Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical issues”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Genome editing in pluripotent stem cells: research and therapeutic applications

Recent progress in human pluripotent stem cell (hPSC) and genome editing technologies has opened up new avenues for the investigation of human biology in health and disease as well as the development of therapeutic applications. Gene editing approaches with programmable nucleases have been successfully established in hPSCs and applied to study gene function, develop novel animal models and perform genetic and chemical screens. Several studies now show the successful editing of disease-linked alleles in somatic and patient-derived induced pluripotent stem cells (iPSCs) as well as in animal models. Importantly, initial clinical trials have shown the safety of programmable nucleases for ex vivo somatic gene therapy. In this context, the unlimited proliferation potential and the pluripotent properties of iPSCs may offer advantages for gene targeting approaches. However, many technical and safety issues still need to be addressed before genome-edited iPSCs are translated into the clinical setting. Here, we provide an overview of the available genome editing systems and discuss opportunities and perspectives for their application in basic research and clinical practice, with a particular focus on hPSC based research and gene therapy approaches. Finally, we discuss recent research on human germline genome editing and its social and ethical implications. - Highlights: • Programmable nucleases have proven efficient and specific for genome editing in human pluripotent stem cells (hPSCs). • Genome edited hPSCs can be employed to study gene function in health and disease as well as drug and chemical screens. • Genome edited hPSCs hold great promise for ex vivo gene therapy approaches. • Technical and safety issues should be first addressed to advance the clinical use of gene-edited hPSCs.

60 APPLIED LIFE SCIENCES↗

The Cost of (In-) Accurate Waste Characterization in the U.S. Nuclear Power Industry - 20066

Proper disposal of waste has never been a human priority. Our history is full of examples of throwing away things with minimal effort or thought to consequence. That is until disease or toxicity become apparent and we realize we need to change. Unfortunately, we almost never have all the information we need at the time we make decisions. In addition to the technical and scientific issues, profits and politics are also factors. Newton's third law also applies to politics and so for every policy (action) put in place, there will be (opposite reaction) forces in play to push back against it. These forces are seldom balanced and so the reaction to the discovery of harm is to over-correct and destroy the benefit to be had. This of course causes those who want the benefit, or profit from it, to work to undermine or repeal those measures put in place to eliminate the harm. The issue is exacerbated when the problem to be solved is highly technical and at the edge of our science so that the harm and benefit cannot be easily or accurately quantified. At these times, reason often goes out the window and our decision makers are influenced by either greed or fear as these emotions are much easier to stoke. Those of us in the middle, with the charge to 'do the right thing for the least cost', are therefore frequently constrained and forced into actions that are neither technically the right thing to do and not cost effective. The cost of radioactive waste disposal is based on the concentrations of various radioisotopes in the waste. Some of these isotopes are relatively easy to quantify and some are not. Most laboratory methods for quantification are limited in the amount of activity that can be present during the measurement process. Current nuclear plants were not designed with the idea that taking truly representative waste samples would be important. The limits used to define waste class and therefore cost are precisely defined but the methods for determining those concentrations are far less precise. Improving the accuracy of radioactivity concentrations in waste and having consistent and reasonable oversight can reduce waste costs through active management of the process. So what can we do about it? Science may provide an answer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Review of Hydrogen/Halogen Flow Cells

Flow batteries provide an energy-storage solution for various grid-related stability and service issues that arise as renewable-energy-generation technologies are adopted. Among the most promising flow-battery systems are those using hydrogen/halogen redox couples, which promise the possibility of meeting the cost target of the US Department of Energy (DOE), due to their fast and reversible kinetics and low materials cost. However, significant critical issues and barriers for their adoption remain. In this review of halogen/hydrogen systems, technical and performance issues, and research and development progress are reviewed. The information in this review can be used as a technical guide for research and development of related redox-flow-battery systems and other electrochemical technologies.

25 ENERGY STORAGE↗

An Effective Health and Medical Technical Authority

The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that risk acceptance and risk trades will be acknowledged and sanctioned at the highest appropriate level; this includes Program Managers, Mission Directorate Associate Administrators and the Agency Administrator.

