Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Building and Executing Aggressive Research Plans in a Large National Laboratory Consortium: Insights from the Co-Optimization of Fuels and Engines Initiative

This report describes lessons learned in the establishment, execution and termination of a large, multi-institutional consortium, derived from the Co-Optimization of Fuels and Engines experience. The decision to form a consortium comes with benefits (in advancing challenging multidisciplinary research) and costs (in time and additional management funds). Once the decision is made, key elements to a strong start include establishing a shared vision and goals; engaging an experienced project manager early; instituting feedback and oversight mechanisms to ensure relevance, strong performance, and situational awareness. Once a consortium is up and running, DOE and leadership should strike the right balance between competition and collaboration; foster an environment that builds trust; and adjust the organizational structure as needed to maintain collaboration. Finally, DOE and the labs can plan effectively for a smooth transition as a consortium winds down. This report provides some additional lessons and details on these lessons that we hope future DOE and lab leaders will find useful as they contemplate standing up new consortia.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Continuously Improving Parametric Modeling with Historical Data on the ICESat-2 Mission

This paper delves into the details of the Joint Confidence Level (JCL) process performed for the Ice, Cloud, and Land Elevation Satellite (ICESat)-2 mission and how past performance was incorporated into subsequent JCL models to enable the project to continuously analyze potential slips to their launch readiness date (LRD). One year prior to the mission Preliminary Review (mPDR), the JCL model development process began. The first model was well received at the mPDR, held on October 10, 2012, and the input received by the Standing Review Board was incorporated into the model for the official data drop for key decision point (KDP)-C. The 70% JCL results of the October 2012 mPDR model forecast an LRD of February 2017 and associated cost of $830M. This result in 2012 immediately highlighted potential challenges with the project-planned LRD of July 2016. The year following the mPDR, the project had sustained a oneyear slip in the LRD due to problematic systems engineering requirement issues which impacted all project subsystems. This slip moved the project planned LRD from July 2016 to July 2017, an additional 5 months beyond the 2012 model’s 70% JCL result for the LRD of February 2017. As the project was quickly approaching the mission Critical Design Review (mCDR), the need for reliable JCL results increased significantly. The project held discussions on the JCL modeling process and focused on the input uncertainty distributions. Specifically, to identify the uncertainty distributions that the 2012 mPDR model would have needed to produce a 70% LRD result of July 2017. This led the project to compare multiple uncertainty distributions, and ultimately spurred the project to utilize uncertainty distributions that incorporated project past performance and historical data to forecast potential LRD slips. The revised results, created in 2014 and utilizing the new uncertainty distributions, showed that with 70% confidence, the ICESat-2 mission would launch in August 2018 with a cost of $1,044M. Today, ICESat-2 is scheduled to launch on September 15, 2018 with a project management (PM) agreement value of $1,056M. This illustrates how a JCL model can be continuously improved to produce valuable results for a project, even in cases of LRD delays. The primary reason for the ICESat-2 LRD delay is due to a laser failure on the primary instrument. Laser failure was one of the highest risk and uncertainty drivers within the JCL model. The project placed the most risk in this area of the model, and the model further identified the laser as the top risk driver and contributor to the LRD result. This further illustrates how a JCL can be used to predict and quantify possible issues on new technology missions.

Krygiel, Joseph↗

V&V on a NASA Technology Demonstration Project: Low Density Supersonic Decelerator

Given their smaller budgets, but higher allowed risk posture, technology demonstration missions face different Verification and Validation (V&V) challenges than typical NASA missions. Despite these challenges, the Low Density Supersonic Decelerator (LDSD) project, managed by NASA’s Jet Propulsion Laboratory (JPL), has been extremely successful in testing new supersonic atmospheric decelerator technologies. A contribution to the project’s success is the unique V&V program that emphasized efficiency and flexibility. This paper will provide an overview of LDSD test objectives, Supersonic Flight Dynamics Tests (SFDT) performed so far, unique requirements structure and V&V processes implemented. The paper will focus on the V&V of the SFDT test architecture. Furthermore, lessons learned will also be presented at the end of the paper to aid future technology demonstration projects.

