Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Concept definition for space station technology development experiments. Experiment definition, task 2

The second task of a study with the overall objective of providing a conceptual definition of the Technology Development Mission Experiments proposed by LaRC on space station is discussed. During this task, the information (goals, objectives, and experiment functional description) assembled on a previous task was translated into the actual experiment definition. Although still of a preliminary nature, aspects such as: environment, sensors, data acquisition, communications, handling, control telemetry requirements, crew activities, etc., were addressed. Sketches, diagrams, block diagrams, and timeline analyses of crew activities are included where appropriate.

Source record↗

Study of selected tether applications in space, phase 3, volume 2

The results of a Phase 3 study of two Selected Tether Applications in Space (STAIS); deorbit of a Shuttle and launch of an Orbital Transfer Vehicle (OTV), both from the space station using a tether were examined. The study objectives were to: perform a preliminary engineering design, define operational scenarios, develop a common cost model, perform cost benefits analyses, and develop a Work Breakdown Structure (WBS). Key features of the performance analysis were to identify the net increases in effective Shuttle cargo capability if tethers are used to assist in the deorbit of Shuttles and the launching of the OTVs from the space station and to define deployer system designs required to accomplish these tasks. Deployer concepts were designed and discussed. Operational scenarios, including timelines, for both tethered and nontethered Shuttle and OTV operations at the space station were evaluated. A summary discussion of the Selected Tether Applications Cost Model (STACOM) and the results of the cost benefits analysis are presented. Several critical technologies needed to implement tether assisted deployment of payloads are also discussed. Conclusions and recommendations are presented.

Source record↗

Telerobotic assembly of space station truss structure

Discussed are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRNS); (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, Grahme↗

Satellite lifetime prediction

Satellite lifetime predictions are critically dependent on the ability to forecast future solar and geomagnetic activity. These quantities are inputs to the atmospheric model with which values of atmospheric density are computed along a projected orbital path. Density values are combined with the predicted ballistic coefficient timeline to compute drag and predict decay histories. The major uncertainty in making predictions that pertain to the time periods that are years in the future is in the solar and geomagnetic activity projections, although the ballistic coefficient is also frequently in doubt. The study concludes that while present density models are adequate for planning, the inputs to them, particularly solar/geomagnetic activity indices, are unreliable.

Wittenstein, Gerald↗

Human factors in space station architecture 2. EVA access facility: A comparative analysis of 4 concepts for on-orbit space suit servicing

Four concepts for on-orbit spacesuit donning, doffing, servicing, check-out, egress and ingress are presented. These are: the Space Transportation System (STS) Type (shuttle system enlarged), the Transit Airlock (Shuttle Airlock with suit servicing removed from the pump-down chamber), the Suitport (a rear-entry suit mates to a port in the airlock wall), and the Crewlock (a small, individual, conformal airlock). Each of these four concepts is compared through a series of seven steps representing a typical Extra Vehicular Activity (EVA) mission: (1) Predonning suit preparation; (2) Portable Life Support System (PLSS) preparation; (3) Suit Donning and Final Check; (4) Egress/Ingress; (5) Mid-EVA rest period; (6) Post-EVA Securing; (7) Non-Routine Maintenance. The different characteristics of each concept are articulated through this step-by-step approach. Recommendations concerning an approach for further evaluations of airlock geometry, anthropometrics, ergonomics, and functional efficiency are made. The key recommendation is that before any particular airlock can be designed, the full range of spacesuit servicing functions must be considered, including timelines that are most supportive of EVA human productivity.

Cohen, Marc M.↗

The Ulysses mission

The Ulysses mission to explore the heliosphere within a few astronomical units of the sun over the full range of heliographic latitudes, thereby providing the first characterization of the uncharted third heliospheric dimension, is discussed. The scientific objectives of the mission are reviewed, and the nine flight experiments which make up the spacecraft payload are summarized. The Ulysses trajectory and mission timeline are described, as are the spacecraft itself and the mission operations. The timing of the mission with the solar cycle is discussed.

Marsden, R. G.↗

Servicing operations for the SIRTF Observatory at the Space Station

This paper describes the servicing requirements, plans, and proposed Space Station-based servicing operations for the Space Infrared Telescope Facility (SIRTF) Observatory. SIRTF is a cryogenically-cooled, long-life, one meter class space telescope which will be operated by NASA as a free-flying observatory for infrared astronomy, in the mid-1990's. To achieve its 5-year lifetime requirement (10 year goal), SIRTF must be replenished periodically with cryogenic helium and have its life-limited modular subsystems replaced; capability for contingency repair of warm components will also be provided in the Observatory design. A general description of the SIRTF Observatory is given, including options for the support systems (spacecraft). The overall servicing philosophy and plans are addressed with scheduling and needed support elements described. A proposed Space Station-based servicing scenario is described, including orbital transfer, servicing and checkout operations. A detailed description and timeline for liquid helium replenishment operations is provided, including a conceptual design and technology development program for the cryogenic helium transfer dewar (tanker). Finally, a preliminary SIRTF spares/logistics philosophy is outlined, including tradeoffs to be considered.

