In the context of this document, efficient windows would be windows made with insulating glass (IG) and an efficient frame assembly. The minimum efficiency metric (or thermal performance) for these windows is not quantified in this document and would generally be established by a governmental agency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Determination of Duty Cycle for Energy Storage Systems in a PV Smoothing Application

This report supplements the document, "Protocol for Uniformly Measuring and Expressing the Performance of Energy Storage Systems," issued in a revised version in April 2016 (see [4]), which will include the photovoltaic (PV) smoothing application for an energy storage system (ESS). This report provides the background and documentation associated with the determination of a duty cycle for an ESS operated in a PV smoothing application for the purpose of measuring and expressing ESS performance in accordance with the ESS performance protocol. ACKNOWLEDGEMENTS The authors gratefully acknowledge the support of Dr. Imre Gyuk, program manager for the DOE Energy Storage Systems Program. The authors would also like to express their appreciation to all the stakeholders who participated as members of the PV Smoothing Subgroup. Without their thoughtful input and recommendations, the definitions, metrics, and duty cycle provided in this report would not have been possible. A complete listing of members of the PV Smoothing Subgroup appears in the first chapter of this report. Special recognition should go to the staffs at Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) in collaborating on this effort. In particular, Mr. David Conover and Dr. Vish Viswanathan of PNNL and Dr. Summer Ferreira of SNL were especially helpful in their suggestions for the determination of a duty cycle for the PV Smoothing application.

25 ENERGY STORAGE↗

Development of a Pyroprocessing Flowsheet Model for Safeguards Analysis

Pyroprocessing flowsheets have been designed that have efficient actinide recovery, meet nonproliferation objectives, minimize waste, and are commercially viable. The analysis of safeguards of pyrochemical recycle systems for the treatment of used fast reactor metal fuel can be greatly enhanced with the employment of robust dynamic models. Electrochemical process modeling also contributes to broader objectives of the MPACT program by supporting MC&A, options screening, and safeguards analysis and can inform development of sensor systems for a used fuel recycle facility. Modeling can also provide a method for defining metrics and requirements on advanced analysis techniques.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Automated spectral classification and the GAIA project

Two dimensional spectral types for each of the stars observed in the global astrometric interferometer for astrophysics (GAIA) mission would provide additional information for the galactic structure and stellar evolution studies, as well as helping in the identification of unusual objects and populations. The classification of the large quantity generated spectra requires that automated techniques are implemented. Approaches for the automatic classification are reviewed, and a metric-distance method is discussed. In tests, the metric-distance method produced spectral types with mean errors comparable to those of human classifiers working at similar resolution. Data and equipment requirements for an automated classification survey, are discussed. A program of auxiliary observations is proposed to yield spectral types and radial velocities for the GAIA-observed stars.

Lasala, Jerry↗

Comparison of ISS Power System Telemetry with Analytically Derived Data for Shadowed Cases

Accurate International Space Station (ISS) power prediction requires the quantification of solar array shadowing. Prior papers have discussed the NASA Glenn Research Center (GRC) ISS power system tool SPACE (System Power Analysis for Capability Evaluation) and its integrated shadowing algorithms. On-orbit telemetry has become available that permits the correlation of theoretical shadowing predictions with actual data. This paper documents the comparison of a shadowing metric (total solar array current) as derived from SPACE predictions and on-orbit flight telemetry data for representative significant shadowing cases. Images from flight video recordings and the SPACE computer program graphical output are used to illustrate the comparison. The accuracy of the SPACE shadowing capability is demonstrated for the cases examined.

