Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Imaging X-Ray Polarimetry Explorer (IXPE) Risk Management

The Imaging X-ray Polarimetry Explorer (IXPE) project is an international collaboration to build and fly a polarization sensitive X-ray observatory. The IXPE Observatory consists of the spacecraft and payload. The payload is composed of three X-ray telescopes, each consisting of a mirror module optical assembly and a polarization-sensitive X-ray detector assembly; a deployable boom maintains the focal length between the optical assemblies and the detectors. The goal of the IXPE Mission is to provide new information about the origins of cosmic X-rays and their interactions with matter and gravity as they travel through space. IXPE will do this by exploiting its unique capability to measure the polarization of X-rays emitted by cosmic sources. The collaboration for IXPE involves national and international partners during design, fabrication, assembly, integration, test, and operations. The full collaboration includes NASA Marshall Space Flight Center (MSFC), Ball Aerospace, the Italian Space Agency (ASI), the Italian Institute of Astrophysics and Space Planetology (IAPS)/Italian National Institute of Astrophysics (INAF), the Italian National Institute for Nuclear Physics (INFN), the University of Colorado (CU) Laboratory for Atmospheric and Space Physics (LASP), Stanford University, McGill University, and the Massachusetts Institute of Technology. The goal of this paper is to discuss risk management as it applies to the IXPE project. The full IXPE Team participates in risk management providing both unique challenges and advantages for project risk management. Risk management is being employed in all phases of the IXPE Project, but is particularly important during planning and initial execution-the current phase of the IXPE Project. The discussion will address IXPE risk strategies and responsibilities, along with the IXPE management process which includes risk identification, risk assessment, risk response, and risk monitoring, control, and reporting.

IXPE↗

Future Aerospace Technology in the Service of the Alliance: Sustained Hypersonic Flight - Volume 3

Sustained Hypersonic Flight capability is envisioned for several future military and civilian applications, such as long range immediate reaction reconnaissance, high speed interception of air targets, long range precision strike against hardened or time critical targets, and access to space. The inherent reduction in time-to-target and low vulnerability will permit new operational tactics. The symposium outlined mission needs and operational scenarios for hypersonic vehicles. Addressed were: Technological issues and challenges in external hypersonic aerodynamics and design, propulsion and engine/airframe integration, military ramjet applications, overall system design including structures and materials development needs, and test facilities. Ground based test facilities cannot provide full simulation at Mach numbers above 5. Therefore, the use of Computational Fluid Dynamics design tools is essential. For routine use of the computational tools in analysis, design and optimization, it is necessary to reduce the time for the entire computational process by two orders of magnitude. Hypersonic boundary layer transition remains a critical design issue because of the important impact on engine drag and on heating, which can affect the choice of materials and thermal protection systems. In addition, reliable prediction of scramjet net thrust is an absolute must in resolving hypersonic air breathing vehicle design issues. Due to current facility and computational shortfalls, the development of future hypersonic flight systems requires research flight tests in the technology areas of boundary layer transition and air-breathing propulsion engine performance. For sustained hypersonic flight beyond Mach 6, the supersonic combustion ramjet (scramjet) engine is the only choice for the near future. Only this air-breathing concept offers a significant promise of large reductions in required propellant fractions, increased payload fractions, and reduced size vehicles, together with a foreseeable technological feasibility. Airframe/engine integration, combustor design and thermal management are the predominant engineering tasks. Fuels, hydrogen or hydrocarbon, must be matched to the operational needs of military or civil use. Experience in existing ramjet propelled missiles capable of speeds up to Mach 4 can support the development effort. The potential mission and cost benefits of sustained hypersonic flight to both military and civil applications are tremendous. From the budget point of view, the possibility of sharing development costs between military and civil programs offers a specific advantage.

