Search NASA⌕ Search

SEARCH · Search NASA

Results for “surface architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Lunar and Planetary Science XXXV: Venus

The session "Venus" included the following reports:Is It Possible to Detect Magnetic Materials on Venus with Bistatic Radar Probing?; Airfall Crater Deposits on the Surface of Venus: Do We See Them in the Venera Panoramas?; Rift System Architecture on Venus; Constraints on Deformation Belt Evolution on Venus; An Admittance Survey of Large Volcanoes on Venus: Implications for Volcano Growth; Crustal Thickening Above a Convecting Mantle with Application to Venus and Mars; Geological Mapping of Venus: Interpretation of Geologic History and Assessment of; Directional and Non-Directional Models; Ages of Venusian Ridge Belts Relative to Regional Plains; and Plumes as a Mechanism for Equilibrium Resurfacing of Venus.

Source record↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗

Mission data system and the future of autonomy at Jet Propulsion Laboratory

Planetary missions require significant levels of autonomy, due to the critical, one-time-only, nature of many mission objectives, and to the long delay times for human intervention. These missions also operate in highly uncertain environments, such as planetary atmospheres or surfaces. Mission Data Systems (MDS) is a project to construct a reusable software architecture for planetary missions, based on identifying the states of the mission.

MDS autonomy↗

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

NASA Technology Area 07: Human Exploration Destination Systems Roadmap

This paper gives an overview of the National Aeronautics and Space Administration (NASA) Office of Chief Technologist (OCT) led Space Technology Roadmap definition efforts. This paper will given an executive summary of the technology area 07 (TA07) Human Exploration Destination Systems (HEDS). These are draft roadmaps being reviewed and updated by the National Research Council. Deep-space human exploration missions will require many game changing technologies to enable safe missions, become more independent, and enable intelligent autonomous operations and take advantage of the local resources to become self-sufficient thereby meeting the goal of sustained human presence in space. Taking advantage of in-situ resources enhances and enables revolutionary robotic and human missions beyond the traditional mission architectures and launch vehicle capabilities. Mobility systems will include in-space flying, surface roving, and Extra-vehicular Activity/Extravehicular Robotics (EVA/EVR) mobility. These push missions will take advantage of sustainability and supportability technologies that will allow mission independence to conduct human mission operations either on or near the Earth, in deep space, in the vicinity of Mars, or on the Martian surface while opening up commercialization opportunities in low Earth orbit (LEO) for research, industrial development, academia, and entertainment space industries. The Human Exploration Destination Systems (HEDS) Technology Area (TA) 7 Team has been chartered by the Office of the Chief Technologist (OCT) to strategically roadmap technology investments that will enable sustained human exploration and support NASA s missions and goals for at least the next 25 years. HEDS technologies will enable a sustained human presence for exploring destinations such as remote sites on Earth and beyond including, but not limited to, LaGrange points, low Earth orbit (LEO), high Earth orbit (HEO), geosynchronous orbit (GEO), the Moon, near-Earth objects (NEOs), which > 95% are asteroidal bodies, Phobos, Deimos, Mars, and beyond. The HEDS technology roadmap will strategically guide NASA and other U.S. Government agency technology investments that will result in capabilities enabling human exploration missions to diverse destinations generating high returns on investments.

Kennedy, Kriss J.↗

Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

Borowski, Stanley K.↗

Quantifying Mapping Orbit Performance in the Vicinity of Primitive Bodies

Predicting and quantifying the capability of mapping orbits in the vicinity of primitive bodies is challenging given the complex orbit geometries that exist and the irregular shape of the bodies themselves. This paper employs various quantitative metrics to characterize the performance and relative effectiveness of various types of mapping orbits including terminator, quasi-terminator, hovering, pingpong, and conic-like trajectories. Metrics of interest include surface area coverage, lighting conditions, and the variety of viewing angles achieved. The metrics discussed in this investigation are intended to enable mission designers and project stakeholders to better characterize candidate mapping orbits during preliminary mission formulation activities.The goal of this investigation is to understand the trade space associated with carrying out remotesensing campaigns at small primitive bodies in the context of a robotic space mission. Specifically,this study seeks to understand the surface viewing geometries, ranges, etc. that are available fromseveral commonly proposed mapping orbits architectures.

