Search NASA⌕ Search

SEARCH · Search NASA

Results for “Object Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Vadose Zone Model for M Pond Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for U Farm Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for T Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for A Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for A Trenches Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The scope of this ECF is to document the development and results of the A Trenches Area vadose zone model. The A Trenches Area model covers the region between the 200 East Area and southwest of the 216-B-3 Pond. The primary waste sites in this area are cribs associated with PUREX Plant (202-A).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for LW Crib Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B Plant Area vadose zone model. The B Plant Area model encompasses the region around B Plant (221-B) in the western part of 200 East Area. The plant was used to separate plutonium from irradiated fuel using the bismuth-phosphate process from 1945 to 1956, and for strontium and cesium recovery from 1968 to 1985.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3 Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3 Pond vadose zone model. The B-3 Pond model covers the main lobe of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for S Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chloiine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thmium-230 (Th-230). The simulation time struts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases ( eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user's guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User 's Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for REDOX Ponds Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for T Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-51031,Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (1-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Subscale Size and Shape on Global Energy Dissipation in a Multiscale Model of a Fiber-Reinforced Composite Exhibiting Post-Peak Strain Softening Using Abaqus and FEAMAC

A mesh objective crack band model is implemented in the generalized method of cells (GMC) micromechanics model to predict failure of a composite repeating unit cell (RUC). The micromechanics calculations are achieved using the MAC/GMC core engine within the ImMAC suite of micromechanics codes, developed at the NASA Glenn Research Center. The microscale RUC is linked to a macroscale Abaqus/Standard finite element model using the FEAMAC multiscale framework (included in the ImMAC suite). The effects of the relationship between the characteristic length of the finite element and the size of the microscale RUC on the total energy dissipation of the multiscale model are investigated. A simple 2-D composite square subjected to uniaxial tension is used to demonstrate the effects of scaling the dimensions of the RUC such that the length of the sides of the RUC are equal to the characteristic length of the finite element. These results are compared to simulations where the size of the RUC is fixed, independent of the element size. Simulations are carried out for a variety of mesh densities and element shapes, including square and triangular. Results indicate that a consistent size and shape must be used to yield preserve energy dissipation across the scales.

Pineda, Evan, J.↗

Panel-Segmentation: A Python Package for Automated Solar Array Metadata Extraction Using Satellite Imagery

The NREL Python Panel-Segmentation package is a toolkit that automates the process of extracting accurate and valuable metadata related to solar array installations, using publicly available Google Maps satellite imagery. Previously published work includes automated azimuth estimation for individual solar installations in satellite images. Our continued research focuses on automated detection and classification of solar installation mounting configuration (tracking or fixed-tilt; rooftop, ground, or carport). Specifically, a Faster-RCNN Resnet-50 feature pyramid network (FPN) model was trained and validated on 862 manually labeled satellite images. This model was used to perform object detection on satellite imagery, locating and classifying individual solar installations' mounting configuration and type. Model results showed a mean average precision score (mAP) of 77.79%, with the model strongest at detecting fixed-tilt ground mount and fixed-tilt carport installations. The object detection model and its outputs have been incorporated into the Panel-Segmentation package's automated metadata extraction pipeline, which returns the mounting configuration and azimuth for individual solar arrays in satellite imagery. The complete image data set with labels has been released on the U.S. Department of Energy (DOE) DuraMAT DataHub, to encourage further research in this area.

deep learning↗

A Variational Assimilation Method for Satellite and Conventional Data: a Revised Basic Model 2B

A variational objective analysis technique that modifies observations of temperature, height, and wind on the cyclone scale to satisfy the five 'primitive' model forecast equations is presented. This analysis method overcomes all of the problems that hindered previous versions, such as over-determination, time consistency, solution method, and constraint decoupling. A preliminary evaluation of the method shows that it converges rapidly, the divergent part of the wind is strongly coupled in the solution, fields of height and temperature are well-preserved, and derivative quantities such as vorticity and divergence are improved. Problem areas are systematic increases in the horizontal velocity components, and large magnitudes of the local tendencies of the horizontal velocity components. The preliminary evaluation makes note of these problems but detailed evaluations required to determine the origin of these problems await future research.