Murry, Michael L.↗

A Review of Wind Project Financing Structures in the USA

The rapid pace of wind power development in the U.S. over the last decade has outstripped the ability of most project developers to provide adequate equity capital and make efficient use of project-related tax benefits. In response, the sector has created novel project financing structures that feature varying combinations of equity capital from project developers and third-party tax-oriented investors, and in some cases commercial debt. While their origins stem from variations in the financial capacity and business objectives of wind project developers, as well as the risk tolerances and objectives of equity and debt providers, each structure is, at its core, designed to manage project risk and allocate federal tax incentives to those entities that can use them most efficiently. This article surveys the six principal financing structures through which most new utility-scale wind projects (excluding utility-owned projects) in the U.S. have been financed from 1999 to the present. These structures include simple balance-sheet finance, several varieties of all-equity special allocation partnership 'flip' structures, and two leveraged structures. In addition to describing each structure's mechanics, the article also discusses its rationale for use, the types of investors that find it appealing and why, and its relative frequency of use in the market. The article concludes with a generalized summary of how a developer might choose one structure over another.

17 WIND ENERGY↗

Image Labeler: Label Earth Science Images for Machine Learning

The application of machine learning for image-based classification of earth science phenomena, such as hurricanes, is relatively new. While extremely useful, the techniques used for image-based phenomena classification require storing and managing an abundant supply of labeled images in order to produce meaningful results. Existing methods for dataset management and labeling include maintaining categorized folders on a local machine, a process that can be cumbersome and not scalable. Image Labeler is a fast and scalable web-based tool that facilitates the rapid development of image-based earth science phenomena datasets, in order to aid deep learning application and automated image classification/detection. Image Labeler is built with modern web technologies to maximize the scalability and availability of the platform. It has a user-friendly interface that allows tagging multiple images relatively quickly. Essentially, Image Labeler improves upon existing techniques by providing researchers with a shareable source of tagged earth science images for all their machine learning needs. Here, we demonstrate Image Labeler’s current image extraction and labeling capabilities including supported data sources, spatiotemporal subsetting capabilities, individual project management and team collaboration for large scale projects.

Acharya, Ashish↗

Roles of social impact assessment practitioners

The effectiveness of social impact assessment (SIA) hinges largely on the capabilities and ethics of the practitioners, yet few studies have dedicated to discuss the expectations for these professionals. Recognising this knowledge gap, we employed the systemic review approach to construct a framework of roles of SIA practitioners from literature. Our conceptual framework encompasses eleven roles, namely project manager of SIA, practitioner of SIA methodologies, social researcher, social strategy developer, social impact management consultant, community developer, visionary, public involvement specialist, coordinator, SIA researcher, and educator. Although these roles have been stratified into three overarching categories, the project, community and SIA development, they are indeed interrelated and should be examined together. The significance of this study is threefold. First, it pioneers the study of the roles of SIA practitioners in a focused and systematic manner. Second, it informs practitioners of the expectations of them thereby fostering professionalism. Third, it prepares the public for SIAs by elucidating the functions and values of the assessment. - Highlights: • We adopt systematic review to construct a framework of roles of social impact assessment (SIA) practitioners from literature. • We use three overarching categorises to stratify the eleven roles we proposed. • This work is a novel attempt to study the work as a SIA practitioner and build a foundation for further exploration. • The framework informs practitioners of the expectations on them thus reinforcing professionalism. • The framework also prepares the public for SIAs by elucidating the functions and values of the assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AmeriFlux FLUXNET-1F US-HWB USDA ARS Pasture Sytems and Watershed Management Research Unit- Hawbecker Site

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-HWB USDA ARS Pasture Sytems and Watershed Management Research Unit- Hawbecker Site. This is the FLUXNET version of the carbon flux data for the site US-HWB USDA ARS Pasture Sytems and Watershed Management Research Unit- Hawbecker Site produced by applying the standard ONEFlux (1F) software. Site Description - Hawbecker farm is owned by Penn State University. The farming that took place was performed by their Farm Operations Division. The ground is rolling terrain, next to wooded areas, the Beef and Sheep Reasearch Farm, The University Airport, and other large fields maintained by Farm Operations. At the time of this collection period, the site housed another Meteorological Site, a Phenocam, and the GraceNet plots. Crop Rotation during period was 2 years Alfalfa, 1 year Corn for grain and 1 year Wheat.

Goslee, Sarah↗

Publicly Accessible Charging Site Host Recruitment During The EV Project

Several assumptions were established at the start of The EV Project. One of the assumptions upon which the Project was based was that plug-in electric vehicle (PEV) drivers would require some form of charging infrastructure away from their residences. The basic need for infrastructure outside the home was assumed to be a key foundation of future EV growth. This assumption was based on surveys conducted as part of the EV Project1, on previous experience of The EV Project management team with charging infrastructure deployment and use, and on a strong desire by Nissan (which was the initial PEV partner of The EV Project), to have visible away-from-home charging infrastructure to support vehicle sales. It was assumed that PEV drivers would have range anxiety and have an expectation that charging infrastructure will be there for their use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