Pavlak, Thomas A.↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

Recommended Crew Systems Capabilities for a Mars Ascent Vehicle as a Function of Flight Duration

In many human Mars exploration architectures, a Mars Ascent Vehicle (MAV) is used at the end of a surface stay to transport crew from the Martian surface to a waiting in-space transportation vehicle. It is possible for this transportation vehicle to be placed in any of several different Mars orbits, the selection of which drives the flight duration of the MAV from launch to docking and the amount of propellant required on the transportation vehicle to reach the same orbit. This paper identifies existing NASA standards and supplies habitability subject matter expert recommendations for the human habitation capabilities of the MAV as a function of flight duration. Living and working functions that may potentially be carried aboard a MAV are assessed. Flight durations considered include up to 8 hours, 8-24 hours, 1-2 days, 2-3 days, 3-4 days, and 4-7 days, which book end flight durations necessary to reach the transportation vehicle at different possible Mars orbits. This analysis will determine if there are key durations that serve as significant break points in required MAV capability.

MAV↗

A Technology Architecture for Accessing the Oceans of Icy Worlds

The icy moon oceans beckon with ingredients that potentially may harbour extant life. Beginning with the Galileo and Cassini missions, measurements have revealed the presence of global oceans under the icy crust of several moons of Jupiter and Saturn. Among those moons, Europa and Enceladus have their ocean in contact with the rocky core, providing an environment similar to the conditions existing on the terrestrial sea-floor where life has developed at hydrothermal vents Accessing these oceans presents considerable difficulty due to a number of issues including the depth and composition of the icy crust, the time needed to travel through the crust, the power needed to propel a probe, communication of scientific and engineering data though the ice and back to Earth, entry and mobility in the ocean and autonomous operations for the life of the mission. A detailed trade space study was conducted to develop a technology architecture defining a system that would access an icy moon’s ocean. To specifically bound the architecture, Jupiter’s moon Europa was chosen as the target body though the work can apply to other bodies. The current understanding of the scientific properties of the ice crust and ocean was used to guide the development. A strawman scientific payload was devised to further develop a baseline set of requirements. Beginning with a launch and trajectory that can bring a system to Europa’s orbit, a complete trade space was developed outlining the engineering systems needed to access the ocean. The architecture was divided into specific phases for i) deorbit, descent and landing, ii) surface operations, iii) ice descent and iv) ocean access. The technical maturity of each of sub-system for the phases was assessed for systems that could be developed to a maturity ready for a preliminary design in less than ten years. Integrated system parameters on power, communication capacity, and mass were developed to further define the overall system. To constrain the design, a total time in the ice, from the ice crust surface to accessing the ocean was limited to three years, and 15Km of ice was baselined with a temperature profile through the ice estimated from the scientific literature.

Sengupta, Anita↗

Experimental Observations of Damage States in Unnotched and Notched 3D Orthogonal Woven Coupons Loaded in Tension

This paper describes a series of unnotched and notched tensile tests on two 3D orthogonal woven architectures. Dog bone specimens were used for the unnotched tests, and open-hole specimens were used for the notched tests. For each architecture and test type, two specimens were loaded under monotonic displacement control to failure and two specimens were incrementally loaded to failure in five steps. X-ray computed tomography (CT) was used to characterize the woven architecture and defects on each specimen prior to testing. Digital image correlation (DIC) images were obtained from both sides of the specimen throughout the loading and unloading. Acoustic emission (AE) data were also continuously acquired throughout the loading. For the incremental tests, X-ray CT was used to document the damage progression after each load increment. The damage progression was analyzed based on the results from these three techniques. The results for both architectures and test specimens followed a pattern where matrix cracks formed at the surface perpendicular to the tensile load direction. New surface cracks formed continuously throughout the loading and cracks extended in depth and width. In general, fiber failure was not detected until specimen failure.

