Search NASA⌕ Search

SEARCH · Search NASA

Results for “assembly reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Assessment of BPM options for the EIC Beam Accumulator Ring

The electron injection system for the Electron-Ion Collider (EIC) at BNL is designed to provide a beam of polarized electrons, which is crucial for studying the structure of protons and atomic nuclei. The Beam Accumulator Ring (BAR) is a part of the injection chain between the 750 MeV linear accelerator and the Rapid Cycling Synchrotron (RCS), which accelerates the beam up to full energy (5–18 GeV). The functional role of the BAR is to accumulate the charge injected from the linear accelerator in order to achieve the high intensity of the polarized electron beam required by the specifications for injection into the RCS. This objective will be realized through the sequential injection of bunches with a charge of 1.1 nC at a repetition rate of 30 Hz. Once the charge of a single bunch reaches 28 nC, the beam will be extracted from the BAR and injected into the RCS. The beam instrumentation needs to provide reliable measurements with the required accuracy over the dynamic range from 0.1 nC (one tenth of a typical injected bunch charge) to 32 nC – the maximum expected accumulated current. There are 10 Beam Position Monitors (BPMs) in the ring, 1 extra button-electrode assembly for the RF system, and 8 BPMs in the beam transport lines. The BPM locations are shown in Fig. 1, marked by blue rectangles. The ring BPMs will be capable of both average orbit and turn-by-turn measurement modes. Accurate measurement of the beam position with a large horizontal offset requires polynomial correction of the BPM nonlinearity.

43 PARTICLE ACCELERATORS↗

Automatic in-orbit assembly of large space structures

The automated assembly of a large number of components required for the on-orbit erection of large tetrahedral space platforms is described. The assembly machine is a huge jig in which a multitude of mechanisms must operated continuously in the thermo vacuum environment of space and under the control of computers programmed to command every step of each motion. The concepts are presented to determine the most reliable solution. Continuous operation of mechanisms in space presents many unresolved problems, with regard to lubrication of unprotected devices, such as chain drives, which must maintain reasonable positioning tolerances.

Jacquemin, G. G.↗

The US Space Station programme

The Manned Space Station (MSS) involves NASA, and other countries, in the operation, maintenance and expansion of a permanent space facility. The extensive use of automation and robotics will advance those fields, and experimentation will be carried out in scientific and potentially commercial projects. The MSS will provide a base for astronomical observations, spacecraft assembly, refurbishment and repair, transportation intersection, staging for interplanetary exploration, and storage. Finally, MSS operations will be performed semi-autonomously from ground control. Phase B analysis is nearing completion, and precedes hardware development. Studies are being performed on generic advanced technologies which can reliably and flexibly be incorporated into the MSS, such as attitude control and stabilization, power, thermal, environmental and life support control, auxiliary propulsion, data management, etc. Guidelines are also being formulated regarding the areas of participation by other nations.

Hodge, J. D.↗

Alternative Treatment of Crew Wastewater Using a Hybrid Membrane Technology

Environmental Control and Life Support Systems (ECLSS) of future long-duration, deep-space human exploration missions should treat all “waste” streams for recovery and ideally by near closed-loop. Onboard the International Space Station (ISS), the Water Recovery System (WRS) does not treat urine and gray water to recover elements beyond water and utilizes physical-chemical technologies that operate with single-use and hazardous consumables. Urine offers a renewable source of nitrogen and other trace elements that can support sustainable crop production. In response to the lack of flight ready technologies capable of treating urine and gray water for water and nutrient recovery, a Suspended Aerobic Membrane Bioreactor (SAMBR) is under development between the University of South Florida and Kennedy Space Center. SAMBR is optimized for an early planetary base/partial gravity habitat and serves as a hybrid alternative to currently utilized urine treatment technologies and support closing the resource recovery loop. With its ECLSS minded form factor and modular design, SAMBR’s operation can be customized to suit the treatment objectives (i.e., nitrogen conversion) at that time. This proceeding presents preliminary research pertaining to: 1) design challenges in maximizing hydraulic throughput while minimizing mass and volume of the assembly; 2) capabilities for treating high nitrogen waste under steady and non-steady state conditions; and 3) measured performance parameters such chemical oxygen demand (COD), nitrogen conversion, nutrients, turbidity, and system throughput. Future research and development pertaining to further optimization on system safety, reliability, and expanded treatment capabilities will also be presented.

