Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Charging Hub Scenario Sheet Screenshot

The Excel-based CHECT tool estimates the LCOC ($/kWh) by charger type (Level 1, Level 2, and DC fast charging) for a given charging hub scenario. CHECT requires users to input certain charging hub scenario parameters, including the number of chargers, daily utilization, and charger replacement frequency by charger type. Additional inputs such as the charging schedule, local utility rates, capital/operational costs, and financial inputs can be customized by the user, or the tool can generate results using appropriate default values from literature for the charging hub scenario and service location(s). Using the above inputs, CHECT performs a robust techno-economic analysis to generate the LCOC by charger type, broken down by cost category (e.g., capital, operational, utility, taxes) for various combinations of charging hub types (multiunit dwelling or public) and ownership models (residential, utility, or private company). It also outputs the annual discounted cash flows and determines the most sensitive input variables. In addition, the tool allows users to easily compare the LCOC across various ownership models or across different states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Free-piston Stirling component test power converter test results and potential Stirling applications

As the principal contractor to NASA-Lewis Research Center, Mechanical Technology Incorporated is under contract to develop free-piston Stirling power converters in the context of the competitive multiyear Space Stirling Technology Program. The first generation Stirling power converter, the component test power converter (CTPC) initiated cold end testing in 1991, with hot testing scheduled for summer of 1992. This paper reviews the test progress of the CTPC and discusses the potential of Stirling technology for various potential missions at given point designs of 250 watts, 2500 watts, and 25,000 watts.

Dochat, G. R.↗

Piloted Simulation Investigation of a Supersonic Transport Configuration (LaRC.4)

This report contains a description of the test facilities and software utilized during a joint NASA/aerospace industry study of improved control laws and desired inceptor characteristics for a candidate supersonic transport air-craft design. Details concerning the characteristics of the simulation cockpit, image generator and display systems, and motion platform are described. Depictions of the various display formats are included. The test schedule, session log, and flight cards describing the maneuvers performed is included. A brief summary of high-lights of the study is given. Modifications made to the industry-provided simulation model are described. This report is intended to serve as a reference document for industry researchers.

Jackson, E. Bruce↗

NiH2 Reliability Impact Upon Hubble Space Telescope Battery Replacement

The NASA Hubble Space Telescope (HST) was designed to be deployed and later serviced for maintenance and upgrades, as required, by the space shuttle fleet, with a Goodyear mission life for the batteries. HST was deployed 380 miles above the Earth, from Space Shuttle Discovery, on April 25, 1990. Four servicing missions, (SM1, SM2, SM3A, AND SM3B) have been performed. Astronauts have replaced or modified optics, solar arrays, a power control unit, and various science packages. A fifth Servicing Mission, SM4 scheduled for early 2004, is planned to replace the batteries for the first time. The HST is powered by solar array wings and nickel hydrogen (NiH2) Duracell batteries, which are grouped into two parallel battery modules of three parallel batteries each. With a design life of 7 years at launch, these batteries have surpassed 12 years in orbit, which gives HST the highest number of charge/discharge cycles of any NiH2 battery currently in low earth orbit (LEO) application. Being in a LEO orbit, HST has a 45-minute umbra period, during which spacecraft power requirements normally force the batteries into discharge, and a 60-minute sun period, which is available for battery recharge. The intent of this paper is to address the issue of NiH2 battery reliability and how battery capacity degradation can impact scheduling of a Servicing Mission to bring replacement batteries to HST, and extend mission life till deployment of Next Generation Space Telescope (NGST), planned for 2008 at the earliest.

