Search NASA⌕ Search

SEARCH · Search NASA

Results for “Collaborative control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

The Uniform Methods Project: Smart Thermostat Evaluation Protocol

A smart thermostat is an internet-connected device that controls home heating, ventilation, and air-conditioning (HVAC) equipment and can automatically adjust temperature set points to optimize performance and achieve energy savings. Smart thermostat features often include two way communication, occupancy detection (such as geofencing and occupancy sensors), schedule learning, and seasonal optimization algorithms. Smart thermostats can control most conventional HVAC systems, including central air conditioners, heat pumps, and forced air furnaces. Several types of residential utility programs offer smart thermostats as replacements measures. Working with smart thermostat vendors, utilities can offer separate optimization programs to produce energy savings beyond those achieved by installing a smart thermostat. From an evaluation perspective, smart thermostat programs have several noteworthy features. First, the energy savings from a smart thermostat may change over the life of the device. As a smart thermostat is connected to the internet, original equipment manufacturers can update the thermostat software to improve the thermostat's energy efficiency. Likewise, users can adjust the thermostat settings and schedules over time in response to changes in weather, thermal comfort, energy prices, or preferences for energy efficiency. Additionally, many thermostat manufacturers offer seasonal optimization programs that recommend changes or make minor, automated adjustments to the thermostat settings to improve energy efficiency. These opt-in programs are now standard offerings for many smart thermostat manufacturers and provided at no additional cost to users. The potential for software updates and continuous optimization and the evolving nature of user interactions mean future energy savings may differ from first-year savings and the energy savings of smart thermostats may need to be evaluated more than once. Second, smart thermostats often have small unit energy savings relative to a home's total energy consumption, especially in comparison to whole- home retrofit programs. This can make it difficult to detect the smart thermostat savings in billing or advanced metering infrastructure (AMI) meter consumption data. For example, as cooling loads in many regions average about 20% of annual electricity consumption, smart thermostat savings of 10% of cooling energy use would equate to a 2% reduction in home electricity consumption. Evaluators should use regression analysis of whole-home billing consumption or advanced metering infrastructure (AMI) meter consumption data to evaluate smart thermostat savings because, as explained at greater length below , these data are usually available to evaluators and regression can control for the impacts of weather and other potentially confounding factors on a home's energy consumption. Finally, as with other energy efficiency programs, participation in smart thermostat programs is self-selective. As discussed at greater length below , smart thermostat participants tend to be, among other things, younger, higher-income, and more likely to adopt electric vehicles (EVs) and internet connected devices than nonparticipants. These differences are often unobservable to the evaluator and correlated with a home's energy consumption, creating the potential for bias in estimating savings. Due to the small unit savings of thermostats, errors and biases from self-selection that may not be very consequential when evaluating a whole- home retrofits (e.g., ±2% of home electricity consumption) can have a major impact when evaluating the savings and cost-effectiveness of smart thermostat programs. A percentage point change in the estimated savings could affect the cost-effectiveness of a program. This means it is important for evaluators to assess and to minimize the potential for error from selection bias in estimating smart thermostat program savings. The Uniform Methods Project provides model protocols for determining energy savings and demand reductions that result from specific energy efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol ; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The UMP protocols can be used by utilities, program administrators, public utility commissions, evaluators, and other stakeholders for both program planning and evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantification of Energy Savings and Demand Reduction for a Heat Pump Integrated with Thermal Energy Storage (Final Report)

