At least 793 records · Page 44

CABLE Big Idea RDD&D Workshop (Workshop Summary Report)

The U.S. Department of Energy’s (DOE’s) Advanced Manufacturing Office (AMO) held the CABLE Big Idea RDD&D Workshop April 7–9, 2021. The virtual workshop brought together approximately 250 leading scientific and technical experts to gather information on the state of the art in conductivity-enhanced materials and their applications. These stakeholders included scientists, engineers, manufacturers, materials experts, utility companies, and other entities within the conductor material and electrical product manufacturing supply chains. The two main goals of the workshop were to 1) start building and strengthening a research ecosystem around conductivity-enhanced materials and 2) inform AMO’s future portfolio of research, development, demonstration, and deployment (RDD&D) investments and other program activities in the area of conductivity-enhanced materials. CABLE—or Conductivity-enhanced materials for Affordable, Breakthrough Leapfrog Electric and thermal applications—was was established as an Office of Energy Efficiency and Renewable Energy initiative as a result of a competitive internal process to identify and prioritize potentially high-impact research topics. Since then, conductivity-enhanced materials have been identified as an important element of the shift to an electrified and decarbonized industry sector, and CABLE remains a Big Idea. The CABLE effort is led by AMO and supported by eight other offices within DOE. The first major effort under CABLE was the development of several subtopics for DOE’s Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) programs in 2020. Another major activity was the launch of the CABLE Conductor Manufacturing Prize in March 2021.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Compliance of SLAC_s Laser Safety Program with OSHA Requirements for the Control of Hazardous Energy

SLAC's COHE program requires compliance with OSHA Regulation 29CFR1910.147, 'The control of hazardous energy (lockout/tagout)'. This regulation specifies lockout/tagout requirements during service and maintenance of equipment in which the unexpected energization or start up of the equipment, or release of stored energy, could cause injury to workers. Class 3B and Class 4 laser radiation must be considered as hazardous energy (as well as electrical energy in associated equipment, and other non-beam energy hazards) in laser facilities, and therefore requires careful COHE consideration. This paper describes how COHE is achieved at SLAC to protect workers against unexpected Class 3B or Class 4 laser radiation, independent of whether the mode of operation is normal, service, or maintenance.

43 PARTICLE ACCELERATORS↗

Project Plan Remote Target Fabrication Refurbishment Project

In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation of a level 1 trigger system using high speed serial (VXS) techniques for the 12GeV high luminosity experimental programs at Thomas Jefferson National Accelerator Facility

We will demonstrate a hardware and firmware solution for a complete fully pipelined multi-crate trigger system that takes advantage of the elegant high speed VXS serial extensions for VME. This trigger system includes three sections starting with the front end crate trigger processor (CTP), a global Sub-System Processor (SSP) and a Trigger Supervisor that manages the timing, synchronization and front end event readout. Within a front end crate, trigger information is gathered from each 16 Channel, 12 bit Flash ADC module at 4 nS intervals via the VXS backplane, to a Crate Trigger Processor (CTP). Each Crate Trigger Processor receives these 500 MB/S VXS links from the 16 FADC-250 modules, aligns skewed data inherent of Aurora protocol, and performs real time crate level trigger algorithms. The algorithm results are encoded using a Reed-Solomon technique and transmission of this Level 1 trigger data is sent to the SSP using a multi-fiber link. The multi-fiber link achieves an aggregate trigger data transfer rate to the global trigger at 8 Gb/s. The SSP receives and decodes Reed-Solomon error correcting transmission from each crate, aligns the data, and performs the global level trigger algorithms. The entire trigger system is synchronous and operates at 250 MHz with the Trigger Supervisor managing not only the front end event readout, but also the distribution of the critical timing clocks, synchronization signals, and the global trigger signals to each front end readout crate. These signals are distributed to the front end crates on a separate fiber link and each crate is synchronized using a unique encoding scheme to guarantee that each front end crate is synchronous with a fixed latency, independent of the distance between each crate. The overall trigger signal latency is <3 uS, and the proposed 12GeV experiments at Jefferson Lab require up to 200KHz Level 1 trigger rate.

43 PARTICLE ACCELERATORS↗

Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its primary goal to start providing 700 kW beam power on NOvA target by the end of 2017 and 2) the foreseen PIP–II will replace the existing LINAC, a 400 MeV injector to the Booster, by an 800 MeV superconducting LINAC by the middle of next decade, with output beam intensity from the Booster increased significantly and the beam power on the NOvA target increased to <1.2 MW. In any case, the Fermilab Booster is going to play a very significant role for the next two decades. In this context, we have recently developed and commissioned an innovative beam injection scheme for the Booster called "early injection scheme". This scheme is already in operation and has a potential to increase the Booster beam intensity from the PIP design goal by a considerable amount with a reduced beam emittance and beam loss. In this paper, we will present results from our experience from the new scheme in operation, current status and future plans.

