Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Pathways towards Valid Data: Assessment of Optimized Packaging Strategies for Core Components - 18158

Every company that runs nuclear power plants needs a strategy for disposal of the radioactive waste and for decommissioning and dismantling of its nuclear reactors. The dismantling progress of several German NPPs is already in an advanced stage. Hence, particularly highly activated core components have to be disposed of as radioactive waste. Nevertheless, this is also an issue during the operating phase due to necessary replacements of highly activated core components such as PWR control elements or RPV heads. The conditioning of waste packages for final disposal in the German repository Konrad requires the core components to be dismantled, packaged and dried. Therefore, a qualified packaging strategy is needed to ensure a reliable compliance with the protection objectives of the repository and an optimized utilization of prescribed contingents. Exemplified by PWR control elements a pathway is drawn how to perform an optimized packaging strategy in compliance with the protection objectives of the repository based on only few relevant radionuclides derived from activation calculations. For these calculations, particularly the influence of trace impurities in the materials has to be considered and their amounts have to be verified or analyzed by sampling. Furthermore, low nuclide activities from contamination cannot simply be neglected because some of them are obliged to be declared or their radiological relevance has not been sufficiently determined. Due to various influence factors, qualified sampling strategies need carefully considered concepts. Therefore, detailed planning facilitates the qualification and approval process and reduces the costs for analyses and the number of containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Theoretical Calculation and Simulation Studies of Axisymmetric Plasma and Halo Current Analysis in EAST

A new technology for developing fusion energy is to use hydrogen isotopes i.e., deuterium (D) and tritium (T) which is a combine effort for building up of International Thermonuclear Reactor (ITER) named as Tokamak, which will come into operation in 2020. Handsome amount of work has already been done by many researchers contingent with plasma shape, halo current and plasma equilibrium properties by numerical techniques. Halo current calculation is the most important work in fusion reactors. In this paper, we have calculated halo current and plasma cross-section energy. The research covers calculation of plasma energy and determines the force on the vessel by magnetic field transformation method, which is the essential part of calculating halo current. Further, we have developed VDE up/down halo current models. These models give total magnetic field, asymmetric forces, conducting points and poloidal halo current. Confined plasma by magnetic field is considered to be an abundant and durable source of energy for future aspects. In this paper, plasma magnetic field of each cross section was calculated by using energy integral. Transformation method has been successfully applied which provides the connection between major sideways forces acting on the plasma. Theoretical investigation and analyses of halo current have successfully been done. Two observations were analyzed, large ratio of halo current during VDE down and cancellation of specific forces at conducting point. The results obtained will be useful for equalizing the simulation and experimental results. The research will be extended to developed new models for future fusion research. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best-Estimate-Plus-Uncertainty-Informed Deterministic Safety Evaluation