To mitigate the variation in demand on the electric grid, thermal energy storage (TES) is an alternative to electric batteries or installing new peaking power plants. Stakeholders and policy makers across the United States have expressed interests in promoting TES, as demonstrated by the US Department of Energy’s Grid-Interactive Efficient Buildings program and the efforts of various state legislatures. However, the cost value provided by TES are unclear. If reliable cost benefits were determined, stakeholders would have a clearer picture of the financial returns that can be gained from their investment in TES. The study in this report is conducted by ORNL with collaboration with Emerson the Helix Innovation Center. In the first part of this report, EnergyPlus was used to perform whole-building simulations for two residential buildings in Indianapolis and Atlanta. The HVAC system in both buildings were equipped with phase change material TES. The TES tank was charged in off-peak hours and discharged in peak hours to perform load shifting. First, the economic value implied by existing time-of-use (TOU) rates offered by utility companies was analyzed via whole-building simulation. Second, existing demand reduction (DR) incentives sourced from 3 different electrical grid administrators (i.e., California, Texas, and New England region) were surveyed to determine their implied value. The study suggests that the traditional value analysis that focuses on ROI for the building owner significantly undervalues TES technology making economic viability difficult. A more comprehensive value analysis that includes peak demand management and deferred capital for peaking power plants shows that TES should be economically viable but here the value is greater for the utility and requires large market penetration and aggregation to fully realize the benefits. Therefore, to facilitate commercialization, new business models are needed that include a broader range of stakeholders and distribute the value of TES proportionally. In the 2 nd part of this project, the benefits of a novel phase change material (PCM) integrated heat pump configuration were evaluated via detailed component based simulation. A one-dimensional PCM heat exchanger model which discretizes the PCM tank and refrigerant tubes into small control volumes is developed. Each control volume can have different PCM temperatures, PCM properties, and heat transfer coefficients. The PCM tank is charged by a wrapped tank condenser and discharged by an internal refrigerant coil. The PCM heat exchanger model is integrated into DOE/ORNL Heat Pump Design Model for heat pump system simulation. To demonstrate the performance of the PCM integrated heat pump, a case study in Chicago was performed. A Time-of-Use utility structure-based control strategy is implemented to schedule the PCM tank charging and discharging mode switching. Compared with a conventional electric heat pump, the PCM integrated heat pump shows superior performance on load shifting and utility cost reduction. As a result, the proposed system demonstrates 24.6% utility saving for cooling application and 25.8% utility saving for heating application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A High-Throughput Computing Infrastructure to Generate Custom, Open Community Geothermal Datasets

The most significant challenge facing geothermal research, development, and deployment is a lack of comprehensive datasets describing the geological and economical properties of North America. Automated knowledge base construction, the process of designing algorithms to analyze text and images to programmatically build new datasets, is one possible solution to this problem. The xDD library of full-text scientific articles (https://xdd.wisc.edu) is one of the largest collections of open and controlled-access scientific documents available for knowledge base construction in the world, but it has been underutilized by experts in geothermal research. The xDD development team attributed the lack of engagement by software developers and geothermal researchers to two perceived shortcomings of the system. First, the workflow for obtaining data from xDD for local development and testing of data mining applications was unnecessarily abstruse and required significant manual intervention by xDD systems administrators. Second, although xDD already held articles from a broad cross-section of scientific literature with an emphasis on the geosciences, it did not have an explicit set of geothermal research documents that could serve as the nucleus of a geothermal data mining application. To address these issues, the Automated Data Extraction PlaTform (ADEPT) was proposed to extend the data distribution capabilities of the xDD system. The ADEPT extension added the following four key features to xDD: 1) integration of National Geothermal Data System (NGDS) documents into the xDD library to provide an explicitly geothermally-themed collection; 2) improved RESTful (i.e., https-protocol driven) web services for external partners to access xDD data for machine learning application development; 3) a web platform for end-users and xDD administrators to coordinate the development of data mining applications from the initial step of browsing available documents to the final stage of deploying a production-quality machine learning application on high-throughput computing infrastructure; and 4) the development of demonstration data mining applications to illustrate the new workflow to potential collaborators. A total of 21,674 geothermal documents from NGDS were fully ingested into the xDD library and the associated metadata is publicly available through the xDD web services; furthermore, the ADEPT web platform is now publicly accessible and fully live at https://xdd.wisc.edu/adept/.

