Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Minnesota Land Management Information Center

A brief history of the Minnesota Land Management Information Center is given and the present operational status and plans for future development are described. The incorporation of LANDSAT data into the system, hardware and software capabilities, and funding are addressed.

Nordstrand, E. A.↗

Middle Atmosphere Program. Handbook for MAP, volume 28

Extended abstracts from the fourth workshop on the technical and scientific aspects of MST (mesosphere stratosphere troposphere) radar are presented. Individual sessions addressed the following topics: meteorological applications of MST and ST radars, networks, and campaigns; dynamics of the equatorial middle atmosphere; interpretation of radar returns from clear air; techniques for studying gravity waves and turbulence; intercomparison and calibration of wind and wave measurements at various frequencies; progress in existing and planned MST and ST radars; hardware design for MST and ST radars and boundary layer/lower troposphere profilers; signal processing; and data management.

Liu, C. H.↗

Aerospace Vehicle Design, Spacecraft Section. Volume 1: Project Groups 3-5

Three groups of student engineers in an aerospace vehicle design course present their designs for a vehicle that can be used to resupply the Space Station Freedom and provide an emergency crew return to earth capability. The vehicle's requirements include a lifetime that exceeds six years, low cost, the capability for withstanding pressurization, launch, orbit, and reentry hazards, and reliability. The vehicle's subsystems are analyzed. These subsystems are structures, communication and command data systems, attitude and articulation control, life support and crew systems, power and propulsion, reentry and recovery systems, and mission management, planning, and costing.

Source record↗

Aerospace Vehicle Design, Spacecraft Section. Final Project Reports: Project Groups 6-8 - Volume 2

Three groups of student engineers in an aerospace vehicle design course present their designs for a vehicle that can be used to resupply the Space Station Freedam and provide emergency crew return to earth capability. The vehicle's requirements include a lifetime that exceeds six years, low cost, the capability for withstanding pressurization, launch, orbit, and reentry hazards, and reliability. The vehicle's subsystems are structures, communication and command data systems, attitude and articulation control, life support and crew systems, power and propulsion, reentry and recovery systems, and mission management, planning, and costing. Special attention is given to spacecraft communications.

Source record↗

Handbook for MAP, volume 32. Part 1: MAP summary. Part 2: MAPSC minutes, reading, August 1989. MAP summaries from nations. Part 3: MAP data catalogue

Extended abstracts from the fourth workshop on the technical and scientific aspects of mesosphere stratosphere troposphere (MST) radar are presented. Individual sessions addressed the following topics: meteorological applications of MST and ST radars, networks, and campaigns; the dynamics of the equatorial middle atmosphere; interpretation of radar returns from clear air; techniques for studying gravity waves and turbulence, intercomparison and calibration of wind and wave measurements at various frequencies; progress in existing and planned MST and ST radars; hardware design for MST and ST radars and boundary layer/lower troposphere profilers; signal processing; and data management.

Vincent, R. A.↗

A review of the US Global Change Research Program and NASA's Mission to Planet Earth/Earth Observing System

This report reflects the results of a ten-day workshop convened at the Scripps Institution of Oceanography July 19-28, 1995. The workshop was convened as the first phase of a two part review of the U.S. Global Change Research Program (USGCRP). The workshop was organized to provide a review of the scientific foundations and progress to date in the USGCRP and an assessment of the implications of new scientific insights for future USGCRP and Mission to Planet Earth/Earth Observing System (MTPE/EOS) activities; a review of the role of NASA's MTPE/EOS program in the USGCRP observational strategy; a review of the EOS Data and Information System (EOSDIS) as a component of USGCRP data management activities; and an assessment of whether recent developments in the following areas lead to a need to readjust MTPE/EOS plans. Specific consideration was given to: proposed convergence of U.S. environmental satellite systems and programs, evolving international plans for Earth observation systems, advances in technology, and potential expansion of the role of the private sector. The present report summarizes the findings and recommendations developed by the Committee on Global Change Research on the basis of the presentations, background materials, working group deliberations, and plenary discussions of the workshop. In addition, the appendices include summaries prepared by the six working groups convened in the course of the workshop.

