Budget Period 1 Summary Report: Hywind Maine Project

In accordance with the Statement of Project Objectives (SOPO) agreed to between the Department of Energy (“DOE”) and Statoil for the Hywind Maine project, Statoil hereby submits a Budget Period 1 Summary Report which includes accomplishments for the project. The report includes summaries of the other submitted reports (see Section 1.2-2) and progress regarding innovations leading to potential reductions in the Cost of Energy (see Section 3). The Hywind Demo project, the world’s first full-scale 2.3 megawatts (MW) floating wind turbine, installed at a water depth of 200 meter (m), 10 kilometer (km) off the coast of Norway, has proven that the Hywind floating substructure is a suitable platform for conventional multi- MW turbines. A principal goal of the Hywind Maine Project was to leverage that experience, both to demonstrate the commercial feasibility of the technology and to further develop and optimize the technology all in order to bring the costs down in a larger scale development. With the Hywind Maine Project, Statoil planned to deploy four turbines of 3 MW in approximately 140 meters water depth. Although the project in Maine will not move forward, much value was gained through the BP1 work package. Advanced modeling related to the design basis, which will have applicability beyond the Maine project, was completed. In addition, initial supply chain analyses were conducted, which will help assist with development of updated cost of energy models. Geophysical and various environmental surveys were also conducted, the results of which Statoil has committed to share publicly, and which will help build a database of information that future developers may be able to access. Finally, Statoil gained a greater understanding of the US offshore wind industry and related markets, which will assist the company as it looks for full-scale, commercial opportunities.

17 WIND ENERGY↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications (Final Technical Report)

Being able to refill a cars gas tank when low on fuel is incredibly convenient and is a lacking feature for battery elective vehicles. New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications was a research project designed to help correct this lacking feature by developing automotive sized Li-ion battery cells and demonstrating their ability to charge in under 10-minutes. To address the technical challenges Microvast, a cell manufacturer, was joined by Argonne National Labs, battery technology innovator, and BMW, a renown OEM, worked together to define and validate materials and cells for this project. By projects end, Microvast had successfully built and demonstrated a 240 Wh/kg, 35 Ah pouch cell that was capable of over 800 10-minute charge, full discharge cycles. From the outset of the project the plan was to use large amp-hour cells (ie automotive relevant sizes) to ensure the project findings and outcomes were most relevant for electric vehicle applications. The manufacture of cells was done using test manufacturing lines at Microvast and BMW that closely resemble the procedures of a Li-ion battery cell factory.

25 ENERGY STORAGE↗

TANK SPACE OPTIONS REPORT

Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Studies Related to Past Operations at the High Flux Isotope Reactor

During the past year, two topics related to past operations of the High Flux Isotope Reactor (HFIR) were reviewed in response to on-going programs at Oak Ridge National Laboratory (ORNL). Currently, studies are being conducted to determine if HFIR can be converted from high enriched uranium (HEU) fuel to low enriched uranium (LEU). While the basis for conversion is the current performance of the reactor, redesign studies revealed an apparent slight degradation in performance of the reactor over its 40 year lifetime. A second program requiring data from HFIR staff is the Integrated Facility Disposition Project (IFDP). The IFDP is a program that integrates environmental cleanup with modernization and site revitalization plans and projects. Before a path of disposal can be established for discharged HFIR beryllium reflector regions, the reflector components must be classified as to type of waste and specifically, determine if they are transuranic waste.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Studies of Past Operations at the High Flux Isotope Reactor

During the past year, two topics related to past operations of the High Flux Isotope Reactor (HFIR) were reviewed in response to on-going programs at Oak Ridge National Laboratory (ORNL). Currently, studies are being conducted to determine if HFIR can be converted from high enriched uranium (HEU) fuel to low enriched uranium (LEU). While the basis for conversion is the current performance of the reactor, redesign studies revealed an apparent slight degradation in performance of the reactor over its 40 year lifetime. A second program requiring data from HFIR staff is the Integrated Facility Disposition Project (IFDP). The IFDP is a program that integrates environmental cleanup with modernization and site revitalization plans and projects. Before a path of disposal can be established for discharged HFIR beryllium reflector regions, the reflector components must be classified as to type of waste and specifically, determine if they are transuranic waste.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Midwest EVOLVE (Midwest Electric Vehicle Opportunities: Learning, eVents, Experience)

The Midwest Electric Vehicle Opportunities: Learning, eVents, Experience (Midwest EVOLVE) project was a 45 month, seven-state effort to introduce electric vehicles to the public, workplaces, corporate fleets and auto dealership staff. Midwest EVOLVE projects were planned and completed in the following states: Illinois, Indiana, Michigan, Minnesota, North Dakota, Ohio, and Wisconsin. The project was coordinated by the American Lung Association of the Upper Midwest (ALAUM), dba Twin Cities Clean Cities Coalition (TC4).

