Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Embedded Volttron Specification - Benchmarking Small Footprint Compute Devices for Volttron

An embedded system is a small footprint computing unit that typically serves a specific purpose closely associated with measurements and control of hardware devices. These units are designed for reasonable durability and operations in a wide range of operating conditions. Some embedded systems support real-time operations and can demonstrate high levels of reliability. Many have failsafe mechanisms built to handle graceful shutdown of the device in exception conditions. The available memory, processing power, and network connectivity of these devices are limited due to the nature of their specific-purpose design and intended application. Industry practice is to carefully design the software for the available hardware capability to suit desired deployment needs. Volttron is an open source agent development and deployment platform designed to enable researchers to interact with devices and appliances without having to write drivers themselves. Hosting Volttron on small footprint embeddable devices enables its demonstration for embedded use. This report details the steps required and the experience in setting up and running Volttron applications on three small footprint devices: the Intel Next Unit of Computing (NUC), the Raspberry Pi 2, and the BeagleBone Black. In addition, the report also details preliminary investigation of the execution performance of Volttron on these devices.

97 MATHEMATICS AND COMPUTING↗

Overview and Current Status of Analyses of Potential LEU Design Concepts for TREAT

Neutronic and thermal-hydraulic analyses have been performed to evaluate the performance of different low-enriched uranium (LEU) fuel design concepts for the conversion of the Transient Reactor Test Facility (TREAT) from its current high-enriched uranium (HEU) fuel. TREAT is an experimental reactor developed to generate high neutron flux transients for the testing of nuclear fuels. The goal of this work was to identify an LEU design which can maintain the performance of the existing HEU core while continuing to operate safely. A wide variety of design options were considered, with a focus on minimizing peak fuel temperatures and optimizing the power coupling between the TREAT core and test samples. Designs were also evaluated to ensure that they provide sufficient reactivity and shutdown margin for each control rod bank. Analyses were performed using the core loading and experiment configuration of historic M8 Power Calibration experiments (M8CAL). The Monte Carlo code MCNP was utilized for steady-state analyses, and transient calculations were performed with the point kinetics code TREKIN. Thermal analyses were performed with the COMSOL multi-physics code. Using the results of this study, a new LEU Baseline design concept is being established, which will be evaluated in detail in a future report.

Connaway, H. M.↗

Mitigation of Syngas Cooler Plugging and Fouling

This Final Report summarizes research performed to develop a technology to mitigate the plugging and fouling that occurs in the syngas cooler used in many Integrated Gasification Combined Cycle (IGCC) plants. The syngas cooler is a firetube heat exchanger located downstream of the gasifier. It offers high thermal efficiency, but its’ reliability has generally been lower than other process equipment in the gasification island. The buildup of ash deposits that form on the fireside surfaces in the syngas cooler (i.e., fouling) lead to reduced equipment life and increased maintenance costs. Our approach to address this problem is that fouling of the syngas cooler cannot be eliminated, but it can be better managed. The research program was funded by DOE using two budget periods: Budget Period 1 (BP1) and Budget Period 2 (BP2). The project used a combination of laboratory scale experiments, analysis of syngas cooler deposits, modeling and guidance from industry to develop a better understanding of fouling mechanisms and to develop and evaluate strategies to mitigate syngas cooler fouling and thereby improve syngas cooler performance. The work effort in BP 1 and BP 2 focused on developing a better understanding of the mechanisms that lead to syngas cooler plugging and fouling and investigating promising concepts to mitigate syngas cooler plugging and fouling. The work effort focused on the following: • analysis of syngas cooler deposits and fuels provided by an IGCC plant collaborating with this project; • performing Jet cleaning tests in the University of Utah Laminar Entrained Flow Reactor to determine the bond strength between an ash deposit to a metal plate, as well as implementing planned equipment modifications to the University of Utah Laminar Entrained Flow Reactor and the one ton per day, pressurized Pilot Scale Gasifier; • performing Computational Fluid Dynamic modeling of industrially relevant syngas cooler configurations to develop a better understanding of deposit formation mechanisms; • performing Techno-Economic-Analysis for a representative IGCC plant to investigate the impact on plant economics, in particular the impacts on the Cost of Electricity (COE), due to plant shutdowns caused by syngas cooler plugging and fouling and potential benefits to plant economics of developing strategies to mitigate syngas cooler fouling; and • performing modeling and pilot scale tests to investigate the potential benefits of using a sorbent (fuel additive) to capture the vaporized metals that result in syngas cooler fouling. All project milestones for BP 1 and BP 2 were achieved. DOE was provided a briefing on our accomplishments in BP1 and BP2 and our proposed plans for Budget Period 3 (BP 3). Based on our research the mitigation technology selected to investigate in BP 3 was the use of a sorbent that can be injected into the gasifier with the fuel slurry to capture vaporized metals that lead to the deposit formation in the syngas cooler. The work effort proposed for BP 3 would have focused on addressing concerns raised by gasification industry personnel for the impacts on gasifier performance of sorbent injection, so that at the end of BP 3 the use of sorbent injection would be at “pre-commercial” stage and ready for use in a Field Demonstration that could be funded by industry or DOE. A Budget Continuation Application (BCA) was submitted to obtain funding for BP3 DOE but DOE chose to not fund the proposed BP3 effort.

