Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Integrated Data Modeling and Simulation on the Joint Polar Satellite System Program

The Joint Polar Satellite System is a modern, large-scale, complex, multi-mission aerospace program, and presents a variety of design, testing and operational challenges due to: (1) System Scope: multi-mission coordination, role, responsibility and accountability challenges stemming from porous/ill-defined system and organizational boundaries (including foreign policy interactions) (2) Degree of Concurrency: design, implementation, integration, verification and operation occurring simultaneously, at multiple scales in the system hierarchy (3) Multi-Decadal Lifecycle: technical obsolesce, reliability and sustainment concerns, including those related to organizational and industrial base. Additionally, these systems tend to become embedded in the broader societal infrastructure, resulting in new system stakeholders with perhaps different preferences (4) Barriers to Effective Communications: process and cultural issues that emerge due to geographic dispersion and as one spans boundaries including gov./contractor, NASA/Other USG, and international relationships.

Roberts, Christopher J.↗

Fluid Structure Interaction of Parachutes in Supersonic Planetary Entry

A research program to provide physical insight into disk-gap-band parachute operation in the supersonic regime on Mars was conducted. The program included supersonic wind tunnel tests, computational fluid dynamics and fluid structure interaction simulations. Specifically, the nature and cause of the "area oscillation" phenomenon were investigated to determine the scale, aerodynamic, and aero-elastic dependence of the supersonic parachute collapse and re-inflation event. A variety of non-intrusive, temporally resolved, and high resolution diagnostic techniques were used to interrogate the flow and generate validation datasets. The results of flow visualization, particle image velocimetry, load measurements, and photogrammetric reconstruction will be presented. Implications to parachute design, use, and verification will also be discussed.

parachute↗

A Probabilistic Mass Estimation Algorithm for a Novel 7- Channel Capacitive Sample Verification Sensor

A document describes an algorithm created to estimate the mass placed on a sample verification sensor (SVS) designed for lunar or planetary robotic sample return missions. A novel SVS measures the capacitance between a rigid bottom plate and an elastic top membrane in seven locations. As additional sample material (soil and/or small rocks) is placed on the top membrane, the deformation of the membrane increases the capacitance. The mass estimation algorithm addresses both the calibration of each SVS channel, and also addresses how to combine the capacitances read from each of the seven channels into a single mass estimate. The probabilistic approach combines the channels according to the variance observed during the training phase, and provides not only the mass estimate, but also a value for the certainty of the estimate. SVS capacitance data is collected for known masses under a wide variety of possible loading scenarios, though in all cases, the distribution of sample within the canister is expected to be approximately uniform. A capacitance-vs-mass curve is fitted to this data, and is subsequently used to determine the mass estimate for the single channel s capacitance reading during the measurement phase. This results in seven different mass estimates, one for each SVS channel. Moreover, the variance of the calibration data is used to place a Gaussian probability distribution function (pdf) around this mass estimate. To blend these seven estimates, the seven pdfs are combined into a single Gaussian distribution function, providing the final mean and variance of the estimate. This blending technique essentially takes the final estimate as an average of the estimates of the seven channels, weighted by the inverse of the channel s variance.

Wolf, Michael↗

International Space Station Payload Operations Integration Center (POIC) Overview

Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

Ijames, Gayleen N.↗

Hayabusa: Navigation Challenges for Earth Return

Hayabusa was a JAXA sample-return mission to Itokawa navigated, in part, by JPL personnel. Hayabusa survived several near mission-ending failures at Itokawa yet returned to Earth with an asteroid regolith sample on June 13, 2010. This paper describes NASA/JPL's participation in the Hayabusa mission during the last 100 days of its mission, wherein JPL provided tracking data and orbit determination, plus verification of maneuver design and entry, descent and landing.