43 PARTICLE ACCELERATORS↗

The Neutron Time-Of-Flight Facility n lowbar TOF At CERN: Phase II

Neutron-induced reactions are studied at the neutron time-of-flight facility n lowbar TOF at CERN. The facility uses 6{approx}ns wide pulses of 20 GeV/c protons impinging on a lead spallation target. The large neutron energy range and the high instantaneous neutron flux combined with high resolution are among the key characteristics of the facility. After a first phase of data taking during the period 2001-2004, the facility has been refurbished with an upgraded spallation target and cooling system for a second phase of data taking which started in 2009. Since 2010, the experimental area at 185 m where the neutron beam arrives, has been modified into a worksector of type A, allowing the extension of the physics program to include neutron-induced reactions on radioactive isotopes.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Research in Experimental and Theoretical High Energy Physics (Close-Out Report for November 1, 2009 - April 30, 2013)

This document is the close-out report of Grant DE-FG02-91ER40682 from the Carnegie Mellon University (CMU) High-Energy Physics (HEP) Group to the U.S. Department of Energy (DOE). This grant started with the current federal identifier number in September 1991 and supported the experimental and theoretical research in HEP at CMU since then. Historically, the Carnegie Mellon experimental high-energy program was an amalgamation of three previously separate tasks: the “Counter” and “Colliding-Beams” groups as well as the Theory group.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Computational physics and applied mathematics capability review June 8-10, 2010 (Advance materials to committee members)

Los Alamos National Laboratory will review its Computational Physics and Applied Mathematics (CPAM) capabilities in 2010. The goals of capability reviews are to assess the quality of science, technology, and engineering (STE) performed by the capability, evaluate the integration of this capability across the Laboratory and within the scientific community, examine the relevance of this capability to the Laboratory's programs, and provide advice on the current and future directions of this capability. This is the first such review for CPAM, which has a long and unique history at the laboratory, starting from the inception of the Laboratory in 1943. The CPAM capability covers an extremely broad technical area at Los Alamos, encompassing a wide array of disciplines, research topics, and organizations. A vast array of technical disciplines and activities are included in this capability, from general numerical modeling, to coupled mUlti-physics simulations, to detailed domain science activities in mathematics, methods, and algorithms. The CPAM capability involves over 12 different technical divisions and a majority of our programmatic and scientific activities. To make this large scope tractable, the CPAM capability is broken into the following six technical 'themes.' These themes represent technical slices through the CP AM capability and collect critical core competencies of the Laboratory, each of which contributes to the capability (and each of which is divided into multiple additional elements in the detailed descriptions of the themes in subsequent sections): (1) Computational Fluid Dynamics - This theme speaks to the vast array of scientific capabilities for the simulation of fluids under shocks, low-speed flow, and turbulent conditions - which are key, historical, and fundamental strengths of the laboratory; (2) Partial Differential Equations - The technical scope of this theme is the applied mathematics and numerical solution of partial differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics; (3) Monte Carlo - Monte Carlo was invented at Los Alamos, and this theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology; (4) Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling; (5) Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling; and (6) Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1, 2, 3, and 6. Because these capability reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other 5 themes). Yearly written status reports will be provided to the Capability Review Committee Chair during off-cycle years.

99 GENERAL AND MISCELLANEOUS↗

Computational physics and applied mathematics capability review June 8-10, 2010

Los Alamos National Laboratory will review its Computational Physics and Applied Mathematics (CPAM) capabilities in 2010. The goals of capability reviews are to assess the quality of science, technology, and engineering (STE) performed by the capability, evaluate the integration of this capability across the Laboratory and within the scientific community, examine the relevance of this capability to the Laboratory's programs, and provide advice on the current and future directions of this capability. This is the first such review for CPAM, which has a long and unique history at the Laboratory, starting from the inception of the Laboratory in 1943. The CPAM capability covers an extremely broad technical area at Los Alamos, encompassing a wide array of disciplines, research topics, and organizations. A vast array of technical disciplines and activities are included in this capability, from general numerical modeling, to coupled multi-physics simulations, to detailed domain science activities in mathematics, methods, and algorithms. The CPAM capability involves over 12 different technical divisions and a majority of our programmatic and scientific activities. To make this large scope tractable, the CPAM capability is broken into the following six technical 'themes.' These themes represent technical slices through the CPAM capability and collect critical core competencies of the Laboratory, each of which contributes to the capability (and each of which is divided into multiple additional elements in the detailed descriptions of the themes in subsequent sections), as follows. Theme 1: Computational Fluid Dynamics - This theme speaks to the vast array of scientific capabilities for the simulation of fluids under shocks, low-speed flow, and turbulent conditions - which are key, historical, and fundamental strengths of the Laboratory. Theme 2: Partial Differential Equations - The technical scope of this theme is the applied mathematics and numerical solution of partial differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics. Theme 3: Monte Carlo - Monte Carlo was invented at Los Alamos. This theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology. Theme 4: Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling. Theme 5: Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling. Theme 6: Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The Laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1,2, 3, and 6. Because these reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other five themes). Yearly written status reports will be provided to the CPAM Committee Chair during off-cycle years.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

