Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

2022 Annual Site Environmental Report for Sandia National Laboratories, Tonopah Test Range, Nevada

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the. U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, Tonopah Test Range. Activities at the site are conducted in support of U.S. Department of Energy weapons programs and have operated at the site since 1957. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding file environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Tonopah Test Range during calendar year 2022. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE 0 231.IB, Admin Change 1, Environment, Safety and Health Reporting and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Energy Management Information Systems Cybersecurity Best Practices

Energy management information systems (EMIS) are a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance. Critical systems are often integrated with or operate on the same networks as EMIS scope systems, necessitating stable, continuous, and secure communication. When connecting EMIS to building automation and utility control systems, there are also many physical assets that could cause harm to the building and its occupants if a malicious act or human error were introduced. It is imperative to ensure all EMIS scope systems are connected securely to the EMIS and do not open vulnerable pathways to other facility networks and operations. The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of EMIS at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. It provides an overview of required EMIS cybersecurity standards for compliance and authority to operate along with additional recommendations.

cybersecurity↗

Simulations of stand-off runaway electron beam termination by tungsten particulates for tokamak disruption mitigation

Abstract Stand-off runaway electron termination by injected tungsten particulates offers a plausible option in the toolbox of disruption mitigation. Tungsten is an attractive material choice for this application due to large electron stopping power and high melting point. To assess the feasibility of this scheme, we simulate runaway collisions with tungsten particulates using the MCNP program for incident runaway energies ranging from 1 to 10 MeV. We assess runaway termination from energetics and collisional kinematics perspectives. Energetically, the simulations show that 99% of runaway beam energy is removed by tungsten particulates on a timescale of 4–9 µ s. Kinematically, the simulations show that 99% of runaways are terminated by absorption or backscattering on a timescale of 3–4 µ s. By either metric, the runaway beam is effectively terminated before the onset of particulate melting. Furthermore, the simulations show that secondary radiation emission by tungsten particulates does not significantly impact the runaway termination efficacy of this scheme. Secondary radiation is emitted at lower particle energies than the incident runaways and with a broad angular distribution such that the majority of secondary electrons emitted will not experience efficient runaway re-acceleration. Overall, the stand-off runaway termination scheme is a promising concept as a last line of defense against runaway damage in ITER, SPARC, and other future burning-plasma tokamaks.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

2022 Annual Site Environmental Report for Sandia National Laboratories, Kaua'i Test Facility, Hawai'i

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the. U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at the Sandia National Laboratories Kaua'i Test Facility in Hawai'i. Activities at the site are conducted in support of U.S. Department of Energy weapons programs., and the site has operated as a rocket preparation launching and tracking facility since 1962. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Kaua'i Test Facility, during calendar year 2022. Environmental topics include cultural resource management, chemical management, air quality, meteorology, ecology, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

2023 Annual Site Environmental Report for Sandia National Laboratories, Tonopah Test Range, Nevada

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, Tonopah Test Range. Activities at the site are conducted in support of U.S. Department of Energy weapons programs and have operated at the site since 1957. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Tonopah Test Range during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

2023 Annual Site Environmental Report for Sandia National Laboratories, Kaua‘i Test Facility, Hawai‘i

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at the Sandia National Laboratories Kaua‘i Test Facility in Hawai‘i. Activities at the site are conducted in support of U.S. Department of Energy weapons programs, and the site has operated as a rocket preparation launching and tracking facility since 1962. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Kaua‘i Test Facility, during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, meteorology, ecology, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Scalable Transmission Expansion Under Uncertainty Using Three-Stage Stochastic Optimization

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and uncertain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty.

multi-stage stochastic optimization↗

2018 Annual Site Environmental Report Sandia National Laboratories, New Mexico

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the United States Department of Energy (DOE) National Nuclear Security Administration. The National Nuclear Security Administration's Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, New Mexico. Activities at the site support research and development programs with a wide variety of national security missions, resulting in technologies for nonproliferation, homeland security, energy and infrastructure, and defense systems and assessments. DOE and its management and operating contractor for Sandia are committed to safeguarding the environment reassessing sustainability practices and ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This report summarizes the environmental protection and monitoring programs in place at Sandia National Laboratories, New Mexico, during calendar year 2018. Environmental topics include air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety, and Health Reporting and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Hydrogen Wide Area Monitoring of LH2 Releases at HSE for the PRESHLY Project

