Search NASA⌕ Search

SEARCH · Search NASA

Results for “protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

REVIEW OF THE NEGOTIATION OF THE MODEL PROTOCOL ADDITIONAL TO THE AGREEMENT(S) BETWEEN STATE(S) AND THE INTERNATIONAL ATOMIC ENERGY AGENCY FOR THE APPLICATION OF SAFEGUARDS,INFCIRC/540 (Corrected) VOLUME I/III SETTING THE STAGE: 1991-1996.

Events in Iraq at the beginning of the 1990s demonstrated that the safeguards system of the International Atomic Energy Agency (IAEA) needed to be improved. It had failed, after all, to detect Iraq's clandestine nuclear weapon program even though some of Iraq's's activities had been pursued at inspected facilities in buildings adjacent to ones being inspected by the IAEA. Although there were aspects of the implementation of safeguards where the IAEA needed to improve, the primary limitations were considered to be part of the safeguards system itself. That system was based on the Nuclear Nonproliferation Treaty of 1970, to which Iraq was a party, and implemented on the basis of a model NPT safeguards agreement, published by the IAEA 1972 as INFCIRC/153 (corrected). The agreement calls for states to accept and for the IAEA to apply safeguards to all nuclear material in the state. Iraq was a party to such an agreement, but it violated the agreement by concealing nuclear material and other nuclear activities from the IAEA. Although the IAEA was inspecting in Iraq, it was hindered by aspects of the agreement that essentially limited its access to points in declared facilities and provided the IAEA with little information about nuclear activities anywhere else in Iraq. As a result, a major review of the NPT safeguards system was initiated by its Director General and Member States with the objective of finding the best means to enable the IAEA to detect both diversions from declared stocks and any undeclared nuclear material or activities in the state. Significant improvements that could be made within existing legal authority were taken quickly, most importantly a change in 1992 in how and when and what design information would be reported to the IAEA. During 1991-1996, the IAEA pursued intensive study, legal and technical analysis, and field trials and held numerous consultations with Member States. The Board of Governors discussed the issue of strengthening safeguards at almost all of its meeting.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

REVIEW OF THE NEGOTIATION OF THE MODEL PROTOCOL ADDITIONAL TO THE AGREEMENT(S) BETWEEN STATE(S) AND THE INTERNATIONAL ATOMIC ENERGY AGENCY FOR THE APPLICATION OF SAFEGUARDS, INFCIRC/540 (Corrected) VOLUME III/III, IAEA COMMITTEE 24, DEVELOPMENT OF INFCIRC/540, ARTICLE-BY-ARTICLE REVIEW (1996-1997).

In this section of the report, the development of INFCIRC/540 is traced by a compilation of citations from the IAEA documents presented to the Board of Governors and the records of discussions in the Board that took place prior to the establishment of Committee 24 as well as the documents and discussions of that committee. The evolution of the text is presented separately for each article or, for the more complex articles, for each paragraph or group of paragraphs of the article. This section covers all articles, including those involving no issues. Background, issues, interpretations and conclusions, which were addressed in Volumes I, II, and III are not repeated here. The comments by states that are included are generally limited to objections and suggested changes. Requests for clarification or elaboration have been omitted, although it is recognized that such comments were sometimes veiled objections.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Siting protocols for marine and hydrokinetic energy projects

Project Objective: The purpose of this project is to identify and address regulatory issues that affect the cost, time and the management of potential effects as it relates to siting and permitting advanced water power technologies. Background: The overall goal of this effort is to reduce the cost, time and effort of managing potential effects from the development advanced water power projects as it relates to the regulatory process in siting and permitting. To achieve this goal, a multi-disciplinary team will collect and synthesize existing information regarding regulatory processes into a user-friendly online format. In addition, the team will develop a framework for project planning and assessment that can incorporate existing and new information. The team will actively collaborate and coordinate with other efforts that support or influence regulatory process. Throughout the process, the team will engage in an iterative, collaborative process for gathering input and testing ideas that involves the relevant stakeholders across all sectors at the national, regional, and all state levels.

16 TIDAL AND WAVE POWER↗

Test Methods and Protocols for Environmental and Safety Hazards Associated with Home Energy Retrofits

A number of health hazards and hazards to the durability of homes may be associated with energy retrofitting and home renovation projects. Among the hazards associated with energy retrofit work, exposure to radon is thought to cause more than 15,000 deaths per year in the U.S., while carbon monoxide poisoning results in about 20,000 injuries and 450 deaths per year. Testing procedures have beendeveloped for identifying and quantifying hazards during retrofitting. These procedures commonly include a battery of tests to screen combustion appliances for safe operation, including worst case depressurization measurement, backdrafting (spillage) under depressurized or normal conditions, and carbon monoxide production.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Storage for DC Fast Chargers Development and Demonstration of Operating Protocols for 20-kWh and 200-kWh Field Sites

Many of the currently available and future electric vehicles can be fast charged, and, typically, at least 50% of the battery capacity can be returned in 15 to 20 minutes. This charge rate requires a power of at least 50 kilowatts, which can be expensive in terms of both infrastructure and electric utility demand charges. One potential way of minimizing this cost is to charge the electric vehicle with combined battery and grid power, thereby reducing the peak load on the grid. Many sizes and configurations are possible for such a battery. This study examines two possibilities: (1) a 20-kilowatt hour (kWh) battery energy storage (BES) system and (2) a 200-kWh BES system, as well as developing standard test procedures for assessing the suitability of battery technologies for use in such systems.

