At least 793 records · Page 44

In situ characterization of metastable Pb3O5 and Pb2O3 phases during thermal decomposition of PbO2 to PbO

Nonstoichiometric lead oxides play a key role in the formation and cycling of the positive electrodes in a lead acid battery. These phases have been linked to the underutilization of the positive active material but also play a key role in the battery’s cycle life, providing inter-particle adhesion and the connection to the underlying lead grid. Similar phases have previously been identified by mass loss or color change during thermal annealing of PbO2 to PbO, suggesting that at least two intermediate PbOx phases exist. Using multiple in situ analysis techniques (powder diffraction, x-ray absorption, x-ray photoelectron spectroscopy) and ex situ nuclear magnetic resonance measurements, the structural conversion and changes in the lead oxidation states were identified during this process. Isolation of the PbOx phases enabled confirmation of Pb3O5 and Pb2O3 by diffraction and the first 207Pb NMR measurement of these intermediates.

Kinnibrugh, Tiffany L.↗

Speed to Power: Solutions for Accelerating Large Load Connections

Rapid growth in demand from data centers and other large loads is creating a range of new challenges for electricity planners, investors, system operators, and regulators, leading to bottlenecks that have slowed connection of large loads to the electric grid. In response, innovative solutions for accelerating large load connections are beginning to emerge across the U.S. Drawing on an extensive document and literature review, this report identifies more than 40 potential solutions for accelerating large load connections, organized into five functional areas: load forecasting, interconnection, resource planning and procurement, markets and operations, and cost allocation and ratemaking. The five functional areas provide a framework for organizing challenges and solutions to large load connection bottlenecks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Decision Support Framework for Grid-Aware Electric Bus Charge Scheduling

While there are many advantages to electric public transit vehicles, they also pose new challenges for fleet operators. One key challenge is defining a charge scheduling policy that minimizes operating costs and power grid disruptions while maintaining schedule adherence. An uncoordinated policy could result in some buses running out of charge before completing their trip, while a grid agnostic policy might incur higher energy costs or cause an adverse impact on the grid’s distribution system. We present a grid aware decision-theoretic framework for electric bus charge scheduling that accounts for energy price, grid load, and bus status. The framework connects environmental models for traffic (SUMO) and the electric grid (GridLAB-D) to a planner, which evaluates bus charging decisions with regard to their long-term effect on grid reliability and cost. The framework has been evaluated on a simulation of Richland, WA’s bus and grid network, and compared to greedy methods.

EV, machine leaning, EV-Grid, Transportation, Grid↗

Service-Based, Segmented, 5G Network-Based Architecture for Securing Distributed Energy Resources: Preprint

As the number of connected devices in the energy grid increase exponentially, so too are the cybersecurity risks. With the development of modern communications standards such as 5G and beyond the extent to which devices will continue to connect will continue to increase exponentially along with the inherent risks. However, 5G also includes features to help address cybersecurity concerns and therefore helping to mitigate many of these risks. This paper proposes a new service-based network architecture implementing network-slicing capabilities for connected systems and devices to improve performance, availability, security, and reliability of the grid devices and services. This paper considers the quality of service requirements and criticality of services needed for securely monitoring, operating, and securing Distributed Energy Resource (DER) devices. From developed use cases, network slicing is implemented based on these requirements and resource allocations. This work then highlights examples of how slicing can help prevent standard existing attack methods such as a denial-of-service or similar attack which limits resource availability and network bandwidth to the service and thus limiting its ability to affect other services by misbehaving. The designed network architecture use case will be further tested on a local virtualized testbed to verify secure operation and availability of services. Using hardware-in-the-loop devices and systems on this local testbed, this fully segmented, secure network may be realized and evaluated. Finally, this paper presents the results of this testing.

5G↗

Practical factors of envelope model setup and their effects on the performance of model predictive control for building heating, ventilating, and air conditioning systems