15 GEOTHERMAL ENERGY↗

Measurements and modeling of CO 2 concentration and isotopes to improve process-level understanding of Arctic and boreal carbon cycling. Final Report

The major goal of this project was to improve understanding of processes that control the exchanges of CO 2 between the atmosphere and the land biosphere on decadal and longer time scales. The approach involves measuring the changes in atmospheric CO 2 concentration and the isotopes of CO 2 ( 13 C/ 12 C and 18 O/ 16 O) at background stations and uses these and other datasets to challenge and improve numerical models of the earth system. The project particularly emphasized the use of these data to improve understanding of changes occurring in boreal and arctic ecosystems over the past 50 years and to seek from these data improved understanding of large-scale processes impacting carbon cycling, such as the responses to warming, CO 2 fertilization, and disturbance. The project also led to advances in the understanding of changes in water-use efficiency of land ecosystems globally based on trends in 13 C/ 12 C. The core element of this project was providing partial support for continuing measurements of CO 2 concentrations and isotopes from the Scripps CO 2 program, initiated by C. D. Keeling in the 1960s. The measurements included analysis of flasks collected at an array of ten stations distributed from the Arctic to the Antarctic. The project also supported modeling studies and interpretive work to help understand the origins of the large ~50% increase in the amplitude of the atmospheric CO 2 cycle detected at high northern latitudes between 1960 and present and to understand the long-term trend in carbon 13 C/ 12 C of CO 2 . The seasonal cycle work was advanced through collaborations with colleagues at MPI Jena and Imperial College

47 OTHER INSTRUMENTATION↗

Porous Organic Cage Membranes for Molecular Gas Separations (Final Technical Report for DE-SC0021357)

This proposal aims at demonstrating the development of a novel family of membranes, composed of porous organic cages (POC) which offer the possibility of displaying high separation performance for challenging molecular gas separations relevant to natural gas purification, and olefin/paraffin separation. The proposed POCs synthesized in membrane form will display the most desirable properties of polymers (facile processability and flexibility) and inorganic materials (hierarchically ordered pores with molecular sieving properties) leading to highly selective and permeable membranes. POCs should display distinctive structural, compositional, adsorption and transport properties than those of conventional porous materials, opening the doors for a new research direction in membrane science, and gas separations. Our preliminary results demonstrate the feasibility of preparing POC crystals with controlled size, and continuous POC membranes with remarkable high permeances, and separation ability for CO 2 /CH 4 , N 2 /CH 4 and C 3 H 6 /C 3 H 8 separations serving as a solid foundation for our proposed work. Fundamentally, this proposal aims at elucidating separation mechanisms of different gas mixtures related to natural gas composition, and olefin/paraffin separation over porous organic cage membranes. The proposed research will result in fundamental understanding of adsorption and transport properties of industrially relevant gas molecules through novel microporous membranes, and may lead to the development of a cost effective membrane technology for natural gas purification, and olefin/paraffin separation surpassing the conventional benchmark technology distillation. Furthermore, we aim at demonstrating selective water transport through POC membranes, which can be positively impactful in numerous industrial applications in which water is present. The ability to fabricate thin, chemically and mechanically stable POC membranes for societal relevant gas separations constitute a new and distinctive direction in membrane science. Our proposed work aims at addressing some of the challenges recognized in the Research Agenda for Transforming Separation Science . Specifically: (a) advancing understanding of complex mixtures on separation performance; (b) exploring thermodynamic and kinetic mechanisms through the elucidation of separation mechanisms, and (c) study potential stability issues of the membranes to be assessed by evaluating the long term membrane stability and performance at various temperatures and pressures. The team is uniquely qualified to execute the proposed work. The PI has solid expertise in the rational molecular engineering design of porous crystalline membranes for molecular gas separations. The PNNL collaborator has extensive experience in the synthesis, characterization, and functional applications of microporous crystals, with particular emphasis on gas adsorption.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development of a Novel Magnesium Alloy for Thixomolding® of Automotive Components (Final Report)

