Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

converter↗

Developing Frequency Stability Constraint for Unit Commitment Problem Considering High Penetration of Renewables: Preprint

As zero-carbon electricity systems become the trend of future grid, the system inertia provided by conventional synchronous generators (SGs) keeps decreasing. The resultant lower system inertia will inevitably cause frequency stability problem, especially in the first few seconds after disturbance. To address this challenge, this paper proposes a frequency stability unit commitment constraint considering the fast frequency responses (FFRs) from inverter-based resources (IBRs). Thus, this paper first analyzes a frequency nadir differential equation that considers SG governor model and three kinds of FFR provided by IBRs. A system frequency nadir estimation framework is developed with consideration of various conventional SG and IBR models. The accuracy of this frequency estimation framework is validated by largest N-1 contingency simulation result of a real island system. Then, the adaptive inertia frequency stability unit commitment constraint is derived from sensitivity analysis method. Finally, we demonstrate the effectiveness of our developed constraints with one year day-ahead unit commitment results of the real island system.

fast frequency response↗

Implementation of Benchmarking Transportation Logistics Practices and Future Benchmarking Organizations

The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how these findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Opportunities and Challenges for Remote Microreactor Operations

The nuclear industry is developing new advanced reactor technologies, and many companies are embracing this advancement by pursuing the development of microreactors. The term microreactor generally refers to a nuclear reactor with an operating power of 20 MW or less. The power range of microreactors makes them appealing for many use cases, such as powering remote communities, mining sites, and military bases. Most of the microreactor designs being pursued will incorporate remote facility operations into the final product. However, no framework has yet been developed to determine what remote operations systems require for reliable, resilient, and secure operation of a microreactor. This work identifies the challenges unique to remote operations and monitoring for microreactors specifically regarding instrumentation and control, communication methods, regulatory requirements, and operational policies. The types of commands and sensor measurements that must be transmitted between the facilities as well as methods for verifying the trustworthiness of these signals are assessed. This work evaluates the security, reliability, and performance requirements that must be met when considering the selection of communication hardware and protocols for use in remote operations. Also, an assessment was performed to study how remote operations fit within current regulatory requirements and what may need to be updated in regulatory policy to allow for remote operation. Finally, the operational contingencies unique to remote operations that must be in place for response to abnormal events are identified. This paper details these challenges and research opportunities to provide a foundation for the design of remote operation systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Waste Feed Delivery Planning at Hanford - 13232

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

54 ENVIRONMENTAL SCIENCES↗

Retrieval System for Calcined Waste for the Idaho Cleanup Project - 12104

This paper describes the conceptual approach to retrieve radioactive calcine waste, hereafter called calcine, from stainless steel storage bins contained within concrete vaults. The retrieval system will allow evacuation of the granular solids (calcine) from the storage bins through the use of stationary vacuum nozzles. The nozzles will use air jets for calcine fluidization and will be able to rotate and direct the fluidization or displacement of the calcine within the bin. Each bin will have a single retrieval system installed prior to operation to prevent worker exposure to the high radiation fields. The addition of an articulated camera arm will allow for operations monitoring and will be equipped with contingency tools to aid in calcine removal. Possible challenges (calcine bridging and rat-holing) associated with calcine retrieval and transport, including potential solutions for bin pressurization, calcine fluidization and waste confinement, are also addressed. The Calcine Disposition Project has the responsibility to retrieve, treat, and package HLW calcine. The calcine retrieval system has been designed to incorporate the functions and technical characteristics as established by the retrieval system functional analysis. By adequately implementing the highest ranking technical characteristics into the design of the retrieval system, the system will be able to satisfy the functional requirements. The retrieval system conceptual design provides the means for removing bulk calcine from the bins of the CSSF vaults. Top-down vacuum retrieval coupled with an articulating camera arm will allow for a robust, contained process capable of evacuating bulk calcine from bins and transporting it to the processing facility. The system is designed to fluidize, vacuum, transport and direct the calcine from its current location to the CSSF roof-top transport lines. An articulating camera arm, deployed through an adjacent access riser, will work in conjunction with the retrieval nozzle to aid in calcine fluidization, remote viewing, clumped calcine breaking and recovery from off-normal conditions. As the design of the retrieval system progresses from conceptual to preliminary, increasing attention will be directed toward detailed design and proof-of- concept testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Radiological Surveys to Address Nuclear Criticality Safety Requirements During Remediation Activities at the Shallow Land Disposal Area, Armstrong County, Pennsylvania - 12268

Cabrera Services Inc. (CABRERA) is the remedial contractor for the Shallow Land Disposal Area (SLDA) Site in Armstrong County Pennsylvania, a United States (US) Army Corps of Engineers - Buffalo District (USACE) contract. The remediation is being completed under the USACE's Formerly Utilized Sites Remedial Action Program (FUSRAP) which was established to identify, investigate, and clean up or control sites previously used by the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineer District (MED). As part of the management of the FUSRAP, the USACE is overseeing investigation and remediation of radiological contamination at the SLDA Site in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 US Code (USC), Section 9601 et. seq, as amended and, the National Oil and Hazardous Substance Pollution Contingency Plan (NCP), Title 40 of the Code of Federal Regulations (CFR) Section 300.430(f) (2). The objective of this project is to clean up radioactive waste at SLDA. The radioactive waste contains special nuclear material (SNM), primarily U-235, in 10 burial trenches, Cabrera duties include processing, packaging and transporting the waste to an offsite disposal facility in accordance with the selected remedial alternative as defined in the Final Record of Decision (USACE, 2007). Of particular importance during the remediation is the need to address nuclear criticality safety (NCS) controls for the safe exhumation and management of waste containing fissile materials. The partnership between Cabrera Services, Inc. and Measutronics Corporation led to the development of a valuable survey tool and operating procedure that are essential components of the SLDA Criticality Safety and Material Control and Accountability programs. Using proven existing technologies in the design and manufacture of the Mobile Survey Cart, the continued deployment of the Cart will allow for an efficient and reliable methodology to allow for the safe exhumation of the Special Nuclear Material in existing SLDA trenches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Sustainability Program, Richland, Washington - 12464