OPERATIONAL TOPOLOGY ESTIMATION OF THREE PHASE UNBALANCED POWER DISTRIBUTION SYSTEMS WITH OUTAGES

Distribution grid, in general, is constructionally loopy but a radially operated network. Opening and closing of suitable tie-switches allows transition from one radial topology to another. Tie-switches ensure reliability and provide restoration paths when faults (outages) occur. The estimation of the system's current operational topology is a precursor to implementing any optimal control actions (during normal operation) or restorative actions (during outage condition). The existing literature in topology detection suffers with several limitations including: (1) computationally intensive nonlinear formulations that are not scalable for large distribution systems, (2) methods requiring exhaustive search for the correct topology by enumerating the complete topological search space, and (3) approaches requiring large volumes of time-series measurements and are not applicable for estimating continuously changing operational topology. Furthermore, the existing literature on distribution grid topology estimation cannot be extended to estimate the operational topology during outage conditions. For operational topology estimation during outages, our objective is to estimate both energized radial feeder and the outaged sections. Starting with a radial topology, these methods identify outaged feeder sections and hence, are inapplicable when the current radial operational topology is not known. In this work, we present a mathematical programming approach to estimate the operational topology of a three-phase unbalanced power distribution system under both outage and normal operating conditions. The aforementioned limitations of existing literature were countered by modeling the problem as a mixed-integer linear programming (MILP) problem which minimizes the errors in available measurements while satisfying the power flow and structural constraints of the system. Specically, a minimum weighted least absolute value estimator is proposed that uses the instantaneous line flow measurements, historical/ forecasted load data, and ping measurements from a limited set of smart meters and solves an MILP to identify the operational topology based on a linearized three-phase unbalanced power flow model. The proposed approach is tested on IEEE 123-bus feeder and 1069 bus multi-feeder test system and the numerical results prove the applicability of the proposed method to large three phase unbalanced grids with high errors in measurements. It is observed that the approach performs well even at high percentages of measurement errors.

GANDLURU NAGA, ANANDINI↗

2016 Nuclear Energy Voucher Pilot Program Final Summary

In March 2016, the Department of Energy Office of Nuclear Energy (DOE-NE) Gateway for Accelerated Innovation in Nuclear (GAIN) initiative launched the NE Voucher pilot program for small businesses that develop advanced nuclear technologies. The intent of this program is to provide access to unique physical and intellectual capital that exists within the DOE National Laboratory complex for private-sector developers of innovative nuclear energy technologies. Vouchers allow recipients to have work performed on their behalf at select DOE laboratory facilities. The work is funded by DOE-NE and must be completed within approximately 12 months of the award date. Awards for the pilot had values of $50,000–300,000 each, depending on the complexity of the task requested. The program requires a 20% cost share by voucher recipients. In addition to providing the technical assistance sought by the awardees, the 2016 pilot award cycle showed that the program fosters relationships between these businesses and DOE laboratory staff, serving the GAIN mission to develop a private-public partnership framework that will enable accelerated commercialization of innovative concepts. For the inaugural voucher program, DOE-NE made a total of $2M available. In total, twenty-nine proposals were received and eight (Table 1) were chosen for award based on several criteria, including technical quality, level of innovation, commercialization potential, and relevance to the DOE-NE mission. After the review process, cooperative agreements were finalized, and work on all eight vouchers started in September 2016 and all but one were completed by the end of September, 2017. The single exception was completed in December, 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Security Technology Demonstration and Validation Sustainability Plan

This report describes the process of creating continuity and sustainability for demonstration and validation (DEMVAL) assets at the National Security Technology Incubator (NSTI). The DEMVAL asset program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The mission of the NSTI program is to identify, incubate, and accelerate technologies with national security applications at various stages of development by providing hands-on mentoring and business assistance to small businesses and emerging or growing companies. Part of this support is envisioned to be research and development of companies’ technology initiatives, at the same time providing robust test and evaluation of actual development activities. This program assists companies in developing technologies under the NSTI program through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. Development of the commercial potential for national security technologies is a significant NSTI focus. As part of the process of commercialization, a comprehensive DEMVAL program has been recognized as an essential part of the overall incubator mission. A number of resources have been integrated into the NSTI program to support such a DEMVAL program.

