Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distribution network planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strawman Philosophical Guide for Developing International Network of GPM GV Sites

The creation of an international network of ground validation (GV) sites that will support the Global Precipitation Measurement (GPM) Mission's international science programme will require detailed planning of mechanisms for exchanging technical information, GV data products, and scientific results. An important component of the planning will be the philosophical guide under which the network will grow and emerge as a successful element of the GPM Mission. This philosophical guide should be able to serve the mission in developing scientific pathways for ground validation research which will ensure the highest possible quality measurement record of global precipitation products. The philosophical issues, in this regard, partly stem from the financial architecture under which the GV network will be developed, i.e., each participating country will provide its own financial support through committed institutions -- regardless of whether a national or international space agency is involved.At the 1st International GPM Ground Validation Workshop held in Abingdon, UK in November-2003, most of the basic tenants behind the development of the international GV network were identified and discussed. Therefore, with this progress in mind, this presentation is intended to put forth a strawman philosophical guide supporting the development of the international network of GPM GV sites, noting that the initial progress has been reported in the Proceedings of the 1st International GPM GV Workshop -- available online. The central philosophical issues themselves, all flow from the fact that each participating institution can only bring to the table, GV facilities and scientific personnel that are affordable to the sanctioning (funding) national agency (be that a research, research-support, or operational agency). This situation imposes on the network, heterogeneity in the measuring sensors, data collection periods, data collection procedures, data latencies, and data reporting capabilities. Therefore, in order for the network to be effective in supporting the central scientific goals of the GPM mission, there must be a basic agreed upon doctrine under which the network participants function vis-a-vis: (1) an overriding set of general scientific requirements, (2) a minimal set of policies governing the free flow of GV data between the scientific participants, (3) a few basic definitions concerning the prioritization of measurements and their respective value to the mission, (4) a few basic procedures concerning data formats, data reporting procedures, data access, and data archiving, and (5) a simple means to differentiate GV sites according to their level of effort and ability to perform near real-time data acquisition - data reporting tasks. Most important, in case they choose to operate as a near real-time data collection-data distribution site, they would be expected to operate under a fairly narrowly defined protocol needed to ensure smooth GV support operations. This presentation will suggest measures responsive to items (1) - (5) from which to proceed,. In addition, this presentation will seek to stimulate discussion and debate concerning how much heterogeneity is tolerable within the eventual GV site network, given that the any individual GV site can only be considered scientifically useful if it supports the achievement of the central GPM Mission goals. Only ground validation research that has a direct connection to the space mission should be considered justifiable given the overarching scientific goals of the mission. Therefore each site will have to seek some level of accommodation to what the GPM Mission requires in the way of retrieval error characterization, retrieval error detection and reporting, and generation of GV data products that support assessment and improvement of the mission's standard precipitation retrieval algorithms. These are all important scientific issues that will be best resolved in open scientific debate.

Smith, Eric A.↗

Assessing potential impacts associated with contamination events in water distribution systems : a sensitivity analysis.

