Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Development of a laboratory prototype water quality monitoring system suitable for use in zero gravity

The development of a laboratory prototype water quality monitoring system for use in the evaluation of candidate water recovery systems and for study of techniques for measuring potability parameters is reported. Sensing techniques for monitoring of the most desirable parameters are reviewed in terms of their sensitivities and complexities, and their recommendations for sensing techniques are presented. Rationale for selection of those parameters to be monitored (pH, specific conductivity, Cr(+6), I2, total carbon, and bacteria) in a next generation water monitor is presented along with an estimate of flight system specifications. A master water monitor development schedule is included.

Misselhorn, J. E.↗

Numerical simulations of the electrodynamic interactions between the Tethered-Satellite-System and space plasma

The first Tethered-Satellite-System (TSS-1), scheduled for a flight in late 1992, is expected to provide relevant information related to the concept of generating an emf in a 20-km-long (or longer) conducting wire. This paper presents numerical simulations of the electrodynamic interactions between the TSS system and space plasma, using a 2D and 3D models of the system. The 2D case code simulates the motion of a long cylinder past a plasma, which is composed of electrons and H(+) ions. The system is solved by allowing the plasma to flow past the cylinder with an imposed magnetic field. The more complex 3D case is considered to study the dynamics in great detail. Results of 2D simulation show that the interaction of a satellite with plasma flowing perpendicularly to the magnetic field results in an enhancement in the current collection.

Vashi, Bharat I.↗

Physical Principle for Generation of Randomness

A physical principle (more precisely, a principle that incorporates mathematical models used in physics) has been conceived as the basis of a method of generating randomness in Monte Carlo simulations. The principle eliminates the need for conventional random-number generators. The Monte Carlo simulation method is among the most powerful computational methods for solving high-dimensional problems in physics, chemistry, economics, and information processing. The Monte Carlo simulation method is especially effective for solving problems in which computational complexity increases exponentially with dimensionality. The main advantage of the Monte Carlo simulation method over other methods is that the demand on computational resources becomes independent of dimensionality. As augmented by the present principle, the Monte Carlo simulation method becomes an even more powerful computational method that is especially useful for solving problems associated with dynamics of fluids, planning, scheduling, and combinatorial optimization. The present principle is based on coupling of dynamical equations with the corresponding Liouville equation. The randomness is generated by non-Lipschitz instability of dynamics triggered and controlled by feedback from the Liouville equation. (In non-Lipschitz dynamics, the derivatives of solutions of the dynamical equations are not required to be bounded.)

Zak, Michail↗

Precision Departure Release Capability (PDRC) Final Report

After takeoff, aircraft must merge into en route (Center) airspace traffic flows that may be subject to constraints that create localized demand/capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool, based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas/Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents research results from the PDRC research activity. Companion papers present the Concept of Operations and a Technology Description.

tactical departure scheduling↗

Precision Departure Release Capability (PDRC): NASA to FAA Research Transition

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations.

ATM↗

A Validation Study of the Performance Prediction Methodology of the Early Warning Metrics

Complex projects frequently experience delays and develop backlogs of their project control milestones during the acquisition and development lifecycles. In response, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) formed an independent group of Subject Matter Experts (SMEs) to monitor the execution performance of GSFC Flight projects and instruments that are under development. The SME team’s objective is to generate data driven performance-based indicators that quantify the degree to which projects are meeting their respective schedule and budget commitments. One of these performance-based indicators, the Early Warning Metrics, provides performance forecasts and insight to project performance relative to historical successful projects. Herein this paper describes the purpose and utility of the Early Warning Metrics. Additionally, the initial prediction method used in the creation of the metrics is described along with its validity and the validity of comparable prediction methods.