Magnesium (Mg) alloy die-castings are increasingly used in the automobile industry to achieve cost effective mass reduction, especially in systems where multiple components can be integrated into a single thin wall die-casting. However, there are several component quality restrictions in thin-walled Mg die castings, including variability in dimensional accuracy, part-to-part variation in mechanical properties, and porosity in the final part, which has limited the continued growth of die-cast components in the automobile industry. An alternative to die-casting is the process of thixomolding®. While the die-casting process relies on filling a mold at high speeds with the alloy in the completely molten state, the thixomolding® process fills a mold with a thixotropic alloy in a semi-solid slurry state at a temperature between the liquidus and solidus temperatures. Ideally, the material should be ~30–65% solid rather than being completely liquid at the beginning of the injection process. Advantages of the thixomolding® process include a finer grain structure, lower porosity, improved dimensional accuracy, improved part-to part consistency, improved mechanical properties, particularly ductility in the component, the ability to reduce wall thickness for mass savings, and longer tool life due to lower process temperatures. The objective of this collaborative project between Oak Ridge National Laboratory, FCA US LLC, and Leggera Technologies was to develop one or more novel Mg alloys more suitable for thixomolding® automotive structural components than the current die-casting alloys used for this process. The primary interest was to improve ductility while maintaining tensile and fatigue strengths, as these are properties that are critical for use in body and chassis structural applications. Since good corrosion resistance is also desirable for this application, this property was also considered when evaluating promising alloy compositions. An initial evaluation of existing components thixomolded® using AM60 was performed and microstructure, and tensile properties were evaluated for the baseline alloy. Targets were established for ease of processing (characterized by the melting range defined as the difference between the liquidus and the solidus), strength, and ductility. Computational modeling was used to identify promising alloys and selected alloys were cast in laboratory scale heats. Properties measured from laboratory scale heats were used to down-select two alloys for further evaluation and component fabrication. Two alloys were prepared in industrial scale heats, cut into small pieces (chips), and thixomolding® trials were initiated. Trial components were successfully fabricated using one alloy composition, but it was concluded that further refinement of the thixomolding® process parameters are required to successfully fabricate component using second alloy. Microstructure and mechanical properties were evaluated on the material removed from the fabricated component and properties were compared to the baseline alloy. Although mechanical properties of the alloys showed improvement over the baseline alloy, it was determined that modifications to the thixomolding® process would result in better microstructure control with further improvement in properties leading to successful commercialization. A provisional patent application has already been filed on the new alloys developed as part of the project.

36 MATERIALS SCIENCE↗

Final Report – Cooperative Research and Development Agreement between National Energy Technology Laboratory and Oxergy, Inc.

The NETL Raman Gas Analyzer (RGA) has been demonstrated to have an extremely fast response (<1 second) multi-gas analysis capability. All but the noble gases are Raman active, although the Raman interaction is weak. The RGA uses a reflectively lined capillary as the optical cell, providing both a small sample volume for fast gas exchange, and a much greater Raman signal collection than traditional instrument configurations. This allows very fast measurement of fuel gases (hydrogen, methane, ethane, propane) as well as other common industrial gases (carbon monoxide, carbon dioxide, nitrogen, oxygen, and water). This provides a new enabling technology for faster, smarter process control based on the chemical composition of the gases in the process – including improved fuel flexibility and efficiency for power generation systems. Research and development up to 2016 resulted in the construction of two field prototypes of the NETL RGA, which has been in applied to various laboratory applications for testing. The results of the testing have been used to improve the RGA design, with the intent to support technology transfer. The quality of the optical capillary used in the RGA is critical to its performance, and prior work at NETL produced a few optical capillaries superior to those commercially available. The production of high optical quality capillaries, however, was inconsistent in its results. With the support of the DOE Office of Technology Transitions, through the Technology Commercialization Fund program, this project was undertaken to address this commercialization barrier and to also evaluate the possible application of Raman gas analysis to a supercritical water gasification process being developed by Oxergy Inc. Oxergy, a small business located in Fairbanks, Alaska, is developing ultra-compact thermochemical reaction devices built with advanced manufacturing processes. Chief Technology Officer Jonathan Kamler holds the (pending) patent to Oxergy’s core reactor technology. Oxergy maintains wet-lab and combustion-lab space at the University of Alaska Fairbanks Center for Sustainable Living in Palmer, Alaska, where Mr. Kamler operates a pilot-scale, supercritical water gasification system designed and built by Oxergy. Mr. Kamler also operates an All Powers Labs Power Pallet gasifier coupled to a 10KW electrical generator as a dry biomass test platform at the Palmer facility. Both systems are suitable for real-world, collaborative testing of Raman gas analysis applications. The objectives of the CRADA include making the production of high-quality optical capillaries consistent and high yield, investigating other options for optical waveguides, and testing the capillaries for measurements in supercritical water gasification. Success on these objectives will support commercialization of both the RGA and supercritical water gasification technologies. Through the work performed on this project, a new apparatus was constructed and optimized to provide consistent production of high-quality optical capillaries. Several thick-walled capillaries were coated using this apparatus and shipped to Oxergy in September 2018 for testing in both dry gasification and supercritical water gasification process monitoring applications at University of Alaska Fairbanks facilities in Palmer. The strong earthquake near Anchorage and Palmer in November 2018 caused extensive damage and closure of the facilities used by Oxergy, preventing Oxergy from proceeding with experimental testing before the end of the project; the facility has been closed indefinitely. Earthquake damage prohibited the completion of all the project objectives prior to the end of the project. However, significant progress was made toward addressing a core technology commercialization barrier. The largest and most mature potential market for Raman gas analysis is its use in analytical instruments, which require sensitivity and low detection limits, and Oxergy’s market research found that market inertia is a barrier to commercial success in this market. Although NETL’s innovations in capillary coating have substantially improved Raman gas analysis capability, the likely market is expected to be niche applications that value the fast detection of real-time changes in gas composition.

