The evolution of the Human Systems and Simulation Laboratory in nuclear power research

The events at Three Mile Island in the United States brought about fundamental changes in the ways that simulation would be used in nuclear operations. The need for research simulators was identified to scientifically study human-centered risk and make recommendations for process control system designs. This paper documents the human factors research conducted at the Human Systems and Simulation Laboratory (HSSL) since its inception in 2010 at Idaho National Laboratory. The facility’s primary purposes are to provide support to utilities for system upgrades and to validate modernized control room concepts. In the last decade, however, as nuclear industry needs have evolved, so too have the purposes of the HSSL. Thus, beyond control room modernization, human factors researchers have evaluated the security of nuclear infrastructure from cyber adversaries and evaluated human-in-the-loop simulations for joint operations with an integrated hydrogen generation plant. Lastly, our review presents research using human reliability analysis techniques with data collected from HSSL-based studies and concludes with potential future directions for the HSSL, including severe accident management and advanced control room technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A generic microgrid controller: Concept, testing, and insights

Microgrids have garnered attention in recent years as a way to increase the reliability of the grid, increase the reliability of electricity service to customers, adapt to an increasing percentage of intermittent renewable generation, and serve both customer critical loads and the needs of adjacent communities in the case of emergencies such as natural disasters. One barrier to microgrids is the historic cost and lack of standardization associated with microgrid controllers. To reduce this cost and address standardization, specifications for a Generic Microgrid Controller (GMC) were developed with the goal to facilitate the design and ease of adaptation of microgrid controllers to various microgrids of different sizes and with different resources. A GMC must address two core functions, Transition and Dispatch, as well as several optional higher level functions such as economic dispatch, and renewable and load forecasting. The GMC specifications were demonstrated and evaluated using a commercial simulation platform for two different microgrids, a 20MW-Class community microgrid and a 10MW-Class medical center microgrid. For each microgrid, the GMC was tested in hardware-in-the-loop (HIL) using an OPAL-RT real-time digital simulator, and the two core functions were assessed. The results established that (1) the GMC is successful in seamlessly transitioning the microgrids to and from an islanded mode, (2) a load/generation mismatch at the time of separation depends on the microgrid configuration and must be lower than a specific value determined by simulation testing, and (3) the GMC Dispatch Function response is acceptable in maintaining, in the islanded mode, 60Hz for a range of load changes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Benefit of Regional Energy Balancing Service on Wind Integration in the Western Interconnection of the United States

Interest in various wide-area balancing schemes to help integrate wind have generated significant interest. As we have shown in past work, large balancing areas not only help with wind integration, but can also increase the efficiency of operations in systems without wind. Recent work on the Western Wind and Solar Integration Study (WWSIS) has found that combining balancing over the WestConnect footprint will increase the efficiency of commitment and dispatch at wind penetrations ranging from 10-20% of annual electricity demand, and will be essential for high penetrations and small balancing areas. In addition the Northwest Wind Integration Action Plan recommended balancing area cooperation as a method to help integrate the large potential wind development. In this paper we investigate the potential impact of a proposed Energy Imbalance Service on the ability of the non-market portions of Western Electricity Coordinating Councils (WECC) United States footprint to integrate wind energy. We will utilize data adapted from the WWSIS for the Western Interconnection. The analysis uses time-synchronized wind and load data to evaluate the potential for ramp requirement reduction that could be achieved with combined operation. Chronological analysis and ramp duration analysis quantify the benefit in terms of not only the ramp sizes, but the frequency of the potentially avoided ramps that must be managed by the non-wind generation fleet. Multiple approaches that can be used to achieve these benefits will also be suggested in the paper. We also suggest other approaches that can help achieve much of the benefit of full consolidation without requiring the physical consolidation of balancing areas.

17 WIND ENERGY↗

Use Cases and Model Development of Thermal Storage Coupling for Advanced Nuclear Reactors

This report discusses the different options for coupling thermal energy storage (TES) systems to advanced nuclear power plants (A-NPPs) in order to enable flexible and hybrid plant operation. An advanced light-water reactor (ALWR) and a high-temperature gas-cooled reactor (HTGR) were selected as the initial use cases for demonstrating a thermally balanced energy storage coupling design for thermal power extraction. Cost functions for the A-LWR were derived from the fully balanced models that were developed based on three different coupling options with three different thermal energy bypass ratios. For the next steps, cost functions for the HTGR will also be derived, and additional nuclear reactors (e.g., a liquid-cooled fast reactor [LFR] or molten-salt reactor [MSR]) will be evaluated for coupling with TES in similar fashion, including the evaluation of their steady-state condition models and cost functions. The models presented herein showcase several design considerations, focusing on optimal deployment methodologies for achieving steady-state operation with minimum disruption to the nuclear power generation cycle. This report presents the results of steady state models developed using Aspen HYSYS®, wherein the thermal energy bypass for an NPP-TES coupling was varied up to 50%. The various components were sized using Aspen Process Economic Analyzer (APEA) and Aspen Exchanger Design and Rating (EDR), when applicable. Cost functions from these models were developed using the latest publicly available data obtained from APEA V11. The current steady-state models and cost functions provide a baseline for additional work focusing on dynamic operation and process optimization by using Idaho National Laboratory (INL)’s Framework for Optimization of Resources and Economics (FORCE) tools to evaluate the technoeconomic viability and transient operations of TES-coupled A-NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Multi-Model Framework for Assessing Long- and Short-Term Climate Influences on the Electric Grid

