Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Interplanetary orbit determination

The logistical aspects of orbit determination (OD) in the interplanetary phase of the Mariner Mars 1971 mission are described and the working arrangements for the OD personnel, both within the Navigation Team and with outside groups are given. Various types of data used in the OD process are presented along with sources of the data. Functional descriptions of the individual elements of the OD software and brief sketches of their modes of operation are provided.

Zielenbach, J. W.↗

Space shuttle/food system study. Volume 2, Appendix G: Ground support system analysis. Appendix H: Galley functional details analysis

The capabilities for preflight feeding of flight personnel and the supply and control of the space shuttle flight food system were investigated to determine ground support requirements; and the functional details of an onboard food system galley are shown in photographic mockups. The elements which were identified as necessary to the efficient accomplishment of ground support functions include the following: (1) administration; (2) dietetics; (3) analytical laboratories; (4) flight food warehouse; (5) stowage module assembly area; (6) launch site module storage area; (7) alert crew restaurant and disperse crew galleys; (8) ground food warehouse; (9) manufacturing facilities; (10) transport; and (11) computer support. Each element is discussed according to the design criteria of minimum cost, maximum flexibility, reliability, and efficiency consistent with space shuttle requirements. The galley mockup overview illustrates the initial operation configuration, food stowage locations, meal assembly and serving trays, meal preparation configuration, serving, trash management, and the logistics of handling and cleanup equipment.

Source record↗

Operations analysis (study 2.1): Payload designs for space servicing

Potential modes of operating in space in the space shuttle era are documented. The October 1973 NASA Mission Model provides a definition of various NASA and non-DOD automated payload configurations when employed in an expendable mode. The model also specifies a launch schedule for initial deployment of payloads as well as for subsequent replacements at periodic cycles. This model and its associated payload definitions serve as a foundation for the data presented in this report. The reference model has been revised to reflect automated space servicing of payloads as an operational concept instead of the existing expendable approach. The indication is that the bulk of a payload's subsystems and mission equipment require no support over the lifetime of the program. However, failure of a single unit could result in loss of the mission objectives. When space servicing is employed, the approach is to replace only that unit causing the anomaly. This concept affords an opportunity to standardize space replacable units, as well as to reduce the expense of logistics support, by allowing multiple servicing on any single upper stage/shuttle flight.

Wolfe, R. R.↗

Space shuttle food system study. Volume 1: System design report

Data were assembled which define the optimum food system to support the space shuttle program, and which provide sufficient engineering data to support necessary requests for proposals towards final development and installment of the system. The study approach used is outlined, along with technical data and sketches for each functional area. Logistic support analysis, system assurance, and recommendations and conclusions based on the study results are also presented.

Source record↗

Operations analysis (study 2.1). Program SEPSIM (solar electric propulsion stage simulation)

Program SEPSIM is a FORTRAN program which performs deployment, servicing, and retrieval missions to synchronous equatorial orbit using a space tug with a continuous low thrust upper stage known as a solar electric propulsion stage (SEPS). The SEPS ferries payloads back and forth between an intermediate orbit and synchronous orbit, and performs the necessary servicing maneuvers in synchronous orbit. The tug carries payloads between the orbiter and the intermediate orbit, deploys fully fueled SEPS vehicles, and retrieves exhausted SEPS vehicles when, and if, required. The program is presently contained in subroutine form in the Logistical On-orbit VEhicle Servicing (LOVES) Program, but can also be run independently with the addition of a simple driver program.

Lang, T. J.↗

Smithsonian Astrophysical Observatory's minicomputer vs. the laser

Review of some of the problems encountered in replacing a CDC 6400, that was used for supplying a network of laser tracking stations with predictions, by an 8K Data General 1200 minicomputer with a teletype for I/O. Before the replacement, the predictions were expensive to compute and to transmit, and were clumsy logistically. The achieved improvements are described, along with every step it took to accomplish them, and the incurred costs.

Cherniack, J. R.↗

Development of large earth orbital space station

This paper outlines the major aspects of the development of large earth orbital space stations. At the outset, the uses of the space station are surveyed and the major systems and configurational drivers enumerated. A representative 12-man space station, studied by the Space Division of North American Rockwell Corporation under NASA contract is described. The subsequent discussion centers around earth-to-orbit logistics and possible future missions with emphasis on the establishment of a branch station geosynchronous orbit. In dealing with the associated transportation between low and high orbits, the concept of a geospace shuttle station oscillating between near-earth and synchronous orbit is compared with conventional shuttle vehicles with chemical and nuclear propulsion. In the final part, the evolution of the 12-man space station to a larger space base is described.