Model predictive control (MPC) for buildings is attracting significant attention in research and industry due to its potential to address a number of challenges facing the building industry, including energy cost reduction, grid integration, and occupant connectivity. However, the strategy has not yet been implemented at any scale, largely due to the significant effort required to configure and calibrate the model used in the MPC controller. While many studies have focused on methods to expedite model configuration and improve model accuracy, few have studied the impact a wide range of factors have on the accuracy of the resulting model. In addition, few have continued on to analyze these factors’ impact on MPC controller performance in terms of final operating costs. Therefore, this study first identifies the practical factors affecting model setup, specifically focusing on the thermal envelope. The seven that are identified are building design, model structure, model order, data set, data quality, identification algorithm and initial guesses, and software tool-chain. Then, through a large number of trials, it analyzes each factor's influence on model accuracy, focusing on grey-box models for a single zone building envelope. Finally, this study implements a subset of the models identified with these factor variations in heating, ventilating, and air conditioning MPC controllers, and tests them in simulation of a representative case that aims to optimally cool a single-zone building with time-varying electricity prices. It is found that a difference of up to 20%25 in cooling cost for the cases studied can occur between the best performing model and the worst performing model. The primary factors attributing to this were model structure and initial parameter guesses during parameter estimation of the model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of thermal and mechanical properties with inventory level of the molten salt storage tank in central receiver concentrating solar power plants

Molten salt thermal energy storage (TES) tanks ensure steady power output of concentrating solar power (CSP) plants; however, recent tank failures have highlighted the need for further analysis. Current studies primarily focus on analyzing the molten salt flow, heat transfer, and thermal efficiency. Additionally, research on the latest tank structures is limited and lacks newest experimental validation. This study measures temperature and molten salt inventory levels in the high-temperature tank at a 50 MW central receiver CSP plant, connected to the power grid in 2019. A multi-physics model was developed to evaluate thermal and mechanical properties of TES tanks by combining computational fluid dynamics and finite element modeling using real plant data. Heat loss, temperature, displacement, and stress distribution of the tank at different inventory levels were investigated. Results show that ambient air velocity near the tank roof reaches 2.14 m/s, much higher than 0.2 m/s near the wall. The temperatures of inventory fluid and tank are close, varying slightly at different levels due to thermal conduction and radiation. Because the heat loss strongly depends on temperature, the total tank loss remains nearly constant across inventory levels. Larger temperature gradients and thermal stresses are primarily localized along the tank floor edge and the air-salt interface. Notably, the maximum thermal stress at the tank edge is three times higher than that at the interface. The magnitude of total stress changes by less than 5 MPa with and without thermal load, indicating that high temperatures exert only a minor impact on tank stress. In contrast, thermal load significantly affects tank deformation, particularly at the roof edge, where values exceed 150 mm. Despite the large variation in molten salt levels, tank wall temperatures and displacements present a minor change, suggesting a weak correlation with inventory levels. In conclusion, the findings obtained in this study provide important insights on the TES tank that could be used to optimize tank design and operation strategies.

14 SOLAR ENERGY↗

Characterizing electrical panel capacity, breaker space, and loads in U.S. single-family homes

Electrical panels distribute electricity to appliances, equipment, and other building loads and maintain safety by preventing overloads of branch circuits, feeders, and utility service wires connecting homes to the grid. Load calculations in the National Electrical Code (NEC) determine the capacity of installed electrical panels in the United States, which are rated in amps (A). Circuit breakers within electrical panels affect the magnitude and number of loads that panels can serve. In home retrofits and renovations, existing electrical panels may not accommodate new electrical loads, either due to insufficient electrical capacity or a lack of available breaker spaces. Homes with these panel constraints may need to replace existing panels with new panels that have greater capacity and breaker space.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enablers towards establishing and growing South Africa’s waste to electricity industry

Highlights: • Electricity supply in South Africa is highly dominated by coal. • A model is initially identified to enable South Africa’s waste to electricity industry. • The model is based on local conditions/challenges but informed by international experience. • The local model is tested based on expert experience of the local waste industry. • Abundance of coal and low cost of land filling identified as primary local barriers. • Enablers required to overcome barriers are proposed as part of revised local model. - Abstract: In South Africa the electricity generation mix is relatively un-diverse whereas globally the transformation of the sector is advancing rapidly. Coal remains the predominant fuel source and limited success has to date been achieved in the renewable energy sector. The electricity generation sector is therefore hindered from moving towards an electricity generation landscape where alternative fuel sources is utilised. This research is aimed at gaining insight into the enablers that led towards an increasing trend (observed globally) in exploiting waste as a fuel for electricity generation, and to outline the presence of obstacles that hinder separation of waste for electricity use in the South African context. Furthermore it is an attempt at informing what appropriate interventions (operational and policy) may be considered suitable for South Africa to overcome these barriers in order to enable a sustainable South African waste to electricity (WTE) Industry. Findings show that numerous barriers to a WTE exists in the South African context, however overcoming these barriers is not as simple as adopting the European model with the aim to modify the electricity generation mix and waste management landscape. Selected enablers deemed appropriate in the South African context are adapted from the European model, and are greatly influenced by the prevailing socio-economic status of South Africa. Primary enablers identified were, (i) government support is needed especially in the form of subsidisation for green energy, (ii) increase landfill costs through the implementation of a landfill tax, (iii) streamline the process for Independent Private Power Producers (IPPPs) to connect to the national grid with off-take guaranteed and the inclusion of WTE into an electricity roadmap (effectively government’s strategy). The proposed enabling interventions would help in overcoming the barriers for a South African WTE industry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fusion for Earth and Space

