Search NASA⌕ Search

SEARCH · Search NASA

Results for “software validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Gain Scheduling for the Orion Launch Abort Vehicle Controller

One of NASAs challenges for the Orion vehicle is the control system design for the Launch Abort Vehicle (LAV), which is required to abort safely at any time during the atmospheric ascent portion of ight. The focus of this paper is the gain design and scheduling process for a controller that covers the wide range of vehicle configurations and flight conditions experienced during the full envelope of potential abort trajectories from the pad to exo-atmospheric flight. Several factors are taken into account in the automation process for tuning the gains including the abort effectors, the environmental changes and the autopilot modes. Gain scheduling is accomplished using a linear quadratic regulator (LQR) approach for the decoupled, simplified linear model throughout the operational envelope in time, altitude and Mach number. The derived gains are then implemented into the full linear model for controller requirement validation. Finally, the gains are tested and evaluated in a non-linear simulation using the vehicles ight software to ensure performance requirements are met. An overview of the LAV controller design and a description of the linear plant models are presented. Examples of the most significant challenges with the automation of the gain tuning process are then discussed. In conclusion, the paper will consider the lessons learned through out the process, especially in regards to automation, and examine the usefulness of the gain scheduling tool and process developed as applicable to non-Orion vehicles.

McNamara, Sara J.↗

Directed Design of Experiments for Validating Probability of Detection Capability of NDE Systems (DOEPOD)

Directed Design of Experiments for Validating Probability of Detection Capability of NDE Systems (DOEPOD) Manual v.1.2 The capability of an inspection system is established by applications of various methodologies to determine the probability of detection (POD). One accepted metric of an adequate inspection system is that there is 95% confidence that the POD is greater than 90% (90/95 POD). Design of experiments for validating probability of detection capability of nondestructive evaluation (NDE) systems (DOEPOD) is a methodology that is implemented via software to serve as a diagnostic tool providing detailed analysis of POD test data, guidance on establishing data distribution requirements, and resolving test issues. DOEPOD demands utilization of observance of occurrences. The DOEPOD capability has been developed to provide an efficient and accurate methodology that yields observed POD and confidence bounds for both Hit-Miss or signal amplitude testing. DOEPOD does not assume prescribed POD logarithmic or similar functions with assumed adequacy over a wide range of flaw sizes and inspection system technologies, so that multi-parameter curve fitting or model optimization approaches to generate a POD curve are not required. DOEPOD applications for supporting inspector qualifications is included.

Generazio, Edward R.↗

Dynamic Emulation of NASA Missions for IVandV: A Case Study of JWST and SLS

Software-Only-Simulations are an emerging but quickly developing field of study throughout NASA. The NASA Independent Verification Validation (IVV) Independent Test Capability (ITC) team has been rapidly building a collection of simulators for a wide range of NASA missions. ITC specializes in full end-to-end simulations that enable developers, VV personnel, and operators to test-as-you-fly. In four years, the team has delivered a wide variety of spacecraft simulations ranging from low complexity science missions such as the Global Precipitation Management (GPM) satellite and the Deep Space Climate Observatory (DSCOVR), to the extremely complex missions such as the James Webb Space Telescope (JWST) and Space Launch System (SLS).

Emulation↗

State Machine Modeling of the Space Launch System Solid Rocket Boosters

The Space Launch System is a Shuttle-derived heavy-lift vehicle currently in development to serve as NASA's premiere launch vehicle for space exploration. The Space Launch System is a multistage rocket with two Solid Rocket Boosters and multiple payloads, including the Multi-Purpose Crew Vehicle. Planned Space Launch System destinations include near-Earth asteroids, the Moon, Mars, and Lagrange points. The Space Launch System is a complex system with many subsystems, requiring considerable systems engineering and integration. To this end, state machine analysis offers a method to support engineering and operational e orts, identify and avert undesirable or potentially hazardous system states, and evaluate system requirements. Finite State Machines model a system as a finite number of states, with transitions between states controlled by state-based and event-based logic. State machines are a useful tool for understanding complex system behaviors and evaluating "what-if" scenarios. This work contributes to a state machine model of the Space Launch System developed at NASA Ames Research Center. The Space Launch System Solid Rocket Booster avionics and ignition subsystems are modeled using MATLAB/Stateflow software. This model is integrated into a larger model of Space Launch System avionics used for verification and validation of Space Launch System operating procedures and design requirements. This includes testing both nominal and o -nominal system states and command sequences.