Wiltsee, Christopher B.↗

Development of OPTIMOD - The new Space Shuttle Orbiter/Payload Thermal Integration Model

The development of the Orbiter/Payload Thermal Integration Model (OPTIMOD), a simplified Space Shuttle Orbiter thermal math model to be used for payload thermal integration analysis, is described. The Orbiter lower fuselage math model has been reduced to the minimum level of detail consistent with accuracy requirements. Instead, an 'environment radiation sensor', a simple closed-end cylinder oriented in a fixed position with respect to the Orbiter, is introduced. Equations are presented which relate the cylinder surface heating rates to external fuselage steady-state temperatures. These equations were derived from a regression correlation analysis of steady-state Orbiter thermal solutions for 2372 points on orbit, representing a complete range of vehicle-earth-sun orientations. An exponential equation is developed to relate the steady-state data to time-variant temperatures for the particular transient attitude timeline being simulated. The accuracy of OPTIMOD is shown to be excellent in the payload bay and to compare favorably with previous models in Orbiter elements outside the bay.

Russell, David J.↗

Access flight hardware design and development

Several items were found to be of immense value in the design and development of the Assembly Concept for Construction of Erectable Space Structures (ACCESS) hardware. The early availability of mock-up and engineering test hardware helped to develop the concept and prove the feasibility of the experiment. The extensive neutral buoyancy testing was invaluable in developing the procedures and timelines, proving that the hardware functioned as intended, and effectively trained the astronauts. The early involvement of the crew systems/astronaut personnel was extremely beneficial in shaping the design to meet the EVA compatibility requirements. Also, the early definition of coupled loads and on-orbit dynamic responses can not be overemphasized due to the relative uncertainty in the magnitude of these loads and their impact on the design.

Rogers, John F.↗

Crew procedures for microwave landing system operations

The objective of this study was to identify crew procedures involved in Microwave Landing System (MLS) operations and to obtain a preliminary assessment of crew workload. The crew procedures were identified for three different complements of airborne equipment coupled to an autopilot. Using these three equipment complements, crew tasks were identified for MLS approaches and precision departures and compared to an ILS approach and a normal departure. Workload comparisons between the approaches and departures were made by using a task-timeline analysis program that obtained workload indexes, i.e., the radio of time required to complete the tasks to the time available. The results showed an increase in workload for the MLS scenario for one of the equipment complements. However, even this workload was within the capacity of two crew members.

Summers, Leland G.↗

Cockpit data management

This study is a continuation of an FAA effort to alleviate the growing problems of assimilating and managing the flow of data and flight related information in the air transport flight deck. The nature and extent of known pilot interface problems arising from new NAS data management programs were determined by a comparative timeline analysis of crew tasking requirements. A baseline of crew tasking requirements was established for conventional and advanced flight decks operating in the current NAS environment and then compared to the requirements for operation in a future NAS environment emphasizing Mode-S data link and TCAS. Results showed that a CDU-based pilot interface for Mode-S data link substantially increased crew visual activity as compared to the baseline. It was concluded that alternative means of crew interface should be available during high visual workload phases of flight. Results for TCAS implementation showed substantial visual and motor tasking increases, and that there was little available time between crew tasks during a TCAS encounter. It was concluded that additional research should be undertaken to address issues of ATC coordination and the relative benefit of high workload TCAS features.

Groce, J. L.↗

Orbiter transfer vehicle concept definition and system analysis study. Volume 4: Space station accommodations. Revision 1

A brief summary is given of the key objectives of Task 5 of the Space Station Accommodations Concept Definition. Space station accommodations were assessed and defined for each potential candidate Space-Based OTV concept and for the composite OTV fleet. To accomplish this, the functional and physical interactions between each OTV concept and the space station were defined. Then, conceptual accommodation designs were prepared and optimized for approach and configuration. Initial space station requirements were identified, including the ability to accommodate and support evolution to maturity, and then a time-phasing of accommodations was prepared showing that evolution. In the process of developing physical and functional interactions, operational requirements were defined, together with associated timelines. In that the crew complement is subject to limitations, the operational requirements derivation is biased toward automation wherever possible. For each candidate Ground-Based OTV concept, operating in conjunction with the space station, the above process was repeated.