An understanding of the nature of the adverse effects that could be associated with contamination events in water distribution systems is necessary for carrying out vulnerability analyses and designing contamination warning systems. This study examines the adverse effects of contamination events using models for 12 actual water systems that serve populations ranging from about 104 to over 106 persons. The measure of adverse effects that we use is the number of people who are exposed to a contaminant above some dose level due to ingestion of contaminated tap water. For this study the number of such people defines the impact associated with an event. We consider a wide range of dose levels in order to accommodate a wide range of potential contaminants. For a particular contaminant, dose level can be related to a health effects level. For example, a dose level could correspond to the median lethal dose, i.e., the dose that would be fatal to 50% of the exposed population. Highly toxic contaminants may be associated with a particular response at a very low dose level, whereas contaminants with low toxicity may only be associated with the same response at a much higher dose level. This report focuses on the sensitivity of impacts to five factors that either define the nature of a contamination event or involve assumptions that are used in assessing exposure to the contaminant: (1) duration of contaminant injection, (2) time of contaminant injection, (3) quantity or mass of contaminant injected, (4) population distribution in the water distribution system, and (5) the ingestion pattern of the potentially exposed population. For each of these factors, the sensitivities of impacts to injection location and contaminant toxicity are also examined. For all the factors considered, sensitivity tends to increase with dose level (i.e., decreasing toxicity) of the contaminant, with considerable inter-network variability. With the exception of the population distribution (factor 4 above), sensitivity to the various factors tends to be highest at lower impact levels (e.g., impacts below the 80th percentile). Conversely, for the population distribution factor, sensitivity is lowest at the lower impact levels. For injection duration, impacts generally are higher for longer duration injections. Definite patterns are present in the sensitivity of impacts to injection time, but these vary substantially across the networks. As would be expected, impacts are larger for larger mass injections, but the sensitivity can vary dramatically depending on dose level and the network. Estimated impacts can be sensitive to assumptions about how population is distributed in a network, particularly at high impact levels and high dose levels, again with considerable variability across networks. Finally, impacts can be sensitive to assumptions about ingestion patterns in the potentially exposed population, with sensitivities varying across networks and tending to be highest for high dose levels. When considered in combination with the other factors (but not including the ingestion model used), impacts at low dose levels (levels at which the effects of highly toxic contaminants can be significant) are most sensitive to injection duration. Similarly, when considered in combination, impacts at higher dose levels (levels required for significant effects from contaminants with low toxicity) are most sensitive to injection mass. At low dose levels, for a likely range in injection masses, impacts are not particularly sensitive to injection mass. The influence of the various factors on the location of high percentile injection locations can be as important or more important than their influence on the magnitudes of impacts. In addition, the choice of contaminant has a major influence on which nodes are high impact injection locations. The sharing (overlap) of the same high-percentile injection nodes for different values of a factor can vary substantially by contaminant and impact level (percentile of impact). Overlap tends to decrease with decreasing toxicity of the contaminant and increasing impact level for all the factors considered, with considerable variability among the networks. Our results demonstrate the great variability in the impacts and the sensitivity of impacts to various factors that can occur in different water systems during a contamination event. Although definite patterns exist in the nature and magnitude of impacts and sensitivities for the diverse set of water systems examined, these results also show that substantial inter-network variability limits the ability to predict or extrapolate these results to other systems. Therefore, although water systems do exhibit some similarities in the magnitude and pattern of impacts during contamination events, each individual water system should be treated as unique.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

InterGraph-CPS: A Graph-Theoretic Approach to Characterize Cross-Domain Cyber-Physical Interdependencies and Uncertainties in Electric Grid Systems for Improved Decision-Making in Operation and Response

Critical infrastructure systems such as the electric grid are increasingly cyber-physical; yet, despite the cyber-physical characteristics of critical infrastructure systems, the physical process system and communication/control network system are traditionally analyzed in siloes. As these systems become more cyber-physical, it is crucial that models and methods are available to assess the cyber physical system (CPS) interdependencies, characteristics, and event propagation for improved planning, operation, and response. Thus, we proposed an integrated structural and temporal CPS interdependency analysis framework, InterGraph-CPS, that provides insight into the CPS function during normal operation as well as disturbances. This integrated structural and temporal interdependency framework is uniquely designed for assessing CPSs by account for the challenges of analyzing cyber and physical data streams together due to data availability, data type, and time scale differences. By leveraging both structural (e.g., graph analysis) and temporal (e.g., data analytics) techniques, different CPS behaviors and configurations can be accounted for.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Continuous snow depth and temperature measurements from dense network of above-ground distributed temperature profiling systems from 2021-09-23 to 2024-08-23, Seward Peninsula, Alaska

