Search NASA⌕ Search

SEARCH · Search NASA

Results for “Handling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Verification and Validation of a Conceptual Model of the Auto-Rigging Payload Handling and Off-Loading System Using LEGO Technic System and Three-Dimensional Printed Parts

A conceptual model (CM) can be used to validate a concept in modeling and simulation life cycles. During the 2020-2022 Coronavirus disease 2019 (COVID-19) pandemic, for employee safety NASA implemented center closures and mandatory telework for the entire workforce. During this challenging time, engineers and researchers at NASA Langley Research Center (LaRC) looked for safe and innovative approaches and methods to continue the development of CMs for various projects. Engineers and researchers at LaRC researched Auto-Rigging Payload Handling and Off-Loading System (ARPHOLS) for payload handing and off-loading a system on an inclined lunar lander deck. In this paper, the development of a CM and the verification and validation of a conceptual idea for ARPHOLS using a LEGO Technic system and three-dimensional printed parts is presented.

Payload offloading↗

Hazard Classification of the Remote Handled Low-Level Waste Disposal Facility

The Battelle Energy Alliance (BEA) at the Idaho National Laboratory (INL) is constructing a new facility to replace remote-handled low-level radioactive waste disposal capability for INL and Naval Reactors Facility operations. Current disposal capability at the Radioactive Waste Management Complex (RWMC) will continue until the facility is full or closed for remediation (estimated at approximately fiscal year 2015). Development of a new onsite disposal facility is the highest ranked alternative and will provide RH-LLW disposal capability and will ensure continuity of operations that generate RH-LLW for the foreseeable future. As a part of establishing a safety basis for facility operations, the facility will be categorized according to DOE-STD-1027-92. This classification is important in determining the scope of analyses performed in the safety basis and will also dictate operational requirements of the completed facility. This paper discusses the issues affecting hazard classification in this nuclear facility and impacts of the final hazard categorization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Handled Transuranic Sludge Retrieval Transfer And Storage System At Hanford

This paper describes the systems developed for processing and interim storage of the sludge managed as remote-handled transuranic (RH-TRU). An experienced, integrated CH2M HILL/AFS team was formed to design and build systems to retrieve, interim store, and treat for disposal the K West Basin sludge, namely the Sludge Treatment Project (STP). A system has been designed and is being constructed for retrieval and interim storage, namely the Engineered Container Retrieval, Transfer and Storage System (ECRTS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uncertainty Analysis for a Virtual Flow Meter Using an Air-Handling Unit Chilled Water Valve

A virtual water flow meter is developed that uses the chilled water control valve on an air-handling unit as a measurement device. The flow rate of water through the valve is calculated using the differential pressure across the valve and its associated coil, the valve command, and an empirically determined valve characteristic curve. Thus, the probability of error in the measurements is significantly greater than for conventionally manufactured flow meters. In this paper, mathematical models are developed and used to conduct uncertainty analysis for the virtual flow meter, and the results from the virtual meter are compared to measurements made with an ultrasonic flow meter. Theoretical uncertainty analysis shows that the total uncertainty in flow rates from the virtual flow meter is 1.46% with 95% confidence; comparison of virtual flow meter results with measurements from an ultrasonic flow meter yielded anuncertainty of 1.46% with 99% confidence. The comparable results from the theoretical uncertainty analysis and empirical comparison with the ultrasonic flow meter corroborate each other, and tend to validate the approach to computationally estimating uncertainty for virtual sensors introduced in this study.

Song, Li↗

Automated cassette-to-cassette substrate handling system

An automated cassette-to-cassette substrate handling system includes a cassette storage module for storing a plurality of substrates in cassettes before and after processing. A substrate carrier storage module stores a plurality of substrate carriers. A substrate carrier loading/unloading module loads substrates from the cassette storage module onto the plurality of substrate carriers and unloads substrates from the plurality of substrate carriers to the cassette storage module. A transport mechanism transports the plurality of substrates between the cassette storage module and the plurality of substrate carriers and transports the plurality of substrate carriers between the substrate carrier loading/unloading module and a processing chamber. A vision system recognizes recesses in the plurality of substrate carriers corresponding to empty substrate positions in the substrate carrier. A processor receives data from the vision system and instructs the transport mechanism to transport substrates to positions on the substrate carrier in response to the received data.