Moore, Berrien, III↗

Columbia Accident Investigation Board Report. Volume Five

Volume V of the Report contains appendices that were not cited in VolumeI. These consist of documents produced by NASA and other organizations, which were provided to the Columbia Accident Investigation Board in support of its inquiry into the February 1, 2003 destruction of the Space Shuttle Columbia The contents include:. Appendix G.1 Requirements and Procedures for Certification of Flight Readiness; Appendix G.2 Appendix R, Space Shuttle Program Contingency Action Plan; Appendix G.3 CAIB Charter, with Revisions; Appendix G.4 Group 1 Matrix Brief on Maintenance, Material, and Management; Appendix G.5 Vehicle Data Mapping(VDM) Team Final Report, Jun 13, 2003; Appendix G.6 SRB Working Group Presentation to CAIB; Appendix G. 7 Starfire Team Final Report, Jun 3, 2003; Appendix G.8 Using the Data and Observations from Flight STS-107, Executive Summary; Appendix G.9 Contracts, Incentives, and Safety/Technical Excellence; Appendix G.10 Detailed Summaries: Rogers Commission Report, ASAP Report, SIAT Report; Appendix G.11 Foam Application and Production Chart; Appendix G.12 Crew Survivability Report; and Appendix G.12 Aero/Aerothermal/ Thermal/Structures Team FinalReport, August 6, 2003.

CAIB (COLUMBIA ACCIDENT INVESTIGATION BOARD)↗

Introduction to Flight Test Engineering [Introduction Aux Techniques Des Essais En Vol]

Flight test is at the core of what organizations must do in order to validate the operation and systems on an aircraft. While the AGARDograph series 300 and 160 series deal with aspects of this testing, this volume pulls it all together as an introduction to the process required to do effective flight test engineering. This volume was originally published in 1995. Its utility has been proven in that many flight test organizations and universities have requested copies for their engineers and students. It was felt that re-issuing it in a new format designed for electronic publication would be valuable to the community. This second printing changes none of the text, but rather reformats it. All the original references to AGARD (instead of RTO) are left in place so that none of the flavor of the original publication is lost. This is the Introductory Volume to the Flight Test Techniques Series. It is a general introduction to the various activities and aspects of Flight Test Engineering that must be considered when planning, conducting, and reporting a flight test program. Its main intent is to provide a broad overview to the novice engineer or to other people who have a need to interface with specialists within the flight test community. The first two Sections provide some insight into the question of why flight test and give a short history of flight test engineering. Sections 3 through 10 deal with the preparation for flight testing. They provide guidance on the preliminary factors that must be considered; the composition of the test team; the logistic support requirements; the instrumentation and data processing requirements; the flight test plan; the associated preliminary ground tests; and last, but by no means least, discuss safety aspects. Sections 11 through 27 describe the various types of flight tests that are usually conducted during the development and certification of a new or modified aircraft type. Each Section offers a brief introduction to the topic under consideration, and the nature and the objectives of the tests to be conducted. It lists the test instrumentation (and, where appropriate, other test equipment and facilities) required, describes the test maneuvers to be executed, and indicates the way in which the test data is selected, analyzed, and presented. The various activities that should take place between test flights are presented next. Items that are covered are: who to debrief; what type of reports to send where: types of data analysis required for next flight; review of test data to make a comparison to predicted data and some courses of action if there is not good agreement; and comments on selecting the next test flight. The activities that must take place upon completion of the test program are presented. The types of reports and briefings that should take place and a discussion of some of the uses of the flight test data are covered. A brief forecast is presented of where present trends may be leading.

Test facilities↗

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

Bundle Data Approach at GES DISC Targeting Natural Hazards

Severe natural phenomena such as hurricane, volcano, blizzard, flood and drought have the potential to cause immeasurable property damages, great socioeconomic impact, and tragic loss of human life. From searching to assessing the Big, i.e., massive and heterogeneous scientific data (particularly, satellite and model products) in order to investigate those natural hazards, it has, however, become a daunting task for Earth scientists and applications researchers, especially during recent decades. The NASA Goddard Earth Sciences Data and Information Service Center (GES DISC) has served Big Earth science data, and the pertinent valuable information and services to the aforementioned users of diverse communities for years. In order to help and guide our users to online readily (i.e., with a minimum effort) acquire their requested data from our enormous resource at GES DISC for studying their targeted hazard event, we have thus initiated a Bundle Data approach in 2014, first targeting the hurricane event topic. We have recently worked on new topics such as volcano and blizzard. The bundle data of a specific hazard event is basically a sophisticated integrated data package consisting of a series of proper datasets containing a group of relevant (knowledge--based) data variables readily accessible to users via a system-prearranged table linking those data variables to the proper datasets (URLs). This online approach has been developed by utilizing a few existing data services such as Mirador as search engine; Giovanni for visualization; and OPeNDAP for data access, etc. The online Data Cookbook site at GES DISC is the current host for the bundle data. We are now also planning on developing an Automated Virtual Collection Framework that shall eventually accommodate the bundle data, as well as further improve our management in Big Data.

