The New Millennium Program: Validating Advanced Technologies for Future Space Missions

This presentation reviews the activities of the New Millennium Program (NMP) in validating advanced technologies for space missions. The focus of these breakthrough technologies are to enable new capabilities to fulfill the science needs, while reducing costs of future missions. There is a broad spectrum of NMP partners, including government agencies, universities and private industry. The DS-1 was launched on October 24, 1998. Amongst the technologies validated by the NMP on DS-1 are: a Low Power Electronics Experiment, the Power Activation and Switching Module, Multi-Functional Structures. The first two of these technologies are operational and the data analysis is still ongoing. The third program is also operational, and its performance parameters have been verified. The second program, DS-2, was launched January 3 1999. It is expected to impact near Mars southern polar region on 3 December 1999. The technologies used on this mission awaiting validation are an advanced microcontroller, a power microelectronics unit, an evolved water experiment and soil thermal conductivity experiment, Lithium-Thionyl Chloride batteries, the flexible cable interconnect, aeroshell/entry system, and a compact telecom system. EO-1 on schedule for launch in December 1999 carries several technologies to be validated. Amongst these are: a Carbon-Carbon Radiator, an X-band Phased Array Antenna, a pulsed plasma thruster, a wideband advanced recorder processor, an atmospheric corrector, lightweight flexible solar arrays, Advanced Land Imager and the Hyperion instrument

Minning, Charles P.↗

Photon-Counting Multikilohertz Microlaser Altimeters for Airborne and Spaceborne Topographic Measurements

We consider the optimum design of photon-counting microlaser altimeters operating from airborne and spaceborne platforms under both day and night conditions. Extremely compact Q-switched microlaser transmitters produce trains of low energy pulses at multi-kHz rates and can easily generate subnanosecond pulse-widths for precise ranging. To guide the design, we have modeled the solar noise background and developed simple algorithms, based on Post-Detection Poisson Filtering (PDPF), to optimally extract the weak altimeter signal from a high noise background during daytime operations. Practical technology issues, such as detector and/or receiver dead times, have also been considered in the analysis. We describe an airborne prototype, being developed under NASA's instrument Incubator Program, which is designed to operate at a 10 kHz rate from aircraft cruise altitudes up to 12 km with laser pulse energies on the order of a few microjoules. We also analyze a compact and power efficient system designed to operate from Mars orbit at an altitude of 300 km and sample the Martian surface at rates up to 4.3 kHz using a 1 watt laser transmitter and an 18 cm telescope. This yields a Power-Aperture Product of 0.24 W-square meter, corresponding to a value almost 4 times smaller than the Mars Orbiting Laser Altimeter (0. 88W-square meter), yet the sampling rate is roughly 400 times greater (4 kHz vs 10 Hz) Relative to conventional high power laser altimeters, advantages of photon-counting laser altimeters include: (1) a more efficient use of available laser photons providing up to two orders of magnitude greater surface sampling rates for a given laser power-telescope aperture product; (2) a simultaneous two order of magnitude reduction in the volume, cost and weight of the telescope system; (3) the unique ability to spatially resolve the source of the surface return in a photon counting mode through the use of pixellated or imaging detectors; and (4) improved vertical and transverse spatial resolution resulting from both (1) and (3). Furthermore, because of significantly lower laser pulse energies, the microaltimeter is inherently more eyesafe to observers on the ground and less prone to internal optical damage, which can terminate a space mission prematurely.

Degnan, John J.↗

Evaluation of smart charging for electric vehicle-to-building integration: A case study

Higher electric vehicle (EV) adoption will stress the importance of demand flexibility to achieve more economic, efficient, and reliable grid operation. Charging technologies will be paramount in shifting temporally to better fit the variable generation of wind and solar. As such, analysis is warranted on the benefits of EV charge scheduling with respect to installation cost, operation cost, difficulty of implementation, and grid flexibility. We tackle this by analyzing the cost savings of implementing an EV charge scheduling infrastructure to reduce demand charges and installation costs. In this paper, we analyze a case study for operation of 16 level 2 chargers and 1 fast charger for two different building types. We then evaluate various test phases for controlling building and charging loads using an adaptive charging network (ACN) algorithm to characterize the ACN’s potential to reduce overall project cost.