47 OTHER INSTRUMENTATION↗

Biodiesel Handling and Use Guide (Fifth Edition)

This document is a guide for those who blend, distribute, and use biodiesel and biodiesel blends. It provides basic information on the proper and safe use of biodiesel and biodiesel blends in engines and boilers, and is intended to help fleets, individual users, blenders, distributors, and those involved in related activities understand procedures for handling and using biodiesel fuels.

33 ADVANCED PROPULSION SYSTEMS↗

Coaxial radio frequency connectors for high-power handling

Coaxial radio frequency (“RF”) connectors for high-power handling are disclosed. Specifically, a high-power male coaxial connector (“HPMC”) is disclosed. The HPMC includes a center conductor, an outer conductor disposed around the center conductor, an insulating layer positioned between the center conductor and the outer conductor, and a first elastomer. The outer conductor has an outer conductor front-end (“OCFE”) and the insulating layer has an insulating layer front-end (“ILFE”). The first elastomer is positioned between the center conductor and the insulating layer. The insulating layer may include an insulating layer cavity (“ILC”) extending inward into the insulating layer from the ILFE and the first elastomer may be within the ILC.

Farrell, James T.↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2020

This Fiscal Year (FY) 2020 annual summary report documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical basis documents for the Remote Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1 Change 1, “Radioactive Waste Management.” In FY 2020, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. Fifteen total waste-canister shipments were received at the RHLLW Disposal Facility, and 15 total waste canisters were emplaced.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation and improvement on external-hazard proof of JSFR fuel handling system

Responding to the the Fukushima Dai-ichi nuclear power plant (1F-NPP) accident, the earthquake and the tsunami proof of the fuel handling system (FHS) in Japan sodium-cooled fast reactor (JSFR) is studied. In the earthquake proof estimation, the margin of seismic resistance against the earthquake of the 1F-envelop condition and the sloshing behavior in the EVST is estimated. In terms of the tsunami proof, the scenario to lead fuel subassemblies into the stable cooling state and the potential of the cooling system is introduced in case of loss of the emergency power supply. As a result, it is clear that JSFR FHS originally could already be prepared to have the potential to prevent the release of radioactive material. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improved methods of handling massive tallies in reactor Monte Carlo Code RMC

Monte Carlo simulations containing a large number of tallies generally suffer severe performance penalties due to a significant amount of run time spent in searching for and scoring individual tally bins. This paper describes the improved methods of handling large numbers of tallies, which have been implemented in the RMC Monte Carlo code. The calculation results demonstrate that the proposed methods can considerably improve the tally performance when massive tallies are treated. In the calculated case with 6 million of tally regions, only 10% of run time is increased in each active cycle against each inactive cycle. (authors)

97 MATHEMATICS AND COMPUTING↗

Issues and Recommendations Arising from the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Facility Composite Analysis - 13374

Development of the composite analysis (CA) for the Idaho National Laboratory's (INLs) proposed remote-handled (RH) low-level waste (LLW) disposal facility has underscored the importance of consistency between analyses conducted for site-specific performance assessments (PAs) for LLW disposal facilities, sites regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) [1], and residual decontamination and decommissioning (D and D) inventories. Consistency is difficult to achieve because: 1) different legacy sources and compliance time-periods were deemed important for each of the sites evaluated at INL (e.g., 100 years for CERCLA regulated facilities vs. 1,000 years for LLW disposal facilities regulated under U.S. Department of Energy (DOE) Order 435.1 [2]); 2) fate and transport assumptions, parameters, and models have evolved through time at the INL including the use of screening-level parameters vs. site-specific values; and 3) evaluation objectives for the various CERCLA sites were inconsistent with those relevant to either the PA or CA including the assessment of risk rather than effective dose. The proposed single site-wide CA approach would provide needed consistency, allowing ready incorporation of new information and/or facilities in addition to being cost effective in terms of preparation of CAs and review by the DOE. A single site-wide CA would include a central database of all existing INL sources, including those from currently operating LLW facilities, D and D activities, and those from the sites evaluated under CERCLA. The framework presented for the INL RH-LLW disposal facility allows for development of a single CA encompassing air and groundwater impacts. For groundwater impacts, a site-wide MODFLOW/MT3D-MS model was used to develop unit-response functions for all potential sources providing responses for a grid of receptors. Convolution and superposition of the response functions are used to compute groundwater concentrations. A similar approach could be applied for the air pathway where air emissions are stored in a central database and air concentrations for unit releases could be scaled to actual releases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Handling Radioactive Waste from the Proton Accelerator Facility at the Paul Scherrer Institut (PSI) - Always Surprising? - 13320