47 OTHER INSTRUMENTATION↗

Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Bumpy Torus Experiment

This document summarizes the Bumpy Torus Experiment as a viable fusion reactor concept. Conclusions reached include the following: In 30 years, order-of-magnitude technological advances have occurred in multiple areas of plasma heating and confinement. The ORNL bumpy torus of the 1970s was technology limited. Now that ITER is technology limited, an alternate concept is needed. A device built on such a concept should be current free, CW, modular, have a gentle shutdown, and demonstrable stability. The bumpy torus meets or has the potential to meet all of these criteria. Earlier, stability was not possible due to power limits; it has not been fully tested. It is time to revisit the bumpy-torus concept with a modest new machine.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

System Study: Residual Heat Removal 1998–2013

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the RHR results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1998–2013

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses suggest that loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2013. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The emergency diesel generator failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant trends in LOOP frequencies over the 1997–2013 period are identified. There is a possibility that a significant trend in grid-related LOOP frequency exists that is not easily detected by a simple analysis. Statistically significant increases in recovery times after grid- and switchyard-related LOOPs are identified.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2012 Joint Research Target (JRT) Final Report

The report summarizes: [1] Diagnostic upgrades and analysis improvements that support the JRT; [2] Descriptions of new experiments and a brief summary of findings; [3] New analysis of previous experiments; [4] Plans for further data analysis and recommendations for further work; [5] Scientific publications that are derived from or contributed directly to the JRT. The report is organized as follows: Section 1: Describes inter-machine comparisons that were facilitated by the JRT focus. Similarities and differences found on the different facilities are outlined, and plans for additional analysis of data and supporting simulations are described.Section 2: Reviews diagnostic development, experiments and results from C-Mod. C-Mod dedicated 13.1 run days to the JRT divided among 10 experimental proposals. These were organized into three general thrust areas that represent distinct experimental approaches to realizing the regimes called for in the JRT description. Initial comparisons with linear and nonlinear simulation have been carried out for these experiments, and plans for an extensive campaign of analysis have been outlined. Section 3: Reviews results from DIII-D including new experiments, detailed comparisons of simulations to previously collected data and connections between the new work and past research. Four experimental days were dedicated to the JRT in 2012. These included studies of L-modes, H-modes and QH-modes. Section 4: Summarizes new analysis of data collected before the NSTX shutdown. The work focuses on the roles of low and high-k turbulence; collisionality scans and impurity particle transport.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

“Exploring High Energy Interactions with CMS at the LHC”

This High Energy Physics research project achieved its goal of exploring high-energy interactions with 7, 8 and 13 TeV data accumulated by CMS at the Energy Frontier. For the original hadron calorimeter (HCAL) and for its upgrade during Long Shutdown 1 (LS1), the PI helped propose and implement the upgrading the phototubes, new electronics, and fast timing of the hadronic forward (HF) and hadronic outer (HO) calorimeters of CMS, projects which he had forcefully advocated since the inception of CMS. The PI and his colleagues Prof. J. Rohlf and chief electronics engineer E. Hazen, his post-docs A. Heister and S. Girgis, and his graduate students (P. Lawson and D. Arcaro) contributed software tools used in perfecting of μTCA and Advanced Mezzanine Card (AMC13) electronics, the PC board that provides clock, timing and DAQ service for HCAL (and now many other subdetectors and central systems in the upgraded CMS detector). This Task reaped the benefits of these hardware contributions 1) to hermiticity for missing energy searches, and 2) to forward tagging jets for Vector Boson Fusion processes by analyzing and publishing early data, including that for the Higgs discovery and for exotic and supersymmetric searches.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Run 16, eIPM Summary