Itokawa↗

Internal NASA Study: NASAs Protoflight Research Initiative

The NASA Protoflight Research Initiative is an internal NASA study conducted within the Office of the Chief Engineer to better understand the use of Protoflight within NASA. Extensive literature reviews and interviews with key NASA members with experience in both robotic and human spaceflight missions has resulted in three main conclusions and two observations. The first conclusion is that NASA's Protoflight method is not considered to be "prescriptive." The current policies and guidance allows each Program/Project to tailor the Protoflight approach to better meet their needs, goals and objectives. Second, Risk Management plays a key role in implementation of the Protoflight approach. Any deviations from full qualification will be based on the level of acceptable risk with guidance found in NPR 8705.4. Finally, over the past decade (2004 - 2014) only 6% of NASA's Protoflight missions and 6% of NASA's Full qualification missions experienced a publicly disclosed mission failure. In other words, the data indicates that the Protoflight approach, in and of it itself, does not increase the mission risk of in-flight failure. The first observation is that it would be beneficial to document the decision making process on the implementation and use of Protoflight. The second observation is that If a Project/Program chooses to use the Protoflight approach with relevant heritage, it is extremely important that the Program/Project Manager ensures that the current project's requirements falls within the heritage design, component, instrument and/or subsystem's requirements for both the planned and operational use, and that the documentation of the relevant heritage is comprehensive, sufficient and the decision well documented. To further benefit/inform this study, a recommendation to perform a deep dive into 30 missions with accessible data on their testing/verification methodology and decision process to research the differences between Protoflight and Full Qualification missions' Design Requirements and Verification & Validation (V&V) (without any impact or special request directly to the project).

Protoflight↗

Dormancy Should Be Avoided for Mars and Deep Space Recycling Life Support

Mars is the crucial goal of human exploration beyond the Earth-moon system. The Mars round trip transit vehicle has been expected to use a regenerative Life Support System (LSS) similar to the one on the International Space Station (ISS). It often assumed that the Mars transit LSS will be operated on the outward trip to Mars, placed in dormancy while the full crew explores the surface, and then restored to operation for the return trip to Earth. The major difference between Mars missions and operations in the Earth-moon system is the need for much higher reliability for Mars missions, since rapid resupply of parts and materials or a quick crew return to Earth are not possible. Mars systems must achieve intrinsic high reliability by design, test, failure analysis, and redesign and then increase operational robustness by providing spare parts and redundant systems. Further requiring the LSS to be capable of dormancy and restoration to operation greatly increases the difficulty of design, test, and verification. The process of implementing dormancy and then restoring operation would add significant risk to the mission. Dormancy should be avoided for Mars and can be avoided several ways. First and most obvious, some crew can remain continually on board. If no crew can remain onboard, dormancy can still be avoided if an unused spare LSS is activated for the return trip, rather than restarting the used out bound system. Systems similar to the ISS LSS would have a significant probability of failure on a Mars trip and therefore would require two or three spares. Another full spare LSS could be provided as the return trip system, rather than refurbishing a used LSS.

dormancy↗

Simulation and Testing of the Range of Motion of a Six Degree of Freedom Docking System

The soft capture system of the NASA Docking System (NDS) is a mechanism with six-degrees of freedom (6DOF). Although the nominal motion of the system is simple and largely in a single degree of freedom, complex movement is permissible within the requirements for docking. As such it is critical in the design, test, and verification of the docking system to fully understand the range of possible movement of the mechanism. This range of motion (ROM) must be large enough to accommodate all permitted docking sequences without internal collisions. This paper will discuss the methods used to perform these analysis for the NDS. Additionally, the testing sequences derived from this analysis will be presented, as illustrated in Figure 1. Finally, lessons learned from the analysis and test program will be discussed.

Docking System↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

When the Eyes Don't Have It: Autonomous Control of Deep Space Vehicles for Human Spaceflight

NASA has been charged with expanding human presence into the solar system. The next phase of exploration will focus on learning how to develop and sustain habitats on the moon for eventual missions to Mars. The Gateway Lunar Orbiting Platform (G-LOP) is a modular spacecraft being built for cis-lunar orbit and offers a true deep space environment for gaining experience for human missions to Mars. The mission concept for Gateway involves long uncrewed periods between missions; therefore, Gateway requires increased self-reliance to separate the spacecraft from Earth-bound control and oversight. This complicates the human-in-the-loop (HITL) concept and requires major adjustments to the traditional automation human-computer interaction paradigm. This paper discusses the design, development, and verification of complex human-computer interactions with the autonomous systems managers which will control the Gateway spacecraft.

Julia M. Badger↗

Design and Development Requirements for Mechanisms

This NASA Technical Standard is published by the National Aeronautics and Space Administration (NASA) to provide uniform engineering and technical requirements for processes, procedures, practices, and methods endorsed as standard for NASA programs and projects, including requirements for selection, application, and design criteria of an item. This Standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers; applicable technical requirements may be cited in contract, program, and other Agency documents. This language applies to the Jet Propulsion Laboratory (a Federally Funded Research and Development Center), other contractors, recipients of grants, cooperative agreements, or other agreements only to the extent specified or referenced in the applicable contracts, grants, or agreements. This Standard establishes uniform design, development, and verification requirements for mechanisms and mechanism components whose correct operation is required for safety or mission success.