The Paul Scherrer Institut (PSI) is the largest national research centre in Switzerland. Its multidisciplinary research is dedicated to a wide field in natural science and technology as well as particle physics. In this context, PSI is operating, amongst others, a large proton accelerator facility since more than 30 years. In two cyclotrons, protons are accelerated to high speeds and then guided along roughly 100 m of beam line to three different target stations to produce secondary particles like mesons and neutrons for experiments and a separately beam line for UCN. The protons induce spallation processes in the target materials, and also at other beam loss points along the way, with emission of protons, neutrons, hydrogen, tritium, helium, heavier fragments and fission processes. In particular the produced neutrons, due to their large penetration depth, will then interact also with the surrounding materials. These interactions of radiation with matter lead to activation and partly to contamination of machine components and the surrounding infrastructures. Maintenance, operation and decommissioning of installations generate inevitably substantial amounts of radioactive operational and dismantling waste like targets, magnets, collimators, shielding (concrete, steel) and of course secondary waste. To achieve an optimal waste management strategy for interim storage or final disposal, radioactive waste has to be characterized, sorted and treated. This strategy is based on radiation protection demands, raw waste properties (size, material, etc.), and requirements to reduce the volume of waste, mainly for legal and economical reasons. In addition, the radiological limitations for transportation of the waste packages to a future disposal site have to be taken into account, as well as special regulatory demands. The characterization is a task of the waste producer. The conditioning processes and quality checks for radioactive waste packages are part of an accredited waste management process of PSI, especially of the Section Dismantling and Waste Management. Strictly proven and accepted methods needed to be developed and enhanced for safe treatment, transport, conditioning and storage. But in the field of waste from research activities, individual and new solutions have to be found in an increasingly growing administrative environment. Furthermore, a wide variety of components, with a really large inventory of radioactive nuclides, has to be handled. And there are always surprising challenges concerning the unusual materials or the nuclide inventory. In case of the operational and dismantling radioactive accelerator waste, the existing conditioning methods are in the process of a continuous enhancement - technically and administratively. The existing authorized specifications of conditioning processes have to be extended to optimize and fully describe the treatment of the inevitably occurring radioactive waste from the accelerator facility. Additional challenges are the changes with time concerning the legal and regulatory requirements - or do we have to consider it as business as usual? This paper gives an overview of the current practices in radioactive waste management and decommissioning of the existing operational accelerator waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Westinghouse Quiver - A simple and safe system for the complete handling and storing of failed BWR and PWR fuel rods and fragments - 17049

Background: Extracted leaking fuel rods from fuel assemblies have been stored in the spent fuel pools at the Nuclear Power Plants for many years. Sending those fuel rods to an intermediate storage has been very difficult due to the uncertainty of the technical requirements. The Westinghouse Quiver is a container that can be used from the first moment when the leaking fuel rod is extracted from the Fuel Assembly. The leaking fuel rod can be placed in the Westinghouse Quiver. When the Quiver is filled, it can be sealed and dried and then treated as a regular fuel assembly during intermediate storage and final repository. Purpose of System: The purpose of the system is to store leaking fuel rods, broken rods and fuel rod fragments leak tight in the fuel pool and after vacuum drying and permanent sealing at an intermediate storage facility. The Quiver is designed to be fully compatible with a regular fuel assembly. That means all handling of the Quiver in a Nuclear Power Plant, during transportation or storage is also identical to that of a regular fuel assembly. Fulfilling these criteria together with functional testing, the Quiver is considered acceptable for long time storage of leaking fuel rods, both in dry or wet condition. The Quiver has been qualified in Switzerland for use in the spent fuel pool, intermediate storage, and for a final repository. The system will be implemented as well in Sweden during 2016-2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Handled TRU Storage Challenges at Sandia National Laboratories/ New Mexico - 16071