Fogarty, Jennifer A.↗

Recurring Causes of Human Spaceflight Mishaps during Flight Tests and Early Operations

n analysis of recurring causes underlying human spaceflight mishaps that occurred during flight tests and early operations was performed. Eight mishaps from the Apollo, Soyuz, Skylab, Space Shuttle, and Constellation Programs (i.e., the Ares-1X test flight) and commercial suborbital systems were included in the study. Detailed event analyses were performed for the historical mishaps and aggregate data analyses conducted to identify recurring issues. The nine most frequent issues were inadequate technical controls or risk management practices, incomplete procedures, system design and development issues, inadequate inspection or secondary verification requirements, failures of organizations to learn from previous incidents, inadequate schedule controls, inadequate task analyses or design processes, flaws in the design of organizations, and issues with organizational safety cultures.

Timothy S Barth↗

Recurring Causes of Human Spaceflight Mishaps During Flight Tests and Early Operations

An analysis of recurring causes underlying human spaceflight mishaps that occurred during flight tests and early operations was performed. Eight mishaps from the Apollo, Soyuz, Skylab, Space Shuttle, and Constellation Programs (i.e., the Ares-1X test flight) and early commercial suborbital operations were included in the study. Detailed event analyses were performed for the historical mishaps and aggregate data analyses conducted to identify recurring issues. The nine most frequent issues were inadequate technical controls or risk management practices, incomplete procedures, system design and development issues, inadequate inspection or secondary verification requirements, failures of organizations to learn from previous incidents, inadequate schedule controls, inadequate task analyses or design processes, flaws in the design of organizations, and issues with organizational safety cultures.

Human Spaceflight↗

Aeroelasticity Benchmark Assessment: Subsonic Fixed Wing Program

The fundamental technical challenge in computational aeroelasticity is the accurate prediction of unsteady aerodynamic phenomena and the effect on the aeroelastic response of a vehicle. Currently, a benchmarking standard for use in validating the accuracy of computational aeroelasticity codes does not exist. Many aeroelastic data sets have been obtained in wind-tunnel and flight testing throughout the world; however, none have been globally presented or accepted as an ideal data set. There are numerous reasons for this. One reason is that often, such aeroelastic data sets focus on the aeroelastic phenomena alone (flutter, for example) and do not contain associated information such as unsteady pressures and time-correlated structural dynamic deflections. Other available data sets focus solely on the unsteady pressures and do not address the aeroelastic phenomena. Other discrepancies can include omission of relevant data, such as flutter frequency and / or the acquisition of only qualitative deflection data. In addition to these content deficiencies, all of the available data sets present both experimental and computational technical challenges. Experimental issues include facility influences, nonlinearities beyond those being modeled, and data processing. From the computational perspective, technical challenges include modeling geometric complexities, coupling between the flow and the structure, grid issues, and boundary conditions. The Aeroelasticity Benchmark Assessment task seeks to examine the existing potential experimental data sets and ultimately choose the one that is viewed as the most suitable for computational benchmarking. An initial computational evaluation of that configuration will then be performed using the Langley-developed computational fluid dynamics (CFD) software FUN3D1 as part of its code validation process. In addition to the benchmarking activity, this task also includes an examination of future research directions. Researchers within the Aeroelasticity Branch will examine other experimental efforts within the Subsonic Fixed Wing (SFW) program (such as testing of the NASA Common Research Model (CRM)) and other NASA programs and assess aeroelasticity issues and research topics.

Florance, Jennifer P.↗

A Qualitative Assessment of Current CCF Guidance Based on a Review of Safety System Digital Implementation Changes with Evolving Technology