The compact reactor concept (Williams, 2007) has the potential to provide clean, safe and unlimited supply of energy for Earth and Space applications. The concept is a potential fusion reactor wherein deuterium nuclei are preferentially fused into helium nuclei. Because the deuterium nuclei are preferentially fused into helium nuclei at temperatures and energies lower than specified by the standard model there is no harmful radiation as a byproduct of this fusion process. Therefore, a reactor using this reaction does not need any shielding to contain such radiation. The energy released from each reaction and the absence of shielding makes the deuterium-plus-deuterium-to-helium (DDH) reactor very compact when compared to other reactors, both fission and fusion types. Moreover, the potential energy output per reactor weight and the absence of harmful radiation makes the DDH reactor an ideal candidate for individual home and space power. The concept also would make it possible for each plant or remote location to have it's own power source, on site, without the need for a connection to the power grid. This would minimize, or eliminate, power blackouts. The concept could replace large fission reactors and fossil fuel power plants plus provide energy for ships, locomotives, trucks and autos. It would make an ideal source of energy for space power applications and for space propulsion.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Automatic outdoor monitoring system for photovoltaic panels

Long-term acquisition of solar panel performance parameters, for panels operated at maximum power point in their real environment, is of critical importance in the photovoltaic research sector. However, few options exist for the characterization of non-standard panels such as concentrated photovoltaic systems, heavily soiled or shaded panels or those operating under non-standard spectral illumination; certainly, it is difficult to find such a measurement system that is flexible and affordable enough to be adopted by the smaller research institutes or universities. We present here an instrument aiming to fill this gap, autonomously tracking and maintaining any solar panel at maximum power point while continuously monitoring its operational parameters and dissipating the produced energy without connection to the power grid. Here, the instrument allows periodic acquisition of current-voltage curves to verify the employed maximum power point tracking approach. At the same time, with hardware schematics and software code being provided, it provides a flexible open development environment for the monitoring of non-standard generators like concentrator photovoltaic systems and to test novel power tracking approaches. The key issues, and the corresponding solutions, encountered in the design are analyzed in detail and the relevant schematics presented.

14 SOLAR ENERGY↗

Real-Time Control of an Ensemble of Heterogeneous Resources

This paper focuses on the problem of controlling an ensemble of heterogeneous resources connected to an electrical grid at the same point of common coupling (PCC). The controller receives an aggregate power setpoint for the ensemble in real time and tracks this setpoint by issuing individual optimal setpoints to the resources. The resources can have continuous or discrete nature (e.g., heating systems consisting of a finite number of heaters that each can be either switched on or off) and/or can be highly uncertain (e.g., photovoltaic (PV) systems or residential loads). A naive approach would lead to a stochastic mixed-integer optimization problem to be solved at the controller at each time step, which might be infeasible in real time. Instead, we allow the controller to solve a continuous convex optimization problem and compensate for the errors at the resource level by using a variant of the well-known error diffusion algorithm. We give conditions guaranteeing that our algorithm tracks the power setpoint at the PCC on average while issuing optimal setpoints to individual resources. We illustrate the approach numerically by controlling a collection of batteries, PV systems, and discrete loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Equitable Design of Behind-the-Meter Energy Storage Programs: A Customer Perspective

Utility deployment of energy storage is done as a utility-scale asset connected directly to the grid (front of meter) or in partnership with a customer on the customer’s premises (behind the meter). By offering incentives for customers to install behind-the-meter storage, utilities can gain operational control of the assets and operate them in a manner that benefits all customers. Some states have also begun providing increased incentive levels to low-income customers to ensure that they can equitably share in the benefits of behind-the-meter energy storage programs. This paper evaluates different approaches to energy storage procurement from the customer’s perspective and evaluates how behind-the-meter programs can be equitably structured while keeping customers financially indifferent between front-of-meter and behind-the-meter energy storage procurements.

