Search NASA⌕ Search

SEARCH · Search NASA

Results for “vacuum simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Confinement models at finite temperature and density

In-medium chiral symmetry breaking in confining potential models of QCD is examined. Past attempts to analyze these models have been hampered by infrared divergences that appear at nonzero temperature. We argue that previous attempts to circumvent this problem are not satisfactory and demonstrate a simple resolution. We also show that the expectation that confining models do not exhibit a chiral phase transition is incorrect. The effect of summing ring diagrams is investigated, and we present the first determination of the temperature-density phase diagram for three model systems. We find that observables and the phase structure of the confinement models depend strongly on whether vacuum polarization is accounted for. Finally, it appears that standard confinement models cannot adequately describe both hadron phenomenology and in-medium properties of QCD.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Coulomb confinement from the Yang-Mills vacuum state in 2+1 dimensions

The Coulomb-gauge ghost propagator and the color-Coulomb potential are computed in an ensemble of configurations derived from our recently proposed Yang-Mills vacuum wave functional in 2+1 dimensions. The results are compared to the corresponding values obtained by standard Monte Carlo simulations in three Euclidean dimensions. The agreement is quite striking for the Coulomb-gauge ghost propagator. The color-Coulomb potential rises linearly at large distances, but its determination suffers from rather large statistical fluctuations, due to configurations with very low values of {mu}{sub 0}, the lowest eigenvalue of the Coulomb-gauge Faddeev-Popov operator. However, if one imposes cuts on the data, effectively leaving out configurations with very low {mu}{sub 0}, the agreement of the potential in both sets of configurations is again satisfactory, although the error bars grow systematically as the cutoff is eliminated.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Heuristic modeling of spectral plasma emission for laser-induced breakdown spectroscopy

A heuristic model was developed to describe the spectral emission of laser-induced plasmas generated for laser-induced breakdown spectroscopy under the assumption that the composition of the plasma and the plasma state is known. The plasma is described by a stationary spherical shell model surrounded by an ambient gas, which partially absorbs the emitted radiation. The radiation transport equation is used to calculate the spectrum emitted by the plasma. Simulations of a multiline iron spectrum and a self-reversed Al line are compared with experimental spectra. For the iron spectrum, the degree of congruence is moderate to good, which may be attributed to a lack of precise atomic and Stark broadening data as well as a simplified plasma model. The line profile of the Al resonance line with self reversal can be simulated with a high degree of agreement. Simulated spectra of a steel sample in the vacuum ultraviolet spectral range demonstrate the strong influence of the ambient atmosphere in the spectral range between 178 and 194 nm. The number of free parameters of the plasma model of 8 can be further reduced down to 3, taking into account the integral parameters of the plasma that are accessible experimentally.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Three dimensional particle simulation of high altitude rocket plumes

The interaction of two nozzles exhausting into vacuum generates a complex three-dimensional shock structure. The shock structure and resulting plume flowfield is characterized by the nozzle separation distance. For the appropriate range of penetration Knudsen numbers, the analysis of this shock structure can be suitably accomplished through a Monte Carlo simulation. This paper describes the application of a general three-dimensional Monte Carlo simulation on the Connection Machine CM-2 to the analysis of the plume self-interaction shock in the near field. Results are presented for two cases, corresponding to a small and a large nozzle separation distance. The results correctly reproduce the expected flow features and demonstrate the ability of this method to properly simulate the start of the plume self-interaction shock. This has significance not only for allowing analysis of the self-interacting plume in the near field, but also for allowing the subsequent simulation of the far field flow through the use of a continuation downstream exit boundary.