Climate change influences many aspects of the electric grid, but prior work and industry practices often ignore the potential effects of changing climate, or they only consider a single effect or individual effects in isolation. Challenges vary with each grid and include adapting to long-term trends such as changing temperature and precipitation or shorter-term events such as drought or storms that could increase in frequency or intensity. Here we present a multi-model framework designed to analyze the effects of long and short-term climate impacts in combination. This framework couples capacity expansion and production cost models with hydrologic models and future climate scenario data to analyze alternative climate and energy futures at high spatial, temporal, and process resolutions. Furthermore, we constructed and evaluated the results of a suite of simulated scenarios exploring climate impacts on capacity investment and stress-tested the resulting future infrastructures using hourly dispatch modeling under alternative drought and load conditions. We demonstrate the approach through a case study of the U.S. Western Interconnection, where climate impacts depend on interactions between temperature-induced load, water availability for hydropower, technology competitiveness, and demand flexibility. Changes in 2038 generating capacity range from -8.5-16.6 GW, and changes in 2038 transmission capacity range from -1-2 GW. Capacity increases are driven by higher load from higher temperatures, while capacity reductions can be achieved in scenarios with higher future hydropower availability and increased demand flexibility. Scenarios requiring additional capacity cost an additional $\$5$-$\$17$ billion (discounted) from 2018 to 2038; however, scenarios with capacity reductions cost $\$1$-$\$18$ billion less. Stress tests on four 2038 infrastructures demonstrated that the identified systems were able to serve at least 99.999% of load and 99.96% of reserves. However, drought and unexpected high-load conditions can result in reduced capacity to respond to contingency events we did not model. Although these results are system and scenario specific, they highlight the importance of considering multiple climate change impacts simultaneously in long-term planning efforts and demonstrate a multi-model, multiscale approach that can be flexibly applied to any system and set of climate change concerns.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Critical values of cyber parameters in a dynamic microgrid system

An islanded microgrid can be used to serve critcal load as a resiliency source when a severe outage occurs. In an islanded mode, control of a microgrid relies on the communication system significantly. Hence, microgrids are cyberphysical systems and, therefore, the cyber system plays a crucial role in the performance of the cyber-power system. A microgrid control scheme is proposed for power dispatch and regulation based on the droop and proportional-integral (PI) feedback control. The proposed control strategy is validated for transient stability following dynamic events. To evaluate the impact of a networked control system on control performance, a cyber model is developed to represent data acquisition periods and communication delays. An analytical method is proposed to determine the critical values for the data reporting periods and communication delays. The analytical method based on a state space model of a networked control system is applicable for large-scale systems. A 2-dimensional stability region of a microgrid in the space of cyber parameters can be obtained by the proposed method, and the critical values of cyber parameters are determined based on the stability region. Simulation results validate that the design of a microgrid as a cyber-physical system needs to be guided by critical values for the data reporting period and communication delay to prevent system instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermodynamically Stable, Plasmonic Transition Metal Oxide Nanoparticle Solar Selective Absorbers towards 95% Optical-to-Thermal Conversion Efficiency at 750 °C