Chorpening, Benjamin↗

Nanostructures for Electrical Energy Storage (NEES) (2020 Final Technical Report)

Nanostructures for Electrical Energy Storage (NEES, www.efrc.umd.edu) was an Energy Frontier Research Center supported by the DOE Office of Science, Basic Energy Sciences, from 8/1/2009 to 7/31/2020. Led by the University of Maryland, NEES enjoyed extensive collaborations with its funded partners, including two DOE Laboratories and six universities. The NEES vision has been to reveal a set of scientific insights and design principles that can underpin a next-generation electrical energy storage approach, building on advances in nanoscale science and technology to achieve simultaneous high power and high energy over extended charge/discharge cycling. The vision is motivated by the recognition that scaling into the nano regime opens the door to new physical phenomena and that the tools enlisted in nanoscale research provide major new opportunities for the synthesis not only of materials at molecular scale but for structures at nano scale and above. NEES has translated this vision into its research program based on two observations. First, while the behavior of ions and electrons in electrolytes and in electrode materials is crucial to electrical energy storage (or more appropriately electrochemical energy storage), it is the transport of ion and electron charge between different structural components of a storage device that ultimately determine its performance. With it well recognized that the choice of electrode materials typically constrain ion transport kinetics as well as maximum ion concentration, the search for better electrode materials has been a primary driver of battery research. At the same time the synthesis of electrodes is typically based on aggregation of particles with varying size, shape, and orientation in the electrode. Together with the presence of additional materials to impart electrical conductivity and cohesion to the composite electrode, change in electrode materials is necessarily accompanied by structural changes at the nano/micro scale that are difficult to categorize and manage. From the beginning, NEES’ vision has been to create and study simpler, highly controlled spatial arrangements of known materials as battery components (electrodes, current collectors, and electrolyte) and to understand how design and structure above the molecular scale determines the energy storage performance available from known materials. Second, advances in nanoscience dramatically expanded the portfolio of synthesis methods, structural motifs, and new phenomena available for research. Some of these gave rapid access to new building blocks at the deep nanoscale (e.g., carbon nanotubes grown by self-assembly, nanoscale arrays formed by electrochemical self-alignment, monolayer films controlled by self-limiting reaction). Such advances served as the enabler for the NEES vision to be pursued experimentally through study of 3D structures created and controlled at the nano, micro, and meso scales. Here, we use meso as in the BES MESO Report, implying not only intermediate or varying length scales, but very much the way behavior is influenced by other factors including aggregation of nanocomponents at different densities and spatial configurations, statistical variations in the aggregates, hierarchical architectures in which they can be assembled, or local 3D configurations that result from the architectures. Over its life cycle, NEES has pursued two overarching goals: (1) to understand the scientific fundamentals of electrochemical storage from the nanoscale to the mesoscale; and (2) to create and learn from innovative, controlled, heterogeneous nanostructures, where such nanostructures can enable the first goal and serve as models for future paradigms in energy storage. Specific goals have included: Synthesize heterogeneous nanostructures comprised of multiple materials arranged in controlled fashion and characterize their behavior; Demonstrate and elucidate design principles for achieving simultaneous high power and high energy; Develop materials processes which enable precision control of thin layers and 3D structures; Investigate the impact of artificial interphases on electrode stability during ion insertion/deinsertion; Create dense arrays of nanostructures to understand how the architecture of these assemblies, along with nanostructure design, influences energy storage behavior at the mesoscale; Identify and understand the consequences of nanoconfinement and local inhomogeneities in 3D mesoscale arrays; Develop and apply computational models to stimulate, guide and interpret experiments.