Dagum, Leonardo↗

NIMROD Development AND Applications for Advanced Simulations of Tokamak Plasmas

Operation in a regime of zero off-normal events is an important goal for ITER, and after that DEMO. Edge Localized Modes (ELMs) are off-normal events of particular concern due to their ubiquity in the highest performing discharges and their localized energy deposition on vessel walls. To avoid damage from these events, ITER has invested in costly coils in addition to exploring other mitigation techniques. A more attractive approach is to find an operational regime that has the requisite high performance while avoiding ELMs entirely. DIII-D experimentalists have found such a regime, wherein the ELMs are prevented from occurring by the existence of a saturated instability. Although this regime is attractive, how this saturated instability occurs and how to extrapolate to ITER is not well understood. NIMROD is well suited for studying this mode, and significant progress has already been made in modeling the equilibria that give rise to this instability. Another off-normal event of concern to ITER is the sawtooth mode in the presence of energetic particles. These modes are ubiquitous in near-steady-state tokamaks, and their behavior in the presence of the energetic particles that will be found in burning plasma experiments is poorly understood. The internal kink is notorious for requiring all extended MHD effects (two-fluid, closures, vacuum regime, energetic particles) in a production level simulation. NIMROD has matured to the point where it can now address this problem, though significant expertise in the MHD physics, numerical algorithms, and large-scale computation will be required. The expertise of Tech-X in attacking the most difficult NIMROD problems has already resulted in significant improvements to the NIMROD code that benefit the larger fusion community, and we expect further improvements as we attack these challenging problems. To maximize the community benefits, Tech-X provided community outreach and code management efforts.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

RF Simulation of the 187 MHz CW Photo-RF Gun Cavity at LBNL

A 187 MHz normal conducting Photo-RF gun cavity is designed for the next generation light sources. The cavity is capable of operating in CW mode. As high as 750 kV gap voltage can be achieved with a 20 MV/m acceleration gradient. The original cavity optimization is conducted using Superfish code (2D) by Staples. 104 vacuum pumping slots are added and evenly spaced over the cavity equator in order to achieve better than 10 -10 -Tor of vacuum. Two loop couplers will be used to feed RF power into the cavity. 3D simulations are necessary to study effects from the vacuum pumping slots, couplers and possible multipactoring. The cavity geometry is optimized to minimize the power density and avoid multipactoring at operating field level. The vacuum slot dimensions are carefully chosen in consideration of both the vacuum conduction, local power density enhancement and the power attenuation at the getter pumps. This technical note gives a summary of 3D RF simulation results, multipactoring simulations (2D) and preliminary electromagnetic-thermal analysis using ANSYS code.