Holloman, Sherrica↗

GNF fuel technology update

In 2015, Global Nuclear Fuel (GNF) launched the GNF3 fuel design by inserting lead-use assemblies into two boiling water reactors (BWRs) in the U.S. A lead use assembly is a nuclear fuel assembly which is inserted in a reactor core to confirm its performance. A third set of GNF3 lead-use assemblies are scheduled to be inserted into another reactor in the spring of 2017. GNF3 is a robust next-generation 10*10 fuel design that will improve both fuel cycle and fuel reliability. In addition, GNF3 will be delivered in a fully assembled condition - forgoing the need to insert fuel channels over the bundles at the site. The process of shipping BWR fuel in a channeled configuration is complex and requires an understanding of the potential high-cycle and low-cycle fatigue conditions that can occur during shipping, as characterized by accelerometer data from ship tests. The key component in evaluating channeled fuel shipping is the spacer, and the GNF3 spacer fatigue performance was found to be approximately twice that of GNF2. While fuel reliability has traditionally been related to the avoidance of fuel leakers, for the past 15 years channel - control blade interference has been a close second for concern. To eliminate this problem, GNF3 will come standard with NSF (a zirconium alloy) channels that are effectively resistant to fluence gradient-induced bow and shadow corrosion-induced bow. In addition to the development of GNF3, GNF is evaluating the use of advancing 3D metal printing or additive manufacturing for manufacturing fuel bundle components. Additive manufacture offers the hope of more flexibility in design and shorter manufacturing development cycles. However, since there is little experience with this technology in the nuclear industry, GNF has been evaluating the use of additive manufacture to fabricate small scale components that are easily retrieved from the reactor for testing. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Monitoring of corrosion effects in pipes with multi-mode acoustic signals

Current commercial long-range guided wave inspection and monitoring technologies for pipes usually require establishment of certain specific acoustic modes for wave propagation and use a large number of sensors in a certain geometric arrangement (for example, uniformly-spaced arrays of sensors on a collar, placed around a pipe). This paper, in contrast, presents a long-range corrosion detection method in pipes based on multi-mode guided acoustic waves, generated and received using simple, single-element sensors. In this technique, available guided wave modes in any interrogated zone of the structure are automatically down-selected by the medium, and changes in energy distribution over the selected modes are analyzed through signal processing to monitor material loss or addition. Here, to investigate the feasibility of the proposed method, we have performed both experimental and numerical simulation studies on 50.8-mm (2-in)-diameter schedule-40 carbon steel pipes. In these studies, a linear chirp signal is injected in compression mode, perpendicular to the surface of the pipe, generating multi-mode, multi-directional guided waves that travel within the pipe wall. Corrosion effects in the pipes are simulated numerically and experimentally. To reduce errors in the measurement technique due to changes in the local or global temperature of the measured media, a universal temperature compensation algorithm is introduced. The experimental results show good agreement with simulation results, indicating that the proposed multi-mode wave generation and detection in a pipe could be used for long-range detection and monitoring of corrosion effects, such as pipe wall losses or solid material deposits.

36 MATERIALS SCIENCE↗

BigData Express: Toward Predictable, Schedulable, and High-Performance Data Transfer [Slides]

Big data has emerged as a driving force for scientific discoveries. Large scientific instruments (e.g., colliders, and telescopes) generate exponentially increasing volumes of data. To enable scientific discovery, science data must be collected, indexed, archived, shared, and analyzed, typically in a widely distributed and highly collaborative manner. Data transfer is now an essential function for science discoveries, particularly within big data environments. To support data transfer for big data science, there is a need for predictable, high performance, scalable, end-to-end, programmable networks that enable science applications to use network resources most efficiently. Software-Defined Networking (SDN) is a novel network architecture and technological approach that separates the network control and data planes.

97 MATHEMATICS AND COMPUTING↗

Packaging, Transportation and Recycling of NPP Condenser Modules - 12262

Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged in inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mathematical and Numerical Aspects of the Adaptive Fast Multipole Poisson-Boltzmann Solver

This paper summarizes the mathematical and numerical theories and computational elements of the adaptive fast multipole Poisson-Boltzmann (AFMPB) solver. We introduce and discuss the following components in order: the Poisson-Boltzmann model, boundary integral equation reformulation, surface mesh generation, the nodepatch discretization approach, Krylov iterative methods, the new version of fast multipole methods (FMMs), and a dynamic prioritization technique for scheduling parallel operations. For each component, we also remark on feasible approaches for further improvements in efficiency, accuracy and applicability of the AFMPB solver to large-scale long-time molecular dynamics simulations. Lastly, the potential of the solver is demonstrated with preliminary numerical results.