The dataset contains temperature measurements from distributed temperature profiling (DTP) systems (Dafflon et al., 2022; Wielandt et al., 2022; Wang et al., 2024a; Fiolleau et al., 2024) deployed vertically above the ground surface at a large number of locations from 2021 to 2024. The research is designed to improve understanding of the local heterogeneity in snow depth and snow thermal insulation dynamics, as well as their interactions in a discontinuous permafrost region (Wang et al., 2025). The DTP systems were deployed at 96 locations in a watershed along the Nome-Teller road at mile marker 27 (T27) and at 54 locations on a hillslope along the Kougarok road at mile marker 64 (K64) in the Seward Peninsula, Alaska. The probe location information is stored in Probe_locations_T27.csv and Probe_locations_K64.csv. Temperature measurements were recorded at 15-minute intervals using high-precision digital sensors (accuracy: ±0.1°C, resolution: 0.0078°C). The temperature probes, either 1.4 m or 1.6 m long, contain sensors spaced every 5 cm or 10 cm along their length. The temperature data are stored in compressed files following the format: DTP_snow_air_temperature_(site)_(start)_(end).zip, where site is either T27 or K64, and start and end represent the time series period. Within each ZIP file, individual CSV files are named by probe ID and contain temperature records at different heights above the ground surface.This dataset also includes derived snow depth time series over three snow seasons, estimated from temperature measurements. Snow depth was estimated by identifying the consecutive sensor pair that exhibited the largest drop in high-frequency temperature fluctuations (detailed in the methods). These data are stored in: Snow_depths_flags_(site)_(start)_(end).csv, which includes snow depth time series and corresponding quality flags (defined in the methods) from different probes. Additionally, the dataset includes derived metrics and supporting measurements at selected locations over two snow seasons, contributing to the manuscript of Wang et al., 2025. These locations were chosen based on the availability of high-quality snow depth time series during both seasons. The additional data include: (1) Air temperature proxies measured from the top sensors on the pole when they were not buried by snow, stored in Air_temperature_proxies_(site)_(start)_(end).csv (2) Ground interface temperature, recorded at 3 cm above the ground, stored in Ground_interface_temperature_(site)_(start)_(end).csv (3) Site characteristics, including vegetation height, elevation, and the topographic position index (TPI) within a 50 m radius, stored in Selected_probe_locations_gps_vegheight_tpi_elevation_(site).csv. These metrics were derived from 1 m resolution summer LiDAR-based digital elevation models and digital surface models from Singhania et al., 2023, DOI:10.5440/1832016. Metadata files include data descriptions (_dd.csv) for tabular data. All included files are listed and described in xxxx_flmd.csv.This dataset is an updated version of a previous archive (Wang et al., 2024b, DOI: 10.15485/2475020), incorporating multiple seasons and improved snow depth estimation. Please note that due to large amount of information present in this dataset, many specificities associated with the acquisition of snow temperature, air temperature proxy and estimation of snow depth, and the future archiving of additional datasets on the soil temperature, thaw depth and soil characteristics at these locations, the author would welcome being contacted by people planning to use this dataset.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research.The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska.Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Land-Use and Land-Cover Change around Mobile Bay, Alabama from 1974-2008