30 DIRECT ENERGY CONVERSION↗

Space propulsion technology overview

Chemical and electric propulsion technologies for operations beyond the shuttle's orbit with focus on future mission needs and economic effectiveness is discussed. The adequacy of the existing propulsion state-of-the-art, barriers to its utilization, benefit of technology advances, and the prognosis for advancement are the themes of the discussion. Low-thrust propulsion for large space systems is cited as a new technology with particularly high benefit. It is concluded that the shuttle's presence for at least two decades is a legitimate basis for new propulsion technology, but that this technology must be predicted on an awareness of mission requirements, economic factors, influences of other technologies, and real constraints on its utilization.

Pelouch, J. J., Jr.↗

Integrated Refrigeration and Storage for Advanced Liquid Hydrogen Operations

NASA has used liquefied hydrogen (LH2) on a large scale since the beginning of the space program as fuel for the Centaur and Apollo upper stages, and more recently to feed the three space shuttle main engines. The LH2 systems currently in place at the Kennedy Space Center (KSC) launch pads are aging and inefficient compared to the state-of-the-art. Therefore, the need exists to explore advanced technologies and operations that can drive commodity costs down, and provide increased capabilities. The Ground Operations Demonstration Unit for Liquid Hydrogen (GODU-LH2) was developed at KSC to pursue these goals by demonstrating active thermal control of the propellant state by direct removal of heat using a cryocooler. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The key technology challenge was efficiently integrating the cryogenic refrigerator into the LH2 storage tank. A Linde LR1620 Brayton cycle refrigerator is used to produce up to 900W cooling at 20K, circulating approximately 22 g/s gaseous helium through the hydrogen via approximately 300 m of heat exchanger tubing. The GODU-LH2 system is fully operational, and is currently under test. This paper will discuss the design features of the refrigerator and storage system, as well as the current test results.

Liquefaction↗

The value of in-reservoir energy storage for flexible dispatch of geothermal power

Geothermal systems making use of advanced drilling and well stimulation techniques have the potential to provide tens to hundreds of gigawatts of clean electricity generation in the United States by 2050. With near-zero variable costs, geothermal plants have traditionally been envisioned as providing “baseload” power, generating at their maximum rated output at all times. However, as variable renewable energy sources (VREs) see greater deployment in energy markets, baseload power is becoming increasingly less competitive relative to flexible, dispatchable generation and energy storage. Herein we conduct an analysis of the potential for future geothermal plants to provide both of these services, taking advantage of the natural properties of confined, engineered geothermal reservoirs to store energy in the form of accumulated, pressurized geofluid and provide flexible load-following generation. We develop a linear optimization model based on multi-physics reservoir simulations that captures the transient pressure and flow behaviors within a confined, engineered geothermal reservoir. We then optimize the investment decisions and hourly operations of a power plant exploiting such a reservoir against a set of historical and modeled future electricity price series. Further, we find that operational flexibility and in-reservoir energy storage can significantly enhance the value of geothermal plants in markets with high VRE penetration, with energy value improvements of up to 60% relative to conventional baseload plants operating under identical conditions. Across a range of realistic subsurface and operational conditions, our modeling demonstrates that confined, engineered geothermal reservoirs can provide large and effectively free energy storage capacity, with round-trip storage efficiencies comparable to those of leading grid-scale energy storage technologies. Optimized operational strategies indicate that flexible geothermal plants can provide both short- and long-duration energy storage, prioritizing output during periods of high electricity prices. Sensitivity analysis assesses the variation in outcomes across a range of subsurface conditions and cost scenarios.

