Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign is a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR will, for the firsttime ever, present a need to communicate with multiple surfaceassets that are co-located on Mars in a coordinated effort toaccomplish the unified objective of fetching, transporting, andreturning samples from Mars. Currently, Mars surface assetsrelay data to and from Earth using a number of orbiters inwhat’s known as the Mars Relay Network (MRN). This networkis characterized by a small number of surface assets distributedacross the Martian globe and a larger number of orbiters toprovide relay services. As of June 2020, there are two surfaceassets for which five orbiters are providing relay. During theMSR Campaign, there will be two rovers and a lander that allwill require relay communication from a small number of Marsorbiters to meet the aggressive MSR timeline. The inversion ofthe current MRN paradigm, a system of many surface assetsrequiring relay and few orbiters to provide relay, necessitatesthe unique challenge of optimally allocating relay passes tomaximize the operational capability of all assets. The allocationmust consider a large number of trade variables includingMars asset operational requirements and Earth ground systemconstraints, including staffing schedules, operations planningacross time zones, and more. To address these telecommunicationchallenges, the Mars Asset Relay Mission Link AllocationDesign Environment (MARMLADE) tool was developed. Itis a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets andquantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbitergeometry and telecommunication capabilities provided by JPL’sTelecom Orbit Analysis and Simulation Tool (TOAST) softwareto compute which asset should get each pass based on a seriesof heuristics and predictions of all assets’ states. WithinMARMLADE, the user can provide inputs including the optionfor time-based pass splitting, fixed FWD data rate capabilities,DFE communication capabilities, and link parameters allowingfor the assessment of complex operations and hardware tradesusing surface mission operational efficiency as a primary figureof merit. As the MSR mission concepts continue to mature,MARMLADE is being used to assess ability of all MSR elementsto meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.

Lee, Charles↗

Stochastic Optimization with Risk Aversion for Virtual Power Plant Operations: A Rolling Horizon Control

While the concept of aggregating and controlling renewable distributed energy resources (DERs) to provide grid services is not new, increasing policy support of DER market participation has driven research and development in algorithms to pool DERs for economically viable market participation. Sandia National Laboratories recently undertook a three-year research program to create the components of a real-world virtual power plant (VPP) that can simultaneously participate in multiple markets. Our research extends current state-of-the-art rolling horizon control through the application of stochastic programming with risk aversion at various time resolutions. Our rolling horizon control consists of (1) day-ahead optimization to produce an hourly aggregate schedule for the VPP operator and (2) sub-hourly optimization for real-time dispatch of each VPP subresource. Both optimization routines leverage a two-stage stochastic program (SP) with risk aversion, and integrate the most up-to-date forecasts to generate probabilistic scenarios in real operating time. Our results demonstrate the benefits to the VPP operator of constructing a stochastic solution regardless of the weather. In more extreme weather, applying risk optimization strategies can dramatically increase the financial viability of the VPP. As a result, the methodologies presented here can be further tailored for optimal control of any VPP asset fleet and its operational requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

N plus 3 Advanced Concept Studies for Supersonic Commercial Transport Aircraft Entering Service in the 2030-2035 Period

Boeing, with Pratt & Whitney, General Electric, Rolls-Royce, M4 Engineering, Wyle Laboratories and Georgia Institute of Technology, conducted a study of supersonic commercial aircraft concepts and enabling technologies for the year 2030-2035 timeframe. The work defined the market and environmental/regulatory conditions that could evolve by the 2030/35 time period, from which vehicle performance goals were derived. Relevant vehicle concepts and technologies are identified that are anticipated to meet these performance and environmental goals. A series of multidisciplinary analyses trade studies considering vehicle sizing, mission performance and environmental conformity determined the appropriate concepts. Combinations of enabling technologies and the required technology performance levels needed to meet the desired goals were identified. Several high priority technologies are described in detail, including roadmaps with risk assessments that outline objectives, key technology challenges, detailed tasks and schedules and demonstrations that need to be performed. A representative configuration is provided for reference purposes, along with associated performance estimates based on these key technologies.