97 MATHEMATICS AND COMPUTING↗

Run-time scheduling and execution of loops on message passing machines

Sparse system solvers and general purpose codes for solving partial differential equations are examples of the many types of problems whose irregularity can result in poor performance on distributed memory machines. Often, the data structures used in these problems are very flexible. Crucial details concerning loop dependences are encoded in these structures rather than being explicitly represented in the program. Good methods for parallelizing and partitioning these types of problems require assignment of computations in rather arbitrary ways. Naive implementations of programs on distributed memory machines requiring general loop partitions can be extremely inefficient. Instead, the scheduling mechanism needs to capture the data reference patterns of the loops in order to partition the problem. First, the indices assigned to each processor must be locally numbered. Next, it is necessary to precompute what information is needed by each processor at various points in the computation. The precomputed information is then used to generate an execution template designed to carry out the computation, communication, and partitioning of data, in an optimized manner. The design is presented for a general preprocessor and schedule executer, the structures of which do not vary, even though the details of the computation and of the type of information are problem dependent.

Crowley, Kay↗

Run-time scheduling and execution of loops on message passing machines

Sparse system solvers and general purpose codes for solving partial differential equations are examples of the many types of problems whose irregularity can result in poor performance on distributed memory machines. Often, the data structures used in these problems are very flexible. Crucial details concerning loop dependences are encoded in these structures rather than being explicitly represented in the program. Good methods for parallelizing and partitioning these types of problems require assignment of computations in rather arbitrary ways. Naive implementations of programs on distributed memory machines requiring general loop partitions can be extremely inefficient. Instead, the scheduling mechanism needs to capture the data reference patterns of the loops in order to partition the problem. First, the indices assigned to each processor must be locally numbered. Next, it is necessary to precompute what information is needed by each processor at various points in the computation. The precomputed information is then used to generate an execution template designed to carry out the computation, communication, and partitioning of data, in an optimized manner. The design is presented for a general preprocessor and schedule executer, the structures of which do not vary, even though the details of the computation and of the type of information are problem dependent.

Saltz, Joel↗

A Geosynchronous Orbit Optical Communications Relay Architecture

NASA is planning to fly a Next Generation Tracking and Data Relay Satellite (TDRS) next decade. While the requirements and architecture for that satellite are unknown at this time, NASA is investing in communications technologies that could be deployed on the satellite to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in December 2017 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the Next Generation TDRS. While it is obvious that a small to medium sized optical communications terminal could be flown on a GEO satellite to provide support to Near Earth missions, it is also possible to deploy a large terminal on the satellite to support Deep Space missions. Onboard data processing and Delay Tolerant Networking (DTN) are two additional technologies that could be used to optimize optical communications link services and enable additional mission and network operations. This paper provides a possible architecture for the optical communications augmentation of a Next Generation TDRS and touches on the critical technology work currently being done at NASA. It will also describe the impact of clouds on such an architecture and possible mitigation techniques.

optics↗

Scheduling strategies for the ESPRESSO follow-up of TESS targets

ABSTRACT Radial-velocity follow-up of stars harbouring transiting planets detected by TESS is expected to require very large amounts of expensive telescope time in the next few years. Therefore, scheduling strategies should be implemented to maximize the amount of information gathered about the target planetary systems. We consider myopic and non-myopic versions of a novel uniform-in-phase scheduler, as well as a random scheduler, and compare these scheduling strategies with respect to the bias, accuracy and precision achieved in recovering the mass and orbital parameters of transiting and non-transiting planets. This comparison is carried out based on realistic simulations of radial-velocity follow-up with ESPRESSO of a sample of 50 TESS target stars, with simulated planetary systems containing at least one transiting planet with a radius below 4R⊕. Radial-velocity data sets were generated under reasonable assumptions about their noise component, including that resulting from stellar activity, and analysed using a fully Bayesian methodology. We find the random scheduler leads to a more biased, less accurate, and less precise, estimation of the mass of the transiting exoplanets. No significant differences are found between the results of the myopic and non-myopic implementations of the uniform-in-phase scheduler. With only about 22 radial velocity measurements per data set, our novel uniform-in-phase scheduler enables an unbiased (at the level of 1 per cent) measurement of the masses of the transiting planets, while keeping the average relative accuracy and precision around 16 per cent and 23 per cent, respectively. The number of non-transiting planets detected is similar for all the scheduling strategies considered, as well as the bias, accuracy and precision with which their masses and orbital parameters are recovered.