Generation 3 (Gen) concentrating solar power (CSP) systems requires a high operation temperature ≥750°C to increase the power-cycle efficiency towards ≥50%. However, such a high operation temperature poses a notable challenge to high temperature materials. On the receiver side, a critical challenge is the lack of solar selective absorbers that demonstrate both high optical-to-thermal energy conversion efficiency η therm approaching 95% and long-term thermal stability at >750°C in air. Existing solar absorbers either have limited η therm ≤89% or deteriorate significantly within 500 h at 750°C; some of these also require costly vacuum deposition for stringent thickness control. Therefore, it is highly desirable to simultaneously achieve η therm ~95% AND high thermal stability at 750°C for future generations of CSP receivers. This project has investigated and developed low-cost, highly scalable spray-coated transition metal oxide nanoparticle (NP) pigmented solar selective coatings on various types of Inconel alloy tube sections that are thermodynamically stable at 750-800°C in air, maintaining η therm >94.3%(93.2%) under a solar concentration ratio of C=1000 after 60 simulated day-night cycles at 750ºC (800ºC) (1 cycle=12 h at 750 or 800°C and 12h ramping down to 25°C). We have also coated up to 48 inches long receiver tubes for preliminary solar testing under Norwich Technology’s parabolic trough systems, demonstrating notably improved performance in solar heating compared to benchmark Pyromark 2500 coatings. Two key innovations have been developed in this project: (1) We achieved an unprecedented high thermal efficiency >94% by optimizing the d-band optical absorption spectra of transition metal ions, engineering their valences and stoichiometry; (2) We were able to maintain or even slightly increase the efficiency when operating at 750°C in air by engineering the interdiffusion of transition metal ions between the coating and the Inconel substrate to our advantage. Featuring high-temperature solar spectral selectivity and thermodynamic stability in air, as well as low-cost, highly scalable solution-chemical synthesis and spray coating techniques, this innovation in solar selective absorber technology alone accounts for nearly 40% of the targeted reduction in the levelized cost of electricity (LCOE) from the receiver, thermal energy storage, and operation & maintenance combined by 2030, as proposed by the U.S. Department of Energy. For a 110 MWe CSP power plant, this LCOE reduction from the solar selective coating alone transfers to ~$\$ $1.9 M increase in annual profit based on a sales price of 10¢/kWh (or an annual sale of $50 M/year). The high solar absorptance (~98%) NP pigment materials developed in this project are equally applicable to volumetric receivers either as a coating or as bigger ceramic microspheres after sintering, potentially benefiting Gen3 falling particle CSP technologies. All these contributions facilitate the larger scale deployment of CSP systems with energy storage capability to address the intermittency issue of solar energy towards dispatchable solar electricity, bridging the temporal gap between peak solar electricity production and peak electricity consumption. The collaboration with Norwich Technologies and Brayton Energy in this project will also facilitate the future commercialization of this new solar selective coating technology developed in this SIPS project.

14 SOLAR ENERGY↗

Hybrid probabilistic-possibilistic approach for capacity credit evaluation of demand response considering both exogenous and endogenous uncertainties

As a featured smart-grid technology, demand response (DR) provides utility companies with unprecedented flexibility to improve the reliability of electricity service in future power systems. However, due to the uncertainties arising from the demand side, the extent to which DR can be utilized for capacity support poses a major question to the utilities. To address this issue, this paper proposes a new methodological framework to assess the potential reliability value of DR in smart grids. The framework is established on the concept of capacity credit (CC), and it accommodates different types of uncertainties (i.e., probabilistic and possibilistic) accrued from physical and anthropogenic factors in DR programs. The capability of DR during operation is considered as a synthesized result of multiple facets, i.e., users' load characteristics, participation levels, and load recoveries, and different models are developed to represent each component. To characterize the stochastic nature of demand responsiveness, the fuzzy theory is introduced, and possibilistic models are proposed to describe the human-related uncertainties under incomplete information. In addition, considering that in reality, DR operation could affect the comfort of customers, the dynamics of demand-side participation have also been incorporated in our study, in which two utility-based indices are defined to quantify the effect of such interdependency. Using a probabilistic propagation technique, the different types of uncertainties involved can be normalized and systematically addressed under the same framework. Then, the relevant models can be applied to the CC evaluation procedures, wherein two dispatching schemes (i.e., reliability-driven and coordinated management) are considered to study the effect of DR operation on its CC. The proposed methodology is tested on a modified RTS system, and the obtained results confirm its effectiveness.

capacity credit↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

Development of Energy Storage: Cost models

Energy storage technologies offer a promising solution to electric grid stability issues associated with the integration of variable renewable generators. The capability to match the electrical power output to instantaneous fluctuations in grid demand is crucial to ensure continuity of service. Including energy storage capability in an integrated energy system (IES) can provide the flexibility needed to meet variable electric demand and reduce the load following demands place on the reactor. In this report, economic data collected for energy storage (ES) technologies are described to support the objective of assessing the profitability of ES integration within the IES framework. In particular, there is a growing interest in thermal energy storage (TES) given its unique capability for long-duration storage for improving electricity reliability at a low levelized cost. It is common practice to evaluate the total lifetime cost and profitability before commercializing new technologies. In this report we identify and examine the models needed to better understand the economics of thermal energy storage. We extend the TES cost model in RAVEN in the context of a balance of plant (BOP) that incorporates thermal storage. To focus the discussion, following a general overview of the most promising TES technologies, we consider a use case that involves a sensible heat, two-tank, molten-salt system. Structural and operational details are reported to identify the source of construction capital expenditure and operation and maintenance cost. A detailed description of the different cost items is provided as well as the cost scaling with different storage capacity and power ratings for capacity optimization purpose. In addition, the capital expenditure and the recurring cost of representative two-tank, molten salt coupled with concentrated solar plants are provided for readers’ reference. The ES use case is noteworthy as it is in the pilot stage of commercialization. We identify those areas that would benefit from an increased economic focus to obtain a more complete compilation of cost data. We also describe the thermal coupling issues that arise from integration of the two-tank molten salt thermal energy storage system with a BOP, which is the subject of our current research. Some components of costs will need to be evaluated through dedicated technoeconomic analysis in future modeling activities using modeling procedures proposed in this report. With the data presented and the procedures described in this report, sufficiently accurate models can be implemented for the solution of both the power dispatch and the capacity expansion problems within the RAVEN-based HYBRID framework.