15 GEOTHERMAL ENERGY↗

The Design and Testing of the LSSIF Advanced Thermal Control System

The Life Support Systems Integration Facility (LSSIF) provides a platform to design and evaluate advanced manned space systems at NASA Johnson Space Center (JSC). The LSSIF Early Human Testing Initiative requires the integration of such subsystems to enable human occupancy of the 6 meter chamber for a 90 day closed volume test. The Advanced Thermal Control System (TCS) is an important component of the integrated system by supplying coolant to the subsystems within the chamber, such as the Air Revitalization System. The TCS incorporates an advanced high efficiency, heat pump to reject waste heat from the chamber to an external sink or 'lift' temperature that emulates a Lunar environment. The heat pump is the High Lift Heat Pump, developed by Foster-Miller, Inc., and is the main test article of the TCS. The heat pump prototype utilizes a non-CFC refrigerant in a design where the thermal requirements exceed existing terrestrial technology. These operating requirements provide a unique opportunity to design and test an advanced integrated thermal system and the associated controls. The design, control, and systems integration of the heat pump and the TCS also have terrestrial technology application. This paper addresses the design of the TCS and the heat pump, along with the control scheme to fully test the heat pump. Design approaches utilized in the LSSIF TCS are promoted for implementation in terrestrial thermal systems. The results of the preliminary thermal and fluid analyses used to develop the control of the thermal systems will also be discussed. The paper includes objectives for the 90 day human test and the test setup. Finally, conclusions will be drawn and recommendations for Earth design application are submitted.

Henson, Robert A.↗

A Vision and Roadmap for Increasing User Autonomy in Flight Operations in the National Airspace

The purpose of Air Transportation is to move people and cargo safely, efficiently and swiftly to their destinations. The companies and individuals who use aircraft for this purpose, the airspace users, desire to operate their aircraft according to a dynamically optimized business trajectory for their specific mission and operational business model. In current operations, the dynamic optimization of business trajectories is limited by constraints built into operations in the National Airspace System (NAS) for reasons of safety and operational needs of the air navigation service providers. NASA has been developing and testing means to overcome many of these constraints and permit operations to be conducted closer to the airspace user's changing business trajectory as conditions unfold before and during the flight. A roadmap of logical steps progressing toward increased user autonomy is proposed, beginning with NASA's Traffic Aware Strategic Aircrew Requests (TASAR) concept that enables flight crews to make informed, deconflicted flight-optimization requests to air traffic control. These steps include the use of data communications for route change requests and approvals, integration with time-based arrival flow management processes under development by the Federal Aviation Administration (FAA), increased user authority for defining and modifying downstream, strategic portions of the trajectory, and ultimately application of self-separation. This progression takes advantage of existing FAA NextGen programs and RTCA standards development, and it is designed to minimize the number of hardware upgrades required of airspace users to take advantage of these advanced capabilities to achieve dynamically optimized business trajectories in NAS operations. The roadmap is designed to provide operational benefits to first adopters so that investment decisions do not depend upon a large segment of the user community becoming equipped before benefits can be realized. The issues of equipment certification and operational approval of new procedures are addressed in a way that minimizes their impact on the transition by deferring a change in the assignment of separation responsibility until a large body of operational data is available to support the safety case for this change in the last roadmap step.This paper will relate the roadmap steps to ongoing activities to clarify the economics-based transition to these technologies for operational use.