Mechanism↗

Quantum Statistical Testing of a QRNG Algorithm

We present the algorithmic design of a quantum random number generator, the subsequent synthesis of a physical design and its verification using quantum statistical testing. We also describe how quantum statistical testing can be used to diagnose channel noise in QKD protocols.

quantum information↗

88 kilowatt automotive inverter with new 900 Volt silicon carbide MOSFET technology

This final report is on the design and experimental verification of a 200 kVA traction inverter using three 900 V, 2.5 mΩ, SiC MOSFET-based half-bridge power modules comprising the power stage. Each dual power module contains four 900 V, 10 mΩ SiC MOSFETs per switch position and uses synchronous conduction to achieve high average and peak efficiencies over its entire operating region to meet the demands of hybrid, plug-in hybrid, and extended-range electrified vehicle architectures. Significant performance improvement, via conduction, switching, and reverse-recovery loss metrics, from this SiC MOSFET-based inverter—especially at light load conditions—will be discussed.

30 DIRECT ENERGY CONVERSION↗

Digital I and C system upgrade integration technique

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Applying Lean Concepts to Waste Site Closure - 13137

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of PFLOTRAN Transport Capability for Use in the Waste Isolation Pilot Plant Performance Assessment - 20545

Waste Isolation Pilot Plant (WIPP) performance assessment (PA) calculations estimate the probability of radionuclide release from the repository to the land surface and across the land withdrawal boundary for a regulatory period of 10,000 years after facility closure. Simulations of flow and transport in the repository and the surrounding Salado Formation are foundational to the PA. Because proposed additional waste emplacement panels would result in an asymmetric repository layout, the US Department of Energy (DOE) is preparing to transition to use of a three-dimensional (3-D) model domain for simulation of flow and transport instead of the two-dimensional (2-D) flared grid domain currently used. DOE has charged Sandia National Laboratories with developing the capability necessary to simulate processes affecting flow and transport in the WIPP in PFLOTRAN, an open-source massively parallel multi-phase flow and reactive transport code. The new flow and transport capabilities developed in PFLOTRAN incorporate WIPP-specific process models and will replace the 2-D simulators (BRAGFLO and NUTS) that are currently utilized for Salado flow and transport calculations in WIPP PA. The focus of this paper is on the development of a new Nuclear Waste Transport (NWT) mode in PFLOTRAN that has all of the capabilities necessary for Salado transport simulations, including the ability to handle complete dry-out (100% gas saturation) of arbitrary cells in the model domain, radionuclide mass conservation at step changes in porosity associated with borehole intrusion, and the ability to calculate fluxes on a flared grid. The new PFLOTRAN transport capability and a suite of verification tests were designed around a list of functional requirements for WIPP PA calculations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AUTOMATIC GENERATION OF EVENT TREES AND FAULT TREES: A MODEL-BASED APPROACH

In the past few decades, increasing complexity in modern engineering systems has been driven by the integration of a large number of components and by the fact that the system operations involve many disciplines (e.g., thermal-hydraulics, plant operations, cyber-security). Current safety/reliability modeling approaches to such systems are labor intensive, difficult to learn, and rely heavily on simplistic Boolean logic to depict failure propagation and accident progression. While these methods serve well for simple systems (i.e., linear causal systems with limited small inter- and intra-system interactions), their results are difficult to verify when modeling complex systems (typically performed through the extensive use of modeling assumptions). The development of new methods is addressed to meet these challenges through a model-based system engineering (MBSE) lens. Under MBSE philosophy, every aspect of the system (form or function) is represented by a model that completely characterizes its architecture or behavior. MBSE approach greatly improves the management of design, analysis and verification of complex systems. An integration of Dynamic Probabilistic Risk Assessment (DPRA) methods with MBSE models is proposed to perform safety/reliability analyses of engineering systems. In particular, MBSE representation of the system (performed using Systems Modeling Language [SysML]) is coupled with DPRA methods to automatically generate event trees and fault trees.

97 - MATHEMATICS AND COMPUTING↗