Nuclear power plant (NPP) utilities operate contingent on receiving a favorable safety assessment from their national regulatory and safety authority. Among the many facets of NPP safety addressed is verification of integral design-basis performance - a demonstration of a plant's response to a suite of challenging transient and accident scenarios. Thermal-hydraulic system computer codes like RELAP5, TRAC, CATHARE, and ATHLET are used as the simulation engine as part of a broader evaluation model that accounts for a variety of uncertainties. It is common for these evaluation models to apply either a super-bounding/ deterministic or best-estimate plus uncertainty (BEPU) approach. The trend over the past two decades has been away from the classical deterministic methods towards methods explicitly incorporating parametric uncertainty models. These methods center upon the evaluation of parametric and system response uncertainties, where these uncertainties are derived from the convolution of one or more parametric uncertainty models. Acceptance of BEPU methods has provided the nuclear industry benefits regarding operational flexibility and, in some cases, power output. The advantage of BEPU for new NPPs is less obvious. Generally, these new designs include engineered safety features that practically eliminate fuel damage resulting from design-basis events. To substantiate such claims, applying super-bounding assumptions on uncertainties may be a more expedient demonstration of a plant's safety case than those based on BEPU. In addition, the requirements on design inputs for a deterministic evaluation model are substantially less than that for a BEPU evaluation model. As such, applying a deterministic evaluation model is expected to have the advantage of reducing the duration of the licensing review process. For the current operating fleet of light-water reactors (LWRs), the nuclear safety authorities in most countries have followed the U.S. Nuclear Regulatory Commission's rules for the preparation of safety analysis. These rules are specified in the U.S. Code of Federal Regulations, most notably in, Part 10, Section 50.46, entitled 'acceptance criteria for emergency core cooling systems for light-water nuclear power reactors' and its Appendix K. Notably, Appendix K specifies deterministic requirements for analysis of the loss-of-coolant accident (LOCA), which is generally regarded as the maximum credible accident for LWRs. Projecting 10 CFR 50, Appendix K, to new plants is not obviously applicable as it addresses light water fluid flow and heat transfer phenomena associated with core uncovery. Preventing core uncovery is a requirement for several designs in the class of small modular reactors (SMR). In doing so, the majority of phenomenological uncertainties prescribed in Appendix K are eliminated. Similarly, the impact of other phenomena to effect a change in various safety measures, i.e., figures-of-merit, is expected to be different. The implication is that development of a deterministic evaluation model must be derived with an original technical basis rather than solely rely on Appendix K. While a logical conclusion, the expectation of original bases, regardless of the treatment of uncertainties, is embodied in the U.S. NRC's Regulatory Guide (RG) 1.203, Transient and Accident Analysis. Within the evaluation model development and application process framework of RG 1.203, this paper describes a BEPU-informed deterministic evaluation model for NPPs with large inherent safety margins. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Theoretical Calculation and Simulation Studies of Balancing Forces and Axisymmetric Poloidal Halo Current in EAST

A new technology for developing fusion energy is to use hydrogen isotopes i.e., deuterium (D) and tritium (T) which is a combine effort for building up of International Thermonuclear Reactor (ITER) named as Tokamak, which will come into operation in 2020. Handsome amount of work has already been performed by many scientists contingent with plasma shape, halo current and plasma equilibrium properties by numerical techniques. Halo current calculation is the most important work in fusion reactors. In this paper, halo current and plasma cross-section energy have been calculated. The research covers calculation of plasma energy and determines the force on the vessel by magnetic field transformation method, which is the essential part of calculating halo current. Further, vertical displacement event (VDE) up/down halo current models have been calculated. These models give total magnetic field, asymmetric forces, conducting points and poloidal halo current.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An overview of the 2014 revision of ANSI/ANS-ANS-8.1-2014, 'Nuclear criticality safety in operations with Fissionable Materials Outside Reactors' - 14577

A revision to the American National Standards Institute (ANSI)/American Nuclear Society (ANS) standard, 'Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors' [ANSI/ANS-8.1 (ANS-8.1)], was completed and published in 2014. The approved scope for the 2014 revision included two major efforts: (1) an editorial revision to clarify the meaning of the process analysis requirement (PA) and the double contingency principle recommendation (DCP) and (2) the generation of new subcritical limits for uranium and uranium compounds for enrichments less than 10 wt % {sup 235}U. After a clarification request was submitted regarding the PA and DCP in 2009, the scope of the revision became focused almost entirely on the editorial revision. With approval from the ANS-8 subcommittee chairman, the computational effort was postponed until the editorial revision could be completed. The 2014 revision of ANS-8.1 involved nuclear criticality safety experts from 14 different sites, each with many years of experience, either maintaining the standard as a working group member or as a criticality safety practitioner. Many of the represented sites had implemented the PA with the language of the DCP to ensure that process operations with fissionable materials would be subcritical. However, the early working group deliberations made it clear that the general industry focus was on the DCP rather than the PA, which requires that 'all normal and credible abnormal conditions remain subcritical'. Over the course of the revision, two new definitions and a new appendix (Appendix B) were developed to enhance understanding of the PA and DCP. The emphasis of Appendix B is on the requirement for subcriticality (PA) rather than the DCP. The phrase 'credible abnormal conditions' in the PA is broader in meaning than 'changes in process conditions,' as recommended by the DCP. This is because a single credible abnormal condition can potentially affect multiple independent process conditions, and consequently, multiple process parameters, simultaneously. The DCP is a technical practice meant to support the PA and cannot be applied to all situations. However, when it can be properly applied, the DCP technical practice, in most cases, ensures compliance with the PA because two unlikely, independent, and concurrent changes in process conditions are generally judged not to be a credible abnormal condition, as specified in the PA. This paper elaborates on the intense working group discussions over the course of the ANSI/ANS-8.1 standard revision and summarizes the modifications made to the revised standard. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of French regulation regulations concerning nuclear criticality safety - 14585

