Search NASA⌕ Search

SEARCH · Search NASA

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

Background: This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. Methods: Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. Results: The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. Discussion: These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Evaluation of Markerless Motion Capture for Monitoring Sensorimotor Performance

BACKGROUND Astronauts returning from long-duration exposure to microgravity frequently exhibit alterations in sensorimotor function leading to postural imbalance, impaired locomotion, and operational challenges to manual control. Mission duration and individual responses often influence both the severity of performance decrements and the variability in adaptation timelines. Postflight disruptions during functional tasks are often detected through body-worn inertial measurement unit (IMU) devices. While IMU sensors are relatively compact, the long-term wear may lead to discomfort, displacement of the sensors on the body, and restrictions in movement or crew behavior. Although IMU data offers valuable insights from a research standpoint, interpreting changes in pre- and post-flight measures can be difficult for crew support personnel beyond the research domain, which can hinder the application for medical assessments and rehabilitation. Finally, the availability of inertial sensors in-flight is limited. There is a need for unobtrusive monitoring tools to improve our ability to monitor adaptation following gravitational transitions in various postflight evaluations and rehabilitation settings. Markerless motion capture (MMC) is an evolving unobtrusive technology that builds upon decades of research with marker-based motion capture systems to provide 3D human pose estimation from multiple synchronized 2D camera views using deep learning algorithms. Markerless technology can revolutionize how data is captured pre- and post-flight and potentially in-flight during intravehicular activity by enabling pose estimation of multiple crew members from onboard camera hardware. METHODS The following presents the initial evaluation of a state-of-the-art commercial-off-the-shelf MMC system, Theia Markerless, compared to IMU devices during various ground-based functional tasks and environmental conditions. The featured functional tasks include assessments from Human Research Program (HRP) funded studies such as Sensorimotor Standard Measures and Sensorimotor Assessments. Synchronous data collected using both motion capture and IMUs are analyzed for six male and female subjects of varying anthropometry. The analysis includes limited assessments of clothing, capture volume configurations, and the tool's sensitivity to detecting performance changes after a spaceflight analog centrifuge exposure. The development of visualization tools to enhance the application of the pose estimation output is also presented. RESULTS Initial results demonstrate comparable root mean square error (RMSE) to existing literature evaluating markerless and marker-based motion capture systems. Considering the relative functional range of motion of the cervical spine, normalized error values for the markerless system’s accuracy of the head was 0.032 in pitch, 0.025 in roll, and 0.018 in yaw plane of motion across a subset of functional tasks. The raw RMSE values were 3.49, 2.25, and 2.81 degrees respectively. For the torso, results suggest normalized errors of 0.469 in pitch, 0.191 in roll, and 0.307 in yaw planes of motion and raw RMSE values of 3.52, 1.53, and 3.07 degrees respectively. The data suggests the functional demands of a particular task influences the estimation accuracy of the MMC system where more dynamic motion and cases where subjects are not upright may introduce diminished tracking accuracy. DISCUSSION The following work lays the foundation for future implementations leveraging markerless motion capture to assess the time course of recovery and provide insight for rehabilitation protocols to enhance crew readiness for the resumption of daily activities. These tools offer effective methods for anonymizing sensitive crew data, facilitating numerous applications across research, medical, and rehabilitation groups. Collaborations with the Anthropometry and Biomechanics Facility will provide further comparisons of the Markerless system to a marker-based system. ACKNOWLEDGEMENT</ This work is supported by NASA’s Exploration Systems Development Mission Directorate Mars Campaign Office Crew Health Countermeasures.