The events at the Waste Isolation Pilot Plant (WIPP) in February 2014 had a significant impact on the packaging, storage, and disposal options at Sandia National Laboratories/New Mexico (Sandia) as with other transuranic generator sites. In 2012, Sandia had identified accountable material for disposal, fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}), which had been used in experiments conducted in the 1970's and 1980's. During the 2012/2013 timeframe, discussions with WIPP determined the samples and experimental vessels qualified as remote-handled (RH) transuranic (TRU) waste for disposal at WIPP. Sandia began discussions with WIPP to determine the process to repackage and characterize the material for disposal at WIPP in addition to obtain funding to complete the project. By January 2014, Sandia had contracted with Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) certified visual examination (VE) and dose-to-curie (DTC) support to package and certify the accountable material/waste. Work began on February 3, 2014 with the arrival of two VE operators. On February 5, 2014, a salt truck caught fire in the underground and on February 14, 2014, the radiological release occurred at WIPP initiating a suspension of shipments. The length of the suspension was not known at the time. Sandia was only a couple of days into this long-term project, had signed a contract with NWP for support, and was still responsible for meeting earlier negotiated milestones. There were 37 parent containers which included experimental vessels from 3 to 10 feet long and unused material pieces. The original plan was to package each of the 37 parent containers separately, but several issues, including the suspension of shipments, made it imperative that a new path forward be developed. Because space is limited in the Auxiliary Hot Cell Facility (AHCF), the storage configuration for criticality safety and material-at-risk was of the highest importance. Therefore, packaging in the fewest number of containers without exceeding WIPP limits, keeping the accountable items together, and not violating any safety basis requirements was Sandia's goal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Waste Acceptance Criteria for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Facility - 19143

The Idaho National Laboratory (INL) Remote-Handled Low-Level Waste (RH LLW) Disposal Facility has been constructed, has received operational approval from the Department of Energy (DOE), and is expected to receive its first waste shipment in FY 2019. The RH LLW Disposal Facility will support the needs of INL and the Naval Reactors Facility (NRF). RH LLW destined for the facility includes waste currently in storage from previous programs and projects conducted at INL; newly generated waste from programs and projects conducted at INL; and waste from NRF spent fuel processing activities. This new facility supports RH LLW disposal needs for the ongoing mission of INL and NRF. Waste to be disposed of at the RH LLW Disposal Facility may exhibit dose rates that range from 0.002 Sv/hr to 600 Sv/hr. Waste types include resins and activated metals as well as surface-contaminated debris generated from existing and new missions. The total number of canisters currently planned for disposal at the RH LLW Disposal Facility is 939 with the possibility of future expansion. The projected waste volume to be disposed of is 3,100 m{sup 3}. The RH LLW Disposal Facility will receive a wide variety of RH LLW and is in preparations to receive its first canisters in FY 2019. Waste acceptance criteria (WAC) and the radioactive waste management basis have been developed and implemented in accordance with the applicable DOE Order. In order to ensure that DOE requirements and guidance were appropriately implemented in the RH LLW Disposal Facility WAC, the project worked closely with the DOE Low Level Waste Disposal Facility Federal Review Group (LFRG) representatives and followed the applicable DOE standard. This paper provides an overview of the development of the WAC, including waste and waste generator certification requirements, for the RH LLW Disposal Facility. The paper illustrates the importance of maintaining strong ties to the development and revision of the RH LLW Disposal Facility Performance Assessment (PA), Documented Safety Analysis, Facility Procedures, Readiness Reviews, DOE Order, and applicable Technical Standards. The paper also provides an overview of the RH LLW Disposal Facility, WAC generator certification requirements, distinctive challenges to acceptance of legacy waste, and the unique approach the RH LLW Disposal Facility has taken to ensure compliance with PA driven limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Readiness Process and Transition to Operation for a Remote-Handled Transuranic Packaging Facility at Hanford - 19298