Source record↗

Neurovestibular Session Summary

Oman - The early mission operational problems caused by space motion sickness have been largely resolved in recent years. This has been achieved by appropriate timeline adjustments, voluntary head movement restriction, and judicious use of promethazine. Crew members now simply accept that some symptoms "come with the job," and usually last only a few days. But as more people have flown longer flights, we've seen cases of space sickness and inversion illusion that take several weeks to resolve. Visual reorientation illusions continue throughout long flights, and occasionally cause difficulties. EVA astronauts sometimes suddenly fear they will fall out of the payload bay or off of the RMS or Strella arms. Orientation and navigation in three dimensions in the MIR station reportedly does not come naturally, because modules have different visual verticals. It is clear that the neurovestibular problems of spaceflight have not disappeared. After return to Earth, many crew members are disoriented and ataxic in the first hour after return, and require assistance leaving the vehicle, Flight surgeons say that the longer the mission, the stronger the aftereffects, certain of which last for weeks. We do not yet know how to predict who will be afflicted. Looking ahead to 3-4 month long voyages to Mars, it seems obvious that if cruise is in O-G, the crew may encounter neurovestibular problems on arrival. Artificial G may be broadly effective as a countermeasure for many of the physiological changes of spaceflight, but from the neurovestibular perspective, it is a double-edged sword. We know that the Coriolis stimulus resulting from rotation is potentially disorienting and nauseogenic. But we don't yet know how much artificial G will be enough, nor how successfully people can adapt to a specific angular velocity and hypo G level. Development of countermeasures remains a big challenge for our neurovestibular community. Maintaining an interdisciplinary perspective is important. Three examples were presented at this meeting: 1) Transgenic animal experiments suggest that in addition to the light illumination cycle, vestibular inputs may also serve as an important input to the circadian system. 2) Radiation can cause important CNS effects in animals, including loss of spatial memory. 3) As described in our session, otolith inputs may contribute to cardiovascular regulation of orthostatic tolerance. Over the past three days, we've all enjoyed catching up with old friends, and making many new ones. On behalf of my colleagues, I want to thank Al Coats and the USRA DSLS staff for the great job they did in running this meeting. And keeping the emphasis on fun. And also my Co- Chair, Mal Cohen, who had more stamina than many of us, despite major surgery only three weeks ago. Mal and I have written a few lines describing each of the seventeen papers in our session, to give you a quick over-view, and as a guide to the full abstracts, We have grouped them under five themes: preflight and inflight countermeasurements, postlanding posture and locomotion deficits: assessment and prediction, adaptive processes, relationships among physical simuli, perceptions, and eye movements, vestibular contribution to human autonomic responses, and implications and recommendations.

Oman, Charles↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Solar Imaging UV/EUV Spectrometers Using TVLS Gratings

It is a particular challenge to develop a stigmatic spectrograph for UV, EUV wavelengths since the very low normal-incidence reflectance of standard materials most often requires that the design be restricted to a single optical element which must simultaneously provide both reimaging and spectral dispersion. This problem has been solved in the past by the use of toroidal gratings with uniform line-spaced rulings (TULS). A number of solar extreme ultraviolet (EUV) spectrometers have been based on such designs, including SOHO/CDS, Solar-B/EIS, and the sounding rockets Solar Extreme ultraviolet Research Telescope and Spectrograph (SERTS) and Extreme Ultraviolet Normal Incidence Spectrograph (EUNIS). More recently, Kita, Harada, and collaborators have developed the theory of spherical gratings with varied line-space rulings (SVLS) operated at unity magnification, which have been flown on several astronomical satellite missions. We now combine these ideas into a spectrometer concept that puts varied-line space rulings onto toroidal gratings. Such TVLS designs are found to provide excellent imaging even at very large spectrograph magnifications and beam-speeds, permitting extremely high-quality performance in remarkably compact instrument packages. Optical characteristics of three new solar spectrometers based on this concept are described: SUMI and RAISE, two sounding rocket payloads, and NEXUS, currently being proposed as a Small-Explorer (SMEX) mission.

Thomas, Roger J.↗

ACTS Operations Extended Through a University-Based Consortium

The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. This was determined to be viable, and in the fall of 2000, NASA announced that it would consider extending operations. On March 19, 2001, NASA, the Ohio Board of Regents, and the Ohio University signed a Space Act Agreement to continue ACTS operations for 2 more years with options to extend operations up to a total of 4 years. To accomplish this, the Ohio University has formed a university-based consortium, the Ohio Consortium for Advanced Communications Technology (OCACT), and acts as the managing member. The Ohio University is responsible for the full reimbursement of NASA's operations costs, and does this through consortium membership. NASA retains the operating license of the spacecraft and has two contractors supporting spacecraft and master control station operations. This flexible arrangement between NASA and academia allows the education community to access a large communications satellite for learning about spacecraft operations and to use the system's transponders for communications applications. It also allows other organizations, such as commercial companies, to become consortium members and use the ACTS wideband Ka-band (30/20 GHz) payload. From the consortium members, six areas of interest have been identified.