model-based systems engineering↗

IV&V Planning & Execution Initiative

Independent verification and validation (IV&V) is a systems engineering discipline which seeks to provide confidence that mission-critical software-dependent systems will operate safely and achieve all mission objectives. In order to optimize application of IV&V resources, it is necessary to identify specific assurance objectives that are most likely to reveal difficulty and therefore to increase confidence. Software assurance literature deals predominantly with the code itself. However, our experience is that the most significant software-related issues are discovered via analysis of other system artifacts such as operations concepts, requirements and design. Consequently, it is desirable to, when assessing risk and defining assurance objectives, consider all facets of the software system architecture. We describe in this presentation progress and lessons learned from an IV&V capability development initiative to enhance the IV&V project planning process using all available architecture information.

Risk↗

State of the Profession Considerations: NASA Langley Research Center Capabilities / Technologies for Autonomous In-Space Assembly and Modular Persistent Assets

Successfully implementing OSAM into next generation revolutionary observatories requires integrating expertise and technologies in modular space structures, assembly operations, autonomy, and modeling/simulation. LaRC OSAM technologies/capabilities have been presented to inform the Planetary Science and Astrobiology Decadal Survey community of the robust and mature existing capability to support an OSAM based architecture for their next observatory. LaRC Structures and Assembly capabilities enable; a modular telescope architecture, high-performance structural modules, and robotic assembly techniques. LaRC Autonomy capabilities ensure that the robotic assembly will be accomplished in a safe and robust manner and only require humans in a supervisory role. The LaRC toolbox of Modeling and Simulation capabilities that is calibrated using module-level ground testing, will ensure that the performance of the fully assembled observatory, a very large zero-g system that will never be assembled/tested in a gravity environment, meets all performance requirements when it enters into service. Integrating all three LaRC capabilities and including embedded metrology, will enable servicing, repair, instrument upgrades (and/or replacement) while ensuring a very long lifetime for the observatory and providing a return-on-investment that is substantially greater than the initial cost. Further confidence will be achieved as OSAM technologies are validated in a new LaRC OSAM laboratory that allows large-scale collaborative testing of modular hardware, simulation software and algorithms, and autonomous agents.

Large space structures↗

Orbit Determination and Navigation Software Testing for the Mars Reconnaissance Orbiter

During the extended science phase of the Mars Reconnaissance Orbiter's lifecycle, the operational duties pertaining to navigation primarily involve orbit determination. The orbit determination process utilizes radiometric tracking data and is used for the prediction and reconstruction of MRO's trajectories. Predictions are done twice per week for ephemeris updates on-board the spacecraft and for planning purposes. Orbit Trim Maneuvers (OTM-s) are also designed using the predicted trajectory. Reconstructions, which incorporate a batch estimator, provide precise information about the spacecraft state to be synchronized with scientific measurements. These tasks were conducted regularly to validate the results obtained by the MRO Navigation Team. Additionally, the team is in the process of converting to newer versions of the navigation software and operating system. The capability to model multiple densities in the Martian atmosphere is also being implemented. However, testing outputs among these different configurations was necessary to ensure compliance to a satisfactory degree.

Deep Space Network↗

Thermal System Verification and Model Validation for NASA's Cryogenic Passively Cooled James Webb Space Telescope

A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location at the L2 Lagrange point. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST. The plan relies on judicious use of cryogenic and thermal design margin, a completely independent thermal modeling cross check utilizing different analysis teams and software packages, and finally, a comprehensive set of thermal tests that occur at different levels of JWST assembly. After a brief description of the JWST mission and thermal architecture, a detailed description of the three aspects of the thermal verification and model validation plan is presented.