Membrane Filtration↗

Ground controlled robotic assembly operations for Space Station Freedom

A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

Parrish, Joseph C.↗

Highly Insulating Windows for Improved Energy Efficiency and Reliability in Fenestration Applications

EverSealed Windows, Inc. (ESW) agreed in early 2006, prior to the contract award, to add three additional deliverables to the Project (new Milestones 30, 31 and 32), and have the results of these three deliverables form the basis of the go/no-go decision for proceeding from BP1 to BP2. ESW completed all three milestones and the DOE agreed in November 2006 to continue the Project. ESW subsequently initiated work on BP2 and its two milestones. These were to (1) Assemble and test glass-to-metal bonded coupons to test the strength of ESW's glass-to-metal bonds (ESW's Test Vehicle 1 or TV1), and (2) to assemble and test the hermeticity of glass and metal packages (ESW's Test Vehicle 2 or TV2). ESW completed both milestones of BP2 in late 2010, demonstrating that its bonds were both strong enough and hermetic enough that vacuum insulating glass units could be assembled and survive a 40+ year service life in any climate in North America. Based on the accomplishments in BP-1, the DOE held a go/no-go meeting in Washington, DC in mid-November 2006 and moved the Project into Budget Period 2 (BP-2). During this go/no-go meeting, the DOE expressed a concern that ESW did not have a back-up plan or process should ESW be unable to make its diffusion bonding process more than adequate for the necessary bond strength and hermeticity of the seal. ESW suggested and volunteered to investigate using a glass frit (i.e., solder glass) as a back-up to its diffusion bonding of glass to oxidized metal.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Status of the Advanced Oxygen Generation Assembly Design

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the international Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce system mass, crew maintenance time and spares mass while increasing reliability. The design team has performed trade studies, tests and analyses to inform the redesign. Upgrades being considered include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed and redesign of the cell stack Power Supply Module. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a flight environment.

ECLSS↗

Packaged Combined Heat and Power Technology Overview and Market Profile

Combined heat and power (CHP), sometimes referred to as cogeneration, is an efficient and clean approach to generating electric power and useful thermal energy onsite from a single fuel source, offering reliable and affordable energy services to businesses and institutions. Furthermore, CHP provides a cost effective opportunity to improve the environmental footprint and resilience of industrial and commercial facilities across the United States. CHP equipment can be custom-engineered or installed as a predesigned and assembled package. A packaged CHP system is a standardized, pre-engineered system that includes all equipment, piping, wiring, and ancillary components to deliver electricity and thermal energy to a host facility with minimal onsite engineering and design time. Packaged CHP systems can be shipped as single or multiple modules with standard interconnections (e.g., fuel; electrical; thermal—hot water, steam, and/or chilled water), which simplifies installation and reduces the costs associated with the project. Most containerized or single packaged CHP system offerings range from 10 kW to 3 MW in capacity. Packaged CHP systems are extending the operating, efficiency, and emissions benefits of CHP to nontraditional markets in commercial, institutional, multifamily, light manufacturing, government, and military applications. These markets tend to be served by smaller systems (less than 5 MW) that are conducive to pre-engineered packaging and/or modularization. Many of these sectors have limited CHP experience and technical resources to adequately evaluate, install, and maintain onsite CHP systems. The introduction of packaged CHP offerings from experienced CHP Packagers and Solution Providers has accelerated CHP adoption, lowered energy costs, reduced emissions, and strengthened energy resilience in these sectors. In 2019, the US Department of Energy (DOE) launched the Packaged CHP eCatalog to promote increased acceptance of efficient, cost-effective CHP in these applications. The Packaged CHP eCatalog is a web-based, searchable platform that hosts DOE-recognized packaged CHP systems with features designed to reduce economic and performance risks for designers, developers, owners, and facility operators interested in installing CHP. DOE established the Packaged CHP Accelerator at the same time to help launch and publicize the eCatalog, and to validate project performance, cost, and installation time of CHP packages across a variety of applications. Accelerator efforts documented installed cost reductions and installation time reductions of more than 20% for packaged CHP systems over 100 kW compared with custom-engineered systems. The Packaged CHP Accelerator and eCatalog established a peer-to-peer network connecting public and private sector partners including utilities, state energy offices, and energy efficiency program administrators interested in promoting cost-effective, efficient CHP systems, Packagers, and Solution Providers. Feedback from these partners, along with input from DOE’s CHP Technical Assistance Partnerships (CHP TAPs), was critical in understanding the current market for packaged CHP technologies, stimulating investment in these technologies, and guiding future directions for packaged CHP systems and their applications. This report provides background on packaged CHP systems, an overview of their benefits, a profile of current packaged CHP installations, and a summary of future market trends; this report is intended for facility owners, project developers, engineers, policymakers, and other stakeholders looking to increase the adoption of efficient, flexible, and resilient packaged CHP systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decision theory in structural reliability

Some fundamentals of reliability analysis as applicable to aerospace structures are reviewed, and the concept of a test option is introduced. A decision methodology, based on statistical decision theory, is developed for determining the most cost-effective design factor and method of testing for a given structural assembly. The method is applied to several Saturn V and Space Shuttle structural assemblies as examples. It is observed that the cost and weight features of the design have a significant effect on the optimum decision.

