Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Developing Government Renewable Energy Projects

The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

17 WIND ENERGY↗

Big Data Analytic for Cascading Failure Analysis

With the challenges of increased grid dynamics and more variability of power generation from renewable energy sources, rapidly increasing complexity in the grid model, and abundant data from measurements and simulations, the requirements for computational analysis have also increased dramatically. Power system operators and engineers need to analyze more scenarios, extract meaningful information from a larger set of data, and respond more quickly when faced with these new challenges for large-scale applications, such as contingency analysis. This paper proposes a novel big data analysis approach for power system cascading analysis, prevention, and remediation. The developed techniques will be capable of cascading analysis, better assessment of the system’s vulnerability level, as well as proposing potential remediation. Case studies using IEEE 118-bus system and a 500-bus system, with a comparison against a commercial tool, validate the advantages of the developed big data approach: accurate prediction, and more importantly, faster and effective correction actions.The developed techniques could be further used for other power system applications.

big data, cascading analysis, corrective action, m↗

Reducing Idle Power Consumption in Office Spaces Saves U.S. Navy in Energy Costs (Fact Sheet)

As part of a two-year project to demonstrate energy efficiency measures, renewable energy generation, and energy systems integration, the National Renewable Energy Laboratory (NREL) has identified advanced plug load controls as a promising technology for reducing energy use and related costs in the U.S. Navy's Naval Facilities Engineering Command (NAVFAC) office spaces.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mitigating the Impacts of Uncertain Geomagnetic Disturbances on Electric Grids: A Distributionally Robust Optimization Approach

Severe geomagnetic disturbances (GMDs) increase the magnitude of the electric field on the Earth’s surface (E-field) and drive geomagnetically-induced currents (GICs) along the transmission lines in electric grids. These additional currents can pose severe risks, such as current distortions, transformer saturation and increased reactive power losses, each of which can lead to system unreliability. Today several mitigation actions (e.g., changing grid topology) exist that can reduce the harmful GIC effects on the grids. Making such decisions can be challenging, however, because the magnitude and direction of the E-field are uncertain and non-stationary. In this paper, we model uncertain E-fields using the distributionally robust optimization (DRO) approach that determines optimal transmission grid operations such that the worst-case expectation of the system cost is minimized. We also capture the effect of GICs on the nonlinear AC power flow equations. For solution approaches, we develop an accelerated column-and-constraint generation (CCG) algorithm by exploiting a special structure of the support set of uncertain parameters representing the E-field. Extensive numerical experiments based on “epri-21” and “uiuc-150” systems, designed for GMD studies, demonstrate (i) the computational performance of the accelerated CCG algorithm, (ii) the superior performance of distributionally robust grid operations that satisfy nonlinear, nonconvex AC power flow equations and GIC constraints, in comparison with standard stochastic programming-based methods during the out-of-sample testing.

42 ENGINEERING↗

National power grid simulation capability : need and issues

On December 9 and 10, 2008, the Department of Homeland Security (DHS) Science and Technology Directorate sponsored a national workshop at Argonne National Laboratory to explore the need for a comprehensive modeling and simulation capability for the national electric power grid system. The workshop brought together leading electric power grid experts from federal agencies, the national laboratories, and academia to discuss the current state of power grid science and engineering and to assess if important challenges are being met. The workshop helped delineate gaps between grid needs and current capabilities and identify issues that must be addressed if a solution is to be implemented. This report is a result of the workshop and highlights power grid modeling and simulation needs, the barriers that must be overcome to address them, and the benefits of a national power grid simulation capability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of adaptive automation on operator-system performance - 103

Adaptive automation (AA) is the dynamic, real-time change in the degree of automation in response to situational changes. AA systems are being developed in many industries, including for nuclear power plant applications. AA is a promising means of mitigating human performance issues that often arise in highly automated systems. The purpose of this Nuclear Regulatory Commission study was to characterize important AA design features, define the effects of AA on performance, examine the human factors engineering (HFE) guidance available to design and evaluate AA systems, and identify research and development needs. In general, we found that AA improves task performance and situation awareness (SA) while managing workload. Although the research is limited, AA also supports operator recognition of automation failure and recovery. Research on human-system interfaces has identified principles showing promise for supporting SA, including failure detection, and limiting workload. Research further suggests that AA systems are both more effective, and less disruptive and distracting, when they follow rules of interaction similar to those used by human crewmembers. Our general conclusion about the HFE guidance available to designers and reviewers is that it is limited and has not kept pace with automation technology. We discuss several research and development needs that will help support a better understanding of where and how AA should be used and support the development of more comprehensive guidance for AA safety reviews. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental Investigation of Spark-Ignited Combustion with High-Octane Biofuels and EGR. 1. Engine Load Range and Downsize Downspeed Opportunity