Wade C Jackson↗

Revealing the Mysteries of Venus: The DAVINCI Mission

The Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging (DAVINCI) mission described herein has been selected for flight to Venus as part of the NASA Discovery Program. DAVINCI will be the first mission to Venus to incorporate science driven flybys and an instrumented descent sphere into a unified architecture. The anticipated scientific outcome will be a new understanding of the atmosphere, surface, and evolutionary path of Venus as a possibly once-habitable planet and analog to hot terrestrial exoplanets. The primary mission design for DAVINCI as selected features a preferred launch in summer/fall 2029, two flybys in 2030, and descent sphere atmospheric entry by the end of 2031. The in situ atmospheric descent phase subsequently delivers definitive chemical and isotopic composition of the Venus atmosphere during an atmospheric transect above Alpha Regio. These in situ investigations of the atmosphere and near infrared descent imaging of the surface will complement remote flyby observations of the dynamic atmosphere, cloud deck, and surface near infrared emissivity. The overall mission yield will be at least 60 Gbits (compressed) new data about the atmosphere and near surface, as well as the first unique characterization of the deep atmosphere environment and chemistry, including trace gases, key stable isotopes, oxygen fugacity, constraints on local rock compositions, and topography of a tessera.

James B Garvin↗

DAVINCI Data Prioritization

The Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging (DAVINCI) mission was selected in June 2021 as part of the NASA Discovery Program to explore Venus through remote sensing, in-situ chemistry measurements, and near-surface imaging. This mission will investigate the evolution of Venus’ atmosphere using an architecture designed to optimize science-relevant measurements within the atmosphere and on targeted flybys. Slated to launch in 2029 and enter Venus June 2031, DAVINCI’s Descent Sphere (DS) will transect the atmosphere acquiring chemistry and environmental measurements, as well as descent imaging of a highland region. This presentation focuses on prioritization and return of the revolutionary datasets. The mission overview and science motivations are summarized in Garvin and others [1][2].

Venus Probe↗

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

Self-assembled tunable networks of sticky colloidal particles

Self-assembled tunable networks of microscopic polymer fibers ranging from wavy colloidal "fur" to highly interconnected networks are created from polymer systems and an applied electric field. The networks emerge via dynamic self-assembly in an alternating (ac) electric field from a non-aqueous suspension of "sticky" polymeric colloidal particles with a controlled degree of polymerization. The resulting architectures are tuned by the frequency and amplitude of the electric field and surface properties of the particles.

36 MATERIALS SCIENCE↗

Spiral antenna assembly with integrated feed network structure and method of manufacture

A spiral antenna assembly with an integrated feed network and method of manufacturing the same are disclosed. The spiral antenna assembly may comprise a supporting structure integrally formed with a feed network structure, thereby presenting a monolithic structure. A spiral antenna element may be disposed on a bottom surface or a top surface of the supporting structure. The feed network structure may comprise the feed network and project from a center of the top surface of the supporting structure. The feed network may comprise a microstrip balun architecture. The spiral antenna assembly may be formed by additively manufacturing the supporting structure and the feed network structure. A laser direct structuring process may write and activate the spiral antenna element on the supporting structure and the feed network on the feed network structure.

Byers, Kyle J.↗

Increased silver activity for direct propylene epoxidation via subnanometer size effects.

Production of the industrial chemical propylene oxide is energy-intensive and environmentally unfriendly. Catalysts based on bulk silver surfaces with direct propylene epoxidation by molecular oxygen have not resolved these problems because of substantial formation of carbon dioxide. We found that unpromoted, size-selected Ag{sub 3} clusters and {approx}3.5-nanometer Ag nanoparticles on alumina supports can catalyze this reaction with only a negligible amount of carbon dioxide formation and with high activity at low temperatures. Density functional calculations show that, relative to extended silver surfaces, oxidized silver trimers are more active and selective for epoxidation because of the open-shell nature of their electronic structure. The results suggest that new architectures based on ultrasmall silver particles may provide highly efficient catalysts for propylene epoxidation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