25 ENERGY STORAGE↗

Protocol for Identifying the Presence of and Understanding the Nature of Soluble, Non-pertechnetate Technetium in Hanford Tank Supernatants

The objective of this report is to propose a method to evaluate the presence and extent of soluble, non-pertechnetate Tc in Hanford tank supernatants as well as methods that might be used to gain insight as to the nature of the specie(s) that make up this fraction. This study will then provide a recommendation as to the preferred approach for identifying and quantifying the presence of Hanford tank supernatant-soluble, non-pertechnetate, technetium. The recommendation will also describe an approach to address the issue of whether inductively coupled plasma mass spectrometry (ICP-MS) analysis, which is useful as a monitoring tool for Tc, may be confounded by the presence of other mass 99 species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maine Tidal Power Initiative: Environmental Impact Protocols For Tidal Power

The Maine Tidal Power Initiative (MTPI), an interdisciplinary group of engineers, biologists, oceanographers, and social scientists, has been conducting research to evaluate tidal energy resources and better understand the potential effects and impacts of marine hydro-kinetic (MHK) development on the environment and local community. Project efforts include: 1) resource assessment, 2) development of initial device design parameters using scale model tests, 3) baseline environmental studies and monitoring, and 4) human and community responses. This work included in-situ measurement of the environmental and social response to the pre-commercial Turbine Generator Unit (TGU®) developed by Ocean Renewable Power Company (ORPC) as well as considering the path forward for smaller community scale projects.

16 TIDAL AND WAVE POWER↗

CCS Project Permit Acquisition Protocols

Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

International Training Course on Implementing State Systems of Accounting for and Control (SSAC) of Nuclear Material for States with Small Quantity Protocols (SQP): Course Overview and Objectives [Slides]

This course is hosted by Los Alamos National Laboratory on behalf of the U.S. National Nuclear Security Administration (NNSA) in collaboration with the IAEA to support Member States in managing small quantities of nuclear and radioactive materials in a manner that is compliant with their international obligations.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Chapter 6: Residential Lighting Evaluation Protocol

In recent years, residential lighting has represented a significant share of ratepayer-funded energy-efficiency electricity savings. Utilities have achieved the majority of these savings by promoting the purchase and installation of compact fluorescent lamps (CFLs), both standard 'twister' bulbs and specialty CFLs such as reflectors, A-Lamps, globes, and dimmable lights.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Test Protocol for Evaluating Inverters Used in Grid-Connected Photovoltaic Systems

Interconnection equipment that connects distributed resources (DR) to an electrical power system (EPS) are expected to do so efficiently. Standardized test procedures are necessary to establish methods for verifying inverter performance that leads to comparable results. These test procedures are provided as a repeatable, independent means of measuring inverter performance regarding maximum continuous power rating, conversion efficiency, and tare loss characteristics.

14 SOLAR ENERGY↗

Test Methods and Protocols for Environmental and Safety Hazards Associated with Home Energy Retrofits

A number of health hazards and hazards to the durability of homes may be associated with energy retrofitting and home renovation projects. Among the hazards associated with energy retrofit work, exposure to radon is thought to cause more than 15,000 deaths per year in the U.S., while carbon monoxide poisoning results in about 20,000 injuries and 450 deaths per year. Testing procedures have been developed for identifying and quantifying hazards during retrofitting. These procedures commonly include a battery of tests to screen combustion appliances for safe operation, including worst case depressurization measurement, backdrafting (spillage) under depressurized or normal conditions, and carbon monoxide production.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Combustion Safety Simplified Test Protocol Field Study

Combustions safety is an important step in the process of upgrading homes for energy efficiency. There are several approaches used by field practitioners, but researchers have indicated that the test procedures in use are complex to implement and provide too many false positives. Field failures often mean that the house is not upgraded until after remediation or not at all, if not include in the program. In this report the PARR and NorthernSTAR DOE Building America Teams provide a simplified test procedure that is easier to implement and should produce fewer false positives. A survey of state weatherization agencies on combustion safety issues, details of a field data collection instrumentation package, summary of data collected over seven months, data analysis and results are included. The project team collected field data on 11 houses in 2015.

Building America↗

Combustion Safety Simplified Test Protocol Field Study

"9Combustions safety is an important step in the process of upgrading homes for energy efficiency. There are several approaches used by field practitioners, but researchers have indicated that the test procedures in use are complex to implement and provide too many false positives. Field failures often mean that the house is not upgraded until after remediation or not at all, if not include in the program. In this report the PARR and NorthernSTAR DOE Building America Teams provide a simplified test procedure that is easier to implement and should produce fewer false positives. A survey of state weatherization agencies on combustion safety issues, details of a field data collection instrumentation package, summary of data collected over seven months, data analysis and results are included. The project provides several key results. State weatherization agencies do not generally track combustion safety failures, the data from those that do suggest that there is little actual evidence that combustion safety failures due to spillage from non-dryer exhaust are common and that only a very small number of homes are subject to the failures. The project team collected field data on 11 houses in 2015. Of these homes, two houses that demonstrated prolonged and excessive spillage were also the only two with venting systems out of compliance with the National Fuel Gas Code. The remaining homes experienced spillage that only occasionally extended beyond the first minute of operation. Combustion zone depressurization, outdoor temperature, and operation of individual fans all provide statistically significant predictors of spillage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 24: Strategic Energy Management (SEM) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Strategic energy management (SEM) focuses on achieving energy-efficiency improvements through systematic and planned changes in facility operations, maintenance, and behaviors (OM&B) and capital equipment upgrades in large energy-using facilities, including industrial buildings, commercial buildings, and multi-facility organizations such as campuses or communities. Facilities can institute a spectrum of SEM actions, ranging from a simple process for regularly identifying energy-savings actions, to establishing a formal, third-party recognized or certified SEM framework for continuous improvement of energy performance. In general, SEM programs that would be considered part of a utility program will contain a set of energy-reducing goals, principles, and practices emphasizing continuous improvements in energy performance or savings through energy management and an energy management system (EnMS).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