Rao, Gopalakrishna M.↗

Reduced In-Plane, Low Frequency Helicopter Noise of an Active Flap Rotor

Results from a recent joint DARPA/Boeing/NASA/Army wind tunnel test demonstrated the ability to reduce in-plane, low frequency noise of the full-scale Boeing-SMART rotor using active flaps. Test data reported in this paper illustrated that acoustic energy in the first six blade-passing harmonics could be reduced by up to 6 decibels at a moderate airspeed, level flight condition corresponding to advance ratio of 0.30. Reduced noise levels were attributed to selective active flap schedules that modified in-plane blade airloads on the advancing side of the rotor, in a manner, which generated counteracting acoustic pulses that partially offset the negative pressure peaks associated with in-plane, steady thickness noise. These favorable reduced-noise operating states are a strong function of the active flap actuation amplitude, frequency and phase. The associated noise reductions resulted in reduced aural detection distance by up to 18%, but incurred significant vibratory load penalties due to increased hub shear forces. Small reductions in rotor lift-to-drag ratios, of no more than 3%, were also measured

Sim, Ben W.↗

Advanced Metal Foam Structures for Outer Space

A document discusses a proposal to use advanced materials especially bulk metallic glass (BMG) foams in structural components of spacecraft, lunar habitats, and the like. BMG foams, which are already used on Earth in some consumer products, are superior to conventional metal foams: BMG foams have exceptionally low mass densities and high strength-to-weight ratios and are more readily processable into strong, lightweight objects of various sizes and shapes. These and other attractive properties of BMG foams would be exploited, according to the proposal, to enable in situ processing of BMG foams for erecting and repairing panels, shells, containers, and other objects. The in situ processing could include (1) generation of BMG foams inside prefabricated deployable skins that would define the sizes and shapes of the objects thus formed and (2) thermoplastic deformation of BMG foams. Typically, the generation of BMG foams would involve mixtures of precursor chemicals that would be subjected to suitable pressure and temperature schedules. In addition to serving as structural components, objects containing or consisting of BMG foams could perform such functions as thermal management, shielding against radiation, and shielding against hypervelocity impacts of micrometeors and small debris particles.

Hanan, Jay↗

Hybrid robust predictive optimization method of power system dispatch

A method of power system dispatch control solves power system dispatch problems by integrating a larger variety of generation, load and storage assets, including without limitation, combined heat and power (CHP) units, renewable generation with forecasting, controllable loads, electric, thermal and water energy storage. The method employs a predictive algorithm to dynamically schedule different assets in order to achieve global optimization and maintain the system normal operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of A Hardware-In-the-Loop (HIL) Testbed for Cyber-Physical Security in Smart Buildings

As smart buildings move towards open communication technologies, providing access to the Building Automation System (BAS) through the building's intranet, or even remotely through the Internet, has become a common practice. However, BAS was historically developed as a closed environment and designed with limited cyber-security considerations. Thus, smart buildings are vulnerable to cyber-attacks with the increased accessibility. This study introduces the development and capability of a Hardware-in-the-Loop (HIT) testbed for testing and evaluating the cyber-physical security of typical BASs in smart buildings. The testbed consists of three subsystems: (1) a real-time HIL emulator simulating the behavior of a virtual building as well as the Heating, Ventilation, and Air Conditioning (HVAC) equipment via a dynamic simulation in Modelica; (2) a set of real HVAC controllers monitoring the virtual building operation and providing local control signals to control HVAC equipment in the HIL emulator; and (3) a BAS server along with a web-based service for users to fully access the schedule, setpoints, trends, alarms, and other control functions of the HVAC controllers remotely through the BACnet network. The server generates rule-based setpoints to local HVAC controllers. Based on these three subsystems, the HIL testbed supports attack/fault-free and attack/fault-injection experiments at various levels of the building system. The resulting test data can be used to inform the building community and support the cyber-physical security technology transfer to the building industry.

Li, Guowen↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

Source record↗

Stochastic Look-Ahead Commitment: A Case Study in MISO

This paper introduces the Stochastic Look Ahead Commitment (SLAC) software prototyped and tested for the Midcontinent Independent System Operator (MISO) look ahead commitment process. SLAC can incorporate hundreds of wind, load, and net scheduled interchange (NSI) uncertainty scenarios. It uses a progressive hedging method to solve a novel two-stage stochastic unit commitment. The first stage commitment decisions, made only for those generators whose decision to commit or not in each time period cannot be deferred, can cover the uncertainties within the next three hours. The second stage includes both the dispatch for each of the scenarios and the commitment decisions that can be deferred. Study results on 15 MISO production days show that SLAC may bring economic and reliability benefits under uncertainty.