Fincannon, H. James↗

TAT-C: A Trade-Space Analysis Tool for Constellations

Under a changing technological and economic environment, there is growing interest in implementing future NASA Earth Science missions as Distributed Spacecraft Missions (DSM). The objective of our project is to provide a framework that facilitates DSM Pre-Phase A investigations and optimizes DSM designs with respect to a-priori Science goals. In this first version of our Trade-space Analysis Tool for Constellations (TAT-C), we are investigating questions such as: Which type of constellations should be chosen? How many spacecraft should be included in the constellation? Which design has the best costrisk value? This paper describes the overall architecture of TAT-C including: a User Interface (UI) interacting with multiple users - scientists, missions designers or program managers; an Executive Driver gathering requirements from UI and formulating Trade-space Search Requests for the Trade-space Search Iterator, which in collaboration with the Orbit Coverage, Reduction Metrics, and Cost Risk modules generates multiple potential architectures and their associated characteristics. UI will include Graphical, Command Line and Application Programmer Interfaces to respond to the demands of various levels of users expertise. Science inputs are grouped into various mission concepts, satellite specifications, and payload specifications, while science outputs are grouped into several types of metrics - spatial, temporal, angular and radiometric. Orbit Coverage leverages the use of the Goddard Mission Analysis Tool (GMAT) to compute coverage and ancillary data that are passed to Reduction Metrics. Then, for each architecture design, Cost Risk will provide estimates of the cost and life cycle cost as well as technical and cost risk of the proposed mission. Additionally, the Knowledge Base module is a centralized store of structured data readable by humans and machines. It will support both TAT-C analysis when composing new mission concepts from existing model inputs, and TAT-C exploration when discovering new mission concepts by querying previous results.

Science Data Processing↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

The International Safeguards Technology Base: How is the Patient Doing? An Exploration of Effective Metrics

The term “Technology Base” is commonly used but what does it mean? Is there a common understanding of the components that comprise a technology base? Does a formal process exist to assess the health of a given technology base? These are important questions the relevance of which is even more pressing given the USDOE/NNSA initiatives to strengthen the safeguards technology base through investments in research & development and human capital development. Accordingly, the authors will establish a high-level framework to define and understand what comprises a technology base. Potential goal-driven metrics to assess the health of a technology base will also be explored, such as linear demographics and resource availability, in the hope that they can be used to better understand and improve the health of the U.S. safeguards technology base. Finally, through the identification of such metrics, the authors will offer suggestions and highlight choices for addressing potential shortfalls. Introduction The U.S. safeguards technology base got its start almost half a century ago in the nuclear weapons program of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and their predecessors: AEC & ERDA. Due to nuclear materials’ strategic importance and value, and the risk associated with the public’s and worker’s health and the potential for theft, significant investments were made to develop techniques to measure nuclear materials using both destructive assay (DA) and non-destructive assay (NDA). Major investment within the U.S. DOE Domestic Safeguards Program continued over the next three decades, resulting in continuous improvements in the state-of-the-art of these techniques. This was particularly true in the area of NDA with its ability to use gamma rays, neutrons, and heat to identify and quantify nuclear materials without the need to take direct samples of the material. Most of these techniques were commercialized and transferred to industry, opening their applications to the nuclear industry worldwide and to the International Atomic Energy Agency (IAEA).

Schanfein, Mark↗

NREL Solar Data, Analysis, & Tools: FY19 Research Dissemination Statistics

This report summarizes the key Fiscal Year 2019 (FY19) outreach metrics for the NREL Solar Data, Analysis, and Tools (DAT) portfolio. All metrics herein reflect the reporting period of Oct. 1, 2018, through Sept. 30, 2019. These projects are all supported by the U.S. Department of Energy Solar Energy Technologies Office Soft Costs program.

14 SOLAR ENERGY↗

Long-Term Management of Mercury at the Savannah River Site Liquid Waste System - 17364

Mercury in the Savannah River Site Liquid Waste System (LWS) originated from decades of canyon processing where it was used as a catalyst for dissolving the aluminum cladding of reactor fuel. Approximately 60 metric tons of mercury (Hg) is currently present throughout the LWS. Mercury has long been a consideration in the LWS, from both hazard and processing perspectives. In February 2015, a Mercury Program Team (MPT) was established at the request of the Department of Energy to 'take an integrated, system-wide approach to evaluating the movement, monitoring, and collection of mercury through the entire Liquid Waste System/Facilities.... The key objective of the Mercury Program Team was to evaluate mercury in the LWS and develop a comprehensive action plan for long term management and removal of mercury. After completion of Phase I and II, a comprehensive action plan for long-term management and removal of mercury was developed and recommendations for actions are categorized under three broad categories - Plant Operations, Technology Development, and Sampling and Monitoring. The resolution of these Action Items will provide long term management and removal of mercury through the LWS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Geologic Nuclear Waste Disposal - No New Taxes - 12469