25 ENERGY STORAGE↗

Predict-first experimental analysis using automated and integrated magnetohydrodynamic modeling

An integrated-modeling workflow has been developed in this paper for the purpose of performing predict-first analysis of transient-stability experiments. Starting from an existing equilibrium reconstruction from a past experiment, the workflow couples together the EFIT Grad-Shafranov solver [L. Lao et al., Fusion Sci. Technol. 48, 968 (2005)], the EPED model for the pedestal structure [P. B. Snyder et al., Phys. Plasmas 16, 056118 (2009)], and the NEO drift-kinetic-equation solver [E. A. Belli and J. Candy, Plasma Phys. Controlled Fusion 54, 015015 (2012)] (for bootstrap current calculations) in order to generate equilibria with self-consistent pedestal structures as the plasma shape and various scalar parameters (e.g., normalized β, pedestal density, and edge safety factor [q 95 ]) are changed. These equilibria are then analyzed using automated M3D-C1 extended-magnetohydrodynamic modeling [S. C. Jardin et al., Comput. Sci. Discovery 5, 014002 (2012)] to compute the plasma response to three-dimensional magnetic perturbations. This workflow was created in conjunction with a DIII-D experiment examining the effect of triangularity on the 3D plasma response. Several versions of the workflow were developed, and the initial ones were used to help guide experimental planning (e.g., determining the plasma current necessary to maintain the constant edge safety factor in various shapes). Subsequent validation with the experimental results was then used to revise the workflow, ultimately resulting in the complete model presented here. We show that quantitative agreement was achieved between the M3D-C1 plasma response calculated for equilibria generated by the final workflow and equilibria reconstructed from experimental data. A comparison of results from earlier workflows is used to show the importance of properly matching certain experimental parameters in the generated equilibria, including the normalized β, pedestal density, and q 95 . On the other hand, the details of the pedestal current did not significantly impact the plasma response in these equilibria. A comparison to the experimentally measured plasma response shows mixed agreement, indicating that while the equilibria are predicted well, additional analysis tools may be needed. In conclusion, we note the implications that these results have for the success of future predict-first studies, particularly the need for scans of uncertain parameters and for close collaboration between experimentalists and theorists.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development, Monitoring, and Control of Fracture Thermal Energy Storage in Crystalline Rock Formations (DEMO-FTES) [Abstract]