43 PARTICLE ACCELERATORS↗

Microwave Structure Construction Capability Year One Accomplishments

The Microwave Structure Construction Capability (MSCC) element, part of the Moon to Mars Planetary Autonomous Construction Project (MMPACT) was initiated in 2020. MSCC is responsible for creating horizontal and vertical infrastructure on the moon using microwave energy. Microwave energy was selected since it is the only method to volumetrically heat the regolith. All other sintering/melting methods rely on thermal conduction through the very low conductivity surface, resulting in an inefficient process. Advances were achieved in materials characterization and understanding, microwave sintering in vacuum, and microwave design and analyses. Two dielectric property testing systems have been developed at Radiance Technologies and JPL. These will examine dielectric properties at cryogenic temperatures and over a broad frequency range. Permittivity and permeability testing at -60 ̊C in vacuum from 0.05 to 3 GHz has been generated at JPL. Additional modifications will be made to go to -190 ̊C (LN2). Radiance Technologies created a test system to measure dielectric properties at greater than 10 GHz and initiated work on developing a vacuum capable, portable test system to measure dielectric properties of Apollo regolith and simulants from 100 MHz to 18 GHz. These tests are to identify optimal heating frequencies and protocols. During microwave sintering at about 1100 ̊C, volatiles were creating difficulty in achieving a reasonably dense specimen. Due to processing in vacuum and the nature of the lunar regolith, some volatiles and porosity are expected. However, the Earth produced simulants have non-lunar materials in them that create volatiles that aren’t representative of lunar regolith. Therefore, a five month effort was conducted to establish a heat treat method to remove these non-lunar materials. Tests were conducted using TGA mass spectrometry, heating in vacuum and conducting mass spectrometry, dielectric and DTA, Raman, BET, particle size analysis, morphological analysis, carbon and sulfur chemical content determination and microscopy. The process has been scaled-up to 6 kg batch size and undergoing evaluation. A 36 kg batch size is the target for JSC-1A and other limited availability simulants. These calcining protocols will be standard for NASA and beyond. MSCC has also created scalable processes for fabricating synthetic lunar materials. Processes to fabricate Anorthite (plagioclase CaAl2Si2O8), Diopside (pyroxene CaMgSi₂O₆), and Enstatite (pyroxene Mg2Si2O6) have been generated. These materials will enable generation of microwave sintering models to bound various composition ranges anticipated on the Moon, therefore mitigating the need for a precise simulant with respect to location on the Moon. Successful microwave sintering in air using a horn applicator was demonstrated. All previous microwave vacuum sintering in the literature was at small scale and in a contained enclosure thus taking advantage of reflections. This is the first to use a lunar like microwave applicator to sinter ceramic in a bed as it would be done on the Moon. Small scale and inert sintering were conducted to assist in developing protocols with quicker turnaround times than larger scale testing. Testing has anchored thermal analysis predicting heat flow in vacuum during microwave sintering. Thermal conductivity testing was also initiated. Microwave coupling to the regolith has been modeled by multiple organizations and with different software packages. At least six horn designs and applicator configurations for both magnetron and solid state sources are being examined. Optimal simulant container designs for microwaves have also been generated. The power and electronics design for the solid state microwave system has been initiated. Concept designs for a lander based microwave sintering have been evaluated.

microwave↗

Vacuum polarization of the quantized massive scalar field in Reissner-Nordstroem spacetime

The approximation of the renormalized stress-energy tensor of the quantized massive scalar field in Reissner-Nordstroem spacetime is constructed. It is achieved by functional differentiation of the first two nonvanishing terms of the Schwinger-DeWitt expansion involving the coincidence limit of the Hadamard-Minakshisundaram-DeWitt-Seely coefficients [a{sub 3}] and [a{sub 4}] with respect to the metric tensor. It is shown, by comparison with the existing numerical results, that inclusion of the second-order term leads to substantial improvement of the approximation of the exact stress-energy tensor. The approximation to the field fluctuation, <{phi}{sup 2}>, is constructed and briefly discussed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Effects of a long low-gap in-vacuum undulator on the impedance and beam lifetime

Possible installation of a long low-gap in-vacuum undulator in the NSLS-II storage ring could result in several impedance-related and beam lifetime issues. High impedance of the low-gap undulator can result in beam instabilities and beam-induced overheating of the undulator itself. These issues have been preliminary studied using analytical formulae, computer simulations and experience of operations with existing in-vacuum undulators. Depending on the device location, the minimum gap and the overall ring-average residual gas pressure, an in-vacuum undulator (IVU) may appreciably shorten the elastic gas scattering component of the beam lifetime. When the latter becomes comparable to the Touschek lifetime, a significant reduction of the total beam lifetime will occur. Here this effect is studied by applying some well-known analytical formulas, as well as insights from NSLS-II operating experience. Finally, the issue of IVU radiation damage also needs to be looked at, and potentially addressed with a dedicated collimation system.