Hannah M. Weiss↗

HIGH EFFICIENCY HIGH DENSITY GAN BASED 6.6KW BI-DIRECTIONAL ON-BOARD CHARGER FOR PEVS

Executive Summary: In the 4th quarter of 2014, a program was formally initiated at Delta Products to develop and commercialize a lightweight, compact and high efficiency bi-directional on-board Charger (OBC) for plug-in electric vehicle use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE- EE0006834. Delta products was the prime contractor to DOE during the three-year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Transphorm, Inc., The Center for Power Electronics Systems (CPES) at Virginia Tech, and Fiat Chrysler Automobiles. The OBC uses novel control schemes enabled by Gallium Nitride (GaN) switches to obtain charger efficiency of 95% and reduce volume and mass by 50% of the existing state-of-the-art silicon (Si) based chargers and inverters. A Si-based bidirectional OBC is typically implemented with two separate modules: a charger and an inverter. A GaN-based bidirectional OBC can integrate both functions into a single module. It will result in substantial reductions in size, weight and cost. This enables the introduction of WBG devices in automotive production programs. The inverter function integrated with PHEV can act as emergency power source in case of power interruption. This increases the power security when the electric infrastructure is damaged by extreme weather conditions. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of OBC prototypes is described in detail. After the program history is reviewed, the key attributes of the resulting OBC are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this OBC to meet or exceed DOE's targets for this program, including: • Construction of a working product-intent prototype of a bi-directional on-board Charger (OBC); • Peak efficiency of 95% and volume reduction of 50% compared to a recent production modules of similar ratings. • Bi-directional operation at 120Vac and 240Vac in vehicle. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

30 DIRECT ENERGY CONVERSION↗

Temporal Analysis and Scene Change Detection in Multispectral Overhead Imagery

Scene change detection can be a tedious and time consuming process especially when concerning large geographical areas, and the process can be even more cumbersome when analyzing changes in an area over large spans of time. Developing a useful way to help analysts recognize at what points in time significant changes to a scene have occurred can allow them to better focus their efforts in characterizing events. Applications include: Facility monitoring, Construction chronology, Monitoring of vehicle/aircraft activity, Characterization of larger sequences of events. In large areas exceeding hundreds to thousands of square kilometers in size, it can be difficult localizing when scene changes have occurred. Analysts can spend hours going through imagery to try to identify new construction, monitor facility activities, monitor vehicle movement, etc. where the object of interest may only be a few square meters. Our goal is to help cut down this time by giving analysts change maps with hot spots of change, allowing them to focus on regions that have experienced actual change in time frames they're interested in. Additionally, by combining these change maps into layers within a data cube, analysts can examine the change maps from a temporal perspective, allowing events to be characterized over spans of time. By opening the data cube in an imaging software capable of separating the layers, we can analyze the change maps sequentially, allowing us to examine scene changes occurring over time. As an example, we examined overhead imagery from Planet Labs of what appears to be a parking lot on Fort Irwin over the course of a year using ENVI, a geospatial satellite imagery analysis software. Using ENVI, we generate a graph of changes over time, and notice a particular segment near the end of our analysis window where no changes are detected. Examination of the actual satellite imagery reveals that during this time span, the parking lot was empty. This could be due to facility shutdown for maintenance or upgrades, or possibly even total workforce/vehicle fleet movement. Information like this could help analysts better characterize events, as well as to help create clearer timelines in larger sequences of events. Workflow steps: - Collect multiple maps of the same AOI (Area of Interest) during a time span of interest; - Generate change maps from AOI maps; - Generate data cube from change maps. An analyst can use the data cube to help inspect an AOI for activities within a time span of interest. If an event of interest is discovered, the analyst can then refer to the maps corresponding to the appropriate dates and times in the data cube to see precisely what is transpiring. The biggest objective being worked on is improving the change detection methodology employed. We currently use PCA-EM (Principal Component Analysis with Expectation Maximization), but we are currently focusing on implementing IR-MAD (Iteratively Reweighted Multivariate Alteration Detection) to be used in conjunction with PCA-EM in an effort to decrease false positivity and noise in the change maps we generate.