This document summarizes the major findings of a Gulf of Mexico Application Pilot project led by NASA Stennis Space Center (SSC) in conjunction with a regional collaboration network of the Gulf of Mexico Alliance (GOMA). NASA researchers processed and analyzed multi-temporal Landsat data to assess land-use and land-cover (LULC) changes in the coastal counties of Mobile and Baldwin, AL between 1974 and 2008. Our goal was to create satellite-based LULC data products using methods that could be transferable to other coastal areas of concern within the Gulf of Mexico. The Mobile Bay National Estuary Program (MBNEP) is the primary end-user, however, several other state and local groups may benefit from the project s data products that will be available through NOAA-NCDDC s Regional Ecosystem Data Management program. Mobile Bay is a critical ecologic and economic region in the Gulf of Mexico and to the entire country. Mobile Bay was designated as an estuary of national significance in 1996. This estuary receives the fourth largest freshwater inflow in the United States. It provides vital nursery habitat for commercially and recreationally important fish species. It has exceptional aquatic and terrestrial bio-diversity, however, its estuary health is influenced by changing LULC patterns, such as urbanization. Mobile and Baldwin counties have experienced a population growth of 1.1% and 20.5% from 2000-2006. Urban expansion and population growth are likely to accelerate with the construction and operation of the ThyssenKrupp steel mill in the northeast portion of Mobile County. Land-use and land-cover change can negatively impact Gulf coast water quality and ecological resources. The conversion of forest to urban cover types impacts the carbon cycle and increases the freshwater and sediment in coastal waters. Increased freshwater runoff decreases salinity and increases the turbidity of coastal waters, thus impacting the growth potential of submerged aquatic vegetation (SAV), which is critical nursing ground for many Gulf fish species. A survey of Mobile Bay SAV showed widespread decreases since the 1940s. Prior to our project, coastal environmental managers in Baldwin and Mobile counties needed more understanding of the historical LULC for properly assessing the impacts of urbanization. In particular, more information on the location and extent of changing urbanization LULC patterns was needed to aid LULC planning and to assess predictions of future LULC patterns. Our products will assist the coastal environmental managers and land-use planners in making better community growth planning decisions. Our project also will help to establish a historical baseline of LULC distributions, which is a fundamental need in any stewardship plan. The primary research objective of our project was to produce historic and current geospatial LULC change products across a 34-year time frame. A multi-decadal coastal LULC change product was the major project deliverable. The geographic extent and nature of change was quantified and assessed for the upland herbaceous, barren, open water, urban, upland forest, woody wetland, and non-woody wetlanddominated land cover types. We focused on regional analyses of decadal-scale urban expansion and watershed-scaled analyses of LULC change for multiple areas of concern to the Mobile Bay NEP (Figure A). We used the following dates to derive LULC classification products from Landsat data: 1974, 1979, 1984, 1988, 1991, 1996, 2001, 2005, and 2008. We assessed the accuracy of our products using randomly sampled locations and digital geospatial reference data including field survey data, high resolution orthorectified aerial photography, high resolution multispectral and panchromatic satellite data displays (from QuickBird and Corona sensors), digital elevation model data, and National Wetlands Inventory wetland cover type data. NOAA s Coastal Change Assessment Program s (C-CAP) and National Land Cover Database (NLCD) procts were used for qualitative comparison in assessing map accuracy. We calculated an average overall classification accuracy of 87% with similar overall accuracies for the older (MSS) and newer (TM and ETM) Landsat LULC products.

Ellis, Jean↗

Enhancing Power Resilience for Remote Communities: A Comprehensive Renewable Energy Solution for Itbayat Island

The island of Itbayat, Philippines, faces significant challenges in maintaining a reliable and resilient power supply due to its current reliance on a vulnerable power distribution system managed by a local electric cooperative. The existing infrastructure, which includes diesel generators and a radial network configuration with some above-ground lines, is highly susceptible to frequent typhoons and adverse weather conditions. These factors, combined with inadequate staffing and high operational costs, result in frequent power outages that disrupt daily life and hinder economic development. This white paper proposes a comprehensive solution to enhance the resilience and reliability of Itbayat's power system by integrating renewable energy sources, specifically solar photovoltaic (PV) systems, battery storage, and a microgrid controller. The proposed solution aims to reduce dependency on diesel fuel, optimize energy use, and provide a sustainable and robust power supply for the island. Key components of the solution include: 1. Solar PV Installation: Deploying solar PV panels to harness abundant solar energy, reducing reliance on diesel fuel. 2. Battery Storage Systems: Installing battery storage to store excess solar energy and ensure a continuous power supply during low solar generation periods. 3. Microgrid Controller: Implementing a microgrid controller to manage and optimize the integration of solar PV, battery storage, and existing diesel generators. The proposed solution addresses several critical issues, including system vulnerability, generator dependency, and operational inefficiencies. By adopting this innovative approach, Itbayat Island can achieve a more resilient, efficient, and sustainable energy infrastructure, ensuring a stable power supply for its residents and enhancing overall energy security.