33 ADVANCED PROPULSION SYSTEMS↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

SU-E-J-100: The Combination of Deformable Image Registration and Regions-Of-Interest Mapping Technique to Accomplish Accurate Dose Calculation On Cone Beam Computed Tomography for Esophageal Cancer

Purpose: We introduce a new method combined with the deformable image registration (DIR) and regions-of-interest mapping (ROIM) technique to accurately calculate dose on daily CBCT for esophageal cancer. Methods: Patients suffered from esophageal cancer were enrolled in the study. Prescription was set to 66 Gy/30 F and 54 Gy/30 F to the primary tumor (PTV66) and subclinical disease (PTV54) . Planning CT (pCT) were segmented into 8 substructures in terms of their differences in physical density, such as gross target volume (GTV), venae cava superior (SVC), aorta, heart, spinal cord, lung, muscle and bones. The pCT and its substructures were transferred to the MIM software to readout their mean HU values. Afterwards, a deformable planning CT to daily KV-CBCT image registration method was then utilized to acquire a new structure set on CBCT. The newly generated structures on CBCT were then transferred back to the treatment planning system (TPS) and its HU information were overridden manually with mean HU values obtained from pCT. Finally, the treatment plan was projected onto the CBCT images with the same beam arrangements and monitor units (MUs) to accomplish dose calculation. Planning target volume (PTV) and organs at risk (OARs) from both of the pCT and CBCT were compared to evaluate the dose calculation accuracy. Results: It was found that the dose distribution in the CBCT showed little differences compared to the pCT, regardless of whether PTV or OARs were concerned. Specifically, dose variation in GTV, PTV54, PTV66, SVC, lung and heart were within 0.1%. The maximum dose variation was presented in the spinal cord, which was up to 2.7% dose difference. Conclusion: The proposed method combined with DIR and ROIM technique to accurately calculate dose distribution on CBCT for esophageal cancer is feasible.

60 APPLIED LIFE SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Comets and cometary missions

The paper deals with the planning phase of a combined NASA/ESA dual comet mission to the two periodic comets, P/Halley and P/Temple-2. The project is planned for a FY 81 start. If approved, the launch would occur in July or August 1985, using Shuttle IUS twin stage. The solar powered ion propulsion engine will provide continuous thrust virtually throughout the three-year flight until the P/Temple-2 rendezvous in July 1988. En route to the Temple-2 rendezvous, an ESA Halley probe will be deployed to encounter Halley about 73 days before perihelion, when the heliocentric distance of Halley is about 1.5 AU.

Mendis, D. A.↗

NASA RECON: Course development, administration, and evaluation. A research and development proposal

This proposal addresses the development, administration, and evaluation of a set of transportable, college-level courses to educate science and engineering students in the effective use of automated scientific and technical information storage and retrieval systems, and, in particular, in the use of the NASA RECON system. Chapter 1 presents a brief introduction. Chapter 2 identifies general and specific objectives, i.e., needs analysis, course development, course administration, and course evaluation. Chapter 3 proposes the methodology to be used in successfully accomplishing these objectives. Chapter 4 highlights expected results and product deliverables, and Chapter 5 presents the project evaluation plan to be followed. Chapter 6 is a brief overview of the institutional resources available at the proposing institutions, i.e., at the University of Southwestern Louisiana and at Southern University to support the project. Chapter 7 proposes a budget, time schedule, and management plan. Chapter 8 is a summary of the foregoing.

Dominick, Wayne D.↗

Power, Optimization, Waste Estimating, Resourcing Tool

Planning, Optimization, Waste Estimating, Resourcing tool (POWERtool) is a comprehensive relational database software tool that can be used to develop and organize a detailed project scope, plan work tasks, develop bottoms-up field cost and waste estimates for facility Deactivation and Decommissioning (D&D), equipment, and environmental restoration (ER) projects and produces resource-loaded schedules.

Nelson, Jerel↗

Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