25 ENERGY STORAGE↗

Reinforcement Learning‐Based Adaptation of Grid Following Inverter's Internal Controller to Networked Microgrids' Strengths

The varying topological configurations, generator commitments and dispatches, and dynamic load demand lead to changing system's strengths during the operations of networked microgrids. When the system's strengths significantly change, the fixed control gains at large devices may result in unsatisfactory system performance; this necessitates the tuning of the control gains at large devices to adapt to the changing system's strengths. In this paper, observer-based reinforcement learning (RL) is utilised to automatically tune the proportional-integral (PI) gains of phase lock loop (PLL) controller of grid-following (GFL) inverters to adapt to the changing strengths of microgrids and networked microgrids. The RL agent in this framework augments an observer predicting system's strengths, from which the RL control policy will adjust accordingly to tune the PLL controller's gains towards the system's strengths. Also, to enhance the control performance, the recently introduced Barrier function-based RL framework is leveraged for the design of reward function to prevent the high frequency nadir. An operational 26 kV electric distribution system, which is modelled as networked microgrids, is used to illustrate the need and effectiveness of the proposed RL-tuned control.

frequency response↗

Parallel derivative-free optimization for simulation-based design of behind-the-meter energy systems

In this work, the integrated design and dispatch of behind-the-meter or distributed resources (e.g. stationary battery storage and solar PV generation) is considered. A simulation-based framework is employed, generating high-fidelity results with closed-loop predictive control at a fine resolution, at the expense of high computational cost (several minutes to a few hours per design point). To address this challenge, parallel derivative-free design methods are considered. Four methods are compared, including state-of-the-art surrogate-based methods (Radial-Basis Functions and Gaussian processes) and sampling strategies, an evolutionary-based method, and a simple sequential grid refinement method. As a case study, two types of design problem with increasing complexity are considered, namely, the design of behind-the-meter resources (three design variables) and the inclusion of grid capacity (four design variables). The second yields a constrained design problem for which violations can only be determined after solving the computationally expensive simulation. For the three-dimensional case, all methods present a good performance, achieving a solution within 1% of the optimum after the first iteration, with the sequential grid refinement exhibiting the fastest convergence and achieving the best final objective value. This indicates that the parallel evaluation of multiple sampling points may be more important than the choice of method for small decision spaces. For the four-dimensional constrained case, the Genetic Algorithm presents the best tradeoff between performance and computational effort, while the rough objective function terrain generated by constraint violation penalties reduces the performance of surrogate-based methods. Contour plots with flat regions indicate flexibility in the optimal design and highlight the importance of characterizing the solution space.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Characterizing and improving the performance of molten-salt-steam heat exchangers in concentrating solar power plants

Shell-and-tube heat exchangers (HXs) for steam generation from molten salts in concentrating solar power (CSP) plants experience thermal fatigue due to significant temperature gradients and inherent transient operation. Molten salt-steam HX design lifespans exceed actual lifespans, and, as a consequence, designers overpredict plant profitability and operators neglect appropriate prescriptions to optimize these lifetimes. Here, this study refines HX lifespan estimates with data benchmarked against thermal-fluid mechanical modeling of stress and accumulated fatigue. Reduced-order thermal models of the molten salt-steam, shell-and-tube evaporator and superheater predict transient temperature profiles along the two HXs salt-steam flow paths. The modeled evaporator and superheater temperature profiles enable assessment of cyclic stresses within the HX tubesheets, where molten-salt HX failures are most common. Evaporator and superheater performance data from a current 110 MW elec commercial CSP plant provide a basis for validating the reduced-order HX models. HX life predictions derived from stochastic failure distributions serve as inputs for simulating and optimizing existing plant operations. The impact of the updated lifespans on overall plant revenue depends on operating scenarios. This study suggests that typical ramping rates for a CSP plant with a high-temperature Rankine cycle result in an evaporator and superheater life of approximately 10 and 25 years, respectively, compared to the design target of 30 years. Reduced HX lifespans decrease operational plant revenue on average by 4.6-5.1%. Furthermore, there may be as many as four HX replacements over the 30-year lifetime of the plant; and, purchase agreement loss due to failure to meet contractual production requirements can have ramifications that include the risk of bankruptcy.

14 SOLAR ENERGY↗