14 SOLAR ENERGY↗

PowerModelsGAT-AI: Physics-Informed Graph Attention for Multi-System Power Flow With Continual Learning

Solving the alternating current power flow equations in real time is essential for secure grid operation, yet classical Newton–Raphson solvers can be slow under stressed conditions. Existing graph neural networks for power flow are typically trained on a single system and often degrade on different systems. We present PowerModelsGAT-AI, a physics-informed graph attention network that predicts bus voltages and generator injections. The model uses bus-type-aware masking to handle different bus types and balances multiple loss terms, including a power-mismatch penalty, using learned weights. We evaluate the model on 14 benchmark systems (4 to 6,470 buses) and train a unified model on 13 of these under contingency conditions with up to two branch outages, achieving an average normalized mean absolute error of 0.89% for voltage magnitudes and R 2 >0.99 for voltage angles. We also show continual learning: when adapting a base model to a new 1,354-bus system, standard fine-tuning causes severe forgetting with error increases exceeding 1000% on base systems, while our experience replay and elastic weight consolidation strategy keeps error increases below 2% and in some cases improves base-system performance. Interpretability analysis shows that learned attention weights correlate with physical branch parameters (susceptance: r=0.38 ; thermal limits: r=0.22 ), and feature importance analysis supports that the model captures established power flow relationships.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coordinated Modeling of Electric Grid and Natural Gas Network Operations

Presentation based upon full report of a Colorado case study and coordination framework, which is available at https://www.nrel.gov/docs/fy20osti/77096.pdf. JISEA analysts Brian Sergi, Omar Guerra, and Bri-Mathias Hodge will present on recent JISEA work on coordination between the natural gas and electricity sectors. Power and gas are becoming increasingly interdependent but weren't designed to function together. How does greater coordination impact system operations with different levels of solar and wind penetrations? This free JISEA presentation will take place in a Webinar on Tuesday, May 11, 2021 at 12 p.m.: Learn how greater coordination between the natural gas and electricity sectors impacts system operations with different levels of solar and wind penetrations. Presentation information includes: Historical and projected data for natural gas consumption and power generation in the United States as demonstrated by 2014 East Coast Polar Vortex, 2021 Texas Winter Storm Uri. Showing coupling points, FERC identified need for better coordination, different levels of coordination (decision making and optimization control), coordination framework. Case study on Colorado Front Range, ramping requirements and gas nominations, real-time dispatch (June and December scenarios), results of analysis of impacts of coordination on unserved load. Total real-time gas offtakes by node, impacts on unserved gas, effect on CO2 emissions. Discussions on clusions drawn from Colorado Case study expanded co-simulation via HELICS, objectives of the HELICS+ natural gas use case, modeling of hydrogen blending, techno economic assessment of blending, and blending impacts on energy content and pressure.