Bauer, Robert A.↗

Multipurpose Crew Restraints for Long Duration Space Flights

With permanent human presence onboard the International Space Station (ISS), a crew will be living and working in microgravity, interfacing with their physical environment. Without optimum restraints and mobility aids (R&MA' s), the crewmembers may be handicapped for perfonning some of the on-orbit tasks. In addition to weightlessness, the confined nature of a spacecraft environment results in ergonomic challenges such as limited visibility and access to the activity area and may cause prolonged periods of unnatural postures. Thus, determining the right set of human factors requirements and providing an ergonomically designed environment are crucial to astronauts' well-being and productivity. The purpose of this project is to develop requirements and guidelines, and conceptual designs, for an ergonomically designed multi-purpose crew restraint. In order to achieve this goal, the project would involve development of functional and human factors requirements, design concept prototype development, analytical and computer modeling evaluations of concepts, two sets of micro gravity evaluations and preparation of an implementation plan. It is anticipated that developing functional and design requirements for a multi-purpose restraint would facilitate development of ergonomically designed restraints to accommodate the off-nominal but repetitive tasks, and minimize the performance degradation due to lack of optimum setup for onboard task performance. In addition, development of an ergonomically designed restraint concept prototype would allow verification and validation of the requirements defined. To date, we have identified "unique" tasks and areas of need, determine characteristics of "ideal" restraints, and solicit ideas for restraint and mobility aid concepts. Focus group meetings with representatives from training, safety, crew, human factors, engineering, payload developers, and analog environment representatives were key to assist in the development of a restraint concept based on previous flight experiences, the needs of future tasks, and crewmembers' preferences. Also, a catalog with existing IVA/EVA restraint and mobility aids has been developed. Other efforts included the ISS crew debrief data on restraints, compilation of data from MIR, Skylab and ISS on restraints, and investigating possibility of an in-flight evaluation of current restraint systems. Preliminary restraint concepts were developed and presented to long duration crewmembers and focus groups for feedback. Currently, a selection criterion is being refined for prioritizing the candidate concepts. Next steps include analytical and computer modeling evaluations of the selected candidate concepts, prototype development, and microgravity evaluations.

Whitmore, Mihriban↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Designing a Software Architecture for the Precision Assembly of Space Structures

As NASA’s space exploration and science missions expand in complexity, longevity, anddistance beyond earth’s orbit, Orbital Servicing, Assembly and Manufacturing (OSAM)technologies and concepts have become a critical area of ongoing research and innovation.Artemis’ Moon-to-Mars goals of building sustainable elements on and around the Moon andMars that allow our robots and astronauts to explore and conduct more scientific researchwill demand in situ resource utilization, construction, and maintenance to succeed. In-spaceAssembly (ISA), as a sub-component of OSAM, focuses on the on-orbit building or fabricationof mission infrastructure and payloads. One such ISA application is highlighted by the recentNASA In-Space Assembled Telescope (iSAT) study, which stated that the next generation ofspace observatories will exceed the fairing size of existing or even planned launch vehicles andISA has emerged as a viable approach for observatory assembly. Research efforts at NASALangley Research Center have led to the design of a novel TriTruss structural concept for themodular construction of large complex persistent platforms. The TriTruss design and otherdeveloping OSAM technologies enable larger and persistent space missions that would notbe possible with single-launch-sized structures. For example, 20 meter or larger telescopesor orbital platform applications. However, the increased complexity will require autonomousoperations for the construction and maintenance of long-term infrastructure to achieve missionsuccess. NASA’s Precision Assembly of Space Structures (PASS) project is focused on thestructural and autonomy capabilities required to construct an iSAT in deep space. PASSresearch efforts will develop and validate critical technologies needed for effective efficienton-orbit assembly that can be confidently adopted for future systems. PASS will utilize theTriTruss modules to demonstrate the autonomous modular assembly of a 20m-class iSAT mirrorbackbone structure including simulated mirrors and wiring harness. In this paper, we addressthe software and hardware design considerations, technologies, and challenges of designing arobust robotics framework for assembling modular space structures in support of In SpaceAssembly missions in general as well as for PASS specifically.

