Search NASA⌕ Search

SEARCH · Search NASA

Results for “STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Kite ground station and system using same

A kite system with a ground station adapted for airborne power generation. The kite system may include a kite which includes one or more airfoils which have mounted thereon a plurality of turbine driven generators. The turbine driven generators may also function as motor driven propellers in a powered flight mode, which may be used during take-off, which may include aspects of vertical take-off and landing. A perch adapted to facilitate the take-off and landing may be used as part of the system. The perch may pivot such that the pivot is oriented towards the tension direction of the tether.

Vander Lind, Damon↗

Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line (BTS) for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this enhancement. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

43 PARTICLE ACCELERATORS↗

Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

43 PARTICLE ACCELERATORS↗

Viability of an Unattended Verification Station for UF6 Cylinders: Phase I Findings

In recent years, the International Atomic Energy Agency (IAEA) has pursued innovative techniques and an integrated suite of safeguards measures to address the verification challenges posed by the front end of the nuclear fuel cycle. Among the unattended instruments currently being explored by the IAEA is an Unattended Cylinder Verification Station (UCVS), which could provide automated, independent verification of the declared relative enrichment, 235U mass, total uranium mass, and identification for all declared uranium hexafluoride (UF6) cylinders in a facility (e.g., uranium enrichment plants and fuel fabrication plants). Under the auspices of the United States and European Commission Support Programs to the IAEA, a project was undertaken to assess the technical and practical viability of the UCVS concept. Phase I of the UCVS viability study was centered on a long-term field trial of a prototype UCVS system at the Westinghouse Fuel Fabrication Facility in South Carolina, USA. A key outcome of the study was a quantitative performance evaluation of two nondestructive assay (NDA) methods being considered for inclusion in a UCVS: Hybrid Enrichment Verification Array (HEVA), and Passive Neutron Enrichment Meter (PNEM). This paper will provide context for the UCVS and potential implementation concepts, a description of the UCVS prototype design, and an overview of the long-term field trial at a fuel fabrication facility. Selected field-trial results and interpretation are presented, including the performance of PNEM and HEVA for the verification of declared enrichment and 235U mass in over 200 “typical” Type 30B cylinders. Example results from a modeling study provide a preliminary assessment of sensitivity to material-substitution scenarios, for the as-fielded NDA methods.

Smith, Leon E.↗

Peña Station NEXT: Visualizing a net-zero energy district

Learn how NREL researchers are using advanced modeling and visualization tools to help create the planned net-zero energy district, Peña Station NEXT, near the Denver International Airport in Denver, Colorado. This project will result in tools for smart city design that can be applied across the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accessibility and Availability of Gas Stations for Liquid Fuel Supply During Severe Weather Events

Energy infrastructure is a pivotal lifeline with wider inter-dependencies. Electric power is essential to the continued functioning of critical assets; liquid fuels and other physical primary energy commodities that are used to supply the local energy needs of these assets during extreme events when electricity infrastructure is compromised. During Superstorm Sandy, the disruption of fuel supplies in the Tri-state area necessitated increasing situational awareness about oil and natural gas (ONG) systems to redirect fuel supplies to first responders and for restoration efforts. During winter storm events over the past several years, the demand for ONG for heating and power generation has skyrocketed in the north-east, which subsequently had caused ONG price to hit their highest level in years. ONG is a major energy source for restoration and recovery activities. However, very little, if any, situational awareness information about ONG supply and demand is available to those coordinating emergency efforts. Often this lack of information is due to the decentralized nature of the ONG supply chain and proprietary data maintained by private entities. To understand the impact of fuel availability on response and recovery efforts, this research focuses on (i) determining the accessibility to gas stations for liquid fuel supply across space and time, and (ii) examining the spatio-temporal variation of fuel availability and demand during extreme weather events. The broader scope of the project focuses on providing spatio-temporal situational awareness information about ONG availability and demand across the fuel supply chain for positioning of resources for response activities.

Kar, Bandana↗

Space vehicle with customizable payload and docking station

A “black box” space vehicle solution may allow a payload developer to define the mission space and provide mission hardware within a predetermined volume and with predetermined connectivity. Components such as the power module, radios and boards, attitude determination and control system (ADCS), command and data handling (C&DH), etc. may all be provided as part of a “stock” (i.e., core) space vehicle. The payload provided by the payload developer may be plugged into the space vehicle payload section, tested, and launched without custom development of core space vehicle components by the payload developer. A docking station may facilitate convenient development and testing of the space vehicle while reducing handling thereof.