Achtemeier, Gary L.↗

Optimization on Manifolds via Graph Gaussian Processes

This paper integrates manifold learning techniques within a Gaussian process upper confidence bound algorithm to optimize an objective function on a manifold. Our approach is motivated by applications where a full representation of the manifold is not available and querying the objective is expensive. We rely on a point cloud of manifold samples to define a graph Gaussian process surrogate model for the objective. Query points are sequentially chosen using the posterior distribution of the surrogate model given all previous queries. We establish regret bounds in terms of the number of queries and the size of the point cloud. Several numerical examples complement the theory and illustrate the performance of our method.

Bayesian optimization↗

The NASA Orbital Debris Engineering Model 3.1: Development, Verification, and Validation

The NASA Orbital Debris Program Office has developed the Orbital Debris Engineering Model (ORDEM) primarily as a tool for spacecraft designers and other users to understand the long-term risk of collisions with orbital debris. The newest version, ORDEM 3.1, incorporates the latest and highest fidelity datasets available to build and validate representative orbital debris populations encompassing low Earth orbit (LEO) to geosynchronous orbit (GEO) altitudes for the years 2016-2050. ORDEM 3.1 models fluxes for object sizes > 10 μm within or transiting LEO and > 10 cm in GEO. The deterministic portion of the populations in ORDEM 3.1 is based on the U.S. Space Surveillance Network (SSN) catalog, which provides coverage down to approximately 10 cm in LEO and 1 m in GEO. Observational datasets from radar, in situ, and optical sources provide a foundation from which the model populations are statistically extrapolated to smaller sizes and orbit regions that are not well-covered by the SSN catalog, yet may pose the greatest threat to operational spacecraft. Objects in LEO ranging from approximately 5 mm to 10 cm are modeled using observational data from ground-based radar, namely the Haystack Ultrawideband Satellite Imaging Radar (HUSIR – formerly known as Haystack). The LEO population smaller than approximately 3 mm in size is characterized based on a reanalysis of in situ data from impacts to the windows and radiators of the U.S. Space Transportation System orbiter vehicle, i.e., the Space Shuttle. Data from impacts on the Hubble Space Telescope are also used to validate the sub-millimeter model populations in LEO. Debris in GEO with sizes ranging from 10 cm to 1 m is modeled using optical measurement data from the Michigan Orbital DEbris Survey Telescope (MODEST). Specific, major debris-producing events, including the Fengyun-1C, Iridium 33, and Cosmos 2251 debris clouds, and unique populations, such as sodium-potassium droplets, have been re-examined and are modeled and added to the ORDEM environment separately. The debris environment greater than 1 mm is forecast using NASA’s LEO-to- GEO ENvironment Debris model (LEGEND). Future explosions of intact objects and collisions involving objects greater than 10 cm are assessed statistically, and the NASA Standard Satellite Breakup Model is used to generate fragments from these events. Fragments smaller than 10 cm are further differentiated based on material density categories, i.e., high-, medium-, and low-density, to better characterize the potential debris risk posed to spacecraft. The future projection of the sub-millimeter environment is computed using a special small-particle degradation model where small particles are created from intact spacecraft and rocket bodies. This work discusses the development, features, and capabilities of the ORDEM 3.1 model; the ne new data analyses used to build the model populations; and sample verification and validation results.

Matney, M.↗

Modeling of turbulence and transition

The first objective is to evaluate current two-equation and second order closure turbulence models using available direct numerical simulations and experiments, and to identify the models which represent the state of the art in turbulence modeling. The second objective is to study the near-wall behavior of turbulence, and to develop reliable models for an engineering calculation of turbulence and transition. The third objective is to develop a two-scale model for compressible turbulence.

Shih, Tsan-Hsing↗

The development of a whole-body algorithm

The whole-body algorithm is envisioned as a mathematical model that utilizes human physiology to simulate the behavior of vital body systems. The objective of this model is to determine the response of selected body parameters within these systems to various input perturbations, or stresses. Perturbations of interest are exercise, chemical unbalances, gravitational changes and other abnormal environmental conditions. This model provides for a study of man's physiological response in various space applications, underwater applications, normal and abnormal workloads and environments, and the functioning of the system with physical impairments or decay of functioning components. Many methods or approaches to the development of a whole-body algorithm are considered. Of foremost concern is the determination of the subsystems to be included, the detail of the subsystems and the interaction between the subsystems.

Kay, F. J.↗