Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Updating Fission Yield Data for Applications (Summary Report)

The First Research Coordination Meeting of the CRP on “Updating Fission Yield Data for Applications” was held by video conference from 31 August to 4 September 2020 with more than 50 international experts from 16 countries attending the meeting. The CRP is devoted to evaluation efforts of cumulative and independent fission yields for incident energies from the thermal point up to 14 MeV on actinide targets. Produced fission yield evaluations should include full uncertainty quantification and are expected to combine available experimental data and state-of-art model information. Four working groups were created within the collaboration: 1) Availability of experimental fission product yield data for evaluations; 2) New fission product yield experimental data; 3) Fission product yield evaluation; and 4) Fission product yield validation. Technical discussions and the resulting work plan of the Coordinated Research Programme are summarized in this report.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Summary Report of the 1st RCM of the CRP on the Updating Fission Yield Data for Applications

The First Research Coordination Meeting of the CRP on “Updating Fission Yield Data for Applications” was held by video conference from 31 August to 4 September 2020 with more than 50 international experts from 16 countries attending the meeting. The CRP is devoted to evaluation efforts of cumulative and independent fission yields for incident energies from the thermal point up to 14 MeV on actinide targets. Produced fission yield evaluations should include full uncertainty quantification and are expected to combine available experimental data and state-of-art model information. Four working groups were created within the collaboration: 1) Availability of experimental fission product yield data for evaluations; 2) New fission product yield experimental data; 3) Fission product yield evaluation; and 4) Fission product yield validation. Technical discussions and the resulting work plan of the Coordinated Research Programme are summarized in this report.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Mark-18A Cold Runs

The Savannah River National Laboratory (SRNL) is tasked by the National Nuclear Security Administration (NNSA) to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The sixty-five Mk-18A targets are currently stored in the L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The remaining unrecovered material will be discarded to the high activity drain (HAD) system in SRNL. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets will be loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 lengths) will then be processed one at a time through the following processes: caustic dissolution and filtration; acidic dissolution and filtration, Reillex anion exchange, diglycolamide (DGA) cation exchange; and DGA calcination. This processing will result in two product streams. The first is an aqueous plutonium solution which will be removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide containing the Am and Cm as well as other lanthanide fission products which will be removed from the shielded cells using a bagless transfer system. Both materials will be packaged for shipment to Oak Ridge National Laboratory (ORNL). All equipment to carry out this process was designed, procured or fabricated, and installed in a mock-up facility (716-4A) at SRS to allow for simulation testing in a non-radioactive area. This equipment was then dismantled and transferred from 716-4A to 773-A and installed in the SRNL Shielded Cells. After installation in the shielded cells facility testing was performed using water followed by surrogates and cold chemicals. Issues were identified during these evaluations, including equipment issues as well as technical challenges. Many of the issues were rectified during performance of the cold runs, and the remaining have a resolution identified. Table ES-1 provides a summary of all issues identified during the cold run operations, as well as the status and identified resolutions to outstanding issues.

07 ISOTOPE AND RADIATION SOURCES↗

State Technical Assistance - New Mexico Energy and Conservation Management Division Report [Slides]

The New Mexico Energy and Conservation Management Division (ECMD) sought technical assistance to enhance their ability to evaluate program impacts using the Low-Income Energy Affordability Data (LEAD) tool. NLR assisted ECMD in leveraging the LEAD tool to calculate and analyze energy burden across electric utility service areas, enabling them to assess program outcomes more effectively. To meet ECMD's goals, NLR developed a customized methodology to calculate utility-specific energy burden metrics using census tract data and available utility service area information from the Energy Information Administration (EIA). While acknowledging some limitations in the EIA dataset, NLR estimated the percentage of households within each service territory and incorporated relevant filters such as income, housing characteristics, and other demographics from the LEAD tool. The analysis provided ECMD with a new capability to evaluate program success based on energy savings, reductions in energy burden, and other performance indicators. The data and methodology also support discussions with utilities to improve the accuracy of service territory datasets. ECMD can use the outputs to track program effectiveness and plan future initiatives. NLR offered the possibility of follow-on work, including capacity-building for ECMD to repeat the analysis independently and the option to refine the analysis with updated service.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Techno-Economic Analysis for GTI's Compact Hydrogen Generator