36 MATERIALS SCIENCE↗

The effects of applied current on one-dimensional interdiffusion between copper and nickel in spark plasma sintering

Spark plasma sintering (SPS) is a powder metallurgy technique that employs the use of fast sintering kinetics to produce final consolidated components in a matter of minutes. In order to use blended powders in SPS to obtain fully alloyed parts, diffusion during sintering must be understood. An investigation into the effects of current on the diffusion of copper and nickel was performed using SPS. Bulk specimens were used to generate diffusion couples in SPS in alternating orientations with respect to the direction of the current. Control samples were produced using a horizontal insertion vacuum furnace. Experiments were performed at temperatures between 850°C and 1000°C for 3 h. Concentration profiles were obtained by the use of both energy-dispersive spectroscopy and a Monte Carlo simulated correction curve. Diffusion coefficients and activation energies were calculated for samples produced by SPS and annealing without current. It was shown that, at temperatures near 0.9 T{sub m}, the application of current in SPS inhibits diffusion between copper and nickel due to the re-orientation of electrons caused by the loss of ferromagnetism in nickel. Activation energy for diffusion is, however, decreased due to the temperature gradients arising from the difference in resistivity between the two species.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

APPLICATION OF VACUUM SALT DISTILLATION TECHNOLOGY FOR THE REMOVAL OF FLUORIDE

Vacuum distillation of chloride salts from plutonium oxide (PuO{sub 2}) and simulant PuO{sub 2} has been previously demonstrated at Department of Energy (DOE) sites using kilogram quantities of chloride salt. The apparatus for vacuum distillation contains a zone heated using a furnace and a zone actively cooled using either recirculated water or compressed air. During a vacuum distillation operation, a sample boat containing the feed material is placed into the apparatus while it is cool, and the system is sealed. The system is evacuated using a vacuum pump. Once a sufficient vacuum is attained, heating begins. Volatile salts distill from the heated zone to the cooled zone where they condense, leaving behind the non-volatile materials in the feed boat. The application of vacuum salt distillation (VSD) is of interest to the HB-Line Facility and the MOX Fuel Fabrication Facility (MFFF) at the Savannah River Site (SRS). Both facilities are involved in efforts to disposition excess fissile materials. Many of these materials contain chloride and fluoride salt concentrations which make them unsuitable for dissolution without prior removal of the chloride and fluoride salts. Between September 2009 and January 2011, the Savannah River National Laboratory (SRNL) and HB-Line designed, developed, tested, and successfully deployed a system for the distillation of chloride salts. Subsequent efforts are attempting to adapt the technology for the removal of fluoride. Fluoride salts of interest are less-volatile than the corresponding chloride salts. Consequently, an alternate approach is required for the removal of fluoride without significantly increasing the operating temperature. HB-Line Engineering requested SRNL to evaluate and demonstrate the feasibility of an alternate approach using both non-radioactive simulants and plutonium-bearing materials. Whereas the earlier developments targeted the removal of sodium chloride (NaCl) and potassium chloride (KCl), the current activities are concerned with the removal of the halide ions associated with plutonium trifluoride (PuF{sub 3}), plutonium tetrafluoride (PuF{sub 4}), calcium fluoride (CaF{sub 2}), and calcium chloride (CaCl{sub 2}). This report discusses non-radioactive testing of small-scale and pilot-scale systems and radioactive testing of a small-scale system. Experiments focused on demonstrating the chemistry for halide removal and addressing the primary engineering questions associated with a change in the process chemistry.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A comparative study of TiN and TiC: Oxidation resistance and retention of xenon at high temperature and under degraded vacuum