Benjamin N Kelley↗

Tools for genetic engineering and gene expression control in Novosphingobium aromaticivorans and Rhodobacter sphaeroides

ABSTRACT Alphaproteobacteria have a variety of cellular and metabolic features that provide important insights into biological systems and enable biotechnologies. For example, some species are capable of converting plant biomass into valuable biofuels and bioproducts that have the potential to contribute to the sustainable bioeconomy. Among the Alphaproteobacteria, Novosphingobium aromaticivorans , Rhodobacter sphaeroides , and Zymomonas mobilis show promise as organisms that can be engineered to convert extracted plant lignin or sugars into bioproducts and biofuels. Genetic manipulation of these bacteria is needed to introduce engineered pathways and modulate expression of native genes with the goal of enhancing bioproduct output. Although recent work has expanded the genetic toolkit for Z. mobilis , N. aromaticivorans and R. sphaeroides still need facile, reliable approaches to deliver genetic payloads to the genome and to control gene expression. Here, we expand the platform of genetic tools for N. aromaticivorans and R. sphaeroides to address these issues. We demonstrate that Tn 7 transposition is an effective approach for introducing engineered DNA into the chromosome of N. aromaticivorans and R. sphaeroides . We screen a synthetic promoter library to identify isopropyl β-D-1-thiogalactopyranoside-inducible promoters with regulated activity in both organisms (up to ~15-fold induction in N. aromaticivorans and ~5-fold induction in R. sphaeroides ). Combining Tn 7 integration with promoters from our library, we establish CRISPR (Clustered Regularly Interspaced Short Palindromic Repeats) interference systems for N. aromaticivorans and R. sphaeroides (up to ~10-fold knockdown in N. aromaticivorans and R. sphaeroides ) that can target essential genes and modulate engineered pathways. We anticipate that these systems will greatly facilitate both genetic engineering and gene function discovery efforts in these species and other Alphaproteobacteria. IMPORTANCE It is important to increase our understanding of the microbial world to improve health, agriculture, the environment, and biotechnology. For example, building a sustainable bioeconomy depends on the efficient conversion of plant material to valuable biofuels and bioproducts by microbes. One limitation in this conversion process is that microbes with otherwise promising properties for conversion are challenging to genetically engineer. Here we report genetic tools for Novosphingobium aromaticivorans and Rhodobacter sphaeroides that add to the burgeoning set of tools available for genome engineering and gene expression in Alphaproteobacteria. Our approaches allow straightforward insertion of engineered pathways into the N. aromaticivorans or R. sphaeroides genome and control of gene expression by inducing genes with synthetic promoters or repressing genes using CRISPR interference. These tools can be used in future work to gain additional insight into these and other Alphaproteobacteria and to aid in optimizing yield of biofuels and bioproducts.

Hall, Ashley N.↗

Processing of KaRIn/SWOT Data

The Surface Water and Ocean Topography (SWOT) mission [1] is part of NASA’s Decadal Survey Program, and prepared jointly by NASA’s Jet Propulsion Laboratory (JPL), the French space agency (CNES), and the Canadian space agency (CSA). Launch is currently foreseen in 2020. The principal instrument KaRIn (Ka-band Radar Interferometer) would be a bistatic SAR system operating at Kaband, with 200 MHz bandwidth, covering 50 km wide near-nadir swaths (1-4° incidence) on both sides of the satellite track. The nominal payload also would include a conventional Ku/C-band nadir altimeter, a water vapor radiometer, and a precise orbit determination suite. Moreover, additional near-nadir channels from KaRIn to reduce the gap between the nominal swaths may be considered. The main mission goals would be to improve the spatio-temporal coverage of the oceans with respect to today’s nadir-looking altimeters (such as the Jason series), by providing measurements on a 1 km2 grid with virtually complete coverage up to ±78° latitude, while keeping a height precision of 1-2 cm, and to extend the altimetry measurements to continental water surfaces, including lakes, reservoirs and wetlands bigger than 250x250 m2 and rivers down to a width of 100 m (50 m as a goal), with a height precision of the order of 10 cm, represented with a horizontal point spacing of about 50 m. The fine scale of the measurements, with continuous acquisition over both oceans and continents, will result in huge data volumes, starting at the spacecraft and flowing through all links of the ground system. Furthermore, the centimetric height accuracy required means that all aspects of the processing must be considered carefully. In this article we give an overview of the foreseen data products and data processing chains for KaRIn on SWOT. Some particularly challenging processing steps are (will be) described in more detail.

