Search NASA⌕ Search

SEARCH · Search NASA

Results for “styling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

A Comparison of Machine Learning Methods of Association Tested on Dense Nodal Arrays

The association of phase picks to form events is one of the fundamental components of seismology. Large and dense sensor networks, such as >1000 geophone arrays (and distributed acoustic sensing), offer unique challenges in association due to the vast numbers of observations and high likelihood of errant picks. In addition, the large number of stations can greatly increase the time it takes to perform the association. For this reason, machine learning (ML) methods might provide a more optimal method of association for such networks. In this work, we examine how well ML methods (e.g., Gaussian mixture model association, PhaseLink, and Graph Earthquake Neural Interpretation Engine) can incorporate dense seismic arrays into regional networks and how well they handle the increasing numbers of stations. Here, we test their capabilities on two dense seismic deployments, one within Rock Valley Nevada (52 nodes and a 9-station sparse local network), and the LArge-n Seismic Survey in Oklahoma dense nodal array (>1800 vertical-component geophones). Processing data from these two different styles of dense seismic deployments allows testing of how the ML algorithms can merge array data with a broader regional network, how they deal with poorly picked phases, and how they handle anthropogenic noise. We compare the ML-associated bulletins to those obtained using the Rapid Earthquake Association and Location algorithm, a more traditional method of association. We find that there are very small differences in results between the methods for small networks (<100 stations) with low pick rates. For large networks (>1000), there are enough errant picks that some of the ML methods start to create false events out of noise. We also find that the ML methods vary in computation time significantly but are all faster than the traditional method tested here.

58 GEOSCIENCES↗

Detection of a Space Capsule Entering Earth’s Atmosphere with Distributed Acoustic Sensing (DAS)

On 24 September 2023, the Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer sample return capsule (SRC) entered Earth’s atmosphere after successfully collecting samples from an asteroid. The known trajectory and timing of this return provided a rare opportunity to strategically instrument sites to record geophysical signals produced by the capsule because it travelled at hypersonic speeds through the atmosphere. For this work, we deployed two distributed acoustic sensing (DAS) interrogators to sample over 12 km of surface-draped fiber-optic cables, as well as six collocated seismometer-infrasound sensor pairs, spread across two sites near Eureka, Nevada. This campaign-style rapid deployment is the first reported recording of an SRC re-entry with any distributed fiber-optic sensing technology. The DAS interrogators recorded an impulsive arrival with an extended coda which had features that were similar to recordings from both the seismometers and infrasound sensors. While the signal-to-noise ratio of the DAS data was lower than the seismic-infrasound data, the extremely dense spacing of fiber-optic sensors allowed for more phases to be clearly distinguished and the visualization of the continuous transformation of the wavefront as it impacted the ground. Unexpectedly, the DAS recordings contain less low-frequency content than is present in both the seismic and infrasound data. The deployment conditions strongly affected the recorded DAS data; in particular, we observed that fiber selection and placement exert strong controls on data quality.

58 GEOSCIENCES↗

Integrated Monitoring Volume: A Summary of Monitoring Studies Conducted in Niagaran Carbonate Pinnacle Reefs During Enhanced Oil Recovery with CO2

This introductory report to the Integrated Monitoring Volume provides an executive summary style overview of each of the monitoring methods deployed during the MRCSP Phase III Program. Each method is discussed in detail in a separate report that together with this Executive Summary comprise the Integrated Monitoring Volume.

BHG,DAS,Monitoring,PNC,VSP,borehole gravity,distri↗

Studies of CSR and Microbunching at Jefferson Laboratory ERLs

One attractive feature of energy recovery linacs (ERLs) is they are source limited. However as beam brightness increases so too do the effects of coherent synchrotron radiation (CSR) and the microbunching instability. The Low Energy Recirculator Facility at Jefferson Laboratory provides a test bed to characterize aspects of CSR's effect on the beam by measuring the energy extraction via CSR as a function of bunch compression. Data was recorded with acceleration occurring on the rising part of the RF waveform while the full compression point was moved along the backleg of the machine and the response of the beam measured. Acceleration was moved to the falling part of the RF waveform and the experiment repeated. Initial start-to-end simulations using a 1D CSR model show good agreement with measurements. The experiment motivated the design of a modified Continuous Electron Beam Accelerator Facility-style arc with control of CSR and the microbunching gain. Insights gained from that study informed designs for recirculation arcs in an ERL-driven electron cooler for Jefferson Laboratory's Electron Ion Collider. Progress on the design and outstanding challenges of the cooler are discussed.