Judd, Stephen↗

Shielding Experiments Under JASMIN Collaboration at Fermilab(IV) - Measurement and Analyses of High-Energy Neutron Spectra in the Anti-Proton Target Station

Neutron spectra in high-energy region between 1 and 100-MeV in the shield configuration of the anti-proton target station and a 120-GeV proton beam at Fermi National Accelerator Laboratory (Fermilab) were determined using the reaction rate data obtained with the multi-foil activation method. Two kinds of methods were employed for the determination of neutron spectra: one is the fitting method which is newly developed in this work, another is the unfolding method with SAND-II code. The calculations were performed using the PHITS. From the comparison between the calculated and experimental neutron spectra, it concluded that the PHITS can be used for shielding design of high-energy proton accelerators.

43 PARTICLE ACCELERATORS↗

Integrated Controls for Plug Loads and Lighting Systems - Case Study: Minnesota DOT Cedar Avenue Truck Station

This case study highlights the strategies the Minnesota Department of Transportation used at Cedar Avenue Truck Station for integrating plug load and lighting systems. An integrated controls pilot project with retrofit installation was conducted from October 2019 to April 2020 and was recognized by DOE's Integrated Lighting Campaign.

integrated lighting, lighting, controls, plug load↗

IGCC demonstration plant at Nakoso Power Station, Japan

The 250 MW IGCC demonstration plant at Nakoso Power Station is based on technology form Mitsubishi Heavy Industries (MHI) Ltd that uses a pressurized, air blown, two-stage, entrained-bed coal gasifier with a dry coal feed system. 5 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

Dubuque generation station, Dubuque, Iowa

Alliant Energy's Dubuque generation station is a fine example of why small does not mean insignificant in the power generation industry. This winner of the EUCG best performer award in the small plant category shows that its operating excellence towers over that of many larger and much newer coal-fired power plants. The plant has three operating units with boilers originally designed for Illinois basin coal but now Powder River Basin coal makes up 75% of the coal consumed. The boilers can also burn natural gas. 4 photos.

20 FOSSIL-FUELED POWER PLANTS↗

Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition

This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as well as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental and code simulation of a station blackout scenario for APR1400 with test facility ATLAS and MARS code

A SBO (station blackout) experiment named SBO-01 was performed at full-pressure IET (Integral Effect Test) facility ATLAS (Advanced Test Loop for Accident Simulation) which is scaled down from the APR1400 (Advanced Power Reactor 1400 MWe). In this study, the transient of SBO-01 is discussed and is subdivided into three phases: the SG fluid loss phase, the RCS fluid loss phase, and the core coolant depletion and core heatup phase. In addition, the typical phenomena in SBO-01 test - SG dryout, natural circulation, core coolant boiling, the PRZ full, core heat-up - are identified. Furthermore, the SBO-01 test is reproduced by the MARS code calculation with the ATLAS model which represents the ATLAS test facility. The experimental and calculated transients are then compared and discussed. The comparison reveals there was malfunction of equipments: the SG leakage through SG MSSV and the measurement error of loop flow meter. As the ATLAS model is validated against the experimental results, it can be further employed to investigate the other possible SBO scenarios and to study the scaling distortions in the ATLAS. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhancement of NRC station blackout requirements for nuclear power plants

The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Steam Dryer Segmentation and Packaging at Grand Gulf Nuclear Station - 13577