GES DISC↗

State Insights On The Water-Energy Nexus And Policy Ideas To Achieve Greater Savings

Governors, state policymakers, utilities and other stakeholders across the country are increasingly aware of the connection between energy and water production and use, and the need to conserve both resources to meet economic and environmental goals. It requires substantial amounts of water to produce energy and considerable amounts of energy to treat and deliver water. The critical interdependence between energy and water was clearly illustrated during the recent winter storm in Texas and other parts of the South in February 2021. Initial power outages contributed to a longer-term water crisis. Power outages led to water pump failures while water demand increased from frozen water pipes that burst. This caused low water pressure that can lead to harmful bacteria growth in the water. The power outages also prevented water treatment plants from properly treating the water for several days, thereby leaving many residents without clean drinking water and worsening the storm’s impacts. The National Governors Association has been working with states on this connection between water and energy and strategies for conserving those resources for several years. NGA held a Water-Energy Nexus Learning Lab in September 2020. This event invited two leading states in the water-energy nexus space, Arizona and Wisconsin, to showcase some of their model policies and programs to other states, Maryland, Nevada, North Carolina, North Dakota, and Washington, looking for greater savings opportunities. This paper provides an overview of challenges that states are facing in developing integrated water and energy conservation policies; provides background on Arizona and Wisconsin’s innovative water-energy policies and programs; and summarizes action items the participating state teams identified for their respective states. The main categories of policy solutions identified by states at NGA’s Water-Energy Nexus Learning Lab were: Funding & Financing – providing financial incentives for water efficiency modeled after established energy efficiency programs, and an emphasis on financial support for small water and energy utilities. Education & Technical Assistance – providing more education and training opportunities about ways to achieve cost-effective energy and water savings, and the needs of resource-constrained small and medium utilities for training and other assistance. Structural Changes to Encourage Conservation – developing ways to incentivize agricultural conservation such as through water allocation strategies; adopting water reuse or water loss standards; and requiring electric utilities to consider water impacts as part of their integrated resource planning process. Communications & Data – conducting energy audits, reviewing water data provided to state agencies, and developing data benchmarking tools to measure and better manage energy and water use. Climate Strategy – establishing a multi-agency working group or other collaborative approach to determine ways to integrate energy and water savings in state policies and help meet the state climate objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flexible Financial Credit Agreements: Blockchain

Flexible Financial Credit Agreements is a broad term used to describe a suite of solar products with innovative features not currently offered in traditional solar financing programs. This brief focuses on blockchain, which is a highly secure, decentralized cryptographic technology that verifies transactional data and stores it on all participating computers in an immutable ledger. Blockchain is best known for its first application in the creation of Bitcoin cryptocurrency, but its principles offer a basis for innovation in a variety of industries where the complexity of transactional data is better suited for secure, decentralized management.

blockchain↗

NIF Projects Controls and Information Systems Software Quality Assurance Plan

Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

42 ENGINEERING↗

Eurasian Reindeer Pastoralism in a Changing Climate: Indigenous Knowledge and NASA Remote Sensing

It is intended that Reindeer Mapper/EALAT will be able to provide reindeer herders with an efficient tool for managing the real-time movements and migrations of their herds through enabling improved efficiency in linking different members of the herder settlements or communities and providing real-time local, satellite or other data (e.g., ice melt in lakes and rivers, weather events), thus enabling real time adjustments to herd movements to avoid problems such as changing weather/climate conditions, freeze-thaw "lock-out" problems, or take advantage of availability of better pasturelands along migration routes. The system is being designed to incorporate local data to allow users to bring their own data into the system for analysis in addition to the data provided by the system itself. With the local information of the population, up to date environmental data and habitat characteristics, the system could generate maps depicting important features of interest for reindeer managers. One of the products derived from the planned Reindeer Mapper system will be a web-based graphic display that allows analysts to quickly pinpoint areas of interest such as those with large concentrations of reindeer and provide surrounding environmental information. The system could be automatically updated with near-real-time information such as hourly precipitation and snowfall rate and accumulation, daily surface and air temperatures, and vegetation cover conditions. The system could bring attention to the proximity of human and animal populations as part of the need for control response. A local GIS will bring these many layers together with several supporting models, showing only a straightforward graphic of the real-time situation in the field. Because the system proposed will be operating in the Internet environment, it should be virtually accessible from any network computers and wireless remote access from the field. The International Center for Reindeer Husbandry in Kautokeino, Norway, is providing regional and international coordination of and access to data sets and expertise, and will act as overall clearinghouse for EALAT information.