Three problems with the eIPMs were corrected during the 2015 summer shutdown. These involved ac coupling and 'negative profiles', detector 'dead zone' created by biasing, and gain control on ramp. With respect to Run 16, problems dealt with included gain depletion on horizontal MCP and rf pickup on profile signals; it was found that the MCP was severely damaged over part of the aperture. Various corrective measures were applied. Some results of these measured obtained during Run 16 are shown. At the end of Run 16 there was a three-­day beam run to study polarized proton beams in the AGS. Attempts to minimize beam injection errors which increase emittance by using the eIPMs to measure the contribution of injection mismatch to the AGS output beam emittance are recounted. .

43 PARTICLE ACCELERATORS↗

Specification of Fenix MPI Fault Tolerance library version 1.0.1

This document provides a specification of Fenix, a software library compatible with the Message Passing Interface (MPI) to support fault recovery without application shutdown. The library consists of two modules. The first, termed process recovery , restores an application to a consistent state after it has suffered a loss of one or more MPI processes (ranks). The second specifies functions the user can invoke to store application data in Fenix managed redundant storage, and to retrieve it from that storage after process recovery.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Evaluation of Erosion of the Dummy “EE” Plate 19 in YA Type ATR Fuel Element During Reactor PALM Cycles

Advanced Test Reactor (ATR) Cycle 153B-1 was a 14-day, high-power, powered axial locator mechanism (PALM) operating cycle that completed on April 12, 2013. Cycle 153B-1 was a typical operating cycle for the ATR, and did not result in any unusual plant transients. ATR was started up and shut down as scheduled. The PALM drive physically moves the selected experiments into and out of the core to simulate reactor startup and heat up, and shutdown and cooldown transients, while the reactor remains in steady-state conditions. However, after the cycle was over, when the fuel elements were removed from the core and inspected, several thousand flow-assisted erosion pits and “horseshoeing” defects were readily observed on the surface of the several YA-type fuel elements (these are aluminum “dummy” plates that contain no fuel). In order to understand these erosion phenomena, a thermal-hydraulic model of coolant channel 20 on a YA-M fuel element was generated. The boundaries of the model were the aluminum EE plate of a YA-M fuel element and a beryllium reflector block with 13 horizontal saw cuts which represented regions of zero flow. The heat generated in fuel plates 1 through 18 was modeled to be passing through the aluminum EE plate. The coolant channel 20 width was set at 0.058 in. (58 mils). It was established that the horizontal saw cuts had a significant effect on the temperature of the coolant. The flow, which was expected to vary linearly with gradual heating of the coolant as it passed through the channel, was extremely turbulent. The temperature rise, which was expected to be a smooth “S” curve, was represented by a series temperature rise “humps,” which occurred at each horizontal saw cut in the beryllium reflector block. Each of the 13 saw cuts had a chamfered edge which resulted in the coolant flow being re-directed as a jet across the coolant channel into the surface of the EE plate, which explained the temperature rise and the observed scalloping and pitting degradation on the YA-M fuel elements. In the case of scalloping (horseshoeing) a surprising similarity of that defect to those appearing on aluminum plate rolled in over-lubrication conditions, were established. In turn, this made us think that the principal feature responsible for the appearance of these defects, was horizontal cuts in the beryllium reflector block created to arrest the propagation of large vertical crack(s) in Be in PALM cycles with higher overall fluence. This assumption was fully confirmed by the results of thermo-hydraulic simulations. The neutronics data for these modeling experiments were provided using advanced irradiation simulations (MCNP, HELIOS). In the case of pitting erosion the following corrective measures were proposed based upon the results of JMatPro v.8.2 modeling (TTT- and CCT-diagrams): change the fabrication process by adding blister anneal before program anneal, immediately after cold rolling of AA6061plate. This step will allow achieving complete recrystallization, eliminating of strengthening due to metastable precipitates, and reduce the possibility of forming sharp microstructural features upon the surface.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