Cleveland, Paul E.↗

Euler Calculations at Off-Design Conditions for an Inlet of Inward Turning RBCC-SSTO Vehicle

The inviscid performance of an inward turning inlet design is calculated computationally for the first time. Hypersonic vehicle designs based on the inward turning inlets have been shown analytically to have increased effective specific impulse and lower heat load than comparably designed vehicles with two-dimensional inlets. The inward turning inlets are designed inversely from inviscid stream surfaces of known flow fields. The computational study is performed on a Mach 12 inlet design to validate the performance predicted by the design code (HAVDAC) and calculate its off-design Mach number performance. The three-dimensional Euler equations are solved for Mach 4, 8, and 12 using a software package called SAM, which consists of an unstructured mesh generator (SAMmesh), a three-dimensional unstructured mesh flow solver (SAMcfd), and a CAD-based software (SAMcad). The computed momentum averaged inlet throat pressure is within 6% of the design inlet throat pressure. The mass-flux at the inlet throat is also within 7 % of the value predicted by the design code thereby validating the accuracy of the design code. The off-design Mach number results show that flow spillage is minimal, and the variation in the mass capture ratio with Mach number is comparable to an ideal 2-D inlet. The results from the inviscid flow calculations of a Mach 12 inward turning inlet indicate that the inlet design has very good on and off-design performance which makes it a promising design candidate for future air-breathing hypersonic vehicles.

Takashima, N.↗

Independent Verification and Validation (IV and V) Criteria

The purpose of this appendix is to establish quantifiable criteria for determining whether IV&V should be applied to a given software development. Since IV&V should begin in the Formulation Subprocess of a project, the process here described is based on metrics which are available before project approval.

McGill, Kenneth↗

Multidisciplinary High-Fidelity Analysis and Optimization of Aerospace Vehicles: Preliminary Results - Part 2

An objective of the High Performance Computing and Communication Program at the NASA Langley Research Center is to demonstrate multidisciplinary shape and sizing optimization of a complete aerospace vehicle configuration by using high-fidelity finite-element structural analysis and computational fluid dynamics aerodynamic analysis in a distributed, heterogeneous computing environment that includes high performance parallel computing. A software system has been designed and implemented to integrate a set of existing discipline analysis codes, some of them computationally intensive, into a distributed computational environment for the design of a high-speed civil transport configuration. The paper describes both the preliminary results from implementing and validating the multidisciplinary analysis and the results from an aerodynamic optimization. The discipline codes are integrated by using the Java programming language and a Common Object Request Broker Architecture compliant software product. A companion paper describes the formulation of the multidisciplinary analysis and optimization system.

Walsh, J. L.↗

Experimental control in software reliability certification

There is growing interest in software 'certification', i.e., confirmation that software has performed satisfactorily under a defined certification protocol. Regulatory agencies, customers, and prospective reusers all want assurance that a defined product standard has been met. In other industries, products are typically certified under protocols in which random samples of the product are drawn, tests characteristic of operational use are applied, analytical or statistical inferences are made, and products meeting a standard are 'certified' as fit for use. A warranty statement is often issued upon satisfactory completion of a certification protocol. This paper outlines specific engineering practices that must be used to preserve the validity of the statistical certification testing protocol. The assumptions associated with a statistical experiment are given, and their implications for statistical testing of software are described.

Trammell, Carmen J.↗

Validating the airborne and ground based components of a differential GPS system

A differential GPS mechanization of an external data link concept under development at NASA Ames Research Center is discussed. The system is intended to evaluate the use of differential GPS to support helicopter approach operation. Analytical techniques for static testing and evaluation of the system hardware and software performance in real time are described. Several techniques that have been used to detect and rectify a specific problem encountered during the tests are dicussed. An example of flight test results using the validated system is provided.

Edwards, F. G.↗

Applying Standard Independent Verification and Validation (IVV) Techniques Within an Agile Framework: Is There a Compatibility Issue?