UAS Related Activities at NASA's Dryden Flight Research Center

NASA's Dryden Flight Research Center is completing its refurbishment and initial flights of one the pre-production Global Hawk aircraft it received from the U.S. Air Force. NASA Dryden has an agreement with the Global Hawk s manufacturer, Northrop Grumman, to partner in the refurbishment and flight operations of the vehicles. The National Oceanic and Atmospheric Administration (NOAA) has also partnered on the project and is assisting NASA with project management and pilot responsibilities for the aircraft. NASA and NOAA will be using the Global Hawks to conduct earth science research. The earth science community is increasing utilizing UAS of all sizes and capabilities to collect important data on a variety of issues including important global climate change issues. To pursue the data collection needs of the science community there is a growing demand for international collaboration with respect to operating UAS in global airspace. Operations of NASA s Ikhana aircraft continued this past year. The Ikhana is a modified Predator B UAS. A UAS dedicated to research at NASA Dryden is the X-48B blended wing body research aircraft. Flight tests with the 500- pound, remotely piloted test vehicle are now in a block 4 phase involving parameter identification and maneuvers to research the limits of the engine in stall situations. NASA s participation in the blended wing body research effort is focused on fundamental, advanced flight dynamics and structural design concepts within the Subsonic Fixed Wing project, part of the Fundamental Aeronautics program managed through NASA s Aeronautics Research Mission Directorate. Potential benefits of the aircraft include increased volume for carrying capacity, efficient aerodynamics for reduced fuel burn and possibly significant reductions in noise due to propulsion integration options. NASA Dryden continues to support the UAS industry by facilitating access to three specially designated test areas on Edwards Air Force Base for the development of small UAS.

Bauer, Jeffrey E.↗

Lessons learned: Managing the development of a corporate Ada training project

The management lessons learned during the implementation of a corporate mandate to develop and deliver an effective Ada training program to all divisions are discussed. The management process involved in obtaining cooperation from all levels in the development of a corporate-wide project is described. The problem areas are identified along with some possible solutions.

Blackmon, Linda F.↗

ETM: Upper Class E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper Class E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper Class E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a discussion of questions in response to a proposal document from Aerospace Industries Association (AIA), an update on modeling and simulation work, and announcements of upcoming plans for the project.

Upper E↗

Engineering and Safety Partnership Enhances Safety of the Space Shuttle Program (SSP)

Project Management must use the risk assessment documents (RADs) as tools to support their decision making process. Therefore, these documents have to be initiated, developed, and evolved parallel to the life of the project. Technical preparation and safety compliance of these documents require a great deal of resources. Updating these documents after-the-fact not only requires substantial increase in resources - Project Cost -, but this task is also not useful and perhaps an unnecessary expense. Hazard Reports (HRs), Failure Modes and Effects Analysis (FMEAs), Critical Item Lists (CILs), Risk Management process are, among others, within this category. A positive action resulting from a strong partnership between interested parties is one way to get these documents and related processes and requirements, released and updated in useful time. The Space Shuttle Program (SSP) at the Marshall Space Flight Center has implemented a process which is having positive results and gaining acceptance within the Agency. A hybrid Panel, with equal interest and responsibilities for the two larger organizations, Safety and Engineering, is the focal point of this process. Called the Marshall Safety and Engineering Review Panel (MSERP), its charter (Space Shuttle Program Directive 110 F, April 15, 2005), and its Operating Control Plan emphasizes the technical and safety responsibilities over the program risk documents: HRs; FMEA/CILs; Engineering Changes; anomalies/problem resolutions and corrective action implementations, and trend analysis. The MSERP has undertaken its responsibilities with objectivity, assertiveness, dedication, has operated with focus, and has shown significant results and promising perspectives. The MSERP has been deeply involved in propulsion systems and integration, real time technical issues and other relevant reviews, since its conception. These activities have transformed the propulsion MSERP in a truly participative and value added panel, making a difference for the safety of the Space Shuttle Vehicle, its crew, and personnel. Because of the MSERP's valuable contribution to the assessment of safety risk for the SSP, this paper also proposes an enhanced Panel concept that takes this successful partnership concept to a higher level of 'true partnership'. The proposed panel is aimed to be responsible for the review and assessment of all risk relative to Safety for new and future aerospace and related programs.