Welge, H. Robert↗

Privacy-Preserving Aggregation of Controllable Loads to Compensate Fluctuations in Solar Power

Cybersecurity and privacy are of the utmost importance for safe, reliable operation of the electric grid. It is well known that the increased connectivity/interoperability between all stakeholders (e.g., utilities, suppliers, and consumers) will enable personal information collection. Significant advanced metering infrastructure (AMI) deployment and demand response (DR) programs across the country, while enable enhanced automation, also generate energy data on individual consumers that can potentially be used for exploiting privacy. Inspired by existing works which consider DR, battery-based perturbation, and differential privacy noise adding, we novelly consider the aggregator (cluster) level privacy issue in the DR framework of solar photovoltaic (PV) generation following. Different from most of the existing works which mainly rely on the charging/discharging scheduling of rechargeable batteries, we utilize controllable building loads to serve as virtual storage devices to absorb a large portion of the PV genertaion while delicately keeping desired noisy terms to satisfy the differential privacy for the raw load profiles at the aggregator level. This not only ensures differential privacy, but also improves the DR efficiency in load following since part of the noisy signal in solar PV generation has been filtered out. In particular, a mixed integer quadratic optimization problem is formulated to optimally dispatch a population of on/off controllable loads to achieve this privacy-preserving DR service.

Dong, Jin↗

Alternative Test Methods for Electronic Parts

It is common practice within NASA to test electronic parts at the manufacturing lot level to demonstrate, statistically, that parts from the lot tested will not fail in service using generic application conditions. The test methods and the generic application conditions used have been developed over the years through cooperation between NASA, DoD, and industry in order to establish a common set of standard practices. These common practices, found in MIL-STD-883, MIL-STD-750, military part specifications, EEE-INST-002, and other guidelines are preferred because they are considered to be effective and repeatable and their results are usually straightforward to interpret. These practices can sometimes be unavailable to some NASA projects due to special application conditions that must be addressed, such as schedule constraints, cost constraints, logistical constraints, or advances in the technology that make the historical standards an inappropriate choice for establishing part performance and reliability. Alternate methods have begun to emerge and to be used by NASA programs to test parts individually or as part of a system, especially when standard lot tests cannot be applied. Four alternate screening methods will be discussed in this paper: Highly accelerated life test (HALT), forward voltage drop tests for evaluating wire-bond integrity, burn-in options during or after highly accelerated stress test (HAST), and board-level qualification.

Plante, Jeannette↗

A Proposed Strategy for the U.S. to Develop and Maintain a Mainstream Capability Suite ("Warehouse") for Automated/Autonomous Rendezvous and Docking in Low Earth Orbit and Beyond

The ability of space assets to rendezvous and dock/capture/berth is a fundamental enabler for numerous classes of NASA fs missions, and is therefore an essential capability for the future of NASA. Mission classes include: ISS crew rotation, crewed exploration beyond low-Earth-orbit (LEO), on-orbit assembly, ISS cargo supply, crewed satellite servicing, robotic satellite servicing / debris mitigation, robotic sample return, and robotic small body (e.g. near-Earth object, NEO) proximity operations. For a variety of reasons to be described, NASA programs requiring Automated/Autonomous Rendezvous and Docking/Capture/Berthing (AR&D) capabilities are currently spending an order-of-magnitude more than necessary and taking twice as long as necessary to achieve their AR&D capability, "reinventing the wheel" for each program, and have fallen behind all of our foreign counterparts in AR&D technology (especially autonomy) in the process. To ensure future missions' reliability and crew safety (when applicable), to achieve the noted cost and schedule savings by eliminate costs of continually "reinventing the wheel ", the NASA AR&D Community of Practice (CoP) recommends NASA develop an AR&D Warehouse, detailed herein, which does not exist today. The term "warehouse" is used herein to refer to a toolbox or capability suite that has pre-integrated selectable supply-chain hardware and reusable software components that are considered ready-to-fly, low-risk, reliable, versatile, scalable, cost-effective, architecture and destination independent, that can be confidently utilized operationally on human spaceflight and robotic vehicles over a variety of mission classes and design reference missions, especially beyond LEO. The CoP also believes that it is imperative that NASA coordinate and integrate all current and proposed technology development activities into a cohesive cross-Agency strategy to produce and utilize this AR&D warehouse. An initial estimate indicates that if NASA strategically coordinates the development of a robust AR&D capability across the Agency, the cost of implementing AR&D on a spacecraft could be reduced from roughly $70M per mission to as low as $7M per mission, and the associated development time could be reduced from 4 years to 2 years, after the warehouse is completely developed. Table 1 shows the clear long-term benefits to the Agency in term of costs and schedules for various missions. (The methods used to arrive at the Table 1 numbers is presented in Appendices A and B.)