Hitherto, in France, licensees used to demonstrate compliance with Fundamental Safety Rule I.3.c. This Rule sets out the principles for demonstrating Nuclear Criticality Safety in all nuclear facilities (excluding reactors). Although there is a good level of consensus between the licensees and the Regulator, this Rule is now somewhat dated (it came into force in 1984) and does not cover all aspects. The French Nuclear Safety Authority (ASN) used the 2006 Law on Transparency and Nuclear Safety as the catalyst for a thorough revision and updating of its regulatory documentation. Thus, in 2010, ASN decided to set up a 'criticality working group' involving ASN, the licensees (AREVA, CEA, EDF...) and the Technical Safety Organization (IRSN). This group was tasked with drafting a regulatory text (a 'resolution') and a criticality guide. The objectives were to update Rule I.3.c, clearly defining the scope for reactors and transport packages of fissile material, to further develop areas not covered in the existing rule and to take account of the feedback and lessons learned from past events. Thus, this paper presents the status of French regulations concerning Nuclear Criticality Safety (NCS). Firstly, it focuses on the existing Rule I.3.c and then explains how this will be modified by the forthcoming improvements to the resolution and the criticality guide. It in particular addresses the scope of the new regulations (concerning reactors and the transport of fissile material), how the principle of defence in depth is to be applied to criticality safety, the double contingency principle, control modes, the reference fissile medium, the organization, the role of the Criticality Engineer, admissibility criteria, validation, etc. (authors)

42 ENGINEERING↗

The application of ICASPA to critical and safe mass calculations - 14586

ICASPA, an Improved Critical and Safe Parameters Algorithm, calculates the size of a fissile body for a given value of k-effective. ICASPA uses an iterative predictor/corrector algorithm in which the MONK9A code is used to derive a precise k-effective value for a given candidate body size; auxiliary equations are then used to adjust the body size. The process is repeated until MONK9A outputs the chosen target value of k-effective. EDF Energy operates eight nuclear power stations comprising one Pressurized Water Reactor (PWR) and seven Advanced Gas-cooled Reactor (AGR) stations. At these sites, the term 'fuel route' is used to encompass all of the ex-reactor arrangements for the handling and storage of fuel. The criticality safety cases for these fuel routes are based on the use of geometrically safe arrangements for the required quantities of fuel. The allowed quantities and arrangements of fuel are safely sub-critical, even under the contingency of accidental moderator ingress. The fuel route safety cases consider all credible potential fault conditions, including events such as dropped fuel. Any such events might change the geometry of the fuel elements, but it is difficult to calculate exact k-effective values for realistic models of dropped fuel. This difficulty is overcome by the use of an alternative approach in which limiting safe masses are calculated for bounding (worst-case) rearrangements of fuel rods and moderators, using geometries similar to those covered by criticality handbook data. Where required, the resulting safe masses are used to set safety case limits and conditions. For example, some fire extinguishants, such as water and ABC dry powder, are also effective moderators. Hence, in some fuel route areas, administrative criticality controls are used to either prohibit or limit the permitted quantities of these materials. This paper describes the work that has been carried out to adopt ICASPA as the approved calculation method for these safe mass calculations. The work has been carried out within the company quality assurance requirements for nuclear safety related software. It has involved the development of a configuration controlled version of ICASPA and the local verification and validation of the resulting code. The benefits from the adoption of ICASPA are also presented. These include accuracy improvements and, because the method uses the MONK9A code for k-effective calculations, the ability to use more sophisticated models for limiting case geometries. (authors)