CH2M Hill Plateau Remediation Company manages the Sludge Retrieval Project, which has the mission to develop and deploy technologies to safely retrieve and package remote-handled transuranic sludge that is currently stored in the 105K West Reactor Fuel Storage Basin located in the 100-K Area of the U.S. Department of Energy's Hanford Site near Richland, Washington. In 2017, CH2M Hill Plateau Remediation Company installed and commissioned a process for removal of the sludge. A contractor Operational Readiness Review was completed in March 2018, and a U.S. Department of Energy, Richland Operations Office Operational Readiness Review was completed in May. The first sludge transfer was successfully completed on June 12, 2018, proving that the Engineered Container Retrieval and Transfer System process equipment worked as intended. This paper will describe the issues and successes along the path of readiness and startup, as well as the challenges that remain and CH2M Hill Plateau Remediation Company's plan to overcome them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Radiological Risk Assessment Model for Disposition of Remote-Handled Transuranic Wastes at Los Alamos National Laboratory Area G - 20116

The U.S. Department of Energy (DOE) operates a low-level radioactive waste (LLW) disposal site at Material Disposal Area G, in Los Alamos, New Mexico, USA. Area G has been the primary LLW disposal site for Los Alamos National Laboratory (LANL) since the 1960's. In addition to LLW, Area G is host to a variety of other wastes, the disposition of which must be determined before closure of the site. A probabilistic Radiological Risk Assessment (RRA) for Area G is used in order to support decision making regarding some wastes that are not addressed in the extant Area G Performance Assessment (PA) and Composite Analysis (CA). Between 1979 and 1987, 33 special shafts were augered into the Bandelier Tuff at Area G. This volcanic tuff is present across Pajarito Plateau on the eastern slopes of the Jemez Mountains, and varies widely in its consistency, from weakly indurated non-welded layers to welded layers that uphold the mesa cliffs of the Plateau. These mesas are home to LANL, Area G, and the townsites of Los Alamos and White Rock, with residences about 1400 m from Area G. The 33 Shafts were lined with steel casing, and contain remote-handled (RH) transuranic wastes (TRU) resulting from experiments and analysis performed in special glove boxes at the Chemistry and Metallurgy Research (CMR) facility at LANL. Some of these wastes originated as used nuclear fuel. The purpose of the Area G RRA is to evaluate the potential future risk to humans and the environment from the RH TRU in the 33 Shafts in the context of the risk associated with the surrounding wastes at Area G. The analysis is responsive to expectations outlined in DOE Order 458.1, Radiation Protection of the Public and the Environment, and is informed by the Manual and Guidance accompanying DOE O 435.1, Radioactive Waste Management. Because the waste meets the definition of TRU, the regulatory context necessarily takes into consideration the regulation governing the disposal of TRU from the U.S. Environmental Protection Agency (EPA): 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Given the broader regulatory context for the RRA, the analysis is subject to different assumptions from those made in the existing DOE O 435.1 PA and CA, such as allowing for future occupation of the site. The analysis begins with a comprehensive evaluation of features, events, processes, and exposure scenarios (FEPS) for Area G and the wastes it contains. These FEPSs are screened to eliminate from further consideration those of extremely low probability and/or consequence, and a conceptual site model (CSM) is subsequently developed. The scope and structure of the Area G RRA Model is informed by this CSM, and the Area G RRA Model is developed using the GoldSim systems analysis modeling platform. This paper presents the initial version of a defensible, transparent, and reasonably realistic model, which is based on the state of knowledge of the wastes, the site, and the FEPSs that govern contaminant transport from wastes into the environment and subsequent exposures to humans and other biota. Probabilistic model input distributions represent uncertainties inherent in the real and modeled systems. The results of the Area G RRA Model inform decisions regarding the disposition of the RH TRU in the 33 Shafts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