The US Nuclear Regulatory Commission (NRC) is initiating a new rulemaking project to develop a digital system common-cause failure (CCF) rule. This rulemaking will review and modify or affirm the NRC's current digital system CCF policy as discussed in the Staff Requirements Memorandum to the Secretary of the Commission, Office of the NRC (SECY) 93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light Water Reactor (ALWR) Designs, and Branch Technical Position (BTP) 7-19, Guidance on Evaluation of Defense-in-Depth and Diversity in Digital Computer-Based Instrumentation and Control Systems, as well as Chapter 7, Instrumentation and Controls, in NRC Regulatory Guide (NUREG)-0800, Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants (ML033580677). The Oak Ridge National Laboratory (ORNL) is providing technical support to the NRC staff on the CCF rulemaking, and this report is one of several providing the technical basis to inform NRC staff members. For the task described in this report, ORNL examined instrumentation and controls (I&C) technology implementations in nuclear power plants in the light of current CCF guidance. The intent was to assess whether the current position on CCF is adequate given the evolutions in digital safety system implementations and, if gaps in the guidance were found, to provide recommendations as to how these gaps could be closed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A qualitative assessment of current CCF guidance based on a review of safety system digital implementation changes with evolving technology - 148

This paper is a summary of a study performed in support of the US Nuclear Regulatory Commission (NRC) to evaluate current policy on software common-cause failure (CCF). The study reported in this paper is one of several that contributed to the technical basis to inform NRC staff. The study first reviewed policies and assessment guidance as discussed in the Staff Requirements Memorandum to the Secretary of the Commission, Office of the NRC (SECY) 93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light Water Reactor (ALWR) Designs, and Branch Technical Position (BTP) 7-19, Guidance on Evaluation of Defense-in-Depth and Diversity in Digital Computer-Based Instrumentation and Control Systems, as well as Chapter 7, 'Instrumentation and Controls', in NUREG-0800, Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants. The study then examined instrumentation and controls (I and C) technology implementations in nuclear power plants in the light of current CCF guidance. The intent was to assess whether the current position on CCF remains appropriate given the evolutions in digital safety system implementations and, if gaps in the guidance were found, to provide recommendations as to how these gaps could be closed. The methodology adopted was to review the vendors' technology and software implementation processes for digital safety systems as technology evolved. The following three representative safety systems were selected to provide illustrative examples: - Eagle 21 was selected to represent vintage microprocessor-based technology used from the 1980's to mid-1990's, - TELEPERM XS (TXS) was selected to represent second generation microprocessor-based technology used from the mid-1990's to the 2000's, and - The advanced logic system (ALS) was selected to represent the latest trend of using technology based on field programmable gate arrays (FPGAs). Technology implementations were reviewed in light of the basic premise of the NRC in BTP 7-19 (Revision 6), that software-based or software-logic-based digital system development errors are a credible source of CCF and therefore are susceptible to CCF because identical copies of the software-based logic and architecture are present in redundant divisions of safety-related systems. BTP 7-19 categorizes firmware and logic developed from software-based development systems all under software. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Joint ASRS and NASA Callback on FANS-1 Datalink Operational Incidents

The recent certification and implementation of the Future Air Navigation System (FANS- 1) was based on the benefits of reduced separation minima, ability to optimize flight plans enroute, and the prompt transmission and reception of messages between oceanic controllers and 747-400 aircraft transiting the Pacific. In addition, FANS was intended to supersede High Frequency (HF) radio which has been the staple, yet problematic, long distance communication link for years. However, in the three initial years of operation, FANS has revealed its own unique operational issues. Although some technical and engineering problems have been studied and addressed, little research has been conducted on human factors issues associated with the use of FANS on the flight deck. This lack of prior data on the operational use of FANS prompted a joint NASA/Aviation Safety Reporting System (ASRS) inquiry into FANS datalink. In addition, two foreign air carriers and their respective safety agencies were recruited to participate. This international FANS research effort consisting of three aviation safety agencies and three international commercial air-carriers has provided a unique opportunity for conducting human factors research in an operational environment. An ASRS 'callback' format was chosen for the study as a practical and viable method for capturing FANS events on the flight deck. Initially, 747-400 pilots were encouraged to submit reports to their respective safety agencies if they had experienced any positive or negative incidents with the use of FANS. Upon receipt of a report, it was evaluated and if deemed pertinent to the study, a telephone interview or 'callback' was conducted on the FANS incident to elicit further details, capture the key events, and gather contextual information. Once the operational data collection phase was completed, the reports and interviews were analyzed with two purposes in mind: primarily to identify and address problematic human factors issues with current FANS technology, and, secondarily, to provide 'lessons learned' for future datalink systems and implementation.