Krishnakumar, Kalmanje S.↗

Robotics On-Board Trainer (ROBoT)

ROBoT is an on-orbit version of the ground-based Dynamics Skills Trainer (DST) that astronauts use for training on a frequent basis. This software consists of two primary software groups. The first series of components is responsible for displaying the graphical scenes. The remaining components are responsible for simulating the Mobile Servicing System (MSS), the Japanese Experiment Module Remote Manipulator System (JEMRMS), and the H-II Transfer Vehicle (HTV) Free Flyer Robotics Operations. The MSS simulation software includes: Robotic Workstation (RWS) simulation, a simulation of the Space Station Remote Manipulator System (SSRMS), a simulation of the ISS Command and Control System (CCS), and a portion of the Portable Computer System (PCS) software necessary for MSS operations. These components all run under the CentOS4.5 Linux operating system. The JEMRMS simulation software includes real-time, HIL, dynamics, manipulator multi-body dynamics, and a moving object contact model with Tricks discrete time scheduling. The JEMRMS DST will be used as a functional proficiency and skills trainer for flight crews. The HTV Free Flyer Robotics Operations simulation software adds a functional simulation of HTV vehicle controllers, sensors, and data to the MSS simulation software. These components are intended to support HTV ISS visiting vehicle analysis and training. The scene generation software will use DOUG (Dynamic On-orbit Ubiquitous Graphics) to render the graphical scenes. DOUG runs on a laptop running the CentOS4.5 Linux operating system. DOUG is an Open GL-based 3D computer graphics rendering package. It uses pre-built three-dimensional models of on-orbit ISS and space shuttle systems elements, and provides realtime views of various station and shuttle configurations.

Johnson, Genevieve↗

Microgravity effects on standardized cognitive performance measures

The purpose of this experiment, selected to fly on the International Microgravity Laboratory (IML-2) Spacelab mission, is to determine the effects of microgravity upon the cognitive skills which are critical to successful performance of many tasks on board the Space Shuttle. Six tests from the Unified Tri-service Cognitive Performance Assessment Battery (UTC-PAB) will be administered to the Mission Specialists to fulfill the goals of this experiment. These tests are based upon current theoretical models of human performance and the hypothesized effects of microgravity. The principle objective is the identification of the effects of microgravity upon specific information processing skills affecting performance from those of fatigue and shifts in work/rest cycles. Multiple measures of both short and long term fatigue will be obtained and used as a major independent variable for the analysis of these performance data. Scientific supporting studies will determine optimum practice and performance testing schedules for the astronauts. The same tests will be used post-flight to collect data on the recovery of any cognitive performance impairment compared with pre-flight, baseline levels.

Schiflett, Samuel G.↗

Enhancing Power System Operational Flexibility With Flexible Ramping Products: A Review

With the increased variability and uncertainty of net load induced from high penetrations of renewable energy resources and more flexible interchange schedules, power systems are facing great operational challenges in maintaining balance. Among these, the scarcity of ramp capability is an important culprit of power balance violations and high scarcity prices. To address this issue, market-based flexible ramping products (FRPs) have been proposed in the industry to improve the availability of ramp capacity. This paper presents an in-depth review of the modeling and implementation of FRPs. The major motivation is that although FRPs are widely discussed in the literature, it is still unclear to many how they can be incorporated into a co-optimization framework that includes energy and ancillary services. The concept and a definition of power system operational flexibility as well as the needs for FRPs are introduced. The industrial practices of implementing FRPs under different market structures are presented. Market operation issues and future research topics are also discussed. In conclusion, this paper can provide researchers and power engineers with further insights into the state of the art, technical barriers, and potential directions for FRPs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Accuracy analysis of TDRSS demand forecasts

This paper reviews Space Network (SN) demand forecasting experience over the past 16 years and describes methods used in the forecasts. The paper focuses on the Single Access (SA) service, the most sought-after resource in the Space Network. Of the ten years of actual demand data available, only the last five years (1989 to 1993) were considered predictive due to the extensive impact of the Challenger accident of 1986. NASA's Space Network provides tracking and communications services to user spacecraft such as the Shuttle and the Hubble Space Telescope. Forecasting the customer requirements is essential to planning network resources and to establishing service commitments to future customers. The lead time to procure Tracking and Data Relay Satellites (TDRS's) requires demand forecasts ten years in the future a planning horizon beyond the funding commitments for missions to be supported. The long range forecasts are shown to have had a bias toward underestimation in the 1991 -1992 period. The trend of underestimation can be expected to be replaced by overestimation for a number of years starting with 1998. At that time demand from new missions slated for launch will be larger than the demand from ongoing missions, making the potential for delay the dominant factor. If the new missions appear as scheduled, the forecasts are likely to be moderately underestimated. The SN commitment to meet the negotiated customer's requirements calls for conservatism in the forecasting. Modification of the forecasting procedure to account for a delay bias is, therefore, not advised. Fine tuning the mission model to more accurately reflect the current actual demand is recommended as it may marginally improve the first year forecasting.