Dense TiN and TiC samples were prepared by hot pressing using micrometric powders. Xenon species (simulating rare gas fission products) were then implanted into the ceramics. The samples were annealed for 1 h at 1500 deg. C under several degraded vacuums with P{sub O{sub 2}} varying from 10{sup -6} to 2x10{sup -4} mbars. The oxidation resistance of the samples and their retention properties with respect to preimplanted xenon species were analyzed using scanning electron microscopy, grazing incidence x-ray diffraction, Rutherford backscattering spectrometry, and nuclear backscattering spectrometry. Results indicate that TiC is resistant to oxidation and does not release xenon for P{sub O{sub 2{<=}}}6x10{sup -6} mbars. When P{sub O{sub 2}} increases, geometric oxide crystallites appear at the surface depending on the orientation and size of TiC grains. These oxide phases are Ti{sub 2}O{sub 3}, Ti{sub 3}O{sub 5}, and TiO{sub 2}. Apparition of oxide crystallites is associated with the beginning of xenon release. TiC surface is completely covered by the oxide phases at P{sub O{sub 2}}=2x10{sup -4} mbars up to a depth of 3 {mu}m and the xenon is then completely released. For TiN samples, the results show a progressive apparition of oxide crystallites (Ti{sub 3}O{sub 5} mainly) at the surface when P{sub O{sub 2}} increases. The presence of the oxide crystallites is also directly correlated with xenon release, the more oxide crystallites are growing the more xenon is released. TiN surface is completely covered by an oxide layer at P{sub O{sub 2}}=2x10{sup -4} mbars up to 1 {mu}m. A correlation between the initial fine microstructure of TiN and the properties of the growing layer is suggested.

36 MATERIALS SCIENCE↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Performance of the Satellite Test Assistant Robot in JPL's Space Simulation Facility

An innovative new telerobotic inspection system called STAR (the Satellite Test Assistant Robot) has been developed to assist engineers as they test new spacecraft designs in simulated space environments. STAR operates inside the ultra-cold, high-vacuum, test chambers and provides engineers seated at a remote Operator Control Station (OCS) with high resolution video and infrared (IR) images of the flight articles under test. STAR was successfully proof tested in JPL's 25-ft (7.6-m) Space Simulation Chamber where temperatures ranged from +85 C to -190 C and vacuum levels reached 5.1 x 10(exp -6) torr. STAR's IR Camera was used to thermally map the entire interior of the chamber for the first time. STAR also made several unexpected and important discoveries about the thermal processes occurring within the chamber. Using a calibrated test fixture arrayed with ten sample spacecraft materials, the IR camera was shown to produce highly accurate surface temperature data. This paper outlines STAR's design and reports on significant results from the thermal vacuum chamber test.

Mcaffee, Douglas↗

Spacecraft charging technology in the satellite X-ray test facility

A satellite X-ray test facility (SXTF) is planned for studying system generated electromagnetic pulse effects on full scale, operational spacecraft. The environment created by a distant, high altitude nuclear burst can be simulated using pulsed X-ray sources. The facility is to be installed in a thermal vacuum chamber with dimensions greater then 10 m diameter and 20 m height and equipped with solar simulators and equipment for simulating the charging environment of space. The spacecraft charging system consists of several low energy electron and hydrogen ion sources (5-25 keV), one or two medium energy electron accelerators (150-300 keV), an array of vacuum ultraviolet lamps, and geomagnetic field suppression coils. Military, scientific, and commercial spacecraft can be tested before launching into the radiation environment of space. construction of SXTF is scheduled to begin in 1982 and the facility should be available for general use in 1984. Potential users are encouraged to express their needs for specific testing environments in SXTF.

Sponaugle, T. J.↗

Electron-Cloud Build-Up Simulations for the FNAL Main Injector

We present a summary on ongoing simulation results for the electron-cloud (EC) buildup in the context of the proposed FNAL Main Injector (MI) intensity upgrade effort [1]. Most of the results presented here are for the field-free region at the location of the retarding field analyzer (RFA) electron detector [2-4]. The primary input variable we exercise is the peak secondary electron yield (SEY) {delta}{sub max}, which we let vary in the range 1.2 {le} {delta}{sub max} {le} 1.7. By combining our simulated results for the electron flux at the vacuum chamber wall with the corresponding RFA measurements we infer that 1.25 {approx}< {delta}{sub max} {approx}< 1.35 at this location. From this piece of information we estimate features of the EC distribution for various fill patterns, including the average electron number density n{sub e}. We then compare the behavior of the EC for a hypothetical RF frequency f{sub RF} = 212 MHz with the current 53 MHz for a given total beam population N{sub tot}. The density n{sub e} goes through a clear threshold as a function of N{sub tot} in a field-free region. As expected, the higher frequency leads to a weaker EC effect: the threshold in N{sub tot} is a factor {approx} 2 higher for f{sub RF} = 212 MHz than for 53 MHz, and ne is correspondingly lower by a factor {approx} 2 when N{sub tot} is above threshold. We briefly describe further work that needs to be carried out, sensitivities in the calculation, and puzzles in the results that remain to be addressed.