Duarte, Alberto↗

AmeriFlux FLUXNET-1F US-RC4 Moscow Mountain on-farm site

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-RC4 Moscow Mountain on-farm site. This is the FLUXNET version of the carbon flux data for the site US-RC4 Moscow Mountain on-farm site produced by applying the standard ONEFlux (1F) software. Site Description - The Moscow Mountain On-farm site operated 2012-2016 as part of a cluster of 5 towers (RC1 to RC5) operated for the Regional Approaches to Climate Change (REACCH) USDA-supported research project. The site is located in the high precipitation agroecological zone of the Columbia Plateau’s dryland cropping region, near Moscow, Idaho. The site was managed with conventional (reduced) tillage. The crop rotation was spring barley, spring field peas, winter wheat, and spring wheat. Soils are silt loam mollisols including the Latahco, Thatuna, Southwick, and Larkin soil series. The site topography is sloping and is situated within the rolling hills of the Palouse region.

Chi, Jinshu [The Hong Kong University of Science a↗

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers

This report is a guidance document prepared for the benefit of commercial nuclear power plants’ (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile technology for the purpose of improving human performance and plant status control (PSC) for field workers in an NPP setting. This document especially is directed at NPP business managers, Electric Power Research Institute, Institute of Nuclear Power Operations, and other non-Information Technology personnel. This information is not intended to replace basic project management practices or reiterate these processes, but is to support decision-making, planning, and preparation of a business case.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Strategy Implementation Plan”

[This is part of a hypothetical scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] In prior years, as a part of efforts to strengthen and better sustain nuclear security within the State, Centralia requested through the Integrated Nuclear Security Support Plan (INSSP) framework that the International Atomic Energy Agency (IAEA) conduct an expert mission on establishing and operating a national nuclear security support centre (NSSC). After the IAEA conducted the NSSC expert mission, members of the Centralia Committee on Nuclear Security (CNS) agreed to initiate the feasibility determination phase of establishing an NSSC, in line with the systematic process recommended by the IAEA. Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, prepared a Feasibility Report in collaboration with members of the CNS and based on input gathered among relevant national stakeholders. The report was presented to the National Security Advisor (NSA), who reviewed and approved the proposal for Centralia to proceed with establishing an NSSC. After Centralia moved into the planning phase for the Centralia Nuclear Security Support Centre (CNSSC), per REF, the primary stakeholders of the centre jointly developed this strategy implementation plan, which provides an outline of the organizational structure, needs analysis, programme objectives, financial and project management, risk management, and other key aspects of the centre. This document will be reviewed and updated as necessary on a semi-annual basis during the project implementation period of establishing CNSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Failure Modes and Effects Analysis (FMEA): A Bibliography

Failure modes and effects analysis (FMEA) is a bottom-up analytical process that identifies process hazards, which helps managers understand vulnerabilities of systems, as well as assess and mitigate risk. It is one of several engineering tools and techniques available to program and project managers aimed at increasing the likelihood of safe and successful NASA programs and missions. This bibliography references 465 documents in the NASA STI Database that contain the major concepts, failure modes or failure analysis, in either the basic index of the major subject terms.

Source record↗

Is the 80 - 20 Principle a Friend or a Foe? Critical Remarks on the Dominant Flat Gradient - 17206

The well-known 80 - 20 principle, also known as the Pareto principle, describes the fact that usually 80 % of the result is achieved by 20 % of the effort, because many probability distributions are caused by a power-law. This principle is valued in the realm of project management and management in general because of the fast progress which generally takes place in the first fifth of the process. If the final result is not exactly specified or resources are spent wisely, 100 % of the planned result will be reached easily. However, in nuclear business safety is a principal parameter. Therefore precision is inevitable. In long-lasting projects the bad end of the Pareto-distribution is dominant: The very shallowly-inclined gradient at the end of the graph means that results at that point come at a very high effort and cost. The graph reaches the 100% only asymptomatically, meaning the initially projected results are never met. Especially if in earlier project phases the Pareto principle is applied very successfully, a lot of work is transferred to the future. For example, in decommissioning projects the waste often is badly characterized causing an enormous effort in the process of characterization and qualification. Especially if funding or time are limited, it is important to be aware of the asymmetric distribution of applied work and result. The 80 - 20 principle is a great advantage, if you start a project and respect the asymmetric distribution of applied resources and results in your project plan. Especially in long-lasting projects with changing perspectives, this asymmetric distribution may cause massive delays and expansion of costs, because small changes near the end cause large/big effort due to consequences on the existing data. If the proper goal of a project is not entirely known in the beginning, it is very probable that the last 5 - 10 % of the result will cause major financial threat and extensions of the estimated time frame. If funding or time are limited, it is almost impossible to readjust a project in the estimated frame of resources. In this case a complete restart of the project may be more reasonable than a long-lasting change management with uncertain results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