42 ENGINEERING↗

Current Scientific Progress and Future Scientific Prospects Enabled by Spaceborne Precipitation Radar Measurements

First, we examine current scientific progress and understanding that have been possible through use of spaceborne precipitation radar measurements being provided by the TRMM and CloudSat satellites. Second, we look across a future 20-year time frame to assess how and why anticipated improvements in space radar systems will further advance scientific progress into topic areas once considered beyond the realm of space-based remote sensing. JAXA's 13.8 GHz Ku-band cross-track scanning Precipitation Radar (PR) developed for flight on NASA's non-sun-synchronous, diurnally-precessing TRMM satellite, was the first Earth radar flown in space that was designed specifically for precipitation measurement. Its proven accuracy in measuring global rainfall in the tropics and sub-tropics and its unanticipated longevity in continuing these measurements beyond a full decade have established the standards against which all follow-up and future space radars will be evaluated. In regards to the current PR measurement time series, we will discuss a selection of major scientific discoveries and impacts which have set the stage for future radar measuring systems. In fact, the 2nd contemporary space radar applicable for terrestrial precipitation measurement, i.e., JPL-CSA's 94 GHz nadir-staring Cloud Profiling Radar (CPR) flown on NASA's sun-synchronous CloudSat satellite, although designed primarily for measurement of non-precipitating cloud hydrometeors and aerosols, has also unquestionably advanced precipitation measurement because CPR's higher frequency and greatly increased sensitivity (approximately 30 dBZ) has enabled global observations of light rain rate spectrum processes (i.e., rain rates below 0.05 mm per hourand of precipitation processes in the high troposphere (particularly ice phase processes). These processes are beyond reach of the TRMM radar because the PR sensitivity limit is approximately 17 dBZ which means its lower rain rate cutoff is around 0.3 mm per hour and its vertical profiling acuity is greatly limited above the melting layer. Thus, the newer CPR measurements have become important for a variety of scientific reasons that will be highlighted and assessed. In considering scientific progress likely to stem from future precipitation radar systems, we will specifically examine possible scientific impacts from three anticipated missions for which NASA and various of its space agency partners are expected to lead the way. These three missions are: (1) the nearterm Global Precipitation Measuring (GPM) Mission; (2) the decadal timeline Aerosol and Cloud Experiment (ACE) Mission; and the post-decadal timeline NEXRAD in Space (NIS) Mission. The observational capabilities of the planned radar systems for each of these three satellite missions are distinct from each other and each provides progressive improvements in precipitation measuring and scientific research capabilities relative to where we are now -- insofar as TRMM PR and the CloudSat CPR capabilities. The potential innovations in scientific research will be discussed in a framework of likely synergisms between next-generation radar capabilities and accessible dynamical and microphysical properties that have heretofore evaded detection.

Smith, Eric A.↗

Argonne Reactor Code Software Verification and Validation Plan for the Versatile Test Reactor

This Argonne Reactor Code (ARC) software has taken a pivotal role in the design work of the Versatile Test Reactor. The ARC software itself consists of several independent or semiindependent pieces of software that are used in concert to carry out specific analysis and design objectives. In this report, we discuss the validation that is needed for the ARC software overall and discuss available, usable experimental data and how it relates to the VTR project. We also discuss the verification that is required for the ARC software with respect to its usage in the VTR project and give some concrete examples as to what it must accomplish. A list of goals for the verification and validation work are presented as the general procedure that will be implemented for every individual piece of software in ARC. The ARC software has been continuously developed for over 50 years and many of the features used for the VTR project have thus been rigorously tested for accuracy during that timeframe. The ARC software is presently under source code control and undergoes nightly regression testing of not only the individual pieces, but the interconnected aspects that are common to most analysis projects. Its greatest weakness, from a software verification and validation perspective, is both a lack of documentation and outdated documentation. As an example, much of the previous validation work will require contemporary effort to re-evaluate given the updated base data libraries and modifications to the software that have occurred since. This requires new documentation to be produced to support the usage of the software in the VTR project. The bulk of the ARC software is focused on steady state neutronics and TH behavior of a reactor system. In this regard, we have identified the ZPPR, FFTF, and EBR-II programs as the best candidates for sources of validation data for the VTR project. The ZPPR-15 series in the ZPPR program was chosen as it is the best representation of the VTR fuel form and reactor core layout of all of the ZPPR measurements. Additional support for it comes from the fact that most of the data has already been processed into usable ARC models for VTR validation. The FFTF and EBR-II reactors were both functional reactors that provide reactor scale measurements. FFTF is clearly a closer match to VTR and its startup measurements would be a very valuable validation basis. EBR-II has invaluable burnup related measurements that will play a key role in the ARC software validation work. Each piece of ARC software will require a report detailing the software verification. The validation work will be logically split into the results of modeling each identified experimental resource (ZPPR, EBR-II, FFTF). The intended timeline for the VTR project is to have the ARC software verified and validated by the end of fiscal year 2020. This is incumbent on sufficient funding allocated to V&V activities and no change in programmatic priorities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Accuracy Signal Validation Framework for Sensor Calibration Assessment in NPPs