W Boson Mass Measurement at CDF

This is the closeout report for the grant for experimental research at the energy frontier in high energy physics. The report describes the precise measurement of the W boson mass at the CDF experiment at Fermilab, with an uncertainty of ≈ 12 MeV, using the full dataset of ≈ 9 fb -1 collected by the experiment up to the shutdown of the Tevatron in 2011. In this analysis, the statistical and most of the experimental systematic uncertainties have been reduced by a factor of two compared to the previous measurement with 2.2 fb -1 of CDF data. This research has been the culmination of the PI's track record of producing world-leading measurements of the W boson mass from the Tevatron. The PI performed the first and only measurement to date of the W boson mass using high-rapidity leptons using the D0 endcap calorimeters in Run 1. He has led this measurement in Run 2 at CDF, publishing two world-leading measurements in 2007 and 2012 with total uncertainties of 48 MeV and 19 MeV respectively. The analysis of the final dataset is currently under internal review in CDF. Upon approval of the internal review, the result will be available for public release.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Proppant backflow: Mechanical and flow considerations

One of the concerns of using proppant in geothermal wells, and particularly in enhanced geothermal systems, is proppant flowback. Particulate proppant maintain post-closure conductivity in hydraulically opened fractures. If that proppant is displaced from the near-wellbore region, either due to overflushing during stimulation or flowback to the wellbore at any time, the reduced fracture width chokes the injection or production. Two intermediate-scale laboratory analogs of a propped hydraulic fracture were prepared, and fluid was flowed through a normally stressed, propped fracture into a central wellbore. The tests were conducted in a polyaxial load frame. Acoustic/microseismic activity was measured during the injection programs. In one scenario—radial flow through a transverse fracture to a wellbore—the results suggest the creation of flow channels and nominally intact propped zones around the channels, maintaining fracture aperture. In the other—linear flow through a longitudinal fracture into a wellbore—there was substantially more proppant removal. The measurements have shown a greater tendency for proppant flowback in a linear flow situation (proppant movement is kinematically more restricted for radial convergent flow). The pressure gradients causing flow are exceedingly small and restraining flowback will be difficult. Convergent flow relationships could be an issue for injector wells, which will experience fluid flowback during hard shutdowns.

15 GEOTHERMAL ENERGY↗

Nuclear-Renewable Energy Systems Secondary Product Market Analysis Study

In order to properly create a program surrounding the development of any technological concept it is necessary to fully understand the market in which it is being developed. In the case of Integrated Nuclear-Renewable Hybrid Energy Systems (HES), there are two economic markets in which it must be able to participate in: the electricity market and the secondary product market associated with the specific system. The purpose of the present report is to characterize the secondary product market in the U.S. and to provide recommendations for further developing the HES program. While HESs have been discussed in depth in many other reports, it is helpful to discuss them briefly in the present work [REF]. The concept of the HES can be deduced to a system, featuring a combination of a nuclear power plant, a renewable energy source, and an industrial manufacturing plant . The system is designed in a fashion that allows it either to produce electricity or to manufacture a secondary product as needed. The primary benefit of this concept lies in its ability to maximize economic performance of the integrated system and to manufacture products in a carbon-free manner. A secondary benefit is the enhanced supply-side flexibility gained by allowing the HES to economically provide grid services. A key tenant to nuclear power plant economics in today’s electricity market is their ability to operate at a very high capacity factor. Unfortunately, in regions with a high penetration of renewable energy, the carbon free energy produced by nuclear power may not be needed at all times. This forces the nuclear power plant to find a user for its excess capacity. This may include paying the electric grid to find a user, releasing energy to the environment by ‘dumping steam’, or reducing power. If the plant is unable to economically or safely do any of these actions, the plant is at risk of being shutdown. In order to allow for nuclear power plants to continue to contribute carbon free electricity to the grid in a future with high renewable energy penetration, HESs allow for excess capacity to be diverted to a chemical process. If the chemical products sold on the market replace those sold previously – which would be the case if a currently operating manufacturing plant was modified to be a HES component – then the products would now be produced with reduced emission of carbon and other greenhouse gases. There are several key economic barriers that must be surmounted for HESs to be developed. The two primary barriers are the increased capital cost associated with coupling and controlling the HES components and the decreased utilization of the manufacturing plant capital due to intermittent energy delivery . Because of this, manufacturing plants that are less complex and have smaller non-variable operations and capital costs may be more attractive for integration. A secondary economic barrier for the HES is the market availability for its products. The system must operate a region where there is either an intermittent demand for its electricity, an intermittent demand for its secondary product, or both. In a region with an intermittent demand, product prices should shift accordingly, making it less attractive to produce one of the products. The HES then can shift production in order to maximize profit. Without an intermittent demand for at least one of its products, there would be little need for it to expend the extra capital required for integration as an HES.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Business Case for Nuclear Plant Control Room Modernization