Randall, Roger M.↗

Microgravity and Materials Processing Facility study (MMPF): Requirements and Analyses of Commercial Operations (RACO) preliminary data release

This requirements and analyses of commercial operations (RACO) study data release reflects the current status of research activities of the Microgravity and Materials Processing Facility under Modification No. 21 to NASA/MSFC Contract NAS8-36122. Section 1 includes 65 commercial space processing projects suitable for deployment aboard the Space Station. Section 2 contains reports of the R:BASE (TM) electronic data base being used in the study, synopses of the experiments, and a summary of data on the experimental facilities. Section 3 is a discussion of video and data compression techniques used as well as a mission timeline analysis.

Source record↗

Analysis of low gravity tolerance of model experiments for space station: Preliminary results for directional solidification

It has become clear from measurements of the acceleration environment in the Spacelab that the residual gravity levels on board a spacecraft in low Earth orbit can be significant and should be of concern to experimenters who wish to take advantage of the low gravity conditions on future Spacelab missions and on board the Space Station. The basic goals are to better understand the low gravity tolerance of three classes of materials science experiments: crystal growth from a melt, a vapor, and a solution. The results of the research will provide guidance toward the determination of the sensitivity of the low gravity environment, the design of the laboratory facilites, and the timelining of materials science experiments. To data, analyses of the effects of microgravity environment were, with a few exceptions, restricted to order of magnitude estimates. Preliminary results obtained from numerical models of the effects of residual steady and time dependent acceleration are reported on: heat, mass, and momentum transport during the growth of a dilute alloy by the Bridgman-Stockbarger technique, and the response of a simple fluid physics experiment involving buoyant convection in a square cavity.

Alexander, J. Iwan D.↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

A plan for time-phased incorporation of automation and robotics on the US space station

A plan for the incorporation of Automation and Robotics technology on the Space Station is presented. The time phased introduction of twenty two selected candidates is set forth in accordance with a technology development forecast. Twenty candidates were chosed primarily for their potential to relieve the crew of mundane or dangerous operations and maintenance burdens, thus freeing crew time for mission duties and enhancing safety. Two candidates were chosen based on a potential for increasing the productivity of laboratory experiments and thus directly enhancing the scientific value of the Space Station. A technology assessment for each candidate investigates present state of the art, development timelines including space qualification considerations, and potential for technology transfer to earth applications. Each candidate is evaluated using a crew workload model driven by crew size, number of pressurized U.S. modules and external payloads, which makes it possible to assess the impact of automation during a growth scenario. Costs for each increment of implementation are estimated and accumulated.

Purves, R. B.↗

Remote servicing of space systems

Space systems are difficult to maintain on orbit. The difficulty arises from the limited ability and availability of the astronaut work force in the hazardous space environment. Remote robotic manipulation can free the astronaut from the hazardous working environment while also increasing the work force. However, remote robotic servicing is not without its own set of problems and limitations, such as communication time delay and unstructured worksites. Tests and test equipment are described which are designed to increase the understanding of the remote servicing problems and to allow development of potential solutions. A half scale satellite mockup was developed for evaluating and improving upon the design of replaceable subsystems, such as batteries and electronic boxes. A servicer system, that includes a six degree of freedom PUMA 560 robot and interchangeable end effectors (tools), was developed to aid in driving out servicer design requirements. The results include the time delay impact on servicing timelines and requirements for the servicer system.

Collins, S. L.↗

Development and demonstration of an on-board mission planner for helicopters

Mission management tasks can be distributed within a planning hierarchy, where each level of the hierarchy addresses a scope of action, and associated time scale or planning horizon, and requirements for plan generation response time. The current work is focused on the far-field planning subproblem, with a scope and planning horizon encompassing the entire mission and with a response time required to be about two minutes. The far-feld planning problem is posed as a constrained optimization problem and algorithms and structural organizations are proposed for the solution. Algorithms are implemented in a developmental environment, and performance is assessed with respect to optimality and feasibility for the intended application and in comparison with alternative algorithms. This is done for the three major components of far-field planning: goal planning, waypoint path planning, and timeline management. It appears feasible to meet performance requirements on a 10 Mips flyable processor (dedicated to far-field planning) using a heuristically-guided simulated annealing technique for the goal planner, a modified A* search for the waypoint path planner, and a speed scheduling technique developed for this project.

Deutsch, Owen L.↗