Effective and efficient health management of sensing channels and instrumentation supports reliable and accurate process monitoring capacities in any industry. Current practice in the nuclear industry relies on periodic calibration assessment and correction activities. This time based maintenance technique consists of three steps: i) removal of sensor to a test environment, ii) testing and recalibration, and iii) reinstallation of sensor into its working environment. This procedure is highly labor intensive, adds to the outage cost and timeline, and contributes to worker radiation exposure and ALARA requirements. Furthermore, the human element contributes to error factors in all stages of the procedure. The effectiveness of this calibration procedure after sensors are returned to working environmental variables also raises concerns, and the practicability of this periodic approach is uncertain for future reactor designs with longer operating cycles between refueling outages. Studies indicate that periodic calibration assessment find only 10% of sensing instrumentations with calibration issues during a single outage (18- 24 months), meaning at least 90% of sensors are undergoing unnecessary maintenance actions. This provides an opportunity to maintain the current levels of safety and functional integrity with fewer, more targeted maintenance actions and lower economic burden. Performance-based maintenance planning shows much promise over current periodic maintenance approaches. Specifically, online monitoring (OLM) utilizes the continually collected process data to non-intrusively monitor the calibration status of process instrumentation and detect the onset of de-calibration, thereby minimizing the number of recalibration procedures required. Ultimately, this can lead to termination of time based recalibration at NPPs. OLM utilizes the process measurements made for process monitoring and control to evaluate the calibration status of the sensors and instrumentation making the measurements. OLM can detect and differentiate sensor faults and process anomalies, thus providing a valuable tool to suit the industry's and regulatory body's requirements. Though supported by more than a decade of research, OLM for sensor calibration assessment is yet to be implemented in the US fleet due to regulatory requirements and constraints. As shown in Figure 1, OLM utilizes process data to train statistical models that predict normal, error-free process behavior. Measured process values are compared with error-corrected predictions to ascertain the presence of faults. The reliability of OLM is dependent on the quality of its predictions, measured in part by the uncertainty in these predictions. This research develops a framework to accurately quantify the prediction uncertainty based on Bayesian inference techniques to provide the required confidence levels for OLM systems. The expected outcomes include signal validation by high-accuracy, high-confidence uncertainty quantification for variable sensor types and operating ranges. Furthermore, the framework will facilitate fault detection capacities and so-called virtual sensors, a capability to replace faulty sensor measurements with error-corrected values when a sensor fault is detected. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding

The primary challenge preventing the deployment of reactor designs that leverage wrought FeCrAl as an advanced light-water reactor (LWR) cladding is irradiation hardening and embrittlement. Wrought FeCrAl alloys experience a loss of post-irradiation ductility and fracture toughness under low-temperature neutron irradiation (< 350°C) resulting from the combined effects of dislocation loop formation and the irradiation-enhanced precipitation of Cr-rich alpha-prime precipitates throughout the microstructure. Over the past decade, significant improvements in our understanding regarding the effect of Cr and Al content have been enabled through neutron irradiations, but even optimized wrought alloys such as C26M remain vulnerable to brittle failure during storage, transportation, and handling following irradiation. This report summarizes multiple irradiation campaigns initiated over the past 7 years and provides recent insights into the effect of (1) minor alloying composition, (2) alloy processing strategy, (3) crystal structure, and (4) the use of advanced oxide dispersion strengthened (ODS) alloys. The first irradiation campaign irradiated body-centered cubic FeCrAl alloy C26M with and without elements such as Mo and Y. It also included face-centered cubic alumina-forming austenitic (AFA) alloys that have a steeper neutronic penalty but that have far superior high-temperature strength than wrought FeCrAl. Finally, this campaign compared conventional wrought C26M with the same material produced using modern powder metallurgical hotisostatic pressing (PM-HIP). The second irradiation campaign, initiated in 2018, irradiated wrought and FeCrAl-ODS materials up to 50 dpa to assess their irradiation resistance to high-doses. The results of this work indicate that wrought C26M suffers significant degradation following neutron irradiation at LWR-relevant temperatures regardless of Mo and Y content. The PM-HIP variant appears to be more resilient to irradiation-induced ductility loss in comparison with wrought variants but still loses almost all ductility by 8 dpa. Notably, the AFAs retained at least 5% total elongation after irradiation at the same dose and temperature condition, although additional deterioration may be expected at higher fluence levels. FeCrAl-ODS materials show the greatest promise as a transformative longer-term accident-tolerant fuel (LT-ATF) cladding material. The extruded 106ZY10C alloy retained 10% total elongation after 16 dpa irradiation and retained 8% total elongation after 50 dpa. Additional challenges with FeCrAl-ODS alloys also remain, including optimization of end cap joining methodologies, enhancement of fracture toughness, scaling production to prove economic viability, and optimizing post-pilger heat treatments to maximize ductility and irradiation resistance. This series of irradiations demonstrates the efficacy of the LWR testbed available within the United States for the rapid irradiation and down-selection of LT-ATF candidates. As the country rapidly accelerates its timeline for the deployment of advanced reactor concepts, the effective utilization of the High Flux Isotope Reactor for separate-effects style irradiations should continue to be prioritized to answer the final questions pertaining to LT-ATF candidates necessary for the deployment of advanced boiling water reactors and small modular reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Viper Science Operations: Lunar Dynamic Science Table and ‘Tracker’ Tool.

Introduction: The NASA VIPER lunar rover mission [1] presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the Lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in duration. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions will directly impact the workflow and speed with which the VIPER Science Team (VST) will be required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations [2]. The VST in the VIPER Mission Science Center (MSC) and the Mission Operations Center (MOC) shall provide mission-enhancing scientific input to guide traverse planning and drill site confirmation/selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar ISRU and exploration activities. Specifically, the VST in the MSC and MOC will provide science-driven, consensus-based, timely input and decision-making to enhance mission operations and align mission science return with broader Agency goals. They will enable the characterization of the distribution (lateral and vertical extent, concentration, variability), form (chemical/physical state of these reservoirs of lunar water and key isotopes), and context (e.g., accessibility/overburden, environment, soil mechanics, trafficability, and temperatures) of lunar polar volatiles and water content for the VIPER mission. Additionally, the MSC will be selecting or reconfirming the location and path towards and from the third drill site (Drill Site Charlie) within each Science Station [6]. To enable scientific decision-making within the operational paradigm of the VIPER lunar rover mission requires detailed articulation of the VST’s scientific objectives and goals, and the operationalization of these objectives and goals through their association with specific data products, tasks, and decisional procedures. Further, defining and tracking scientific success metrics throughout surface operations will enable the VST to have a quantified understanding of the mission’s evolving ability to accomplish the stated scientific objectives and goals both during and after the mission. This abstract provides an overview of the methods and development activities towards defining, operationalizing, and tracking scientific objectives and goals throughout VIPER surface operations. Specifically, we focus on the VIPER Lunar Dynamic Science Table (LDST) and the VIPER “Tracker” tool.

Darlene Sze Shien Lim↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

First Look Fund - An Early-Stage Aligned Intermediary to Enhance the Flow of Private Capital into Energy Companies (Final Technical Report)