The characterization of liquid hydrogen (LH2) releases has been identified as an international research priority to expand the safe use of hydrogen as an energy carrier. Empirical field measurements such as those afforded by Hydrogen Wide Area Monitoring (HyWAM) can elucidate the behavior of LH2 releases, which can then be used to support and validate dispersion models. HyWAM can be defined as the quantitative three-dimensional spatial and temporal profiling of planned or unintentional hydrogen releases. The NREL Sensor Laboratory developed a HyWAM based upon a distributed array of hydrogen Sensors. The NREL Sensor Laboratory and Health and Safety Executive (HSE) formally committed to collaborate on profiling GH2 and LH2 releases, which allowed for the integration of the NREL HyWAM into the HSE LH2 release behavior investigation supported by the FCH JU Prenormative Research for the Safe Use of Liquid Hydrogen (PRESLHY) program. A HyWAM system consisting of 32 hydrogen measurement points and co-located temperature sensors were distributed downstream of the LH2 release apparatus developed by HSE. In addition, there were proximal wind and weather monitors. In a separate presentation at this conference "HSE SD Experimental Summary for the Characterisation, Dispersion and Electrostatic Hazards of LH2 for the PRESLHY Project" HSE researchers summarize the experimental apparatus and experimental protocols utilized in the HSE LH2 releases that were performed under the auspices of PRESLHY. To supplement the HSE presentation, this presentation will focus on the spatial and temporal behavior LH2 releases as measured by the NREL HyWAM. Correlations to ambient conditions, such as wind speed and direction, plume temperature and hydrogen concentrations will be discussed in addition to the design and performance of the NREL HyWAM, and its potential for improving hydrogen facility safety.

HYDROGEN↗

Energy-dependent optimization of the prompt fission neutron spectrum with CGMF

Throughout the course of FY21, significant effort was put into investigating models within the LANL developed Hauser-Feshbach fission fragment decay code, CGMF, to understand and potentially solve the long-standing challenge of a too-soft prompt fission neutron spectrum, PFNS. Several inputs and models to CGMF were investigated, including the discrete nuclear levels, the optical model potential, level densities, and the fission fragment initial conditions. Some of the global models within CGMF led to a slight hardening of the neutron spectrum—particularly the likely incomplete discrete levels in through which γ-rays decay—but none of the changes where large enough for the tail of the PFNS to reproduce experimental data. A significant hardening of the spectrum tail was observed when the fission fragment initial conditions were optimized based on their sensitivities to the PFNS data for thermal incident neutrons. In this way, the parameters for the CGMF mass and total kinetic energy distributions, along with the spin cutoff factor were adjusted to better reproduce the experimental PFNS measurements. This optimization hardened the tail of the PFNS slightly but led to unphysical mass distributions for the fission fragments before neutron emission. It was clear from the above that we do not expect to be able to produce an evaluation-quality PFNS with CGMF in the near future. Challenges at thermal will persist–and possibly worsen–with increasing incident energy, where more models are needed to completely describe the fission. Basic-science research funding exceeding the amount available and scope of our NCSP funds would be needed to tackle this decade-long challenge impacting many fission-fragment event generator. And, in fact, Amy Lovell won LDRD ECR funding to do so over the next few years. Therefore, we focused in FY22 on extending evaluation capabilities beyond thermal incident neutrons, to take into account the incident energy dependence of the PFNS and fission fragment initial condition distributions in CGMF. We chose to set up the evaluation methodology to perform PFNS evaluations with CGMF across incident-neutron energies, in order to have it readily available for future NCSP evaluations when the PFNS from CGMF has improved. In this report, we outline the evaluation methodology, along with the results of the optimization, including full model calculations with CGMF using the evaluated parameters.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Best Practices for Renewable Energy Installations in the National Parks