To some, the perceived inability of the United States to dispose of high-level nuclear waste justifies a moratorium on expansion of nuclear power in this country. Instead, it is more an example of how science yields to social pressure, even on a subject as technical as nuclear waste. Most of the problems, however, stem from confusion on the part of the public and their elected officials, not from a lack of scientific knowledge. We know where to put nuclear waste, how to put it there, how much it will cost, and how well it will work. And it's all about the geology. The President's Blue Ribbon Commission on America's Nuclear Future has drafted a number of recommendations addressing nuclear energy and waste issues (BRC 2011) and three recommendations, in particular, have set the stage for a new strategy to dispose of high-level nuclear waste and to manage spent nuclear fuel in the United States: 1) interim storage for spent nuclear fuel, 2) resumption of the site selection process for a second repository, and 3) a quasi-government entity to execute the program and take control of the Nuclear Waste Fund in order to do so. The first two recommendations allow removal and storage of spent fuel from reactor sites to be used in the future, and allows permanent disposal of actual waste, while the third controls cost and administration. The Nuclear Waste Policy Act of 1982 (NPWA 1982) provides the second repository different waste criteria, retrievability, and schedule, so massive salt returns as the candidate formation of choice. The cost (in 2007 dollars) of disposing of 83,000 metric tons of heavy metal (MTHM) high-level waste (HLW) is about $ 83 billion (b) in volcanic tuff, $ 29 b in massive salt, and $ 77 b in crystalline rock. Only in salt is the annual revenue stream from the Nuclear Waste Fund more than sufficient to accomplish this program without additional taxes or rate hikes. The cost is determined primarily by the suitability of the geologic formation, i.e., how well it performs on its own for millions of years with little engineering assistance from humans. It is critical that the states most affected by this issue (WA, SC, ID, TN, NM and perhaps others) develop an independent multi-state agreement in order for a successful program to move forward. Federal approval would follow. Unknown to most, the United States has a successful operating deep permanent geologic nuclear repository for high and low activity waste, called the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Its success results from several factors, including an optimal geologic and physio-graphic setting, a strong scientific basis, early regional community support, frequent interactions among stakeholders at all stages of the process, long-term commitment from the upper management of the U.S. Department of Energy (DOE) over several administrations, strong New Mexico State involvement and oversight, and constant environmental monitoring from before nuclear waste was first emplaced in the WIPP underground (in 1999) to the present. WIPP is located in the massive bedded salts of the Salado Formation, whose geological, physical, chemical, redox, thermal, and creep-closure properties make it an ideal formation for long-term disposal, long-term in this case being greater than 200 million years. These properties also mean minimal engineering requirements as the rock does most of the work of isolating the waste. WIPP has been operating for twelve years, and as of this writing, has disposed of over 80,000 m{sup 3} of nuclear weapons waste, called transuranic or TRU waste (>100 nCurie/g but <23 Curie/1000 cm{sup 3}) including some high activity waste from reprocessing of spent fuel from old weapons reactors. All nuclear waste of any type from any source can be disposed in this formation better, safer and cheaper than in any other geologic formation. At the same time, it is critical that we complete the Yucca Mountain license application review so as not to undermine the credibility of the Nuclear Regulatory Commission and the scientific community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Image quality against metric capability of an aerial camera

Glass plate targets containing multiple contrast three bar patterns and a military standard resolution target were photographed through a light-source collimator-camera system. The glass plate targets and images were then scanned. Through a computer plotting program selected portions of the scanned items were presented. The plots were then measured and analyzed to obtain information of image quality parameters and effects. The measurement errors are discussed together with aspects of resolution determination.

Ghosh, S. K.↗