The technologies required to advance society into a cleaner, better future will come from a broad range of scientific disciplines including materials science, chemistry, physics, and biology. The innovations will rely on scientific breakthroughs rather than software innovation and can be referred to as “hardtech.” These new technology developments will have vast implications across most industrial sectors: energy, materials, manufacturing, electronics, life sciences, etc. The majority of these scientific breakthroughs will be produced and developed by startup companies, which are best suited for high-risk, early-stage development work. However, a large funding gap exists between lab-scale scientific research of the startup world and industrial-scale commercialization. Activate Global, Inc (Activate), a 501(c)3 nonprofit, fills one part of this gap with the Activate Fellowship program1.To fully bridge the gap between lab and market, additional and aligned capital sources are needed. Through this project, Activate’s goals were: Research the recent history (2005-2015) of hardtech investing to discover the driving forces behind positive and negative outcomes from the viewpoint of investors.; Create a database of “technology pathways” categorized by specific technology areas and showing what technology milestones would be needed to be attractive to a partner or acquirer and what resources were available to achieve those goals.; Build a financial model supported by the data acquired that would show attractive returns were possible in early-stage hardtech investing.; Create an investment thesis around the financial model to show how attractive returns could be achieved in an early-stage hardtech-focused fund.; Publish a paper with a qualitative comparative analysis to help investors better understand driving factors of outcomes.; Share these findings with asset managers not currently investing in early-stage hardtech to attract partners to execute the investment strategy.; Implement the investment strategy and begin investing in early-stage hardtech companies through a new vehicle: First Look Fund. Through this research, Activate created a database of nearly 200 hardtech companies that exited via an M&A transaction between 2005 and 2015. Much of the data Activate obtained was nonpublic information and therefore, the database was anonymized. Activate also created the technology pathways database to help new early-stage hardtech companies define milestones, technology objectives and potential resources. Activate created a financial model with a legal structure showing that market-rate returns were possible, created an investment thesis around that model, and then shared these findings with potential partners. Finally, Activate’s research was used to publish a paper with Stanford on driving factors behind financial outcomes that will help investors better guide their portfolios. While Activate was not able to launch the First Look Fund during the project timeline, mostly due to the fallout from COVID-19 (global economic shocks decreasing interest in first time funds, inability to meet potential investors in person), the research has created enough interest for Activate to continue pursuing the goals of the project, showing the potential feasibility of the endeavor. Regardless of Activate’s ability to execute on the investment strategy, the resulting research has been downloaded, viewed, and referenced by investors and becomes another tool to encourage investment in the early-stage hardtech space.

14 SOLAR ENERGY↗

Pumped Storage Hydropower Augmented with Pressurized Air: The Ground-Level Integrated Diverse Energy Storage (GLIDES) System — GLIDES System Configurations and Use Cases

Energy storage is essential for cost-effective integration of variable renewable energy sources to support a low-carbon grid. It is also a key enabler of a modern grid infrastructure for demand management. However, several main challenges remain for different kind of energy storage technologies in grid scale deployment. Currently, the largest source of utility-scale storage and long-duration storage in the US is pumped storage hydropower (PSH). Prospect of growth in conventional PSH faces challenges that have limited its deployment over the last three decades, including high capital costs and long deployment timelines. Batteries have high energy densities and are the primary technology of choice for small-scale energy storage. Compressed air energy storage (CAES) is another large-scale energy storage technology, but there are few plants deployed worldwide. They suffer from their low round trip efficiency (RTE) due to the use of high-pressure air compressors. To address some of the challenges associated with these various storage technologies, the Ground-Level Integrated Diverse Energy Storage (GLIDES) is a modular PSH technology that was invented in 2015 at Oak Ridge National Laboratory. It utilizes gas compression to store electric energy. GLIDES stores energy by compressing gas using a liquid piston in high-pressure vessels. In doing so the vessels act as the upper reservoir in conventional PSH. Initially, the vessels are filled with gas to a prescribed pressure. To store energy, GLIDES uses a hydraulic piston pump to pump water into the pressurized vessels. As the water volume increases inside the vessels, water acts as a hydraulic piston compressing the gas on top of it. This process can be thought of as pumping water from the lower reservoir to the higher reservoir in PSH, increasing the water head. To dispatch the stored energy, the high-head water in the vessel is discharge through a high head Pelton hydraulic turbine that is connected to an electric generator. Employing high-pressure vessels enables GLIDES to reach water heads ~10-80 times higher than conventional PSH, achieving ~40 times higher energy densities, and overcomes the geographic limitation of conventional PSH. Although its energy density is much lower than that of batteries, GLIDES holds the potential advantages of having long service life, ease of system integration and being less hazardous over batteries. GLIDES prospective scalability could make it suitable for wide range of applications from behind the meter storage in buildings to grid-scale storage. It also makes it suitable for installations in densely populated urban areas where energy storage is most needed and real estate is limited. Over the last 5 years, work has focused on increasing GLIDES’ energy density, decreasing its initial capital cost of the system, and increasing its revenue potential. Several designs were developed and prototyped to verify and demonstrate the improvement in energy density. The latest prototype achieved energy density of 1.21 kWh/m 3 . Our analysis showed that it could achieve up to 1.7 kWh/m 3 with a mixture of air and carbon dioxide as the gas being compressed.