Cotton, William B.↗

Design definition study of a lift/cruise fan technology V/STOL aircraft. Volume 2: Technology aircraft

Technology flight vehicles were defined for three different approaches which demonstrate the concept and characteristics of the multipurpose aircraft established for Navy missions. The propulsion system used for the various technology flight vehicles was representative of that established for the multipurpose aircraft. Existing J97-GE100 gas generators were selected based on cost, availability and exhaust characteristics. The LF459 fans were also selected and are compatible with both technology and operational vehicles. To comply with the design guideline safety criteria, it was determined that three gas generators were required to provide engine out safety in the hover flight mode. The final propulsion system established for the technology aircraft was three existing J97 gas generators powering three LF459 fans. Different aircraft candidates were evaluated for application to the three designated design approaches. Each configuration was evaluated on the basis of (1) propulsion system integration, (2) modification required, (3) pilot's visibility, (4) payload volume, and (5) adaptability to compatible location of center-of-gravity/aerodynamic center and thrust center.

Source record↗

Built-Environment Report Summary

Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. The findings presented in this presentation cannot be extended to wind energy deployments in general because of the large difference in application and technology maturity. This presentation summarizes the results of a report investigating the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology. The authors generated a series of case studies that outlines the pertinent project details, project outcomes, and lessons learned.

17 WIND ENERGY↗

Wind Turbines in the Built Environment: Summary of a Technical Report

Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. The findings presented in this presentation cannot be extended to wind energy deployments in general because of the large difference in application and technology maturity. This presentation summarizes the results of a report investigating the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology. The authors generated a series of case studies that outlines the pertinent project details, project outcomes, and lessons learned.

17 WIND ENERGY↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

Bit-parallel arithmetic in a massively-parallel associative processor

A simple but powerful new architecture based on a classical associative processor model is presented. Algorithms for performing the four basic arithmetic operations both for integer and floating point operands are described. For m-bit operands, the proposed architecture makes it possible to execute complex operations in O(m) cycles as opposed to O(m exp 2) for bit-serial machines. A word-parallel, bit-parallel, massively-parallel computing system can be constructed using this architecture with VLSI technology. The operation of this system is demonstrated for the fast Fourier transform and matrix multiplication.

Scherson, Isaac D.↗

Innovative Thermal Management & Control to Surmount Challenges of Exploring Ocean Worlds on Europa and Enceladus

Probes to penetrate the thick ice shells of our solar system’s Ocean Worlds have been studied for nearly 20 years, since scientific evidence strongly suggested a subsurface ocean on the Jupiter moon called Europa. There is keen scientific interest in exploring four significant themes on such proposed missions: 1) Geodynamics, 2) Geochemistry, 3) Habitability, and 4) Life Detection. The ice shells of Ocean Worlds are predicted to be up to 40 km thick; they exhibit extreme thermal environments, with ice temperatures from 100 K to 270 K, and extreme pressure environments from vacuum to 53 MPa. Jet Propulsion Laboratory has conducted a broad-look investigation of proposed mission concepts to Europa to identify the significant technology and operational challenges of Europa ice-penetration. The thermal-mechanical system (TMS) of an ice penetration probe (IPP) designed to access the ocean of an icy moon using radioisotope thermoelectric generators for heat and power faces technological hurdles exacerbated by severe thermal and volume constraints. This study identified thermal management and control (TMC) challenges that are strongly linked to: ice penetration start-up, mobility and navigation in the ice, communications while in the ice sheet, and detecting and avoiding in-ice hazards. The major objectives of the TMC system are: 1) Absorb internal thermal energy from the IPP radioisotope power source, 2) Maintain liquid water conditions around the IPP at all times, 3) Manage and control thermal flows from probe nose to tail, and 4) Provide pressure containment for all internal probe components. This work discusses the baseline TMC system architecture and design developed to accomplish these objectives, and survive and transit the extreme ice thicknesses in pursuit of Icy/Ocean Worlds science goals. The proposed TMC system consisting of an internal pumped two-phase fluid loop “thermal bus” for thermal energy capture, variable conductance heat pipe system for passively adaptive thermal energy transport around the probe, and water jetting system for ice cutting is described and discussed. Critical testing performed to date is described.