43 PARTICLE ACCELERATORS↗

Vehicle-Level Oxygen/Methane Propulsion System Hotfire Testing at Thermal Vacuum Conditions

A prototype integrated liquid oxygen/liquid methane propulsion system was hot-fire tested at a variety of simulated altitude and thermal conditions in the NASA Glenn Research Center Plum Brook Station In-Space Propulsion Thermal Vacuum Chamber (formerly B2). This test campaign served two purposes: 1) Characterize the performance of the Plum Brook facility in vacuum accumulator mode and 2) Collect the unique data set of an integrated LOX/Methane propulsion system operating in high altitude and thermal vacuum environments (a first). Data from this propulsion system prototype could inform the design of future spacecraft in-space propulsion systems, including landers. The test vehicle for this campaign was the Integrated Cryogenic Propulsion Test Article (ICPTA), which was constructed for this project using assets from the former Morpheus Project rebuilt and outfitted with additional new hardware. The ICPTA utilizes one 2,800 lbf main engine, two 28 lbf and two 7 lbf reaction control engines mounted in two pods, four 48-inch propellant tanks (two each for liquid oxygen and liquid methane), and a cold helium system for propellant tank pressurization. Several hundred sensors on the ICPTA and many more in the test cell collected data to characterize the operation of the vehicle and facility. Multiple notable experiments were performed during this test campaign, many for the first time, including pressure-fed cryogenic reaction control system characterization over a wide range of conditions, coil-on-plug ignition system demonstration at the vehicle level, integrated main engine/RCS operation, and a non-intrusive propellant mass gauging system. The test data includes water-hammer and thermal heat leak data critical to validating models for use in future vehicle design activities. This successful test campaign demonstrated the performance of the updated Plum Brook In-Space Propulsion thermal vacuum chamber and incrementally advanced the state of LOX/Methane propulsion technology through numerous system-level and subsystem experiments.

Morehead, Robert L.↗

Effect of Emergency Argon on FCF Operational Incidents

The following report presents analyses of operational incidents which are considered in the safety analysis of the FCF argon cell and the effect that the operability of the emergency argon system has on the course of these incidents. The purpose of this study is to determine if the emergency argon system makes a significant difference in ameliorating the course of these incidents. Six incidents were considered. The following three incidents were analyzed. These are: 1. Cooling failing on 2. Vacuum Pump Failing on 3. Argon Supplies Failing on. In the remaining three incidents, the emergency argon supply would have no effect on the course of these transients since it would not come on during these incidents. The transients are 1. Loss of Cooling 2. Loss of power (Differs from above by startup delay till the Diesel Generators come on.) 3. Cell rupture due to an earthquake or other cause. The analyses of the first three incidents are reported on in the next three sections. This report is issued realizing the control parameters used may not be optimum, and additional modeling must be done to model the inertia of refrigeration system, but the major conclusion concerning the need for the emergency argon system is still valid. The timing of some events may change with a more accurate model but the differences between the transients with and without emergency argon will remain the same. Some of the parameters assumed in the analyses are Makeup argon supply, 18 cfm, initiates when pressure is = -6 iwg., shuts off when pressure is = -3.1 iwg. 170,000 ft3 supply. Min 1/7th always available, can be cross connected to HFEF argon supply dewar. Emergency argon supply, 900 cfm, initiates when pressure is = -8 iwg. shuts off when pressure is =-4 iwg. reservoir 220 ft3, refilled when tank farm pressure reduces to 1050 psi which is about 110 ft3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