13 HYDRO ENERGY↗

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

Compressible Arch Segments for the Cigeo Access Ramps, Drifts and Vaults - A Field Test - 17011

Andra is currently implementing the detailed engineering phase of the step-wise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the requirements linked to 'Reversibility / Retrievability', at different stages of the repository life cycle (from its construction start-up to its final closure and monitoring). These reversibility requirements have a significant impact on the way Cigeo is designed, will be progressively developed, operated, later closed and monitored. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible. In that sense, the structural dimensioning of the ramps and mains, as well as that of the IL-LLW disposal vaults, is critical, since the concrete liner supporting the rock walls must last over a period of some 100 to 150 years (lapse of time during which retrieval operations are likely to take place). The present paper starts with a description of the geomechanical conditions prevailing in the Callovo-Oxfordian (COX) clay-stone formation (aka the argillite). The structural dimensioning of the IL-LLW disposal vault liner, as calculated at the end of the basic engineering phase is indicated. The thickness values obtained so far have led to considering an alternative design in which a compressible material is positioned between the concrete liner intrados and the rock walls: in such situation, the 'creeping effect' of the rock is mitigated, for a time, by the compressible material (nearly a perfect elastoplastic material), hence reducing the stress level exerted inside the concrete liner. This situation enables to significantly reduce the liner thickness and provides potentially significant saving in the construction of the works concerned (preliminary sensitivity results are given). The following part of the paper is then focused on a practical case story: a technological demonstration (still ongoing) of a tunnel boring experiment, implemented underground (in a dedicated drift of the Meuse Haute Marne URL infrastructures, at scale 1:2 of the Cigeo drifts/vaults). In this excavation and construction experiment, the tunnel boring machine (TBM) lays (via an erector) 'classical' concrete arch segments (forming a ring) in a first portion of the drift and 'compressible' ones (the compressible material is positioned on their extrados) in a second portion of the drift. The technical demonstration objective is two-fold: the capacity to lay compressible arch segments with a TBM is checked, their structural behavior (with time) is compared with that of 'classical' ones. The way the compressible material is produced and then fixed on the arch concrete segment is also documented, c/w a description of the complementary testing campaign to be carried out on a test bench (on surface) of a concrete ring (at a scale 1:2 of Cigeo) formed of compressible arch segments. This paper concludes with a timeline of the experiment. Should the results obtained provide some perspectives of technical and economic improvement (i.e. saving vis-a-vis the 'classical' solution) a decision could be taken by Andra to incorporate this alternative solution in the 'design freeze' of Cigeo underground infrastructures. The positive outcomes of this technical test campaign would also pave the way for specifying the Cigeo TBM characteristics (dimensions and handling equipment), scheduled for manufacturing order around 2020. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power Operations of the Mars Exploration Rovers