Moses, John↗

Cost estimation of HVDC transmission system of Bangka’s NPP candidates

Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange is a two-year research effort to visualize the U. S. aviation industry at a point 50 years in the future, and to define potential communication solutions to meet those future data exchange needs. The research team, led by XCELAR, was tasked with identifying future National Airspace System (NAS) scenarios, determining requirements and functions (including gaps), investigating technical and business issues for air, ground, & air-to-ground interactions, and reporting on the results. The project was conducted under technical direction from NASA and in collaboration with XCELAR's partner, National Institute of Aerospace, and NASA technical representatives. Parallel efforts were initiated to define the information exchange functional needs of the future NAS, and specific communication link technologies to potentially serve those needs. Those efforts converged with the mapping of each identified future NAS function to potential enabling communication solutions; those solutions were then compared with, and ranked relative to, each other on a technical basis in a structured analysis process. The technical solutions emerging from that process were then assessed from a business case perspective to determine their viability from a real-world adoption and deployment standpoint. The results of that analysis produced a proposed set of future solutions and most promising candidate technologies. Gap analyses were conducted at two points in the process, the first examining technical factors, and the second as part of the business case analysis. In each case, no gaps or unmet needs were identified in applying the solutions evaluated to the requirements identified. The future communication solutions identified in the research comprise both specific link technologies and two enabling technologies that apply to most or all specific links. As a result, the research resulted in a new analysis approach, viewing the underlying architecture of ground-air and air-air communications as a whole, rather than as simple "link to function" paired solutions. For the business case analysis, a number of "reference architectures" were developed for both the future technologies and the current systems, based on three typical configurations of current aircraft. Current and future costs were assigned, and various comparisons made between the current and future architectures. In general, it was assumed that if a future architecture offers lower cost than the current typical architecture, while delivering equivalent or better performance, it is likely that the future solution will gain industry acceptance. Conversely, future architectures presenting higher costs than their current counterparts must present a compelling benefit case in other areas or risk a lack of industry acceptance. The business case analysis consistently indicated lower costs for the proposed future architectures, and in most cases, significantly so. The proposed future solutions were found to offer significantly greater functionality, flexibility, and growth potential over time, at lower cost, than current systems. This was true for overall, fleet-wide equipage for domestic and oceanic air carriers, as well as for single, General Aviation (GA) aircraft. The overall research results indicate that all identified requirements can be met by the proposed solutions with significant capacity for future growth. Results also illustrate that the majority of the future communication needs can be met using currently allocated aviation RF spectrum, if used in more effective ways than it is today. A combination of such optimized aviation-specific links and commercial communication systems meets all identified needs for the 50-year future and beyond, with the caveat that a new, overall function will be needed to manage all information exchange, individual links, security, cost, and other factors. This function was labeled "Delivery Manager" (DM) within this research. DM employs a distributed client/server architecture, for both airborne and ground communications architectures. Final research results included identifying the most promising candidate technologies for the future system, conclusions and recommendations, and identifying areas where further research should be considered.

Communications↗

Space resources. Volume 3: Materials

Space Resources addresses the issues of using space resources to support life on the Moon and for exploration of Mars. This volume - Materials - covers a number of technical and policy issues regarding the materials in space (mainly lunar and asteroidal) which can be used to support space operations. In part 1, nature and location of these materials, exploration strategy, evaluation criteria, and the technical means to collect or mine these materials is discussed. A baseline lunar mine and the basics of asteroid mining are presented and critiqued. In part 2, the beneficiation of ores and the extraction of such materials as oxygen, metals, and the makings of concrete are discussed. In part 3, the manufacturing and fabrication of nonterrestrial products are discussed. The economic tradeoffs between bringing needed products from Earth and making these products on location in space is considered.