Thomas, J. M.↗

Development of a truss joint for robotic assembly of space structures

This report presents the results of a detailed study of mechanical fasteners which were designed to facilitate robotic assembly of structures. Design requirements for robotic structural assembly were developed, taking into account structural properties and overall system design, and four candidate fasteners were designed to meet them. These fasteners were built and evaluated in the laboratory, and the Hammer-Head joint was chosen as superior overall. It had a high reliability of fastening under misalignments of 2.54 mm (0.1 in) and 3 deg, the highest end fixity (2.18), the simplest end effector, an integral capture guide, good visual verification, and the lightest weight (782 g, 1.72 lb). The study found that a good design should incorporate chamfers sliding on chamfers, cylinders sliding on chamfers, and hard surface finishes on sliding surfaces. The study also comments on robot flexibility, sag, hysteresis, thermal expansion, and friction which were observed during the testing.

Parma, George F.↗

ENRE 655 Class Project. Development of the Initial Main Parachute Failure Probability for the Constellation Program (CxP) Orion Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS)

Loss of Crew (LOC) and Loss of Mission (LOM) are two key requirements the Constellation Program (CxP) measure against. To date, one of the top risk drivers for both LOC and LOM has been Orion's Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS). Even though the Orion CPAS is one of the top risk drivers of CxP, it has been very difficult to obtain any relevant data to accurately quantify the risk. At first glance, it would seem that a parachute system would be very reliable given the track record of Apollo and Soyuz. Given the success of those two programs, the amount of data is considered to be statistically insignificant. However, due to CxP having LOC/LOM as key design requirements, it was necessary for Orion to generate a valid prior to begin the Risk Informed Design process. To do so, the Safety & Mission Assurance (S&MA) Space Shuttle & Exploration Analysis Section generated an initial failure probability for Orion to use in preparation for the Orion Systems Requirements Review (SRR).

Fuqua, Bryan C.↗

Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

Chakrabarti, Suman↗

Failure of Pyrotechnic Operated Valves with Dual Initiators

Investigation of recent pyrovalve failures reveals timing of redundant initiator firings is crucial for reliable operation of pyrovalves. Simultaneous firing, i.e., within a very narrow time frame, was found to be the primary cause of the valve failing to operate. Testing of both single and dual initiators revealed important design characteristics affecting pyrovalve device performance. They include Primer Chamber Assembly (PCA) geometry and material properties, as well as operational effects on combustion product flow, and resulting energy transfer to the booster. The CONAX PCA design has evolved slowly over time undergoing incremental changes to correct known issues. These piecewise changes were verified by limited test, without a full understanding of the overall system impact or effect on margins. Adequate system performance margins may be adversely affected in existing or future systems incorporating a pyrovalve actuated by simultaneous firing of dual initiators.

Failure of Pyrotechnic Operated Valves↗

Analysis of the VERA Core Physics Benchmark Problems using cosRMC Code

In reactor physics, two kinds of numerical methods are generally employed to solve the neutron transport equations, one of which is the deterministic method and the other one is the Monte Carlo method. Monte Carlo is widely used to provide reference solution because of its ability to deal with continuous energy cross sections and complex geometry. Just like any statistical process, the Monte Carlo method requires repetition to achieve a small relative uncertainty, and therefore may inevitably have larger simulation times than deterministic method. Fortunately, the great advancements of computer technology make it possible to apply Monte Carlo method in reactor core analysis. To promote nuclear power plant system design and simulation software self-reliance development, a Monte Carlo neutron/photon transport code cosRMC has been developed jointly by State Nuclear Power Software Development Center (SNPSDC) and Tsinghua University. The cosRMC is aimed at achieving full core calculations and analysis with high fidelity and efficiency by means of advanced methodologies and algorithms as well as high performance computing techniques. The cosRMC has many functions as criticality calculation, fixed-source calculation, burnup calculation, etc. In order to ensure its reliability, several types of verification and validation (V and V) work have been and are being carried out for cosRMC. The simulation results of cosRMC based on Problem 1 to 3 of VERA Core Physics Benchmark showed its good capability of 2D lattice and 3D assembly modeling. In this paper, some progressive verification results of multi-assembly and full core problems are presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CANDELS/GOODS-S, CDFS, and ECDFS: photometric redshifts for normal and X-ray-detected galaxies