The rovers of the National Aeronautics and Space Administration’s (NASA) Mars Exploration Rovers (MER) project, Spirit (MER-A) and Opportunity (MER-B), safely landed on the surface of Mars three weeks apart during January 2004. Spirit and Opportunity were built and operated by the Jet Propulsion Laboratory (JPL), which is managed by the California Institute of Technology (Caltech) for NASA. Spirit landed at Gusev Crater, 14.8 degrees south of the equator, and operated continuously on the surface of Mars from January 4, 2004 until last contact from Spirit on March 22, 2010. Opportunity landed at Meridiani Planum, a location 2.5 degrees south of the Martian equator. Opportunity operated continuously on the Martian surface from January 25, 2004 until the last received transmission from Opportunity on June 10, 2018. The goal of the MER project was to determine if Mars ever had a habitable environment, in particular, if it ever had water. During their missions, both Spirit and Opportunity found evidence that liquid water once flowed on the surface of Mars. Both Spirit and Opportunity used a 1.33 m2 triple-junction solar array as their power sources. Based on observations of the original Mars rover, the Sojourner rover of the Mars Pathfinder mission that landed on Mars on July 4, 1997, the expectation was that the Martian dust would rapidly accumulate on the solar arrays of Spirit and Opportunity, and that the rovers would not have enough energy to continue operations after 90 Martian days (sols). Instead, due in part to lower dust accumulation rates than expected and numerous dust cleaning events, the Spirit and Opportunity rovers continued to operate on the Martian surface for over 2000 sols (MER-A) and 5000 sols (MER-B), respectively. During this time, the rovers experienced multiple Martian winters and several dust storms. Because the sources of solar array energy loss were known, the solar array energy output offered a method to scientifically estimate the loading and aeolian removal of dust from the solar arrays each sol. The MER Power operations team called this value that they calculated the solar array Dust Factor (DF). Dust Factor was defined as the fraction of sunlight that penetrates the accumulated dust on the surface of the solar array. A Dust Factor of 1.0 would indicate that the solar array was perfectly clean. A Dust Factor of 0.6 would indicate that only 60% of the available sunlight was able to penetrate the accumulated dust on the solar arrays. The MER Power subsystem operations team used the Multi-Mission Power Analysis Tool (MMPAT) to perform these Dust Factor calculations. The MMPAT software tool modeled the behavior of the solar arrays and the batteries as they interacted with the spacecraft power loads over the mission timeline. MMPAT also had knowledge (through telemetry and user inputs) of telemetered Power subsystem voltages and currents, atmospheric opacity (Tau), rover surface location, rover attitude, the planetary tilt and distance of Mars from the sun based on day of year, the instantaneous elevation of the sun based on time of day, temperatures (internal and external), terrain masking, and shadowing (due to the camera mast and antennas). Once all of the known sources of array energy loss are accounted, the remaining difference between the expected array energy and the actual array energy determines the solar array Dust Factor. The assumptions made while determining the Dust Factor are 1) that the single measured atmospheric opacity value (Tau) is constant over the course of the entire sol, 2) there is no measurable solar cell degradation, 3) there are no shorted strings and therefore, 4) all unexpected solar array energy losses are due to accumulated dust on the solar array. Although it cannot provide an absolute measure of dust loading, the determination of solar array Dust Factor provides a useful way of tracking dust accumulation and aeolian dust removal trends on Martian spacecraft. Any spacecraft on the Martian surface is vulnerable to dust, especially solar-powered spacecraft. The Spirit and Opportunity rovers were operational on the Martian surface for much longer than expected due in part to aeolian removal of dust from their solar arrays. The first few dust removal events were a pleasant surprise to the MER operations teams; however, over time a pattern began to arise. In over three Mars Years on the surface, the Power operations team tracked the solar array Dust Factor at Gusev Crater (location of MER-A) and observed that there were several significant dust removal and deposition events in Mars Year (MY) 27, even in the absence of a large dust storm. In MY 28 at Gusev Crater, the large atmospheric opacity (Tau) increase lagged significant dust removal events. Overall at Gusev Crater, there was a pattern of steady dust accumulation on the solar arrays, with a small number of significant dust cleaning events. At Meridiani Planum, where Opportunity rover operated for over seven Mars Years (late MY 26 to mid MY 34), a clear and consistent pattern of dust movement emerged. Meridiani Planum had a predictable, seasonally dependent pattern of gradual and continuous dust accumulation and removal. In summary, this paper explains the reasons for the development of the solar array Dust Factor and how it was used in mission operations. In particular, this paper describes the MMPAT software package, how it models array energy, including the important assumptions, model inputs and sources of error. And finally, this paper will show how the calculated solar array Dust Factor was used at Gusev Crater and Meridiani Planum to predict dust accumulation rates and weather patterns, and the importance of this generated data set for current and future solar- powered missions to Mars, such as the InSight lander and the planned Mars Sample Return rover.

Chin, Keith B.↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