Maynard, N. G.↗

Risk to Ecological Resources from Delaying Decommissioning and Waste Management: conceptualization and examples from the Hanford Site - 17156

Ecological evaluation is essential for remediation, restoration, and future land-use decisions for contaminated lands, and forms a basis for many management practices. Ecological evaluations or assessments can also be used to examine the efficacy of remediation and restoration methods, providing valuable data to plan and improve future restoration. Assessments can examine past activities, current conditions, and the effects of future remediation or restoration. In general, ecological evaluations have not been used to assess the effects of delaying remediation. Yet for complicated situations, such as at Hanford Site, where there are dozens of remediation sites still to be completed, understanding the effects of delaying remediation on ecological and eco-cultural resources adds measurably to making sound sequencing decisions. Ecological evaluations are inherently complex compared to human health risk assessment because there are hundreds of species, composing a great number of communities and ecosystems. Ecosystems are dynamic, undergoing changes in response to predictable environmental conditions (succession), as well as unforeseen events. Further, ecosystems respond to remediation and restoration actions, even when they are on adjacent areas. Conducting evaluations of the risk to ecological resources must account for the dynamic nature of ecosystems, and for the dynamic, changing landscape that results from remediation on nearby areas. The approach will provide information for sound decision-making with stakeholder participation. This project was partially funded by CRESP through the Department of Energy (DE-FC01-95EW55084). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geographic Information Systems and Web Page Development

The Facilities Engineering and Architectural Branch is responsible for the design and maintenance of buildings, laboratories, and civil structures. In order to improve efficiency and quality, the FEAB has dedicated itself to establishing a data infrastructure based on Geographic Information Systems, GIS. The value of GIS was explained in an article dating back to 1980 entitled "Need for a Multipurpose Cadastre" which stated, "There is a critical need for a better land-information system in the United States to improve land-conveyance procedures, furnish a basis for equitable taxation, and provide much-needed information for resource management and environmental planning." Scientists and engineers both point to GIS as the solution. What is GIS? According to most text books, Geographic Information Systems is a class of software that stores, manages, and analyzes mapable features on, above, or below the surface of the earth. GIS software is basically database management software to the management of spatial data and information. Simply put, Geographic Information Systems manage, analyze, chart, graph, and map spatial information. GIS can be broken down into two main categories, urban GIS and natural resource GIS. Further still, natural resource GIS can be broken down into six sub-categories, agriculture, forestry, wildlife, catchment management, archaeology, and geology/mining. Agriculture GIS has several applications, such as agricultural capability analysis, land conservation, market analysis, or whole farming planning. Forestry GIs can be used for timber assessment and management, harvest scheduling and planning, environmental impact assessment, and pest management. GIS when used in wildlife applications enables the user to assess and manage habitats, identify and track endangered and rare species, and monitor impact assessment.

Reynolds, Justin↗

Evolution of CMS Workload Management Towards Multicore Job Support

The successful exploitation of multicore processor architectures is a key element of the LHC distributed computing system in the coming era of the LHC Run 2. High-pileup complex-collision events represent a challenge for the traditional sequential programming in terms of memory and processing time budget. The CMS data production and processing framework is introducing the parallel execution of the reconstruction and simulation algorithms to overcome these limitations. CMS plans to execute multicore jobs while still supporting singlecore processing for other tasks difficult to parallelize, such as user analysis. The CMS strategy for job management thus aims at integrating single and multicore job scheduling across the Grid. This is accomplished by employing multicore pilots with internal dynamic partitioning of the allocated resources, capable of running payloads of various core counts simultaneously. An extensive test programme has been conducted to enable multicore scheduling with the various local batch systems available at CMS sites, with the focus on the Tier-0 and Tier-1s, responsible during 2015 of the prompt data reconstruction. Scale tests have been run to analyse the performance of this scheduling strategy and ensure an efficient use of the distributed resources. This paper presents the evolution of the CMS job management and resource provisioning systems in order to support this hybrid scheduling model, as well as its deployment and performance tests, which will enable CMS to transition to a multicore production model for the second LHC run.

Perez-Calero Yzquierdo, A.↗