Desroches, Damien↗

Implementation of a Hybrid Edge Node-Centroid Node Approach for the Generation of Reduced Thermal Models

Reduced thermal models are often required for delivery to organizations that manage observatory or launch models at the highest levels of assembly. However, the effort to generate reduced models, and verify against their detailed counterparts, is a challenge that has not yet been conclusively solved. Higher level organizations often place a limit on the number of nodes for delivered models with the assumption that smaller models generally result in less computation time. However, the burden of producing and verifying the accuracy of the reduced models is placed primarily on the lower-level organizations, which in turn consumes resources needed to produce these models. Limiting the total number of allowable nodes may also prevent users from taking full advantage of software capabilities that allow for faster generation of models, such as finite elements, which generally require more nodes than older centroid based models. A methodology using Thermal Desktop was described in 2010 which used: (1) finite elements and edge nodes for a conduction matrix, (2) centroid nodes for capacitance and radiative computations, and (3) the super network feature to produce a conduction matrix based only on the centroid nodes. At that time, the methodology was clear, but the implementation would have had to be done manually; however, with the inclusion of the OpenTD API, this methodology can now be implemented programmatically and for the first time, be a viable approach for the generation of reduced models. The approach was implemented and developed at the NASA Goddard Space Flight Center (GSFC) for the Capture, Containment, and Return System (CCRS) payload on the Earth Return Orbiter (ERO) as part of the Mars Sample Return (MSR) mission, resulting in the TCYEE tool. ERO features a spacecraft bus provided by Airbus through the European Space Agency (ESA) with node limitations on the delivered CCRS model provided by GSFC. TCYEE was used to generate the reduced model for this delivery and the predictions compared favorably to the detailed model currently in use for the thermal performance evaluation. Furthermore, TCYEE is being explored for potential use on the Roman Space Telescope (RST) for the generation of reduced models for delivery to the launch provider, which also has node limit requirements on the RST observatory model for use in launch simulation analyses. This paper describes the methodology, its implementation, and compares the performance of reduced models generated by TCYEE to their detailed counterparts.

Hume L. Peabody↗

Implementation of a Hybrid Edge Node-Centroid Node Approach for the Generation of Reduced Thermal Models

Reduced thermal models are often required for delivery to organizations that manage observatory or launch models at the highest levels of assembly. However, the effort to generate reduced models, and verify against their detailed counterparts, is a challenge that has not yet been conclusively solved. Higher level organizations often place a limit on the number of nodes for delivered models with the assumption that smaller models generally result in less computation time. However, the burden of producing and verifying the accuracy of the reduced models is placed primarily on the lower-level organizations, which in turn consumes resources needed to produce these models. Limiting the total number of allowable nodes may also prevent users from taking full advantage of software capabilities that allow for faster generation of models, such as finite elements, which generally require more nodes than older centroid based models. A methodology using Thermal Desktop was described in 2010 which used: (1) finite elements and edge nodes for a conduction matrix, (2) centroid nodes for capacitance and radiative computations, and (3) the super network feature to produce a conduction matrix based only on the centroid nodes. At that time, the methodology was clear, but the implementation would have had to be done manually; however, with the inclusion of the OpenTD API, this methodology can now be implemented programmatically and for the first time, be a viable approach for the generation of reduced models. The approach was implemented and developed at the NASA Goddard Space Flight Center (GSFC) for the Capture, Containment, and Return System (CCRS) payload on the Earth Return Orbiter (ERO) as part of the Mars Sample Return (MSR) mission, resulting in the TCYEE tool. ERO features a spacecraft bus provided by Airbus through the European Space Agency (ESA) with node limitations on the delivered CCRS model provided by GSFC. TCYEE was used to generate the reduced model for this delivery and the predictions compared favorably to the detailed model currently in use for the thermal performance evaluation. Furthermore, TCYEE is being explored for potential use on the Roman Space Telescope (RST) for the generation of reduced models for delivery to the launch provider, which also has node limit requirements on the RST observatory model for use in launch simulation analyses. This paper describes the methodology, its implementation, and compares the performance of reduced models generated by TCYEE to their detailed counterparts.