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) and National Park Service (NPS) have partnered to support the development and utilization of renewable energy technology at federal facilities and on federal lands. FEMP provides technical support to NPS on renewable energy projects to identify and generate significant cost savings and efficiency benefits, investigate opportunities to reduce carbon footprint and/or achieve carbon neutrality, and improve resilience to NPS-owned facilities and sites. The purpose of this report is to support NPS staff as they evaluate whether and how to use renewable energy technologies in park operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Matrix Completion Using Alternating Minimization for Distribution System State Estimation

This paper examines the problem of state estimation in power distribution systems under low-observability conditions. The recently proposed constrained matrix completion method which combines the standard matrix completion method and power flow constraints has been shown to be effective in estimating voltage phasors under low-observability conditions using single-snapshot information. However, the method requires solving a semidefinite programming (SDP) problem, which becomes computationally infeasible for large systems and if multiple-snapshot (time-series) information is used. This paper proposes an efficient algorithm to solve the constrained matrix completion problem with time-series data. This algorithm is based on reformulating the matrix completion problem as a bilinear (non-convex) optimization problem, and applying the alternating minimization algorithm to solve this problem. This paper proves the summable convergence of the proposed algorithm, and demonstrates its efficacy and scalability via IEEE 123-bus system and a real utility feeder system. This paper also explores the value of adding more data from the history in terms of computation time and estimation accuracy.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Matrix Completion Using Alternating Minimization for Distribution System State Estimation: Preprint

This paper examines the problem of state estimation in power distribution systems under low-observability conditions. The recently proposed constrained matrix completion method which combines the standard matrix completion method and power flow constraints has been shown to be effective in estimating voltage phasors under low-observability conditions using single-snapshot information. However, the method requires solving a semidefinite programming (SDP) problem, which becomes computationally infeasible for large systems and if multiple-snapshot (time-series) information is used. This paper proposes an efficient algorithm to solve the constrained matrix completion problem with time-series data. This algorithm is based on reformulating the matrix completion problem as a bilinear (non-convex) optimization problem, and applying the alternating minimization algorithm to solve this problem. This paper proves the summable convergence of the proposed algorithm, and demonstrates its efficacy and scalability via IEEE 123-bus system and a real utility feeder system. This paper also explores the value of adding more data from the history in terms of computation time and estimation accuracy.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Usability and Optimization Improvements in MOOSE

The Multiphysics Object-Oriented Simulation Environment (MOOSE) framework is a foundational capability used by the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program to create over 15 different simulation tools for advanced nuclear reactors. Due to MOOSE’s broad use, improvements to the framework in support of modeling and simulation goals are critical to the program. Such improvements can take many forms, including optimization, improved user experience, streamlined application programming interfaces (APIs), parallelism, and new capabilities. The work described in this report was conducted in direct support of the simulation tools and has already been deployed. The capabilities were implemented in the same order as they are covered in this report: multiple nonlinear systems in the same input file, implementation of generic field transfers and other transfer system enhancements, support for stateful material property redistribution for adaptivity and distributed meshes, and dynamic linking and loading of individually compiled applications. These four additions are fundamental capabilities that will be leveraged by many NEAMS applications.

97 MATHEMATICS AND COMPUTING↗

Experimental Evidence on Latency in a Fleet of Controllable Water Heaters

Demand response is an important emerging part of smart grids with wide coverage in theoretical and modeling research. However, experimental evidence on the real-life behavior of controllable loads is still limited. We present observations regarding latency and communication aspects of the operation on a fleet of residential water heaters in a smart neighborhood in Atlanta, GA. Our analysis shows that latency in water heaters is not constant and does not follow a Gaussian distribution. We also find that there is a systematic relationship between latency and hour of the day. Latency was found to increase during morning and evening hours compared to the afternoon. These findings could help better plan deployment of control for demand response programs. Understanding delays associated with controlling smart devices is crucial for proper design and algorithm development for optimization, frequency of dispatch, and override detection.