Tennant, C.↗

Electron bunch position determination using a high frequency button beam position monitor in the AWAKE facility

The AWAKE facility uses novel proton beam-driven plasma wakefields to accelerate electron bunches over 10m of Rubidium plasma. Precise monitoring of 2 diverse beam types necessitates an electron beam position monitor (BPM) working in a frequency regime of tens of GHz. A high frequency conical button-style BPM with a working regime of up to 40 GHz has been investigated as a way to discriminate the electromagnetic fields of 19 MeV, 4 ps electron bunches propagating spatially and temporally together with a 400 GeV, 170 ps proton bunch in the AWAKE common beamline. The sensitivity of the HF BPM to the electron beam position is determined under various beam conditions, with both electrons and protons, and integration with a TRIUMF front-end is discussed.

43 PARTICLE ACCELERATORS↗

Design and Implementation of the LLRF System for LCLS-II

The SLAC National Accelerator Laboratory is building LCLS-II, a new 4 GeV CW superconducting (SCRF) linac as a major upgrade of the existing LCLS. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded QL of ~ 4 x 10⁷. Each individual RF cavity will be powered by one 3.8 kW solid state amplifier. To ensure optimum field stability a single source single cavity control system has been chosen. It consists of a precision four channel cavity receiver and two RF stations (Forward, Reflected and Drive signals) each controlling two cavities. In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) was modeled and cavity microphonic testing has started. This paper will describe the main system elements as well as test results on LCLS-II cryomodules.

Serrano, Carlos↗

Beyond Like-for-Like: A User-centered Approach to Modernizing Legacy Applications

When modernizing a legacy application, it is easy to fall back on a like-for-like replica with new tools and updated design stylings, but this is an opportunity to explore making a more intuitive application that supports user tasks and efficiency. Rather than having a blank canvas-unburdened by legacy tech debt-to create a new application, you are working with an existing application that is integral to accelerator operations and one that expert users are already familiar with. Due to this, you might assume people will prefer the like-for-like, but you could be carrying forward the pain points, processes that are inefficient, and ultimately wind up with an application that no one wants to use because it doesn't solve existing problems. Getting users involved can make all the difference in your approach to modernizing a legacy application that caters to both newer and expert users. It also can bridge the gap between like-for-like and introducing new GUI design. Having a legacy application doesn't have to make the modernized one difficult to develop, as the existing application is a tool in how you move forward with the new application. It provides insight into areas that an application with a clean slate doesn't give you.

Polzin, M. [Fermilab]↗

SRF Systems for ASTA at Fermilab

The Advanced Superconducting Test Accelerator (ASTA) at Fermilab now being commissioned is comprised of a number of superconducting RF systems including single-cavity cryomodules and a TESLA/ILC style 8-cavity cryomodule. Two of them, 'Capture Cavity 2' and 'Cryomodule 2', have been cooled to 2 Kelvin and brought into operation. We provide an overview of the unique characteristics of each of the systems, commissioning experience, and latest results including their respective operating characteristics.

43 PARTICLE ACCELERATORS↗

First Beam and High-Gradient Cryomodule Commissioning Results of the Advanced Superconducting Test Accelerator at Fermilab

The advanced superconducting test accelerator at Fermilab has accelerated electrons to 20 MeV and, separately, the International Linear Collider (ILC) style 8-cavity cryomodule has achieved the ILC performance milestone of 31.5 MV/m per cavity. When fully completed, the accelerator will consist of a photoinjector, one ILC-type cryomodule, multiple accelerator R&D beamlines, and a downstream beamline to inject 300 MeV electrons into the Integrable Optics Test Accelerator (IOTA). We report on the results of first beam, the achievement of our cryomodule to ILC gradient specifications, and near-term future plans for the facility.

43 PARTICLE ACCELERATORS↗

Investigation of Thermal Acoustic Effects on SRF Cavities within CM1 at Fermilab

Two TESLA-style 8-cavity cryomodules have been operated at Fermilab Accelerator Science and Technology (FAST), formerly the Superconducting Radio Frequency (SRF) Accelerator Test Facility. Operational instabilities were revealed during Radio Frequency (RF) power studies. These observations were complemented by the characterization of thermal acoustic effects on cavity microphonics manifested by apparent noisy boiling of helium involving vapor bubble and liquid vibration. The thermal acoustic measurements also consider pressure and temperature spikes which drive the phenomenon at low and high frequencies.

