Optimizing a falling particle receiver geometry using CFD simulations to maximize the thermal efficiency.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Many tracking PV systems avoid row-to-row shading by backtracking in morning and afternoon. Because the common single-axis backtracking implementation assumes the array is in a horizontal plane, it does not fully prevent row-to-row shading in arrays installed on cross-axis slopes. This paper simulates the effect of reduced self-shading on annual production with two modified backtracking strategies. Depending on the array geometry and the steepness of the cross-axis grade, using a modified backtracking strategy improved annual yield by 3-10%.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
Converting biomass to biochar presents exciting opportunities to mitigate climate change, improve forest and soil health, decrease wildfire risk, bolster ecosystem services, and revitalize rural economies. Our expert panel examined how biomass is harvested, converted to biochar and applied and where operational changes and funding could significantly magnify biochar's contributions. To advance knowledge and efficacies, we found that a rigorous combination of coordinated long-term research, market research and development and enhancement of business support infrastructure that leads to collaborative policy development is essential. We also identified how barriers to five specific biochar technology sectors could be overcome and provide guidelines for effective funding.
Abstract not provided.
Explore the source record for details and available documents.
Despite significant cost declines utility-scale solar projects have to perform well over their lifetime in order to return profits in a low-PPA environment of under $50/MWh. Using multivariate regression analysis this paper examines the 2014 Net Capacity Factors for 128 utility-scale projects that came online before the end of 2013 and explores the impact (in decreasing order of importance) of global horizontal irradiance, tracking technology, inverter loading ratios and project vintage plus three other interactive variables on performance. The model complies with the assumptions of OLS regressions and explains 93% of the observed NCF variation.
The next generation of high energy recirculating linear accelerators (RLAs) will rely on the energy recovery (ER) process for their extreme high current operation. Here, we discuss optimum design of multi-pass linac optics for an RLA based on a large scale superconducting linac. Initial strategy used in the design of 60 GeV, 6 pass RLA for the LHeC, has been extended to 10 passes for the proposed CEBAF ER experiment. The presented optimization scheme addresses overall beam transport performance, as well as specific beam dynamics issues, such as, beam stability due to collective effects. *work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Solomon has developed a methodology to determine a large optimum point where availability meets maintenance spending for Powder River Basin (PRB) coal-fired units. Using a database of sufficient size and composition across various operating ranges, Solomon generated an algorithm that predicts the relationship between maintenance spending and availability. Coupling this generalized algorithm with a unit-specific market-loss curve determines the optimum spending for a facility. The article presents the results of the analysis, how this methodology can be applied to develop optimum operating and financial targets for specific units and markets and a process to achieve those targets. It also describes how this methodology can be used for other types of fossil-fired technologies and future enhancements to the analysis. 5 figs.
The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.
Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)
Good management of dismantling and decontamination (D and D) operations and activities is requiring safety, time saving and perfect radiological knowledge of the contaminated environment as well as optimization for personnel dose and minimization of waste volume. In the same time, Fukushima accident has imposed a stretch to the nuclear measurement operational approach requiring in such emergency situation: fast deployment and intervention, quick analysis and fast scenario definition. AREVA, as return of experience from his activities carried out at Fukushima and D and D sites has developed a novel multi-sensor solution as part of his D and D research, approach and method, a system with real-time 3D photo-realistic spatial radiation distribution cartography of contaminated premises. The system may be hand-held or mounted on a mobile device (robot, drone, e.g). In this paper, we will present our current development based on a SLAM technology (Simultaneous Localization And Mapping) and integrated sensors and detectors allowing simultaneous topographic and radiological (dose rate and/or spectroscopy) data acquisitions. This enabling technology permits 3D gamma activity cartography in real-time. (authors)
Explore the source record for details and available documents.