The present study experimentally investigates spark-ignited combustion with 87 AKI E0 gasoline in its neat form and in midlevel alcohol–gasoline blends with 24% vol/vol isobutanol–gasoline (IB24) and 30% vol/vol ethanol–gasoline (E30). A single-cylinder research engine was used with an 11.85:1 compression ratio, hydraulically actuated valves, laboratory intake air, and was capable of external exhaust gas recirculation (EGR). Experiments were conducted with all fuels to full-load conditions with λ = 1, using both 0% and 15% external cooled EGR. Higher octane number biofuel blends exhibited increased stoichiometric torque capability at this compression ratio, where the unique properties of ethanol enabled a doubling of the stoichiometric torque capability with E30 as compared to 87 AKI, up to 20 bar IMEPg (indicated mean effective pressure gross) at λ = 1. EGR provided thermodynamic advantages and was a key enabler for increasing engine efficiency for all fuel types. However, with E30, EGR was less useful for knock mitigation than gasoline or IB24. Torque densities with E30 with 15% EGR at λ = 1 operation were similar or better than a modern EURO IV calibration turbo-diesel engine. The results of the present study suggest that it could be possible to implement a 40% downsize + downspeed configuration (1.2 L engine) into a representative midsize sedan. For example, for a midsize sedan at a 65 miles/h cruise, an estimated fuel consumption of 43.9 miles per gallon (MPG) (engine out 102 g-CO 2 /km) could be achieved with similar reserve power to a 2.0 L engine with 87AKI (38.6 MPG, engine out 135 g-CO 2 /km). Data suggest that, with midlevel alcohol–gasoline blends, engine and vehicle optimization can offset the reduced fuel energy content of alcohol–gasoline blends and likely reduce vehicle fuel consumption and tailpipe CO 2 emissions.

Splitter, Derek↗

Investigation of the Impact of Fuel Properties on Particulate Number Emission of a Modern Gasoline Direct Injection Engine

Gasoline Direct Injection (GDI) has become the preferred technology for spark-ignition engines resulting in greater specific power output and lower fuel consumption, and consequently reduction in CO2 emission. However, GDI engines face a substantial challenge in meeting new and future emission limits, especially the stringent particle number (PN) emissions recently introduced in Europe and China. Studies have shown that the fuel used by a vehicle has a significant impact on engine out emissions. In this study, nine fuels with varying chemical composition and physical properties were tested on a modern turbo-charged side-mounted GDI engine with design changes to reduce particulate emissions. The fuels tested included four fuels meeting US certification requirements; two fuels meeting European certification requirements; and one fuel meeting China 6 certification requirements being proposed at the time of this work. Two risk safeguard fuels (RSG), representing the properties of worst case market fuels in Europe and China, were also included. The particle number concentration of the solid particulates was measured in the engine-out exhaust flow at steady state engine operations with load and speed sweeps, and semi-transient load steps. The test results showed a factor of 6 PN emission difference among all certification fuels tested. Combined with detailed fuel analyses, this study evaluated important factors (such as oxygenates, carbon chain length and thermo-physical properties) that cause PN emissions which were not included in PMI index. A linear regression was performed to develop a PN predictive model which showed improved fitting quality than using PMI.

33 ADVANCED PROPULSION SYSTEMS↗

Connecting LWRS Human Factor Engineering R&D to NUREG-0711 Elements and Modification Activities in Nuclear Power Plants

This Report documents the connection between DOE INL LWRS HFE R&D activities and the technical content of NUREG-0711 Results Summary Reports. Since the current and most recent LWRS HFE activities are associated with modernization and modification of nuclear power electric generating stations, this Report will limit its scope to these topics. NUREG-0711 Results Summary Reports content is shared with US nuclear generating stations by INL HFE staff through HFE Technical Reports to identify potential HEDs with planned upgrades. With such information, utilities have confidence that their upgraded HMIs, operating procedures, conduct of operations, and training with the upgraded systems will ensure their continued safe control of the nuclear plant. The utilities use the HFE Technical Reports as basis documents in their licensing processes used to modify the plant (LAR or 10CFR50.59). For plant modifications, LWRS HFE R&D activities commence as early as an agreement is reached between the utility and the LWRS Program staff. The multiple interfaces usually result in the two organizations meeting at INL, at the utility’s site, and at the vendor’s facility. Since there generally is a shortage of utility based HFE experience, INL HFE staff supports the HFE related utility modernization & modification (obsolescence) activities whenever requested.

10 CFR 50.59↗

Advanced Packaging Designs

The primary deliverable for this project will be to construct a power electronics package utilizing an organic, electrically insulating substrate material and demonstrate superior thermal performance and greater reliability under thermal cycling, thermal aging, vibration, power cycling, and electrical high-potential evaluation over traditional packages.