43 PARTICLE ACCELERATORS↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Exploratory splitter bend system designs for FFA@CEBAF

An upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (JLAB) is anticipated to provide an electron beam of over 20 GeV using the existing superconducting-RF linear accelerator and new fixed-field alternating (FFA) gradient recirculation arcs made up of Halbach-style permanent magnets. In the current design, the FFA arcs will carry six beams with energies of approximately 11, 13, 16, 18, 20, and 22 GeV which will require horizontal splitter lines to match the beam from the preceding linac. In this paper, we describe two alternative splitter beamline designs that are tuned to match the beam's Twiss parameters, R56, time-of-flight, bend-plane offset, and dispersion into the FFA cells.

Accelerator Physics↗

Current status of conceptual horizontal splitter design for FFA@CEBAF energy Upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations of the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. In order to control the beam parameters through these FFA arcs, horizontal splitters must be used. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

New Progress with HF-free Chemical Finishing for Nb SRF Cavities

Jefferson Lab has implemented a bipolar pulsed electropolishing system for final chemical processing of niobium SRF cavities. This FARADAYIC bi-polar electropolishing (BPEP) has been applied to single cells, a 7-cell CEBAF C100 cavity, and to 9-cell TESLA-style cavities.* As a mechanistic characterization of the process emerges, the critical role played by the local current density during each cathodic pulse is becoming clear. This influences system and operational parameter refinement. We present current process parameters, removal characterization, and rf performance of the processed cavities. This is the fruit of collaborative work between Jefferson Lab and Faraday Technology, Inc. directed toward the routine commercialization and industrialization of niobium cavity processing. We also present supporting data from controlled-parameter coupon studies.

Tian, Hui↗

Analog Signal Multiplexing System for the Iota Proton Injector

The Fermilab Accelerator Science and Technology (FAST) Facility at FNAL is a dedicated research and development center focused on advancing particle accelerator technologies for future applications worldwide. Currently, a key objective of FAST Operations is to commission the 2.5 MeV IOTA Proton Injector (IPI) and enable proton injection into the Integrable Optics Test Accelerator (IOTA) storage ring. The low and medium-energy sections of the IPI include four frame-style dipole trims and two multi-function correctors with independently controlled coils, requiring readout of 32 analog channels for current and voltage monitoring in total. To reduce cost and optimize rack space within the PLC-based control system, a 32-to-4 analog signal multiplexing system was designed and implemented. This system enables real-time readback of excitation parameters from all magnetic correctors. This paper presents the design, construction, implementation, and performance of the multiplexing system.

MacLean, Daniel R. [Fermilab] (ORCID:0000000210103↗

Status of conceptual horizontal splitter design for FFA@CEBAF energy upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. Horizontal splitters are needed to control the beam parameters through these FFA arcs. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

Final Design of the Production SSR1 Cryomodule for PIP-II Project at Fermilab

This contribution reports the design of the production Single Spoke Resonator Type 1 Cryomodule (SSR1 CM) for the PIP-II project at Fermilab. The innovative design is based on a structure, the strongback, which supports the coldmass from the bottom, stays at room temperature during operations, and can slide longitudinally with respect to the vacuum vessel. The Fermilab style cryomodule developed for the prototype Single Spoke Resonator Type 1 (pSSR1), the prototype High Beta 650 MHz (pHB650), and preproduction Single Spoke Resonator Type 2 (ppSSR2) cryomodules is the baseline of the present design. The focus of this contribution is on the results of calculations and finite element analyses performed to optimize the critical components of the cryomodule: vacuum vessel, strongback, thermal shield, and magnetic shield.

43 PARTICLE ACCELERATORS↗

Copper plating qualification process for the fundamental power coupler waveguides for CEBAF cryomodules

To provide sufficient energy for CEBAF operation, cryomodules and components are being refurbished yearly as necessary. Copper plated fundamental power coupler waveguides are important components of the cryomodules. The integrity and quality of copper plating is critical to reduce the heat load from the waveguides into the He bath at 2.07 K. A search of copper plating resources is underway for plating or re-plating CEBAF-style waveguides. This effort ensures a continuous capability of copper plating on cryomodule components, especially on waveguides. To qualify plating vendors, the waveguide copper plating specifications were revisited, and a thorough plating evaluation process is being developed. The evaluation process ranges from coupon testing to sample waveguide qualification. Recent results are summarized and future work is planned.

Zhao, Liang↗