Thermal desktop↗

Lunar and Lagrangian Point L1 L2 CubeSat Communication and Navigation Considerations

CubeSats have grown in sophistication to the point that relatively low-cost mission solutions could be undertaken for planetary exploration. There are unique considerations for lunar and L1/L2 CubeSat communication and navigation compared with low earth orbit CubeSats. This paper explores those considerations as they relate to the Lunar IceCube Mission. The Lunar IceCube is a CubeSat mission led by Morehead State University with participation from NASA Goddard Space Flight Center, Jet Propulsion Laboratory, the Busek Company and Vermont Tech. It will search for surface water ice and other resources from a high inclination lunar orbit. Lunar IceCube is one of a select group of CubeSats designed to explore beyond low-earth orbit that will fly on NASA’s Space Launch System (SLS) as secondary payloads for Exploration Mission (EM) 1. Lunar IceCube and the EM-1 CubeSats will lay the groundwork for future lunar and L1/L2 CubeSat missions. This paper discusses communication and navigation needs for the Lunar IceCube mission and navigation and radiation tolerance requirements related to lunar and L1/L2 orbits. Potential CubeSat radios and antennas for such missions are investigated and compared. Ground station coverage, link analysis, and ground station solutions are also discussed. This paper will describe modifications in process for the Morehead ground station, as well as further enhancements of the Morehead ground station and NASA Near Earth Network (NEN) that are being considered. The potential NEN enhancements include upgrading current NEN Cortex receiver with Forward Error Correction (FEC) Turbo Code, providing X-band uplink capability, and adding ranging options. The benefits of ground station enhancements for CubeSats flown on NASA Exploration Missions (EM) are presented. This paper also describes how the NEN may support lunar and L1/L2 CubeSats without any enhancements. In addition, NEN is studying other initiatives to better support the CubeSat community, including streamlining the compatibility testing, planning and scheduling associated with CubeSat missions. Because of the lower cost, opportunity for simultaneous multipoint observations, it is inevitable that CubeSats will continue to increase in popularity for not only LEO missions, but for lunar and L1/L2 missions as well. The challenges for lunar and L1/L2 missions for communication and navigation are much greater than for LEO missions, but are not insurmountable. Advancements in flight hardware and ground infrastructure will ease the burden.

CubeSat↗

Implementation of a Hybrid Edge Node-Centroid Node Approach for the Generation of Reduced Thermal Models

Reduced thermal models are often required for delivery to organizations that manage observatory or launch models at the highest levels of assembly. However, the effort to generate reduced models, and verify against their detailed counterparts, is a challenge that has not yet been conclusively solved. Higher level organizations often place a limit on the number of nodes for delivered models with the assumption that smaller models generally result in less computation time. However, the burden of producing and verifying the accuracy of the reduced models is placed primarily on the lower-level organizations, which in turn consumes resources needed to produce these models. Limiting the total number of allowable nodes may also prevent users from taking full advantage of software capabilities that allow for faster generation of models, such as finite elements, which generally require more nodes than older centroid based models. A methodology using Thermal Desktop was described in 2010 which used: (1) finite elements and edge nodes for a conduction matrix, (2) centroid nodes for capacitance and radiative computations, and (3) the super network feature to produce a conduction matrix based only on the centroid nodes. At that time, the methodology was clear, but the implementation would have had to be done manually; however, with the inclusion of the OpenTD Application Programming Interface, this methodology can now be implemented programmatically and for the first time, be a viable approach for the generation of reduced models. The approach was implemented and developed at the NASA Goddard Space Flight Center (GSFC) for the Capture, Containment, and Return System (CCRS) payload on the Earth Return Orbiter (ERO) as part of the Mars Sample Return mission, resulting in the TCYEE tool. ERO features a spacecraft bus provided by Airbus through the European Space Agency with node limitations on the delivered CCRS model provided by GSFC. TCYEE was used to generate the reduced model for this delivery and the predictions compared favorably to the detailed model currently in use for the thermal performance evaluation. Furthermore, TCYEE is being explored for potential use on the Roman Space Telescope (RST) for the generation of reduced models for delivery to the launch provider, which also has node limit requirements on the RST observatory model for use in launch simulation analyses. This paper describes the methodology, its implementation, and compares the performance of reduced models generated by TCYEE to their detailed counterparts.