A technoeconomic analysis of the compact hydrogen generator compared to a traditional steam methane reformer (SMR) was performed for both processes with and without carbon capture. The project goal for the technoeconomic analysis was to demonstrate a minimum of 20% lower CAPEX and 15% lower levelized cost of hydrogen compared to SMR with and without carbon capture. GTI obtained baseline capital and costs for the SMR with and without and methodology to calculate the levelized cost of hydrogen from an IEAGHG Technical Report: 2017-02 Techno-Economic Evaluation of SMR Based Standalone (Merchant) Hydrogen Plant with CCS. This methodology was then applied to GTI’s compact hydrogen generator using direct material costs previously obtained from a reputable engineering procurement and construction company, CB&I Howe-Baker. The analysis was performed for plants producing 90MMSCFD (million standard cubic feed per day) of hydrogen. Direct material costs were converted to total installed costs and total capital requirements using the same multiplying factors for both processes. We have found that the direct materials cost of the compact hydrogen generator is less than half the direct materials cost required for SMR without capture, and about one quarter the direct materials cost of SMR with carbon capture. This low materials cost translates into a significant CAPEX savings and lower levelized cost of hydrogen that exceed the goals of the techno-economic assessment. We have found that the CHG has a 43% lower installed cost and capital requirement compared to SMR without capture, that results in a levelized cost of hydrogen that is 19% lower than SMR. When 90% CO2 capture is added to the plants, the advantages is even better. The CHG has a 51% lower installed and capital requirement compared to SMR with capture, resulting in a 28% lower levelized cost of hydrogen. A sensitivity analysis was performed and showed natural gas feedstock cost and discount rate to be the main contributors to hydrogen price sensitivity. Given these significant cost advantages, GTI is encouraged to continue to develop the technology and market the economic advantages as well as the efficiency gains and ability to inherently capture CO2.

08 HYDROGEN↗

Competitiveness Improvement Project 2020 Informational Workshop

These presentations from the Dec. 8, 2020, Competitiveness Improvement Project (CIP) workshop provide an overview of the CIP process, evaluation criteria, certification requirements, and NREL's technical support opportunities for those interested in applying to CIP solicitations.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

PILOT PLANT EVALUATIONS OF RARE EARTH ELEMENT RECOVERY AND CONCENTRATION FROM PRE-COMBUSTION BITUMINOUS COAL SOURCES

Rare earths and other critical elements are commonly associated with coal-based sources and sometimes at concentrations that may be attractive for recovery as a byproduct of coal production. The results obtained from laboratory research performed during the past five years have led to the design, construction and testing of a pilot plant that recovered rare earth elements from several bituminous coal-based materials including coarse refuse as well as solutions from a small heap leach and acid mine drainage. From this initial design, rare earth oxide (REO) concentrates having a purity greater than 90% have been produced using solvent extraction as the primary means of concentration. Following cost reduction and process intensification efforts, the circuit was revised to include feed calcination and several selective precipitation stages as a substitute for the original direct leach-solvent extraction circuit. Pilot test results revealed that the modified circuit was ideal for treating the relatively low-grade feedstocks and provided similar final REO purities at a significantly lower cost. This communication will present the flowsheets evaluated in the pilot plant along with technical and economic analyses for each circuit.

Coal↗

Financial Planning as a Tool for Efficient and Timely Decommissioning of Nuclear Research Facilities

It is generally recognized in the technical and economical literature that reliable cost evaluations with adequate estimates also of the errors and uncertainties involved are necessary in order for rational and appropriate management decisions to be made on any major plant investment. Such estimates are required for the selection of technologies to be applied and for selection to be made between alternative technologies and designs as well as for the overall financing issues including the one of whether to go ahead with the project. Inadequacies in the cost calculations typically lead to suboptimal decisions and ultimately substantial overruns and/or needs for retrofits. Actually, a very strict discipline has to be applied with adaptation of the approach used with regard to the stage of the planning. Deviations from the expected tend to raise the estimated cost much more frequently than they lower it. The same rationale applies to planning and cost calculations for decommissioning of nuclear research facilities. There are, however, many reasons why such estimations may be very treacherous to carry out. This will be dealt with in the following. The knowledge base underlying the present paper has been developed and accumulated as a result of the research that the Swedish Nuclear Power Inspectorate (SKI) has carried out in support of its regulatory oversight over the Swedish system of finance. The findings are, however, equally applicable and appropriate for implementers in their planning, decision, monitoring and evaluation activities. In the nineteen fifties and sixties, Sweden had a comprehensive program for utilization of nuclear power including uranium mining, fuel fabrication, reprocessing and domestically developed heavy water reactors. Examples of facilities are presented in Figures 1-5. Eventually, the development work lead to the present nuclear program with ten modern light water reactors in operation at present. According to Swedish law, those who benefit from the use of these plants must pay a fee which is accumulated in a fund so that all future costs for decommissioning and waste management can be covered. Each year, estimates on all future costs are submitted to the SKI for review. The Government then decides on the size of the fee, based on the results of the review. In conclusion: it has been concluded in the SKI work - in spite of the difficulties pointed out above - that cost calculations with the precision needed for a system of finance can be achieved even at early stages provided that the various features of the task are adequately dealt with.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Using simulation to evaluate warhead monitoring system effectiveness