analysis↗

Soft costs and knowledge pathways in the US solar photovoltaic ecosystem

An enduring puzzle in the US solar industry is that despite substantial reductions in the cost of photovoltaic hardware, soft costs (defined here as all costs not directly driven by hardware) have not done the same (US DOE, 2012). In fact, soft costs now account for the majority of the cost of total cost of installed solar systems, despite decades of efforts by firms and policy-makers to reduce these costs. In this study, we address two questions: a) what drives soft costs within the US solar industry, and b) how do firms gain the knowledge required to address these costs? We address this question through an explorative inductive multiple-case study (e.g., Eisenhardt, 1989; Appleyard, 1996). Our sample consists of 15 actors from across various roles within the industry, including residential and commercial installers (8), distribution intermediaries (3), and business software vendors (4). We conducted extensive interviews with executives at each firm (76 interviews in total), and supplemented this information with archival resources such as press releases, news coverage, analyst reports, and internet articles. This data was synthesized into a comprehensive case for each actor, detailing the activities conducted within each firm, the drivers of soft costs within that firm, and knowledge flows (e.g., new technologies, best practices, etc) within and across firms. We then compared across these cases to identify common patterns in cost and knowledge dynamics. Our study contributes a nuanced perspective on the drivers of soft costs within the solar industry as well as the patterns and mechanisms of knowledge flows within the industry. We find for example that the majority of the soft costs occur at the interface between firms (e.g., utilities, suppliers). We also observe substantive variation in costs across different types of actors and even within firm types (e.g., small vs. large installers). We also provide insight into how firms acquire knowledge and when they are able to apply it in order to reduce these costs. Our data reveal heterogeneity in a) the types of knowledge, and b) the pathways of knowledge flow between the actors in the industry. For example, we observe that distributors and suppliers play a key role in the dissemination of new technologies as well as general management knowledge for smaller firms. In contrast, informal personal networks and internal experimentation appear to be more important for larger firms. We also reveal critical distinctions across markets – e.g., differences in organizational culture that facilitate learning and experimentation more readily in residential vs. commercial markets. Overall, these results contribute preliminary insights into the knowledge dynamics of the solar industry, the persistence of soft costs over time, heterogeneity across firm types and regions, and the effective design of policy to support the solar industry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exe-Guard Project

The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical manual scanning process. Control systems are vulnerable to performance losses if off-the-shelf blacklist antivirus solutions aren’t implemented with care. This investment in configuration in addition to constant decommissioning to perform manual signature file updates is unprecedented and impractical. Additionally, control systems are often disconnected or islanded from the network making the delivery of signature updates difficult. Exe-Guard project developed a white list antivirus solution that mitigated the above drawbacks and allows control systems to cost-effectively apply malware protection while maintaining high reliability. The application of security patches can also be minimized since white listing maintains constant defense against unauthorized code execution. Security patches can instead be applied in less frequent intervals where system decommissioning can be scheduled and planned for. Since control systems are less dynamic than IT environments, the feasibility of maintaining a secure baselined state is more practical. Because upgrades are performed in infrequent, calculated intervals, it allows a new security baseline to be established before the system is returned to service. Exe-Guard built on the efforts of SNL under the Code Seal project. SNL demonstrated prototype Trust Anchors on the project which are independent monitoring and control devices that can be integrated into untrustworthy components. The exe-Guard team started with the lessons learned under this project then designed commercial solution for white list malware protection. Malware is a real threat, even on islanded or un-networked installations, since operators can unintentionally install infected files, plug in infected mass storage devices, or infect a piece of equipment on the islanded local area network that can then spread to other connected equipment. Protection at the device level is one of the last layers of defense in a security-in-depth defense model before an asset becomes compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Analytics for Electrical Distribution Systems with Micro PMUs (GMLC 1.4.9 Technical Report)

This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.

42 ENGINEERING↗

Economical and Engineering Aspects of Proactive Demand Participation: Centralized versus Bilateral Control Structure