Thermal Desktop↗

NASA's Space Launch System: Progress Report

NASA and its commercial industry team achieved significant progress in 2016 in manufacturing and testing of the Block 1 vehicle for the first launch of the Space Launch System (SLS). Test and flight article hardware for the liquid hydrogen fuel tank as well as the engine section for the core stage were completed at Michoud Assembly Facility (MAF) in New Orleans. Test stands neared completion at Marshall Space Flight Center for the propellant tanks, engine section, intertank and payload section. Stennis Space Center completed major structural renovations on the B2 test stand, where the core stage "green run" test program will be conducted. The SLS team completed a hotfire test series at Stennis to successfully demonstrate the ability of the RS-25 engine to operate under SLS environments and performance conditions. The team also test fired the second qualification five-segment solid rocket motor and cast the first six motor segments for the first SLS mission. The Interim Cryogenic Propulsion Stage (ICPS) test article was delivered to Marshall for structural tests, and work is nearly finished on the flight stage. Flight software testing completed at Marshall included power quality and command and data handling. In 2017, that work continues. SLS completed Preliminary Design Review (PDR) on the Exploration Upper Stage (EUS), a powerful, human-rated spacecraft that will propel explorers to cis-lunar space. In 2017, hardware will continue to be integrated at MAF for core stage structural test articles and the first two operational flights. RS-25 hotfire testing will continue to explore engine performance, as well as test flight-like software and four new Engine Controller Units (ECUs) for the first mission. Production of development components for a more affordable RS-25 design is underway. Core stage structural test articles have begun arriving at Marshall. While engineering challenges typical of a new development are possible, SLS is working toward launch readiness in late 2018. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before first flight

Cook, Jerry↗

SPARTNIK: Engineering catalyst for government and industry

Industrial demands for highly motivated and competent technical personnel to carry forward with the technological goals of the US has posed a significant challenge to graduating engineers. While curricula has improved and diversified over time to meet these industry demands, relevant industry experience is not always available to undergraduates. The microsatellite development program at San Jose State University (SJSU) has allowed an entire undergraduate senior class to utilize a broad range of training and education to refine their engineering skills, bringing them closer to becoming engineering professionals. Close interaction with industry mentors and manufacturers on a real world project provides a significant advantage to educators and students alike. With support from companies and government agencies, the students have designed and manufactured a microsatellite, designed to be launched into a low Earth orbit. This satellite will gather telemetry for characterizing the state of the spacecraft. This will enable the students to have a physical check on their predicted value of spacecraft subsystem performance. Additional experiments will also be undertaken during the two year lifetime, including micro-meteorite impact sensing and capturing digital color images of the Earth. This paper will detail the process whereby students designed, prototype and manufactured a small satellite in a large team environment, along with the experiments that will be performed on board. With the project's limited funds, it needed the support of many industry companies to help with technical issues and hardware acquisition. Among the many supporting companies, NASA's space shuttle small payloads program could be used for an affordable launch vehicle for the student project. The paper address these collaborations between the student project and industry support, as well as explaining the benefits to both. The paper draws conclusion on how these types of student projects can be used by industry as a feasible resource for developing small platforms for space based experiments, as well as increasing the practical experience and engineering knowledge of graduating students. These benefits to industry and universities, can lead to a close working relationship between the two. These types of projects can facilitate the development of low-cost space rated parts to be used by the industry and university projects. It can also help with the understanding and use of acceptable risk non-space rated parts reducing the cost of the spacecraft. This will lead to the development of low cost platforms for space based experiments, providing research companies an inexpensive, long duration platform to conduct their in-space experiments, while better preparing engineering undergraduates for their transition into the work force.

Prass, James D.↗