99 GENERAL AND MISCELLANEOUS↗

CyOTE ASSET OWNER ENGAGEMENT – SIDE CHANNEL POWER ANALYSIS PROTOTYPE

The U.S. Department of Energy’s (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER), through the Cybersecurity for the Operational Technology Environment (CyOTE) Program, worked with energy sector asset owners and operators (AOOs), partners, and Idaho National Laboratory (INL) to develop capabilities for AOOs to independently identify adversarial tactics, techniques, and procedures (TTPs) within their operational technology (OT) environments. The CyOTE methodology seeks to identify adversarial techniques within an AOO OT environment that could result in physical disruptions to energy flow or damage to equipment. CyOTE provides a general roadmap for AOOs, starting from a triggering event, or the point in time and space they perceive an anomalous event or condition meriting investigation, and culminating when the AOO has sufficient confidence to make a business risk decision on the appropriate resolution. This paper outlines the results of one such engagement with the New York Power Authority (NYPA), where the CyOTE program partnered with an AOO to develop a design specification for a power side channel detector to identify anomalous changes to device load. It describes the goal of developing this capability, the development process, the challenges the technical teams faced and the future steps an AOO will need to take to install and use this detector in its OT environment.

99 GENERAL AND MISCELLANEOUS↗

Status of PLS-II Upgrade Program

The Pohang Light Source (PLS) at the Pohang Accelerator Laboratory has been operated first at 2.0 GeV since 1995, and later was upgraded to 2.5 GeV. During this time, 6 insertion devices like undulators and multipole wigglers have been put into operation to produce special photon beams, with a total of 27 beamlines installed and 3 beamlines under construction. Recently, Korea synchrotron user's community is demanding high beam stability, higher photon energies as well as more straight sections for insertion devices in the PLS. To meet the user requirements, the PLS-II upgrade program has been launched in January, 2009, incorporating a modified chromatic version of Double Bend Achromat (DBA) to achieve almost twice as many straight sections as the current PLS with a design goal of the relatively low emittance, {epsilon}, of 5.9 nm{center_dot}rad. In the PLS-II, the top-up injection using full energy linac is planned for much higher stable beam as well and thus the production of hard x-ray undulator radiation of 8 to 13 keV is anticipated to allow for the successful research program namely Protein Crystallography. The PLS-II machine components of storage ring, linear accelerator and photon beamlines will be partly dismantled and reinstalled in a 6-months shutdown beginning January, 2011 and then the PLS-II upgrade be started the initial commissioning with a 100 mA beam current from July in 2011.

43 PARTICLE ACCELERATORS↗

SU-E-T-562: Motion Tracking Optimization for Conformal Arc Radiotherapy Plans: A QUASAR Phantom Based Study

Purpose: This study is to use plan parameters optimization (Dose rate, collimator angle, couch angle, initial starting phase) to improve the performance of conformal arc radiotherapy plans with motion tracking by increasing the plan performance score (PPS). Methods: Two types of 3D conformal arc plans were created based on QUASAR respiratory motion phantom with spherical and cylindrical targets. Sinusoidal model was applied to the MLC leaves to generate motion tracking plans. A MATLAB program was developed to calculate PPS of each plan (ranges from 0–1) and optimize plan parameters. We first selected the dose rate for motion tracking plans and then used simulated annealing algorithm to search for the combination of the other parameters that resulted in the plan of the maximal PPS. The optimized motion tracking plan was delivered by Varian Truebeam Linac. In-room cameras and stopwatch were used for starting phase selection and synchronization between phantom motion and plan delivery. Gaf-EBT2 dosimetry films were used to measure the dose delivered to the target in QUASAR phantom. Dose profiles and Truebeam trajectory log files were used for plan delivery performance evaluation. Results: For spherical target, the maximal PPS (PPSsph) of the optimized plan was 0.79: (Dose rate: 500MU/min, Collimator: 90°, Couch: +10°, starting phase: 0.83π). For cylindrical target, the maximal PPScyl was 0.75 (Dose rate: 300MU/min, Collimator: 87°, starting phase: 0.97π) with couch at 0°. Differences of dose profiles between motion tracking plans (with the maximal and the minimal PPS) and 3D conformal plans were as follows: PPSsph=0.79: %ΔFWHM: 8.9%, %Dmax: 3.1%; PPSsph=0.52: %ΔFWHM: 10.4%, %Dmax: 6.1%. PPScyl=0.75: %ΔFWHM: 4.7%, %Dmax: 3.6%; PPScyl=0.42: %ΔFWHM: 12.5%, %Dmax: 9.6%. Conclusion: By achieving high plan performance score through parameters optimization, we can improve target dose conformity of motion tracking plan by decreasing total MLC leaf travel distance and leaf speed.