In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan [1] was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site has made significant progress in the area of environmental stewardship through multiple initiatives to reduce energy consumption and GHG emissions, despite increased demands in those areas due to accelerated cleanup work driven by ARRA funding. Future plans, contingent on available funding, include additional enhancements in the areas of fleet management, including installation of additional charging stations and continued acquisition of alternate fueled vehicles, implementation of one or more of the recommendations from the Feasibility Study on reducing GHG emissions from employee commuting, and potential diversion of solid waste from on-site landfills. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed on tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uncertainty in decommissioning, the benefits of 3D simulation - 15124

Any industrial plant whatever the industry is will face its end of life. In the nuclear field decommissioning is inevitable for returning to green. Because of the specificity of each plant, decommissioning projects are never the same. The choice of a specific strategy for each operation during a scenario has cascade consequences on the generated waste, extension of due date, costs and risks. Decommissioning in nuclear industry is a new domain where countries have a limited experience. When starting a decommissioning project engineers have to gather some data needed for planning and realizing the best scenario strategy. Scenario which should consider the costs, waste management, received dose and the planning. The quality of the input data has a strong influence on the risks and should be analyzed with care to reduce all doubts for the study. Nuclear plants running decommissioning programs concerns old plants with poorly documented history resulting in missing or uncertain data. The ambient dose rate is not always well-known as dose measurement or samples have not been taken or updated for many years. This kind of data may vary quite a lot when radiological events happen. An efficient way to reduce contingencies is to go through simulations. It allows determining the best scenario strategy for each set of data while evaluating the influence of all uncertainties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global Solutions Through Simulation For Better Decommissioning - 16457

Each nuclear facility is different due to their history and there is no rule for choosing a decommissioning strategy. There are three major decommissioning strategies. First, 'immediate dismantling', which means the decommissioning begins immediately after the transfer of waste and nuclear material. Second, 'deferred dismantling strategy', meaning the facility is maintained into a containment zone from thirty to one hundred years before being decommissioned. Finally, 'entombment', referring to the placement of the facility into a reinforced containment until the radionuclides decay and reach a level allowing the site release. When a strategy is decided many factors have to be taken into account. Into a major project such as a reactor decommissioning, there are many smaller projects and the decommissioning strategy can be different among these smaller projects. Very often, some entry data are not perfectly known, for example, the dosimetric activity has not been updated through time or after specific events. Because of uncertainties and/or hypothesis existing around projects and their high level of interdependency, global solutions are a good way to choose the best decommissioning strategy. Especially since each entry data has consequences on output results whether it is on costs, cumulated dose, waste or delays. Also the dose, delays or waste management, all have impact on costs. To obtain an optimal scenario into a special environment, it is necessary to deal with all these items together. This global solution can be implemented thanks to simulation in dedicated software which helps define the global strategy, optimize the scenario, and prevent contingencies. For a specific environment, when many scenarios have been developed and simulated, sensitivity studies are really important to choose the optimal decommissioning strategy. Sensitivity studies can be done with simulation tools by comparing results of scenarios directly into the software. This comparison helps to choose the optimal scenario according to which output data is considered as key determinant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Cost Estimate Uncertainty: What is It, How Do You Deal with It? - 16527

The issue of decommissioning cost estimate uncertainty has returned to plague the industry. As we gain more hands-on experience, the expectations are that the cost estimates for future projects should be more accurate and the uncertainties reduced. To some extent this is true, but there remains the issue of how to deal with the major elements of uncertainty of allowances, contingency and risk. The OECD/NEA and the IAEA have joined forces through its member states and outside consultants to bring definition and insight into how to deal with uncertainty. The author has been a participant in this joint organization effort since the outset two years ago. This paper will present the current state-of-the-art in the definitions, approaches, and limitations in the topic of uncertainty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Cumulative Impacts from Source Units within Hanford's Inner Area - 16546

The Central Plateau area at the Hanford Site has a complex mix of waste sites in several operable units, with many co-mingled source contamination and groundwater plumes. A key component of the evaluation process involves a planned assessment of the potential cumulative impacts resulting from co-mingled plumes and potential contribution from waste sites sources throughout the Inner Area, about 26 million square meters (10 square miles) area located in the middle of the Central Plateau. This assessment will evaluate the fate and transport of contamination at each waste site and remedial actions at those waste sites, providing an integrated vadose zone and groundwater fate and transport assessment. Although DOE's goal is to remediate the entire Inner Area to meet standard requirements in the National Contingency Plan (NCP), the complexity of the contamination including continuing contaminant sources in the Inner Area may not allow restoration of groundwater in a reasonable timeframe. DOE and regulatory agencies may need to evaluate the technical practicability of remedial actions and the potential for establishment of one or more waste management areas where drinking water standards can be obtained and maintained. The cumulative impacts evaluation is the tool to evaluate remedial action effects across source and groundwater operable units, contribute to technical impracticability evaluations, support remedial design and remedial process optimization efforts, identify additional monitoring requirements, and evaluate standard and conditional points of compliance for use considering all contaminant sources and groundwater plumes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