Twitchell, Jeremy B.↗

Inertia Estimation Under High Penetration of Inverter-based Resources

Many types of renewable energy sources, especially solar and wind generation, are connected to the electric grid through power-electronic-based interfaces (inverters). These inverter-based resources (IBRs) are mechanically decoupled from the grid, which reduces system inertia and thus may compromise its stability and reliability. In this study, we examine the impact of high penetration of IBRs on the power grid’s inertia. To achieve this, we intentionally introduce disturbances into a simulation case study, such as a step load change, to observe and record the system’s frequency responses. This study offers a nuanced understanding of how the integration of IBRs affects grid stability, and it provides essential guidance for future grid management and resilience strategies.

Yadav, Ajay↗

Role of the Reference Bus in Three-Phase State Estimation

As more and more renewable energy sources are being connected to the power grid at lower voltage levels, closer monitoring of distribution networks is becoming a necessity. This is accomplished by state estimation and deployment of Distribution Management Systems (DMS). Distribution feeders are typically untransposed with unbalance loads. Thus, their modeling and analysis show significant differences compared to those for transmission networks. This paper focuses on the state estimation problem and its formulation for unbalanced distribution systems. Specifically, it is concerned about the modeling and solution of three-phase networks without a fully balanced bus to be selected as the angle reference. It is shown that best results will be obtained via the use of a virtual symmetrical bus. Validation of the proposed formulation is carried out by simulations.

Langner, A. L.↗

A New Model for Simulating the Imbibition of a Wetting-Phase Fluid in a Matrix-Fracture Dual Connectivity System

The imbibition experiment is an effective approach for measuring petrophysical properties of porous media, with many such experiments performed over the past decade. Quite some empirical, analytical, and numerical models have been developed to simulate spontaneous imbibition of the wetting phase fluid into porous media, but limitations still exist. In previous studies, the imbibition process has been considered to give a piston-like displacement or the porous medium modeled as multiply-sized pores linked with bonds; both approaches fail to yield comprehensive results due to their neglect of the presence of irregular fractures or nonuniform flow paths through the matrix. By building a numerical model for simulating laboratory-scale experimental data, we performed imbibition tests on several fractured Barnett Shale samples having fractures either parallel ( P ) or transverse ( T ) to the bedding plane and used MATLAB to build a new numerical model by combining the imbibition process in fractures and the matrix using concepts from percolation theory. The experimental data show that the rocks with P -direction fractures have a more steady increase of imbibition rates than the case of T -direction one. As the shale matrix with low pore connectivity hampers the upward water movement, the imbibition rate of shales with T -direction fractures will decrease suddenly after the bottom layer in contact with water is saturated during the initial period. This wetting phase movement (WPM) model can simulate 3D porous media with 2D fractures. The rate of imbibition by fractured porous media is associated with physical parameters such as porosity and fracture distribution (e.g., the number and angle of fractures). Using Monte Carlo methods, we examined fracture parameters and predicted elapsed time and cumulative water imbibition, for the Barnett Shale samples. The results show that the rate of imbibed water mass is sensitive to the number of fractures directly connected to water source, and the connectivity between two neighboring grid cells is a key parameter for the wetting-front progression. The findings of this study can help to better understand the imbibition process with multiple influencing processes and factors in fractured-matrix rocks. Although the experiments, data simulation, and prediction results are based only on Barnett Shale samples, the model is readily applicable to imbibition tests of other fractured rocks to show the spatial and temporal behavior during a dynamic imbibition process that are not easily captured experimentally.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced TidGen Power System - LCOE Calculations and System Overview

The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU) device. This submission includes the Advanced TidGen cost and cost of energy metrics after critical design review for BP1, and a complete LCOE content model and LCOE reporting according to DOE guidance for the baseline system and the system with advanced technology integrated. A revised LCOE content model is also included, with more relevant market array assumptions. Additionally, this submission includes a complete system overview and component overview content models. The LCOE Content Model provides data submitters with an easy and consistent means of uploading data that can be used to calculate the levelized cost of energy for MHK devices. Data represents the design completed for the Critical Design Review conducted at ORPC in December, 2017. All values are for a single device. Note that with substantial fixed costs, larger arrays will greatly reduce LCOE. For an array in Admiralty Inlet producing 136,000 MWh, 270 devices with an array CAPEX of $540,260,052 and an array OPEX of $39,959,207 would result in an LCOE of $722/MWh.

16 TIDAL AND WAVE POWER↗