Lee, Kuan-Lin↗

Hanford and Savannah River Site Programmatic and Technical Integration

Abstract only. The Hanford Site and the Savannah River Site (SRS) were the primary plutonium production facilities within the U.S. nuclear weapons complex. Radioactive wastes were generated as part of these missions and are stored in similar fashion. The majority of radioactivity maintained by the two sites is located in underground carbon steel tanks in the physical form of supernatant, saltcake, or sludge. Disposition of SRS tank waste is ongoing by converting it into glass (pathway for sludge and radionuclides separated from supernatant or dissolved saltcake) or cement (pathway for the decontaminated supernatant and dissolved saltcake). Tank closure activity has also begun at SRS and will continue for the duration of mission. The Hanford tank waste inventory is roughly 2/3rds larger than SRS's by volume- but nominally half the radioactivity. The baseline disposition path includes high-level and low-activity waste vitrification with separate disposition of contact-handled transuranic tank waste. Retrieval of tank waste from aging single­ shell tanks (SSTs) into double-shell tanks (DSTs) is currently ongoing. As vitrification commences later this decade, Hanford will be in a similar operations mode as SRS. Site integration is increasing as the missions align. The ongoing integration is centered on key issues that impact both sites- regardless of mission timeframe. Three recent workshop exchanges have been held to improve communication with the primary intent of improving operations and technical work organization. The topics of these workshops are as follows: DST space utilization, optimization, and closure; Waste Feed Qualification; and, Cementitious Waste Forms. Key goals for these and future exchanges include aligning research and technology, preparing for joint initiatives (to maximize budgetary value for the customer), and reviewing lessons learned. Each site has played a leading role in the development of technology and operational practices that can be used to meet current challenges and to minimize the impact of future challenges. This paper provides an overview of the exchanges held, but predominately focuses on the team development and actions leading from the workshops.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation Deployment; NREL (National Renewable Energy Laboratory)

Automakers, commercial fleet operators, component manufacturers, and government agencies all turn to the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to help put more green vehicles on the road. The lab’s independent analysis and evaluation pinpoint fuel-efficient and low-emission strategies to support economic and operational goals, while breaking down barriers to widespread adoption. Customized assessment of existing equipment and practices, energy-saving alternatives, operational considerations, and marketplace realities factor in the multitude of variables needed to ensure meaningful performance, financial, and environmental benefits. NREL provides integrated, unbiased, 360-degree sustainable transportation deployment expertise encompassing alternative fuels, advanced vehicles, and related infrastructure. Hands-on support comes from technical experts experienced in advanced vehicle technologies, fleet operations, and field data collection coupled with extensive modeling and analysis capabilities. The lab’s research team works closely with automakers and vehicle equipment manufacturers to test, analyze, develop, and evaluate high-performance fuel-efficient technologies that meet marketplace needs.

33 ADVANCED PROPULSION SYSTEMS↗

Physical Sciences Vistas: Perspectives on Simultaneous Excellence (Issue 1, 2023)

The issue begins with an article highlighting Physics Division’s involvement in diagnostic development that led to the measurement of ignition at the National Ignition Facility at Lawrence Livermore National Laboratory. Subsequent articles transition to some of the materials development occurring in Sigma, Materials Science and Technology, and Materials Physics and Applications divisions. This is inclusive of the development of next generation moderator materials as an enabling technology of small modular reactors. These materials will most likely be qualified at a facility at Idaho National Laboratory. The issue also highlights development of novel, additively manufactured foams for next generation weapons. This work is being done in close collaboration with the Kansas City National Security Campus to enable transition of materials development to production in a more agile way. Finally, an article describes Accelerator Operations and Technology Division’s hard work to replace the legacy remote instrumentation and control equipment at the Los Alamos Neutron Science Center (LANSCE) with a modern control system. The story discusses how that engineering success will lead to improved sustainability of the beam during operation and thus a better experience for all of our collaborators and partners in the LANSCE user program.

36 MATERIALS SCIENCE↗