Mckay, Mary Fae↗

Issues associated with establishing control zones for international space operations

Cooperative missions in Earth orbit can be facilitated by developing a strategy to regulate the manner in which vehicles interact in orbit. One means of implementing such a strategy is to utilize a control zones technique that assigns different types of orbital operations to specific regions of space surrounding a vehicle. Considered here are issues associated with developing a control zones technique to regulate the interactions of spacecraft in proximity to a manned vehicle. Technical and planning issues, flight hardware and software issues, mission management parameter, and other constraints are discussed. Also covered are manned and unmanned vehicle operations, and manual versus automated flight control. A review of the strategies utilized by the Apollo Soyuz Test Project and the Space Station Freedom Program is also presented.

Nader, Blair A.↗

Issues in developing control zones for international space operations

Cooperative missions in earth orbit can be facilitated by developing a strategy to regulate the manner in which vehicles interact in orbit. One means of implementing such a strategy is to utilize a control zones technique that assigns different types of orbital operations to specific regions of space surrounding a vehicle. Considered here are issues associated with developing a control zones technique to regulate the interactions of spacecraft in proximity to a manned vehicle. Technical and planning issues, flight hardware and software issues, mission management parameter, and other constraints are discussed. Also covered are manned and unmanned vehicle operations, and manual versus automated flight control. A review of the strategies utilized by the Apollo Soyuz Test Project and the Space Station Freedom Program is also presented.

Nader, Blair A.↗

Underground Test Area Activity Preemptive Review Guidance Nevada National Security Site, Nevada

This report is a revision to the preemptive review (PER) guidance originally released as U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) document DOE/NV--1552 in 2016 (NNSA/NFO, 2016). PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the DOE Environmental Management (EM) Nevada Program and NDEP. PERs are designed to be adaptable to the varying requirements of individual CAU studies. Their goals include the following: Maintaining high technical standards; ensuring work is technically adequate, competently performed, and documented consistent with other programmatic documents; and verifying that established quality requirements are satisfied. Helping focus CAU studies on UGTA Activity objectives identified in the FFACO by implementing Section 3 of Appendix VI, which includes the UGTA Strategy Flowchart (Figure 3-2) and Process Flow Diagram Dictionary for the UGTA CAUs (Table 3-1). Providing a mechanism for early identification of technical and/or strategy issues that could affect successfully implementing the UGTA strategy. Providing assurance to NDEP that work in progress and final reports are technically sound. Providing independent reviews that allow for a better understanding of the technical work, and result in products that are transparent and sufficient to allow the DOE EM Nevada Program to meet regulatory objectives.

54 ENVIRONMENTAL SCIENCES↗

Improvement of Anadromous Fish Habitat and Passage in Omak Creek, 2008 Annual Report : February 1, 2008 to January 31, 2009.

During the 2008 season, projects completed under BPA project 2000-100-00 included installation of riparian fencing, maintenance of existing riparian fencing, monitoring of at-risk culverts and installation of riparian vegetation along impacted sections of Omak Creek. Redd and snorkel surveys were conducted in Omak Creek to determine steelhead production. Canopy closure surveys were conducted to monitor riparian vegetation recovery after exclusion of cattle since 2000 from a study area commonly known as the Moomaw property. Additional redd and fry surveys were conducted above Mission Falls and in the lower portion of Stapaloop Creek to try and determine whether there has been successful passage at Mission Falls. Monitoring adult steelhead trying to navigate the falls resulted in the discovery of shallow pool depth at an upper pool that is preventing many fish from successfully navigating the entire falls. The Omak Creek Habitat and Passage Project has worked with NRCS to obtain additional funds to implement projects in 2009 that will address passage at Mission Falls, culvert replacement, as well as additional riparian planting. The Omak Creek Technical Advisory Group (TAG) is currently revising the Omak Creek Watershed Assessment. In addition, the group is revising strategy to focus efforts in targeted areas to provide a greater positive impact within the watershed. In 2008 the NRCS Riparian Technical Team was supposed to assess areas within the watershed that have unique problems and require special treatments to successfully resolve the issues involved. The technical team will be scheduled for 2009 to assist the TAG in developing strategies for these special areas.

13 HYDRO ENERGY↗

Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

54 ENVIRONMENTAL SCIENCES↗