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority of savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Energy Physics Research with the CMS Experiment at CERN - Energy Frontier Experiment

The Large Hadron Collider (LHC) at the European Organization for Nuclear Research (CERN) near Geneva, Switzerland, is now the highest energy accelerator in the world, colliding protons with protons. On July 4, 2012, the two general-purpose experiments, ATLAS and the Compact Muon Solenoid (CMS) experiment, announced the observation of a particle consistent with the world’s most sought-after particle, the Higgs boson, at a mass of about 125 GeV (approximately 125 times the mass of the proton). The Higgs boson is the final missing ingredient of the standard model, in which it is needed to allow most other particles to acquire mass through the mechanism of electroweak symmetry breaking. We are members of the team in the CMS experiment that found evidence for the Higgs boson through its decay to two photons, the most sensitive channel at the LHC. We are proposing to carry out studies to determine whether the new particle has the properties expected for the standard model Higgs boson or whether it is something else. The new particle can still carry out its role in electroweak symmetry breaking but have other properties as well. Most theorists think that a single standard model Higgs boson cannot be the complete solution – there are other particles needed to answer some of the remaining questions, such as the hierarchy problem. The particle that has been observed could be one of several Higgs bosons, for example, or it could be composite. One model of physics beyond the standard model is supersymmetry, in which every ordinary particle has a superpartner with opposite spin properties. In supersymmetric models, there must be at least five Higgs bosons. In the most popular versions of supersymmetry, the lightest supersymmetric particle does not decay and is a candidate for dark matter. This proposal covers the period from June 1, 2013, to March 31, 2016. During this period the LHC will finally reach its design energy, almost twice the energy at which it now runs. We will be able to study the Higgs boson at the current LHC energy using about three times as much data as were used to make the observation. In 2013 the LHC will shut down to make preparations to run at its design energy in 2015. During the shutdown period, we will be preparing upgrades of the detector to be able to run at the higher rates of proton-proton collisions that will also be possible once the LHC is running at design energy. The upgrade on which we are working, the inner silicon pixel tracker, will be installed in late 2016. Definitive tests of whether the new particle satisfies the properties of the standard model Higgs boson will almost certainly require both the higher energy and the larger amounts of data that can be accumulated using the higher rates. Meanwhile we will use the data taken during 2012 and the higher energy data starting in 2015 to continue to search for beyond-the-standard-model physics such as supersymmetry and heavy neutrinos. We have already made such searches using data since the LHC started running. We are discussing with theorists how a 125-GeV Higgs modifies such models. Finding such particles will probably also require the higher energy and larger amounts of data beginning in 2015. The period of this proposal promises to be very exciting, leading to new knowledge of the matter in the Universe.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Foil Bearing Coating Behavior in CO 2

The Sandia S-CO 2 Recompression Closed Brayton Cycle (RCBC) utilizes a series of gas foil bearings in its turbine-alternator-compressors. At high shaft rotational speed these bearings allow the shaft to ride on a cushion of air. Conversely, during startup and shutdown, the shaft rides along the foil bearing surface. Low-friction coatings are used on bearing surfaces in order to facilitate rotation during these periods. An experimental program was initiated to elucidate the behavior of coated bearing foils in the harsh environments of this system. A test configuration was developed enabling long duration exposure tests, followed by a range of analyses relevant to their performance in a bearing. This report provides a detailed overview of this work. The results contained herein provide valuable information in selecting appropriate coatings for more advanced future bearing-rig tests at the newly established test facility in Sandia-NM.

36 MATERIALS SCIENCE↗