There is a need to develop and demonstrate technical approaches for verifying potential future agreements to limit and reduce total warhead stockpiles. To facilitate this aim, warhead monitoring systems employ both concepts of operations (CONOPS) and technologies. A systems evaluation approach can be used to assess the relative performance of CONOPS and technologies in their ability to achieve monitoring system objectives which include: 1) confidence that a treaty accountable item (TAI) initialized by the monitoring system is as declared; 2) confidence that there is no undetected diversion from the monitoring system; and 3) confidence that a TAI is dismantled as declared. Although there are many quantitative methods that can be used to assess system performance for the above objectives, this paper focuses on a simulation perspective primarily for the ability to support analysis of the probabilities that are used to define operating characteristics of CONOPS and technologies. This paper describes a discrete event simulation (DES) model, comprised of three major sub-models: including TAI lifecycle flow, monitoring activities, and declaration behavior. The DES model seeks to capture all processes and decision points associated with the progressions of virtual TAIs, with notional characteristics, through the monitoring system from initialization through dismantlement. The simulation updates TAI progression (i.e., whether the generated test objects are accepted and rejected at the appropriate points) all the way through dismantlement. Evaluation of TAI lifecycles primarily serves to assess how the order, frequency, and combination of functions in the CONOPS affect system performance as a whole. It is important, however, to note that discrete event simulation is also capable (at a basic level) of addressing vulnerabilities in the CONOPS and interdependencies between individual functions as well. This approach is beneficial because it does not rely on complex mathematical models, but instead attempts to recreate the real world system as a decision and event driven simulation. Finally, because the simulation addresses warhead confirmation, chain of custody, and warhead dismantlement in a modular fashion, a discrete-event model could be easily adapted to multiple CONOPS for the exploration of a large number of “what if” scenarios.

Perkins, Casey J.↗

Assessment of the Impact of a New Guanidine Suppressor In NGS on F/H Laboratory Analyses For DWPF and Saltstone MCU Transfers

Implementation of the Next Generation Solvent (NGS) in the Modular Caustic-Side Solvent Extraction Unit (MCU) will now proceed with a new suppressor compound, 1,2,3-tris(3,7-dimethyloctyl)guanidine (TiDG), replacing the originally planned suppressor for NGS, 1,3-dicyclohexyl-2-(11-methyldodecyl) guanidine (DCiTG). The Savannah River National Laboratory (SRNL) was tasked with evaluating the potential impact to F/H Laboratory analyses supporting the Defense Waste Processing Facility (DWPF) Waste Acceptance Criteria (WAC) used to qualify transfers of MCU Strip Effluent (SE) into the facility and the Saltstone WAC used to qualify transfers of Tank 50 containing Decontaminated Salt Solution (DSS) from MCU into Saltstone. This assigned scope is covered by a Task Technical and Quality Assurance Plan (TTQAP). Previous impact evaluations were conducted when the DCiTG suppressor was planned for NGS and concluded that there was no impact to either the determination of MCU SE pH nor the analysis of Isopar ® L carryover in the MCU SE and DSS streams. SRNL reported on this series of cross-check studies between the SRNL and F/H Laboratories. The change in suppressor from DCiTG to TiDG in the NGS should not impact the measurement of Isopar ® L or pH in SE or DSS necessary to satisfy DWPF and Saltstone WAC (Tank 50) criteria, respectively. A statistical study of the low bias observed in Isopar ® L measurements in both SRNL and F/H Laboratories may be necessary now that the final NGS composition is fixed in order to quantify the low bias so that a proper correction can be applied to measurements critical to the DWPF and Saltstone WACs. Depending upon the final DWPF WAC requirement put in place for SE pH, it could become necessary to implement an alternative ICP-AES measurement of boron. The current blended solvent system testing in SRNL should address any impacts to Isopar ® L carryover into either the DSS or the SE. It is recommended that SRNL monitor the current blended solvent work underway with simulants in SRNL as well as any DWPF CPC testing done with the new SE stream to ascertain whether any need develops that could result in modification of any currently planned F/H Laboratory testing protocols.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance evaluation approach for the supercritical helium cold circulators of ITER