Entergy recently performed an Extended Power Up-rate (EPU) on their Grand Gulf Nuclear Station, near Port Gibson, Mississippi. To support the EPU, a new Steam Dryer Assembly was installed during the last refueling outage. Due to limited access into the containment, the large Replacement Steam Dryer (RSD) had to be brought into the containment in pieces and then final assembly was completed on the refueling floor before installation into the reactor. Likewise, the highly contaminated Original Steam Dryer (OSD) had to be segmented into manageable sections, loaded into specially designed shielded containers, and rigged out of containment where they will be safely stored until final disposal is accomplished at an acceptable waste repository. Westinghouse Nuclear Services was contracted by Entergy to segment, package and remove the OSD from containment. This work was performed on critical path during the most recent refueling outage. The segmentation was performed underwater to minimize radiation exposure to the workers. Special hydraulic saws were developed for the cutting operations based on Westinghouse designs previously used in Sweden to segment ABB Reactor Internals. The mechanical cutting method was selected because of its proven reliability and the minimal cutting debris that is generated by the process. Maintaining stability of the large OSD sections during cutting was accomplished using a custom built support stand that was installed into the Moisture Separator Pool after the Moisture Separator was installed back in the reactor vessel. The OSD was then moved from the Steam Dryer Pool to the Moisture Separator Pool for segmentation. This scenario resolved the logistical challenge of having two steam dryers and a moisture separator in containment simultaneously. A water filtration/vacuum unit was supplied to maintain water clarity during the cutting and handling operations and to collect the cutting chips. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dense Non Aqueous Phase Liquid Source Area Delineation Using Membrane Interface Probe and Hydraulic Profile Tool Technology at Space Launch Complex 16, Cape Canaveral Air Force Station, Florida - 16352

The historical use and disposal of chlorinated solvents throughout Department of Defense and Department of Energy sites has resulted in subsurface contamination by dense non-aqueous phase liquids (DNAPL). The nature and environmental persistence of DNAPLs makes delineation and remediation of these compounds challenging and costly. This paper examines the utilization of data from a membrane interface probe (MIP) and hydraulic profile tool (HPT) to reduce a typical 18 to 24 month field investigation to 3 months; thereby, significantly reducing costs and resulting in a three-dimensional (3D) imagery of a deep DNAPL plume in order to support an aggressive remedial design for Space Launch Complex 16 (SLC16) at Cape Canaveral Air Force Station, Florida. During the early stages of the U.S. space program, chlorinated solvents were routinely used at space complexes. Spent solvents were discharged to surface impoundments where they migrated into the subsurface. Over time, these chlorinated solvents reached concentrations high enough to form a DNAPL plume. Recent investigations near SLC16 identified a previously unknown DNAPL plume co-mingled with dissolved-phase chlorinated compounds. The DNAPL source area (concentrations of trichloroethene [TCE] as high as 1,000,000 micrograms per liter [μg/L]) was discovered approximately 1,200 feet (ft) west of the existing monitoring network area. The U.S. Air Force, along with the U.S. Army Corps of Engineers, developed data quality objectives (DQO) to delineate the extent of the DNAPL and the dissolved-phase contaminant plume. A multi-phase investigation approach was developed by HydroGeoLogic, Inc. (HGL) emphasizing the use of MIP and HPT sampling technologies, conventional direct push technology (DPT), and monitoring well sampling methods. This approach allowed the collection of real-time data that supported the project DQOs and significantly reduced overall project costs and the field implementation schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Demonstration - San Onofre Nuclear Generating Station South Yard Facility - 16544

Following the decision to retire Units 2 and 3 at the San Onofre Nuclear Generating Station (SONGS), Southern California Edison (SCE) staffed a multi-discipline team to investigate decommissioning best practices. SCE also tasked this team with reducing the overall radiological footprint and radioactive material inventory in the near term. The SCE decommissioning activities investigation team targeted projects at the facility which could reduce the source term and risk, and investigate management approaches with decommissioning contractors. SCE, through this team, contracted EnergySolutions to provide a solution for processing and disposal of equipment and materials at a storage facility south of the plant. The South Yard Facility included offices, instrument repair facilities, a large machine shop, outage equipment storage, waste management facilities, and decontamination facilities. SCE contracted EnergySolutions to manage, supervise, plan, and provide labor for the disposition of the legacy waste stored at the South Yard to include the Radioactive Equipment/Materials Storage (REMS) Pad and South Yard Facility. Under the Contractor Work Authorization (CWA), SCE authorized EnergySolutions to consolidate, package, transport, and dispose of the Low Level Radioactive Waste (Class A) and Mixed Low Level Radioactive Waste from the aforementioned areas. The scope also included disposition of material that was expected to be free from radiological contamination, but required management as a hazardous waste. The legacy waste consisted of an inventory of containers designated as trash provided by SCE, as well as, all materials stored within the rooms of the SYF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