Approximately half of global energy consumption is used for heating and cooling. Because fossil fuels are used to meet most of this demand, heating and cooling of buildings produces a large portion of global greenhouse gas (GHG) emissions. The proposed project seeks to demonstrate the feasibility of a seasonal thermal energy storage concept called fracture thermal energy storage (FTES), which has the potential to dramatically lower energy requirements for heating and cooling and improve the resilience of building energy systems. FTES is a technique for building a highly efficient heat exchanger by creating a carefully designed set of fractures in the ground below a building. This heat exchanger allows thermal energy to be stored over seasonal timeframes—for example, hot thermal energy that is easily captured in the summer or energy from waste heat sources—to meet heating needs during colder months. FTES offers a solution with a relatively small footprint and lower cost compared to currently operating aquifer thermal energy storage (ATES) systems and could be used in the many areas without aquifers suitable for ATES. If commercialized, FTES systems could exceed the 2.5 TWh of energy storage per year from the more than 2,800 ATES systems in operation worldwide, which range from 0.1 MW to 30 MW. The savings in CO2 emissions per year are also expected to match or exceed individual ATES projects, with the largest, a 30 MW system used to provide heating and cooling to the University of Technology in Eindhoven in the Netherlands, estimated to save 13,000 tons of CO2 emissions per year. FTES utilizes mature drilling and fracturing technology and therefore has the potential to be rapidly commercialized once demonstrated. The ability to construct and establish flow through an FTES heat exchanger has been demonstrated by a previous project and the potential for efficient, large-capacity energy storage has been shown using numerical models. However, no experimental validation of these numerical estimates of thermal energy storage has been made. The first crucial need to advance FTES technology is to identify the sensitivity of key metrics such as thermal energy storage and production rates, capacities, and efficiencies to design parameters such as the number of fractures, depth/temperature of fractures, size of fractures, and circulation rates. The second crucial need is experimental testing of achievable thermal performance with optimized system design parameters. The proposed scope of work seeks to systematically address these two critical needs through a highly complementary international collaboration spanning theory, laboratory, and mesoscale field evaluation. The proposed work plan calls for using dimensional analysis and existing state-of-the-art numerical simulators to design carefully scaled laboratory and 10-meter-scale field tests of the thermal efficiency of FTES. The existing advanced laboratory and intermediate-scale field testbeds that will be used for this project will allow for detailed monitoring of the system performance during the test and of how the performance changes across time and length scales. These results will determine the feasibility of full- scale FTES systems. If the thermal performance is consistent with model predictions, the results will provide a strong economic justification for rapid commercialization of FTES technology in a wide range of geographical areas.

25 ENERGY STORAGE↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding the Mechanism of Light and Elevated Temperature Induced Degradation of p-type Silicon Solar Cells (Final Report)

Light- and elevated-temperature-induced degradation (LeTID) was first discovered in multicrystalline Si (mc-Si) solar cells and was initially attributed to metal impurities. Later, LeTID was reported in Czochralski (Cz) and float-zone (FZ) Si, and is considered as an important efficiency loss mechanism in p-type passivated emitter rear contact (p-PERC) Cz Si solar cells. LeTID causes ~10% relative and permeant efficiency losses in these cells in warmer climate regions where the module temperature is > 50 °C. Unlike light-induced degradation (LID), which is also observed in p-PERC cells, LeTID is slower and takes weeks to months in the field to saturate. Another difference compared to LID is that regeneration in LeTID proceeds very slowly, and field regeneration could take > 25 years — essentially the life of the module. Unlike B-O defects that are responsible for LID, neither B nor O impurities are directly involved in LeTID. LeTID appears to be unique to p-type Si, and is also observed in Ga-doped Si. Currently, most experimental evidence relates LeTID to the injection of hydrogen present in the dielectric surface passivation layers, such as SiN x and Al 2 O 3 , into the monocrystalline Si (c-Si) bulk during the fast-firing step. The involvement of hydrogen is further strengthened by controlled studies that show that increasing the amount of hydrogen in the dielectric during fast-firing increases the degree of LeTID. Similar to LID, a regeneration process has been discovered for LeTID. Regeneration of LeTID defects occurs when samples are exposed to 2–4 Suns illumination at elevated temperatures of 140–220 °C for 2–15 hr. Given the slower kinetics of LeTID and sample regeneration compared to LID, this poses a challenge for the manufacturing and field reliability of p-PERC cells, which will be the leading photovoltaic technologies over the next decade. Therefore, there is a need to understand LeTID and develop strategies to mitigate this effect. The defect responsible for LeTID has been extensively studied with over 100 publications, but direct spectroscopic evidence of this defect’s structure is lacking. Without an atomistic understanding of the LeTID defect, it is difficult to assess the long-term efficacy of the current industrial mitigation strategies. This, in turn, has implications on energy production for tens of gigawatts of these cells that will be deployed yearly worldwide. Using electron paramagnetic resonance, we identified a defect associated with LeTID with a g-value of 2.006, which we attribute to an Si dangling bond in an extended defect such as a vacancy agglomerate with H possibly within or in close vicinity. These vacancy agglomerates are likely created during the firing process, during which time H atoms are also injected into the bulk from the hydrogenated SiN x dielectric layer. Our atomistic-level insight shows that the LeTID defect can be mitigated by targeted intrinsic defect engineering of the c-Si material through a slower pull rate of the Cz ingot or 1000 °C oxygen ambient processing of the Si wafer to reduce the vacancy concentration. This project was a collaborative effort between the Colorado School of Mines and the National Renewable Energy Laboratory.