The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe cold circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Evaluation of Geothermal and Natural Gas Resources Beneath Camp Dawson and Opportunities for Deep Direct Use of Geothermal Energy or Natural Gas for Heat and Electricity Production; NETL-TRS-8-2017; NETL Technical Report Series; U.S. Department of Energy, National Energy Technology Laboratory: Morgantown, WV, 2017; p 148.

NETL has reviewed available information and evaluated the deep geothermal and natural gas resources located beneath the Camp Dawson National Guard Training Center in West Virginia. This facility is located in the northeastern portion of the state in Preston County, near the town of Kingwood. This study reviews options for the onsite drilling of wells for the production of geothermal heat or natural gas, as well as the utilization of these resources for on-site power and heating needs. Resources of potential interest are at subsurface depths between 7,000 feet and 15,000 feet.

03 NATURAL GAS↗

Technical analysis of prospective photovoltaic systems in Utah

This report explores the technical feasibility of prospective utility-scale photovoltaic system (PV) deployments in Utah. Sandia National Laboratories worked with Rocky Mountain Power (RMP), a division of PacifiCorp operating in Utah, to evaluate prospective 2-megawatt (MW) PV plants in different locations with respect to energy production and possible impact on the RMP system and customers. The study focused on 2-MW{sub AC} nameplate PV systems of different PV technologies and different tracking configurations. Technical feasibility was evaluated at three different potential locations in the RMP distribution system. An advanced distribution simulation tool was used to conduct detailed time-series analysis on each feeder and provide results on the impacts on voltage, demand, voltage regulation equipment operations, and flicker. Annual energy performance was estimated.

42 ENGINEERING↗

External Engagement During Evaluations of Shutdown Nuclear Power Plant Sites - 19221

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. A key part of the shutdown site evaluations are visits to the sites. These site visits typically take place over 3 days. The first day is spent at the nuclear power plant site. The second day is spent evaluating the near-site transportation infrastructure, including rail infrastructure, potential heavy-haul routes, and potential rail and barge transload locations. The third day is often spent meeting with community engagement or advisory panels. External engagement activities during site visits are conducted in two areas. The first area involves inviting tribal and state representatives, State Regional Group (SRG) representatives, and Federal Railroad Administration (FRA) representatives to participate in the entire site visit. The SRG representatives are from the Southern States Energy Board, the Western Interstate Energy Board, the Council of State Governments - Midwest, or the Council of State Governments - Eastern Regional Conference, according to the location of the nuclear power plant. State representatives typically represent their state department of energy, state department of environmental or natural resources, State Rail Safety Participation Program, state police, state department of transportation, radiation protection organization, or emergency management organization. Tribal representatives explore issues associated with cultural affiliation and tribal involvement with past and present site activities. As the regulator of the U.S. railroads, the FRA representatives bring unique experience to the site visits. They also coordinate meetings with the railroads that serve the shutdown sites. The second area of external engagement activities during site visits involves meeting with local community engagement or advisory panels. Meeting with local community engagement or advisory panels provides an opportunity to inform these panels on DOE activities and the roles and responsibilities of federal agencies during site decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Offshore Wind Energy Leasing Areas for the Rhode Island/Massachusetts Wind Energy Area

The National Renewable Energy Laboratory (NREL), under an interagency agreement with the Bureau of Ocean Energy Management (BOEM), is providing technical assistance to BOEM on the identification and delineation of offshore leasing areas for offshore wind energy development within the Atlantic Coast Wind Energy Areas (WEAs) established by BOEM in 2012. This report focuses on NREL's evaluation of BOEM's Rhode Island/Massachusetts (RIMA) WEA leasing areas. The objective of the NREL evaluation was to assess the proposed delineation of the two leasing areas and determine if the division is reasonable and technically sound. Additionally, the evaluation aimed to identify any deficiencies in the delineation. As part of the review, NREL performed the following tasks: 1. Performed a limited review of relevant literature and RIMA call nominations. 2. Executed a quantitative analysis and comparison of the two proposed leasing areas 3. Conducted interviews with University of Rhode Island (URI) staff involved with the URI Special Area Management Plan (SAMP) 4. Prepared this draft report summarizing the key findings.