We present photometric redshifts and associated probability distributions for all detected sources in the Extended Chandra Deep Field South (ECDFS). This work makes use of the most up-to-date data from the Cosmic Assembly Near-IR Deep Legacy Survey (CANDELS) and the Taiwan ECDFS Near-Infrared Survey (TENIS) in addition to other data. We also revisit multi-wavelength counterparts for published X-ray sources from the 4 Ms CDFS and 250 ks ECDFS surveys, finding reliable counterparts for 1207 out of 1259 sources (∼96%). Data used for photometric redshifts include intermediate-band photometry deblended using the TFIT method, which is used for the first time in this work. Photometric redshifts for X-ray source counterparts are based on a new library of active galactic nuclei/galaxy hybrid templates appropriate for the faint X-ray population in the CDFS. Photometric redshift accuracy for normal galaxies is 0.010 and for X-ray sources is 0.014 and outlier fractions are 4% and 5.2%, respectively. The results within the CANDELS coverage area are even better, as demonstrated both by spectroscopic comparison and by galaxy-pair statistics. Intermediate-band photometry, even if shallow, is valuable when combined with deep broadband photometry. For best accuracy, templates must include emission lines.

79 ASTRONOMY AND ASTROPHYSICS↗

Electronic assembly thermal testing - Dwell/duration/cycling

Testing of electronic assemblies varies throughout industry, NASA, and the military. Differences include test levels, atmospheric versus vacuum testing of assemblies, dwell durations at temperature extremes (especially high temperature), and thermal cycling versus dwell testing. Of particular interest are the different philosophies of thermal cycling versus single-cycle thermal dwell. An examination of the various failure physics for electronic assemblies has been initiated at JPL. The intent is to determine which failure modes are best revealed by thermal cycling testing and which are susceptible to high-temperature dwell physics. Preliminary results of this study are presented, along with discussions of testing goals, flight environments, reliability models, and the differences between industry and JPL design/test approaches.

Gibbel, Mark↗

Optical Microscopy Techniques to Inspect for Metallic Whiskers

Metal surface finishes of tin, zinc and cadmium are often applied to electronic components, mechanical hardware and other structures. These finishes sometimes unpredictably may form metal whiskers over periods that can take from hours to months or even many years. The metal whiskers are crystalline structures commonly having uniform cross sectional area along their entire length. Typical whisker dimensions are nominally on the order of only a few microns (um) across while their lengths can extend from a few microns to several millimeters. Metal whiskers pose a reliability hazard to electronic systems primarily as an electrical shorting hazard. The extremely narrow dimensions of metal whiskers can make observation with optical techniques very challenging. The videos herein were compiled to demonstrate the complexities associated with optical microscope inspection of electronic and mechanical components and assemblies for the presence or absence of metal whiskers. The importance of magnification, light source and angle of illumination play critical roles in being able to detect metal whiskers when present. Furthermore, it is demonstrated how improper techniques can easily obscure detection. It is hoped that these videos will improve the probability of detecting metal whiskers with optical inspection techniques.

Brusse, Jay A.↗

Improved DC Gun and Insulator Assembly

Many user facilities such as synchrotron radiation light sources and free electron lasers rely on DC high voltage photoguns with internal field gradients as high as 10 to 15 MV/m. These high gradients often lead to field emission which poses serious problems for the photocathode used to generate the electron beam and the ceramic insulators used to bias the photocathode at high voltage. Ceramic insulators are difficult to manufacture, require long commissioning times, and have poor reliability, in part because energetic electrons bury themselves in the ceramic causing a buildup of charge and eventual puncture, and also because large diameter ceramics are difficult to braze reliably. The lifetimes of photo cathodes inside high current DC guns exhibiting field emission are limited to less than a hundred hours. Reducing the surface gradients on the metals reduces the field emission, which serves to maintain the required ultrahigh vacuum condition. A novel gun design with gradients around 5 MV/m and operating at 350 kV, a major improvement over existing designs, was proposed that allows for the in-situ replacement of photo cathodes in axially symmetric designs using inverted ceramics. In this project, the existing JLAB CEBAF asymmetric gun design with an inverted ceramic support was modeled and the beam dynamics characterized. An improved structure was designed that reduces the surface gradients and improves the beam optics. To minimize the surface gradients, a number of electrostatic gun designs were studied to determine the optimum configuration of the critical electrodes within the gun structure. Coating experiments were carried out to create a charge dissipative coating for cylindrical ceramics. The phase II proposal, which was not granted, included the design and fabrication of an axially symmetric DC Gun with an inverted ceramic that would operate with less than 5 MV/m at 350 kV and would be designed with an in-situ replaceable photo-cathode.

43 PARTICLE ACCELERATORS↗