ENGINEERING↗

The PHEV Charging Infrastructure Planning (PCIP) Problem

Increasing debates over a gasoline independent future and the reduction of greenhouse gas (GHG) emissions has led to a surge in plug-in hybrid electric vehicles (PHEVs) being developed around the world. The majority of PHEV related research has been directed at improving engine and battery operations, studying future PHEV impacts on the grid, and projecting future PHEV charging infrastructure requirements. Due to the limited all-electric range of PHEVs, a daytime PHEV charging infrastructure will be required for most PHEV daily usage. In this paper, for the first time, we present a mixed integer mathematical programming model to solve the PHEV charging infrastructure planning (PCIP) problem for organizations with thousands of people working within a defined geographic location and parking lots well suited to charging station installations. Our case study, based on the Oak Ridge National Laboratory (ORNL) campus, produced encouraging results, indicates the viability of the modeling approach and substantiates the importance of considering both employee convenience and appropriate grid connections in the PCIP problem.

02 PETROLEUM↗

Application of CFB technology for large power generating units and CO{sub 2} capture

Data on the development of the circulating fluidized bed (CFB) technology for combustion of fuels in large power generating units are examined. The problems with raising the steam parameters and unit power of boilers with a circulating fluidized bed are examined. With the boiler system at the 460 MW unit at Lagisza (Poland) as an example, the feasibility of raising the efficiency of units with CFB boilers through deep recovery of the heat of the effluent gases and reducing expenditure for in-house needs is demonstrated. Comparative estimates of the capital and operating costs of 225 and 330 MW units are used to determine the conditions for optimum use of CFB boilers in the engineering renovation of thermal power plants in Russia. New areas for the application of CFB technology in CO{sub 2} capture are analyzed in connection with the problem of reducing greenhouse gas emissions.

01 COAL, LIGNITE, AND PEAT↗

Cooperative Research and Development Agreement among National Energy Technology Laboratory, The Board of Regents of the University System of Georgia by and on behalf of Georgia Institute of Technology, and University of Texas at El Paso [Abstract]

Georgia Institute of Technology (GIT), University of Texas at El Paso (UTEP), and the National Energy Technology Laboratory (NETL) will collaborate and develop cyber-physical systems for advanced power systems. GIT will test virtual models on hybrid power system hardware and cyber physical components. UTEP will test novel actuators on hybrid power system hardware. NETL will access GIT’s expertise in the engineering and real time simulation of power system processes for cyber-physical systems and simulations to control hardware. NETL will establish a relationship to promote UTEP’s capabilities in additive manufacturing and high-temperature piezo-electric devices with the potential for controlling high-temperature flows with a light and inexpensive device at high response rates. This project is the result of an EERE Advanced Manufacturing Office open Multi-Topic awarded proposal led by GIT titled, “Robust Combined Heat and Hybrid Power (CHHP) for High Electrical Efficiency Cogeneration”.

42 ENGINEERING↗

Neutron Transport and Nuclear Burnup Analysis for the Laser Inertial Confinement Fusion-Fission Energy (LIFE) Engine

Lawrence Livermore National Laboratory is currently developing a hybrid fusion-fission nuclear energy system, called LIFE, to generate power and burn nuclear waste. We utilize inertial confinement fusion to drive a subcritical fission blanket surrounding the fusion chamber. It is composed of TRISO-based fuel cooled by the molten salt flibe. Low-yield (37.5 MJ) targets and a repetition rate of 13.3 Hz produce a 500 MW fusion source that is coupled to the subcritical blanket, which provides an additional gain of 4-8, depending on the fuel. In the present work, we describe the neutron transport and nuclear burnup analysis. We utilize standard analysis tools including, the Monte Carlo N-Particle (MCNP) transport code, ORIGEN2 and Monteburns to perform the nuclear design. These analyses focus primarily on a fuel composed of depleted uranium not requiring chemical reprocessing or enrichment. However, other fuels such as weapons grade plutonium and highly-enriched uranium are also under consideration. In addition, we have developed a methodology using {sup 6}Li as a burnable poison to replace the tritium burned in the fusion targets and to maintain constant power over the lifetime of the engine. The results from depleted uranium analyses suggest up to 99% burnup of actinides is attainable while maintaining full power at 2GW for more than five decades.

42 ENGINEERING↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Boosting engine performance with Bose–Einstein condensation

Abstract At low-temperatures a gas of bosons will undergo a phase transition into a quantum state of matter known as a Bose–Einstein condensate (BEC), in which a large fraction of the particles will occupy the ground state simultaneously. Here we explore the performance of an endoreversible Otto cycle operating with a harmonically confined Bose gas as the working medium. We analyze the engine operation in three regimes, with the working medium in the BEC phase, in the gas phase, and driven across the BEC transition during each cycle. We find that the unique properties of the BEC phase allow for enhanced engine performance, including increased power output and higher efficiency at maximum power.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

TCSR Features Facilitating Safe Testing of 500 kV Power Transmission Lines

Reasons are examined for failures of gas-insulated circuit breakers on lines with shunt reactors that provide a level of line compensation close to 100%. It is shown that using a TCSR as a linear reactor makes it possible to eliminate the reason leading to failure of the circuit breaker in line testing.

24 POWER TRANSMISSION AND DISTRIBUTION↗