42 ENGINEERING↗

Training practices for CEA engineers qualified in criticality safety - 14598

Soon after the Tokai Mura criticality accident, the French nuclear authority addressed nuclear operators to take measures regarding criticality safety. In CEA in particular after a thorough assessment of the late 1990's - early 2000's practices, the decision was taken to put up a training program in criticality safety for young (and 'old') nuclear safety specialists. The evolution of the training practices for the IQC (Ingenieurs Qualifies en Criticite - Engineers Qualified in Criticality safety) are presented hereafter, beginning with the first training session set up in October 2001 until now. This primarily deals with the kind of audience this training addresses (professional background), what is taught, learned, used later on and how one becomes an IQC. Furthermore, a discussion involves who recognizes the qualification, how long does one need to become a real criticality safety specialist on an operational basis, how the staff uses (or not) the knowledge and how this ensemble contributes to the professional careers advancement (criticality safety is a strong 'card'). The methodological documents in support of the IQC are also presented, particularly the last version of the 'criticality guide fiches (files, cards, sheets)' collection which summarizes the main aspects and principles of criticality safety (including the rudiments of neutron physics, criticality control modes, double contingency principle, etc.). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improved Evaluation of Large Network Matrices for Linear Power Flow Within Optimization Problems: Preprint

This work discusses methods for evaluating the Power Transfer Distribution Factor (PTDF) and Line Outage Distribution Factor (LODF) matrices by employing sparse linear algebra for large-scale computing applications. These matrices are critical in many power systems applications, such as the Unit Commitment Problem (UC), pre- and post-contingency power flow analysis, and transmission expansion. These matrices are typically dense, which means they require a significant amount of time and memory to be computed for large networks. However, by analyzing the structure of the matrices and their computation method, it is possible to use reduced memory methods based on sparse matrix operations. This paper shows that sparse linear algebra algorithms are faster and require less memory and time than traditional dense approaches. Additionally, we explore the effect of matrix sparsification by eliminating trailing digits on power flow calculations.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Sensitivity-Based Reactive Power Dispatch of DERs to Support Transmission Grid During Emergency

This paper proposes a TSO-DSO framework including DER set-point dispatch using sensitivity analysis. We address all three steps of TSO-DSO integration stating by estimating the capability curve of an unbalanced distribution system and then modeling of capability curve on the transmission side grid and estimating the reactive power needed from DSO during emergencies, and ending by dispatching the requested reactive power from TSO. The proposed interaction framework is tested on an IEEE 37-node distribution network connected to IEEE 9 bus transmission system. The simulation shows that using sensitivity-based dispatch would reduce the number of communication signals between DERs and DSO and that can decrease the risk of communication contingency.

Alkhonain, Ahmed↗

Solving the Grid Optimization Competition Challenge 3 Problem

The Grid Optimization Competition Challenge 3 Problem posed a multiperiod security-constrained unit commitment problem with base-case AC power flow. The problem formulation includes binary unit commitment decisions, nonlinear AC power flow and balance, dispatchable loads, and linearized contingency real power flow, among other features. This talk will present a modified consensus ADMM algorithm, which splits the problem into mixed-integer linear and nonlinear components, as a heuristic solution method for this large-scale mixed integer nonlinear program. We will present some computational results from the competition for our implementation and reflect on the challenges of participating the grid optimization competition.

AC power flow↗