61 RADIATION PROTECTION AND DOSIMETRY↗

Speed vs Accuracy: Effect on Ligand Pose Accuracy of Varying Box Size and Exhaustiveness in AutoDock Vina

Abstract Structure‐based virtual high‐throughput screening involves docking chemical libraries to targets of interest. A parameter pertinent to the accuracy of the resulting pose is the root mean square deviation (RMSD) from a known crystallographic structure, i. e., the ‘docking power’. Here, using a popular algorithm, Autodock Vina, as a model program, we evaluate the effects of varying two common docking parameters: the box size (the size of docking search space) and the exhaustiveness of the global search (the number of independent runs starting from random ligand conformations) on the RMSD from the PDBbind v2017 refined dataset of experimental protein‐ligand complexes. Although it is clear that exhaustiveness is an important parameter, there is wide variation in the values used, with variation between 1 and >100. We, therefore, evaluated a combination of cubic boxes of different sizes and five exhaustiveness values (1, 8, 25, 50, 75, 100) within the range of those commonly adopted. The results show that the default exhaustiveness value of 8 performs well overall for most box sizes. In contrast, for all box sizes, but particularly for large boxes, an exhaustiveness value of 1 led to significantly higher median RMSD (mRMSD) values. The docking power was slightly improved with an exhaustiveness of 25, but the mRMSD changes little with values higher than 25. Therefore, although low exhaustiveness is computationally faster, the results are more likely to be far from reality, and, conversely, values >25 led to little improvement at the expense of computational resources. Overall, we recommend users to use at least the default exhaustiveness value of 8 for virtual screening calculations.

Agarwal, Rupesh↗

Leveraging the Run 3 experience for the evolution of the ATLAS software-based readout towards HL-LHC

The High-Luminosity Large Hadron Collider (HL-LHC), scheduled to start operating in 2030, aims to increase the instantaneous luminosity by a factor of 10 compared to the LHC. To match this increase, the ATLAS experiment has been implementing a major upgrade program divided into two phases. The first phase (Phase-I), completed in 2022, introduced new trigger and detector systems that have been used during the Run 3 data taking period which began in July 2022. These systems have been used in conjunction with the new Data Acquisition (DAQ) Readout system, based on a software application called Software Readout Driver (SW ROD). SW ROD receives and aggregates data from the front-end electronics via the Front-End Link eXchange (FELIX) system and passes aggregated data fragments to the High-Level Trigger (HLT) system. During Run 3, SW ROD operates in parallel with the legacy Readout System (ROS) at an input rate of 100 kHz. For the Phase-II, the legacy ROS will be completely replaced with a new system based on the next generation of FELIX and an evolution of the SW ROD application called Data Handler. Data Handler has the same functional requirements as SW ROD but must be able to operate at an input rate of 1 MHz. To facilitate this evolution the SW ROD has been implemented using plugin architecture. This contribution presents the design and implementation of the SW ROD application for Run 3, along with the strategy for its evolution to the Phase-II Readout system. It discusses the lessons learned during Run 3 and describes the challenges that have been addressed to accomplish the demanding performance requirements of HL-LHC.

Kolos, Serguei [Univ. of California, Irvine, CA (U↗

A Mulit-State Model for Catalyzing the Home Energy Efficiency Market

The RePower Kitsap partnership sought to jump-start the market for energy efficiency upgrades in Kitsap County, an underserved market on Puget Sound in Washington State. The Washington State Department of Commerce partnered with Washington State University (WSU) Energy Program to supplement and extend existing utility incentives offered by Puget Sound Energy (PSE) and Cascade Natural Gas and to offer energy efficiency finance options through the Kitsap Credit Union and Puget Sound Cooperative Credit Union (PSCCU). RePower Kitsap established a coordinated approach with a second Better Buildings Neighborhood Program project serving the two largest cities in the county – Bainbridge Island and Bremerton. These two projects shared both the “RePower” brand and implementation team (Conservation Services Group (CSG) and Earth Advantage).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