communication delay↗

Cosmic-Ray Extremely Distributed Observatory

The Cosmic-Ray Extremely Distributed Observatory (CREDO) is a newly formed, global collaboration dedicated to observing and studying cosmic rays (CR) and cosmic-ray ensembles (CRE): groups of at least two CR with a common primary interaction vertex or the same parent particle. The CREDO program embraces testing known CR and CRE scenarios, and preparing to observe unexpected physics, it is also suitable for multi-messenger and multi-mission applications. Perfectly matched to CREDO capabilities, CRE could be formed both within classical models (e.g., as products of photon–photon interactions), and exotic scenarios (e.g., as results of decay of Super-Heavy Dark Matter particles). Their fronts might be significantly extended in space and time, and they might include cosmic rays of energies spanning the whole cosmic-ray energy spectrum, with a footprint composed of at least two extensive air showers with correlated arrival directions and arrival times. As the CRE are predominantly expected to be spread over large areas and, due to the expected wide energy range of the contributing particles, such a CRE detection might only be feasible when using all available cosmic-ray infrastructure collectively, i.e., as a globally extended network of detectors. Thus, with this review article, the CREDO Collaboration invites the astroparticle physics community to actively join or to contribute to the research dedicated to CRE and, in particular, to pool together cosmic-ray data to support specific CRE detection strategies.

79 ASTRONOMY AND ASTROPHYSICS↗

Data Centers and Digital Assurance Workshop 3 – Mitigations for Digital Assurance Risks

The third session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 18, 2025, focused on developing mitigation strategies for digital assurance risks identified in previous workshops. Hosted by Idaho National Laboratory (INL) and ScottMadden, the session emphasized the application of Cyber-Informed Engineering (CIE) to data center infrastructure, particularly at the utility–data center interface. Participants revisited and ranked key digital assurance risks, including architecture and interface weaknesses, governance gaps, and AI-enabled threats. The workshop introduced the 12 principles of CIE, advocating for consequence-focused design, engineered controls, and secure information architecture to proactively reduce cyber-physical vulnerabilities. These principles were applied to critical data center systems such as power distribution, UPS, cooling, SCADA/BMS, and grid-forming batteries. The session also addressed governance challenges at the interconnection boundary, highlighting the need for clear roles in telemetry sharing, firmware management, and trip settings. Special attention was given to emerging risks from behind-the-meter (BTM) generation, including reverse-power flow and the integration of small modular reactors (SMRs), which shift data centers from large loads to complex generation nodes. Participants explored how interconnection agreements can serve as enforceable instruments for digital assurance, and reviewed gaps in current standards such as NERC CIP, IEC 62443, and IEEE 1547. The workshop concluded with pathways to standardization, including model agreement language, state-level programs, and expanded NERC guidance. INL also presented tools and frameworks for secure procurement and supplier risk management, reinforcing the need for integrated engineering and policy solutions to secure the evolving data center–grid ecosystem. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Energy Northwest — Advanced Grid Interactive Load Efficiency (AGILE) : A Techno-economic Assessment

The Advanced Grid Interactive Load Efficiency project team, led by Energy Northwest, was awarded funding as part of the fourth round of the Clean Energy Fund program to investigate, co-create, and complete a preliminary design for grid-interactive efficient buildings (GEBs) for a number of schools served by Grays Harbor PUD. The project team has evaluated different combinations of systems at selected school buildings and the potential to respond to grid and customer needs, and develop a preliminary system technical design, including specifying desired GEB technology options, determining communication and electrical interface requirements, assessing control software sensor requirements, and interfacing with building management systems. PNNL led the techno-economic assessment efforts, leveraging its advanced modeling and analytical methods and tools developed for building-to-grid integration. This report documents the economic assessment for different GEB design options, encompassing an in-depth examination of use cases and value propositions, assumptions and inputs, models, methods, case studies, as well as key findings.

24 POWER TRANSMISSION AND DISTRIBUTION↗