The electric grid of the U.S. is evolving from a system characterized by large and centralized fossil-fueled power plants and passive customers to a network with high penetration of distributed energy resources and proactive customers. This project facilitated the evolution of the U.S. electric power grid by enabling proactive participation of demands in electricity market at the power distribution system level. This project has three major achievements. First, we designed a centralized distribution system operator managed electricity market and developed a three-phase alternating current optimal power flow algorithm to coordinate the operation of large-scale flexible loads and distributed energy resources. Second, we designed a decentralized bilateral coordinate framework for retail electricity market, where each participating customer is capable of making decisions regarding energy production and consumption based on information received from transactive neighbors. Third, the impacts of centralized and decentralized demand-side participation scheme on power system operations were evaluated with both large-scale simulations and hardware-in-the-loop demonstrations. The major activities and specific accomplishments of the technical tasks are summarized in Section II. The detailed design of centralized/hierarchical and decentralized/bilateral retail electricity markets and the comparison between the two markets are described in Section III. The accomplishments and conclusions of the project are presented in Section IV. The major findings of the project falls into three areas, hierarchical distribution system operator managed electricity market, bilateral electricity market and decentralized market coordination, and comparison of centralized and decentralized market coordination mechanisms. In the area of hierarchical distribution system operator managed electricity market design, an integrated wholesale and retail electricity market was shown to be highly effective in extracting the operational flexibility from distributed energy resources to provide services to the wholesale market. A chordal conversion based convex iteration algorithm is not only computationally efficiency but also achieves global optimal solution in coordinating the operations of a large number of heterogeneous distributed energy resources.In the area of decentralized market coordination approach, we showed that bilateral transactions among proactive customers and decentralized transaction clearing mechanism based on simultaneous second-price sealed-bid auction can encourage truthful bidding strategies from the market participations. In addition, the individual customers can rely on a portfolio optimization approach to maximize their returns while minimizing risks. In the area of comparison of centralized and decentralized market coordination mechanisms, we found that the centralized market design results in higher social welfare and lower wholesale market clearing price for electricity. In general, centralized market design favors distributed energy resources and fixed loads. The decentralized market design mostly benefits flexible loads and conventional generators.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Keep it short: Exploring the impacts of configuration choices on the recent economics of solar-plus-battery and wind-plus-battery hybrid energy plants

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$10$/MWh across ISOs on average. The highest boost occurs in California ($\$15$/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$12.5$/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$12.5$/MWh coupling penalty is reduced to $\$1.6$/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$2$–$\$13$/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

A simplified, data-constrained approach to estimate the permafrost carbon–climate feedback

We present an approach to estimate the feedback from large-scale thawing of permafrost soils using a simplified, data-constrained model that combines three elements: soil carbon (C) maps and profiles to identify the distribution and type of C in permafrost soils; incubation experiments to quantify the rates of C lost after thaw; and models of soil thermal dynamics in response to climate warming. We call the approach the Permafrost Carbon Network Incubation–Panarctic Thermal scaling approach (PInc-PanTher). The approach assumes that C stocks do not decompose at all when frozen, but once thawed follow set decomposition trajectories as a function of soil temperature. The trajectories are determined according to a three-pool decomposition model fitted to incubation data using parameters specific to soil horizon types. We calculate litterfall C inputs required to maintain steady-state C balance for the current climate, and hold those inputs constant. Soil temperatures are taken from the soil thermal modules of ecosystem model simulations forced by a common set of future climate change anomalies under two warming scenarios over the period 2010 to 2100. Under a medium warming scenario (RCP4.5), the approach projects permafrost soil C losses of 12.2–33.4 Pg C; under a high warming scenario (RCP8.5), the approach projects C losses of 27.9–112.6 Pg C. Projected C losses are roughly linearly proportional to global temperature changes across the two scenarios. These results indicate a global sensitivity of frozen soil C to climate change (γ sensitivity) of –14 to –19 Pg C °C–1 on a 100 year time scale. For CH 4 emissions, our approach assumes a fixed saturated area and that increases in CH 4 emissions are related to increased heterotrophic respiration in anoxic soil, yielding CH 4 emission increases of 7% and 35% for the RCP4.5 and RCP8.5 scenarios, respectively, which add an additional greenhouse gas forcing of approximately 10–18%. In conclusion, the simplified approach presented here neglects many important processes that may amplify or mitigate C release from permafrost soils, but serves as a data-constrained estimate on the forced, large-scale permafrost C response to warming.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