Ehricke, K. A.↗

Skylab Experiment M516 - Crew Activities/Maintenance Study

Skylab required daily movement about the interior of a 340 cu m vehicle and the handling and transfer of numerous loose items. Planned and unplanned maintenance tasks were also included in the daily routine of activity. Experiment M516, Crew Activities/Maintenance Study, involved an investigation of crew activity during routine daily operations. The overall objective was to secure in-flight data relevant to the performance of tasks in the weightless environment. This paper will present an evaluation of man's ability to handle and transport items of various sizes and masses (logistics management) and to make equipment repairs (maintenance). Results and conclusions are based on subjective crew comments, motion-picture film, and television transmissions.

Bond, R. L.↗

An evaluation of SAO sites for laser operations

Operational criteria are provided for the selection of laser tracking sites for the Earth and Ocean Physics Applications Program. A compilation of data is given concerning the effect of weather conditions on laser and Baker-Nunn camera operations. These data have been gathered from the Smithsonian astrophysical observing station sites occupied since the inception of the satellite tracking program. Also given is a brief description of each site, including its characteristic weather conditions, comments on communications and logistics, and a summary of the terms of agreement under which the station is or was operated.

Thorp, J. M.↗

Conduct overall test operations and evaluate two Doppler systems to detect, track and measure velocities in aircraft wake vortices

A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.

Wilson, D. J.↗

Earth Observatory Satellite system definition study. Report no. 6: Space shuttle interfaces/utilization

The impacts of achieving compatibility of the Earth Observatory Satellite (EOS) with the space shuttle and the potential benefits of space shuttle utilization are discussed. Mission requirements and mission suitability, including the effects of multiple spacecraft missions, are addressed for the full spectrum of the missions. Design impact is assessed primarily against Mission B, but unique requirements reflected by Mission A, B, and C are addressed. The preliminary results indicated that the resupply mission had the most pronounced impact on spacecraft design and cost. Program costs are developed for the design changes necessary to achieve EOS-B compatibility with Space Shuttle operations. Non-recurring and recurring unit costs are determined, including development, test, ground support and logistics, and integration efforts. Mission suitability is addressed in terms of performance, volume, and center of gravity compatibility with both space shuttle and conventional launch vehicle capabilities.

Source record↗

EPA requirements and programs

The proposed ERTS-DCS system is designed to allow EPA the capability to evaluate, through demonstrable hardware, the effectiveness of automated data collection techniques. The total effectiveness of any system is dependent upon many factors which include equipment cost, installation, maintainability, logistic support, growth potential, flexibility and failure rate. This can best be accomplished by installing the system at an operational environmental control agency (CAMP station) to insure that valid data is being obtained and processed. Consequently, it is imperative that the equipment interface must not compromise the validity of the sensor data nor should the experimental system effect the present operations of the CAMP station. Since both the system which is presently in use and the automatic system would be in operation in parallel, conformation and comparison are readily obtained.

Koutsandreas, J. D.↗

Preliminary design polymeric materials experiment

A typical Advanced Technology Laboratory mission flight plan was developed and used as a guideline for the identification of a number of experiment considerations. The experiment logistics beginning with sample preparation and ending with sample analysis are then overlaid on the mission in order to have a complete picture of the design requirements. The results of this preliminary design study fall into two categories. First specific preliminary designs of experiment hardware which is adaptable to a variety of mission requirements. Second, identification of those mission considerations which affect hardware design and will require further definition prior to final design. Finally, a program plan is presented which will provide the necessary experiment hardware in a realistic time period to match the planned shuttle flights. A bibliography of all material reviewed and consulted but not specifically referenced is provided.

Mattingly, S. G.↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

Manned systems utilization analysis (study 2.1). Volume 3: LOVES computer simulations, results, and analyses

The LOVES computer program was employed to analyze the geosynchronous portion of the NASA's 1973 automated satellite mission model from 1980 to 1990. The objectives of the analyses were: (1) to demonstrate the capability of the LOVES code to provide the depth and accuracy of data required to support the analyses; and (2) to tradeoff the concept of space servicing automated satellites composed of replaceable modules against the concept of replacing expendable satellites upon failure. The computer code proved to be an invaluable tool in analyzing the logistic requirements of the various test cases required in the tradeoff. It is indicated that the concept of space servicing offers the potential for substantial savings in the cost of operating automated satellite systems.

Stricker, L. T.↗