14 SOLAR ENERGY↗

EV SALaD 2023 Demonstration: Best Practices and Mitigations for Protecting EVSE Infrastructure

The Electric Vehicle Secure Architecture Laboratory Demonstration (EV SALaD) program is a demonstration of cybersecurity best practices for high-power electric vehicle (EV) charging infrastructure led by Idaho National Laboratory (INL), in collaboration with other DOE National Laboratories participating in the EVs at Scale Consortium.a Sandia National Laboratories (SNL) and Pacific Northwest National Laboratory (PNNL) participated in the first 2-year (FY22-23) demonstration cycle for EV SALaD. This report documents the FY23 demonstration, the second in a series of demonstrations and collaborations in deploying and operating cybersecure EV charging infrastructure. It includes a summary of improvements from the FY22 demonstration, technical analysis of the FY23 demonstration, how the research demonstrates cyber-physical and cybersecurity best practices for high-power EV charging infrastructure, and related impacts to national and energy security. For EV SALaD, the FY22 demonstration focused on the detection, ranking, and prioritization of anomalous events for high-power EV charging. The FY23 demonstration additionally included the demonstration of cybersecurity best practices, which included protection and mitigation solutions to prevent, respond, and recover from anomalous events. During the demonstrations, the multi-lab EV SALaD team conducted a Test Effect Payload (TEP)b evaluation on extreme fast charger (XFC) hardware equipped with Cerberus, a detection and response solution, to demonstrate anomaly detection and mitigation cybersecurity best practices against cyber-enabled events.

33 ADVANCED PROPULSION SYSTEMS↗

Advanced Models for Nondestructive Evaluation of Aging Nuclear Power Plant Cables

Background: Nuclear power plant (NPP) cables must function correctly for proper power supply and control of the nuclear reactor. This is especially important for public and environmental safety at critical times such as during reactor shut-down following loss of coolant. Over extended periods of service, the cable insulation and jacket polymer materials suffer from degradation due to exposure to environmental stressors such as heat and ionizing radiation. The focus of this project has been the development of detailed descriptions of the way in which insulation polymers degrade, from a materials science perspective, and the development of new electrical techniques to monitor cable polymer condition nondestructively. Objectives: The objectives of this project have been to i) perform detailed characterization experiments upon cable insulation polymers that have experienced thermal and radiation exposure mimicking that received during NPP operation, including the exploration of novel cable nondestructive evaluation methods; capacitive, THz and infrared methods; ii) identify the most sensitive indicators of aging in these materials, and iii) develop advanced, validated models describing microstructural and chemical changes that are observed in cable insulation polymers due to thermal and radiation exposure. Methods: Accelerated aging was performed on the two most common United States NPP cable insulation polymers (cross-linked polyethylene (XLPE) and ethylene propylene rubber (EPR)) under various conditions of elevated temperature and gamma radiation dose. Aging mechanisms were elucidated through extensive thermal, mechanical and microscopic characterization of the aged samples, and materials modeling. Dielectric and IR spectra were measured on pristine and aged samples. Data was analyzed statistically, via multiple linear regression, partial least squares and probabilistic neural network approaches. Impact: Extant cable monitoring techniques do not deal successfully with all polymer types. This research has laid a foundation upon which new electrical nondestructive test methods for cable polymer condition monitoring may be developed, hence launching the development of new test methods for cable insulation monitoring based on measuring electrical rather than mechanical parameters. Collaboration: This project has benefitted from collaboration between experts in materials science and engineering, materials modeling, electrical engineering, and nondestructive evaluation. The majority of the characterization measurements were carried out at Iowa State University. Materials modeling was carried out primarily at Washington State University. Irradiation of samples took place at Pacific Northwest National Laboratory (PNNL), where a student intern from Iowa State was hosted for one summer, setting up the aging experiments. A research student from the University of Bologna, Italy, joined the project for their thesis research at Iowa State University with samples provided by PNNL. The project benefitted from regular involvement of senior engineers in US-based industry partners. Project investigators presented findings at various national and international conferences and workshops.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY↗