17 WIND ENERGY↗

Benefits of Integration of Aerojet Rocketdyne and RTI Advanced Gasification Technologies for Hydrogen-Rich Syngas Production

The key objective for this project was to evaluate the potential to achieve substantial reductions in the production cost of H 2 -rich syngas via coal gasification with near-zero emissions due to the cumulative and synergistic benefits realized when multiple advanced technologies are integrated into the overall conversion process. In this project, Aerojet Rocketdyne’s (AR’s) advanced gasification technology (currently being offered as R-GAS™) and RTI International’s (RTI’s) advanced warm syngas cleanup technologies were evaluated via a number of comparative techno-economic case studies. AR’s advanced gasification technology consists of a dry solids pump and a compact gasifier system. Based on the unique design of this gasifier, it has been shown to reduce the capital cost of the gasification block by between 40 and 50%. At the start of this project, actual experimental work had been demonstrated through pilot plant systems for both the gasifier and dry solids pump. RTI’s advanced warm syngas cleanup technologies consist primarily of RTI’s Warm Gas Desulfurization Process (WDP) technology, which effectively allows decoupling of the sulfur and CO 2 removal allowing for more flexibility in the selection of the CO 2 removal technology, plus associated advanced technologies for direct sulfur recovery and water gas shift (WGS). WDP has been demonstrated at pre-commercial scale using an activated amine carbon dioxide recovery process which would not have been possible if a majority of the sulfur had not been removed from the syngas by WDP. This pre-commercial demonstration of RTI’s advanced warm syngas cleanup system was conducted in parallel to the activities on this project. The technical data and cost information from this pre-commercial demonstration were extensively used in this project during the techno-economic analysis. With this project, both of RTI’s advanced WGS technologies were investigated. Because RT’s advanced fixed-bed WGS (AFWGS) process was successfully implemented in the WDP pre-commercial demonstration test mentioned above, this technology was used as part of RTI’s advanced warm syngas technology package for the techno-economic analyses for this project. RTI’s advanced transport-reactor-based WGS (ATWGS) process was still conceptual at the start of this project, but one of the tasks for this project was to evaluate the technical feasibility of this technology. In each of the three application-based comparison studies conducted as part of this project, the reference case was based on an existing Department of Energy National Energy Technology Laboratory (DOE/NETL) system study. Each of these references cases used existing commercial technology and the system resulted in > 90% carbon capture. In the comparison studies for the use of the hydrogen-rich syngas generated in either an Integrated Gasification Combined Cycle (IGCC) or a Coal-to-Methanol (CTM) plant, the comparison cases consisted of the reference case, a case with the integration of each individual advanced technology (either AR or RTI), and finally a case with the integration of all the advanced technologies (AR and RTI combined). In the Coal-to-Liquids (CTL) comparison study, the comparison study consisted of only three cases, which included a reference case, a case with just RTI’s advanced syngas cleaning technology, and a case with AR’s and RTI’s advanced technologies. The results from these comparison studies showed that the integration of the advanced technologies did result in substantial benefits, and by far the greatest benefits were achieved for cases integrating all the advanced technologies. For the IGCC study, the fully integrated case resulted in a 1.4% net efficiency improvement, an 18% reduction in capital cost per kW of capacity, a 12% reduction in the operating cost per kWh, and a 75–79% reduction in sulfur emissions. For the CTM case, the fully integrated plant resulted in a 22% reduction in capital cost, a 13% reduction in operating costs, a > 99% net reduction in sulfur emissions, and a reduction of 13–15% in CO 2 emissions. Because the capital cost represents over 60% of the methanol Required Selling Price (RSP), the significant reduction in the capital cost for the advanced technology case resulted in an 18% reduction in methanol RSP. For the CTL case, the fully integrated plant resulted in a 16% reduction in capital cost, which represented a 13% reduction in diesel RSP. Finally, the technical feasibility analysis of RTI’s ATWGS process demonstrated that a fluid-bed catalyst with sufficient attrition resistance and WGS activity could be made and that the process achieved about a 24% reduction in capital cost compared to a conventional fixed-bed commercial process.

08 HYDROGEN↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0.[19] NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