MATHEMATICS AND COMPUTING↗

Advanced Shuttle Strategies for Parallel QCCD Architectures

Trapped ions (TIs) are at the forefront of quantum computing implementation, offering unparalleled coherence, fidelity, and connectivity. However, the scalability of TI systems is hampered by the limited capacity of individual ion traps, necessitating intricate ion shuttling for advanced computational tasks. The quantum charge-coupled device (QCCD) framework has emerged as a promising solution, facilitating ion mobility for universal quantum computation. Current QCCD architectures predominantly feature a linear topology, which is increasingly recognized as inefficient for complex quantum operations. Anticipating the shift toward more efficacious designs, this article introduces an innovative quantum scheduling strategy optimized for parallel QCCD topologies. Our strategy proposes a probabilistic formula for ion movement, alongside ingenious methods for local layer generation and layer compression, yielding a significant reduction in ion shuttle times. Through simulations, we demonstrate that our strategy not only substantially outstrips the linear model but also exhibits better performance over other parallel strategies that employ greedy algorithms. This is achieved through our nuanced resolution of complexities, such as traffic blocks and trap capacity limitations. The consequent reduction in shuttle operations leads to lower energy consumption and an enhancement in the quantum computer's fidelity, ultimately accelerating program execution times.

43 PARTICLE ACCELERATORS↗

Precision Departure Release Capability (PDRC) Technology Description

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Technology Description. Companion papers include the Final Report and a Concept of Operations.

tactical departure scheduling↗

Precision Departure Release Capability (PDRC) Concept of Operations

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demandcapacity imbalances. When demand exceeds capacity Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in DallasFort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Concept of Operations. Companion papers include the Final Report and a Technology Description. ? SUBJECT:

tactical departure scheduling↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

High-Level Synthesis of Parallel Specifications Coupling Static and Dynamic Controllers

The increased need for efficient ways to implement domain-specific accelerators is driving design methodologies towards the use of abstractions higher than the Register Transfer Level (RTL). In this scenario, High Level Synthesis (HLS) plays a significant role by enabling the automatic generation of custom hardware accelerators starting from high level descriptions (e.g., C code). Conventional HLS tools exploit parallelism mostly at the Instruction Level (ILP). They statically schedule the input specifications, and build centralized Finite State Machine (FSM) controllers. However, aggressive exploitation of ILP in many applications has diminishing returns and, usually, centralized approaches do not efficiently exploit coarser parallelism because FSMs are inherently serial. In this paper we present a HLS framework able to synthesize applications that, beside ILP, also expose Task Level Parallelism (TLP). An application can expose TLP through annotations that identify the parallel functions (i.e., tasks). To generate accelerators that efficiently execute concur- rent tasks, we need to solve several issues: devise a mechanism to support concurrent execution flows, exploit memory parallelism, and manage synchronization. To support concurrent execution flows, we introduce a novel adaptive controller. The adaptive controller is composed of a set of interacting control elements that independently manage the execution of a single operation or function call. These control elements check dependencies and resource constraints at runtime, enabling as soon as possible execution. To support parallel access to shared memories and synchronization, we introduce a novel Hierarchical Memory Interface (HMI). With respect to previous solutions, the proposed interface supports multi-ported memories and atomic memory operations, which commonly occur in parallel programming. Our framework can generate the hardware implementation of C functions by employing two different approaches, depending on its characteristics. If a function exposes TLP, then the framework generates hardware implementations based on the adaptive controller. Otherwise, the framework implements the function by exploiting a more conventional FSM approach, which is optimized for ILP exploitation. We evaluate our framework on a set of parallel applications, and show substantial performance improvements (average speedup of 4.7) with limited area over- heads (average area increase of 5.48 times).

Castellana, Vito G.↗