Stern, Daniel C.↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

The Impact of Traffic Prioritization on Deep Space Network Mission Traffic

A select number of missions supported by NASA's Deep Space Network (DSN) are demanding very high data rates. For example, the Kepler Mission was launched March 7, 2009 and at that time required the highest data rate of any NASA mission, with maximum rates of 4.33 Mb/s being provided via Ka band downlinks. The James Webb Space Telescope will require a maximum 28 Mb/s science downlink data rate also using Ka band links; as of this writing the launch is scheduled for a June 2014 launch. The Lunar Reconnaissance Orbiter, launched June 18, 2009, has demonstrated data rates at 100 Mb/s at lunar-Earth distances using NASA's Near Earth Network (NEN) and K-band. As further advances are made in high data rate space telecommunications, particularly with emerging optical systems, it is expected that large surges in demand on the supporting ground systems will ensue. A performance analysis of the impact of high variance in demand has been conducted using our Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) simulation tool. A comparison is made regarding the incorporation of Quality of Service (QoS) mechanisms and the resulting ground-to-ground Wide Area Network (WAN) bandwidth necessary to meet latency requirements across different user missions. It is shown that substantial reduction in WAN bandwidth may be realized through QoS techniques when low data rate users with low-latency needs are mixed with high data rate users having delay-tolerant traffic.

prioritization↗

The Impact of Traffic Prioritization on Deep Space Network Mission Traffic

A select number of missions supported by NASA's Deep Space Network (DSN) are demanding very high data rates. For example, the Kepler Mission was launched March 7, 2009 and at that time required the highest data rate of any NASA mission, with maximum rates of 4.33 Mb/s being provided via Ka band downlinks. The James Webb Space Telescope will require a maximum 28 Mb/s science downlink data rate also using Ka band links; as of this writing the launch is scheduled for a June 2014 launch. The Lunar Reconnaissance Orbiter, launched June 18, 2009, has demonstrated data rates at 100 Mb/s at lunar-Earth distances using NASA's Near Earth Network (NEN) and K-band. As further advances are made in high data rate space telecommunications, particularly with emerging optical systems, it is expected that large surges in demand on the supporting ground systems will ensue. A performance analysis of the impact of high variance in demand has been conducted using our Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) simulation tool. A comparison is made regarding the incorporation of Quality of Service (QoS) mechanisms and the resulting ground-to-ground Wide Area Network (WAN) bandwidth necessary to meet latency requirements across different user missions. It is shown that substantial reduction in WAN bandwidth may be realized through QoS techniques when low data rate users with low-latency needs are mixed with high data rate users having delay-tolerant traffic.

quality of service↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

Preparation of the Multi-Site Data Processing at the Vera C. Rubin Observatory

The Vera C. Rubin Observatory’s Legacy Survey of Space and Time (LSST) Camera is scheduled to start taking data in the summer of 2025. The Data Release Production will run the LSST Science Pipe software at data facilities in the US, France and the UK. The LSST Science Pipeline consists of complex directed acyclic graphs (DAGs) of tasks. Rubin will use the Production and Distributed Analysis (PanDA) workflow and workload management system to orchestrate this complex workflow and the distribution of workloads to the data facilities. When run end-to-end by a team of data production staff, this processing (the Science Pipelines, distributed by the workflow and workload management system) is referred to as a 'campaign'. This paper describes the central services and data facility specific services that support this multi-site data process model, including the service deployment infrastructure, the workload and workflow system, the Campaign Management tools, and connection to Rubin Data Management. This paper will also mention the experience of processing the Rubin Commissioning Camera data. All these are part of the effort to scale up the processing capabilities for the expected very large data volume from the LSST Camera.