Agile methods have gained wide acceptance over the past several years, to the point that they are now a standard management and execution approach for small-scale software development projects. While conventional Agile methods are not generally applicable to large multi-year and mission-critical systems, Agile hybrids are now being developed (such as SAFe) to exploit the productivity improvements of Agile while retaining the necessary process rigor and coordination needs of these projects. From the perspective of Independent Verification and Validation (IVV), however, the adoption of these hybrid Agile frameworks is becoming somewhat problematic. Hence, we find it prudent to question the compatibility of conventional IVV techniques with (hybrid) Agile practices.This paper documents our investigation of (a) relevant literature, (b) the modification and adoption of Agile frameworks to accommodate the development of large scale, mission critical systems, and (c) the compatibility of standard IVV techniques within hybrid Agile development frameworks. Specific to the latter, we found that the IVV methods employed within a hybrid Agile process can be divided into three groups: (1) early lifecycle IVV techniques that are fully compatible with the hybrid lifecycles, (2) IVV techniques that focus on tracing requirements, test objectives, etc. are somewhat incompatible, but can be tailored with a modest effort, and (3) IVV techniques involving an assessment requiring artifact completeness that are simply not compatible with hybrid Agile processes, e.g., those that assume complete requirement specification early in the development lifecycle.

Agile↗

Serial Network Flow Monitor

Using a commercial software CD and minimal up-mass, SNFM monitors the Payload local area network (LAN) to analyze and troubleshoot LAN data traffic. Validating LAN traffic models may allow for faster and more reliable computer networks to sustain systems and science on future space missions. Research Summary: This experiment studies the function of the computer network onboard the ISS. On-orbit packet statistics are captured and used to validate ground based medium rate data link models and enhance the way that the local area network (LAN) is monitored. This information will allow monitoring and improvement in the data transfer capabilities of on-orbit computer networks. The Serial Network Flow Monitor (SNFM) experiment attempts to characterize the network equivalent of traffic jams on board ISS. The SNFM team is able to specifically target historical problem areas including the SAMS (Space Acceleration Measurement System) communication issues, data transmissions from the ISS to the ground teams, and multiple users on the network at the same time. By looking at how various users interact with each other on the network, conflicts can be identified and work can begin on solutions. SNFM is comprised of a commercial off the shelf software package that monitors packet traffic through the payload Ethernet LANs (local area networks) on board ISS.

Robinson, Julie A.↗

Modal test and analysis: Multiple tests concept for improved validation of large space structure mathematical models

For the structural dynamic analysis of large space structures, the technology in structural synthesis and the development of structural analysis software have increased the capability to predict the dynamic characteristics of the structural system. The various subsystems which comprise the system are represented by various displacement functions; the displacement functions are then combined to represent the total structure. Experience has indicated that even when subsystem mathematical models are verified by test, the mathematical representations of the total system are often in error because the mathematical model of the structural elements which are significant when loads are applied at the interconnection points are not adequately verified by test. A multiple test concept, based upon the Multiple Boundary Condition Test (MBCT), is presented which will increase the accuracy of the system mathematical model by improving the subsystem test and test/analysis correlation procedure.

Wada, B. K.↗

Independent Verification and Validation Program

Presentation to be given to European Space Agency counterparts to give an overview of NASA's IVV Program and the layout and structure of the Software Testing and Research laboratory maintained at IVV. Seeking STI-ITAR review due to the international audience. Most of the information has been presented to public audiences in the past, with some variations on data, or is in the public domain.

Research↗

Fault-free performance validation of fault-tolerant multiprocessors

A validation methodology for testing the performance of fault-tolerant computer systems was developed and applied to the Fault-Tolerant Multiprocessor (FTMP) at NASA-Langley's AIRLAB facility. This methodology was claimed to be general enough to apply to any ultrareliable computer system. The goal of this research was to extend the validation methodology and to demonstrate the robustness of the validation methodology by its more extensive application to NASA's Fault-Tolerant Multiprocessor System (FTMP) and to the Software Implemented Fault-Tolerance (SIFT) Computer System. Furthermore, the performance of these two multiprocessors was compared by conducting similar experiments. An analysis of the results shows high level language instruction execution times for both SIFT and FTMP were consistent and predictable, with SIFT having greater throughput. At the operating system level, FTMP consumes 60% of the throughput for its real-time dispatcher and 5% on fault-handling tasks. In contrast, SIFT consumes 16% of its throughput for the dispatcher, but consumes 66% in fault-handling software overhead.

Czeck, Edward W.↗