Cabona, L.↗

Driving Next-Generation Workflows from the Data Plane

We observe the emergence of a new generation of scientific workflows that process data produced at a sustained rate by scientific instruments and large scale numerical simulations. This data is consumed by multiple analysis, visualization, or Machine Learning components not only to enable inference and justify the scientific program, but also to monitor and steer the evolution of these experiments. In such workflows, moving intermediate data efficiently is key to performance, more than efficiently scheduling computational tasks. However, most traditional workflow management systems focus on optimizing task scheduling and then deal with data management, assuming a “move little, compute for long” model, which makes them unfit to the efficient management of this new generation of workflows. Therefore, we advocate for a new way to manage scientific workflows. We propose to consider an efficiently and independently managed data plane that can store and stream data. Workflows compute components, in the application plane can then interact with the data plane, abstracted from complexities of data management. Then, the role of a workflow management system would become that of a control plane that allows users to connect services together to execute the workflow and manages connections between the application and data planes. In this position paper, we characterize several next-generation workflow motifs and describe how their interaction with the data plane is a challenge to traditional workflow management systems. Then, we express a set of requirements that a workflow management system should meet to efficiently manage next-generation workflows at different scales. Based on these requirements, we expose our vision of driving next-generation workflows from the data plane and list remaining open challenges.

Suter, Fred↗

Design of Safe Separation Bounds for Temporally Deconflicted Trajectories Under Bounded Uncertainties

This paper explores the derivation of safe separation bounds for a heterogeneous group of~$n$ Uncrewed Aerial Systems (UAS) that are assigned temporally deconflicted trajectories. Compared to spatially deconflicted trajectories, temporal deconfliction can lead to higher traffic capacities and a more efficient use of the available airspace. One challenge with this type of deconfliction is that collisions can occur if some cooperating UAS are behind or ahead of schedule. To overcome this risk, this paper derives a lower bound on the safety distance between two heterogeneous UAS in the presence of bounded uncertainties. This safety distance can be leveraged to inform trajectory generation algorithms. The proposed bound establishes a rigorous safety margin when the fleet deviates from the planned trajectories, both temporally and spatially. For its derivation the paper assumes the UAS implement a distributed coordination algorithm that allows the fleet to maintain their schedules synchronized within a bounded temporal error, and a path-following algorithm that lets the vehicles track a target that moves along the planned trajectory with a bounded spatial error.

autonomy↗

Lessons Learned from Most Recent Chemical Decontamination for Decommissioning Projects - 19280

In 2017, Westinghouse performed a full system chemical decontamination of Units 1 and 2 of the Bohunice V1 Nuclear Power Plant. Bohunice V1 is a VVER 440 design with six loops. The application was performed two loops at a time, with the reactor core bypassed. The Pressurizer and Pressurizer Relief Tank (Bubble Tank) were decontaminated as well, in a separate application. This was a recovery decontamination that had been attempted by another company prior to Westinghouse. Several modifications to equipment and design of process were required to make the decontamination successful. The project was initiated to perform pre-dismantling chemical decontamination of primary circuits of both V1 units using Decontamination for Decommissioning (DfD) to meet the following objectives (see References 1 and 2 for process descriptions of DfD): - Remove activity from the primary circuit components; - Reduce dose rates around piping and components; - Simplify access to the installations, making it possible to use hands-on techniques for dismantling, rather than the more expensive use of robotics or manipulators; - Minimize the potential for spreading contamination during decommissioning activities - Reduce the activity of components that they may be disposed of at a lower classification, therefore more economical, waste disposal category. Several techniques were employed that were unique, or first of a kind, to aid in the decontamination, including resin regeneration and bypass of the reactor core, while still providing enough flow to to allow sufficient dispersal through all the steam generator tubes. Equipment that was already available on site was evaluated and, when possible, combined with Westinghouse equipment to minimize application cost and schedule. The lessons learned from the first unit (Unit 2) were applied to the second unit (Unit 1) application. The partial relocation of equipment allowed for the most efficient schedule to complete the second decontamination. The paper will describe in more detail the results and lessons learned from the full system chemical decontaminations performed, as well as updates on another recent decontamination project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