Yang, Wei [SLAC]↗

Information Power Grid: Distributed High-Performance Computing and Large-Scale Data Management for Science and Engineering

We use the term "Grid" to refer to distributed, high performance computing and data handling infrastructure that incorporates geographically and organizationally dispersed, heterogeneous resources that are persistent and supported. This infrastructure includes: (1) Tools for constructing collaborative, application oriented Problem Solving Environments / Frameworks (the primary user interfaces for Grids); (2) Programming environments, tools, and services providing various approaches for building applications that use aggregated computing and storage resources, and federated data sources; (3) Comprehensive and consistent set of location independent tools and services for accessing and managing dynamic collections of widely distributed resources: heterogeneous computing systems, storage systems, real-time data sources and instruments, human collaborators, and communications systems; (4) Operational infrastructure including management tools for distributed systems and distributed resources, user services, accounting and auditing, strong and location independent user authentication and authorization, and overall system security services The vision for NASA's Information Power Grid - a computing and data Grid - is that it will provide significant new capabilities to scientists and engineers by facilitating routine construction of information based problem solving environments / frameworks. Such Grids will knit together widely distributed computing, data, instrument, and human resources into just-in-time systems that can address complex and large-scale computing and data analysis problems. Examples of these problems include: (1) Coupled, multidisciplinary simulations too large for single systems (e.g., multi-component NPSS turbomachine simulation); (2) Use of widely distributed, federated data archives (e.g., simultaneous access to metrological, topological, aircraft performance, and flight path scheduling databases supporting a National Air Space Simulation systems}; (3) Coupling large-scale computing and data systems to scientific and engineering instruments (e.g., realtime interaction with experiments through real-time data analysis and interpretation presented to the experimentalist in ways that allow direct interaction with the experiment (instead of just with instrument control); (5) Highly interactive, augmented reality and virtual reality remote collaborations (e.g., Ames / Boeing Remote Help Desk providing field maintenance use of coupled video and NDI to a remote, on-line airframe structures expert who uses this data to index into detailed design databases, and returns 3D internal aircraft geometry to the field); (5) Single computational problems too large for any single system (e.g. the rotocraft reference calculation). Grids also have the potential to provide pools of resources that could be called on in extraordinary / rapid response situations (such as disaster response) because they can provide common interfaces and access mechanisms, standardized management, and uniform user authentication and authorization, for large collections of distributed resources (whether or not they normally function in concert). IPG development and deployment is addressing requirements obtained by analyzing a number of different application areas, in particular from the NASA Aero-Space Technology Enterprise. This analysis has focussed primarily on two types of users: the scientist / design engineer whose primary interest is problem solving (e.g. determining wing aerodynamic characteristics in many different operating environments), and whose primary interface to IPG will be through various sorts of problem solving frameworks. The second type of user is the tool designer: the computational scientists who convert physics and mathematics into code that can simulate the physical world. These are the two primary users of IPG, and they have rather different requirements. The results of the analysis of the needs of these two types of users provides a broad set of requirements that gives rise to a general set of required capabilities. The IPG project is intended to address all of these requirements. In some cases the required computing technology exists, and in some cases it must be researched and developed. The project is using available technology to provide a prototype set of capabilities in a persistent distributed computing testbed. Beyond this, there are required capabilities that are not immediately available, and whose development spans the range from near-term engineering development (one to two years) to much longer term R&D (three to six years). Additional information is contained in the original.

Johnston, William E.↗

Argobots: A Lightweight Low-Level Threading and Tasking Framework

In the past few decades, a number of user-level threading and tasking models have been proposed in the literature to address the shortcomings of OS-level threads, primarily with respect to cost and flexibility. Current state-of-the-art user-level threading and tasking models, however, are either too specific to applications or architectures or are not as powerful or flexible. In this paper, we present Argobots, a lightweight, low-level threading and tasking framework that is designed as a portable and performant substrate for high-level programming models or runtime systems. Argobots offers a carefully designed execution model that balances generality of functionality with providing a rich set of controls to allow specialization by the user or high-level programming model. We describe the design, implementation, and optimization of Argobots and present integrations with three example high-level models: OpenMP, MPI, and co-located I/O service. Evaluations show that (1) Argobots outperforms existing generic threading runtimes; (2) our OpenMP runtime offers more efficient interoperability capabilities than production OpenMP runtimes do; (3) when MPI interoperates with Argobots instead of Pthreads, it enjoys reduced synchronization costs and better latency hiding capabilities; and (4) I/O service with Argobots reduces interference with co-located applications, achieving performance competitive with that of the Pthreads version.