Search NASA⌕ Search

SEARCH · Search NASA

Results for “BATTERY MODELS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

A Comprehensive Numerical and Experimental Study for the Passive Thermal Management in Battery Modules and Packs

Cooling plates in battery packs of electric vehicles play critical roles in passive thermal management systems to reduce risks of catastrophic thermal runaway. In this work, a series of numerical simulations and experiments are carried out to unveil the role of cooling plates (both between cells and a bottom plate parallel to the cell stack) on the thermal behavior of battery modules and packs under nail penetrations. First, we investigated the role of side cooling plates on the thermal runaway propagation mitigation in battery modules (1S3P) and packs (3S3P) by varying the key parameters of the side cooling plates, such as plate thicknesses, thermal contact resistances, and materials. Then, three important factors for passive thermal management systems are identified: (i) thermal mass of side cooling plates, (ii) interfacial thermal contact resistances, and (iii) the effective heat transfer coefficients at exterior surfaces. The roles of bottom cooling plates on thermal runaway propagation mitigation in 1S3P and 1S5P battery modules are numerically investigated by comparing the thermal behavior of the modules with only side cooling plates and with both side and bottom cooling plates.

25 ENERGY STORAGE↗

Modeling & Analysis of a Small Hydropower Plant and Battery Energy Storage System Connected as a Microgrid

Puget Sound Energy (PSE) is a utility with headquarters in Bellevue, WA that provides electric and gas service to customers in many regions of western Washington State. PSE is undertaking the implementation of a battery energy storage system pilot project in Glacier, WA, a small town located in the North Cascade Mountains near Mt. Baker Ski Area. Glacier experiences power outages that are both somewhat frequent and lengthy (roughly 2.8 outages per year with a duration of 7.5 hours average). The primary cause of the outages is faults on a long 55 kV transmission line that serves the town of Glacier from the Kendall substation. This approximately 10-mile long line is shown in the upper left of Figure 1 below. The Kendall-Glacier transmission line extends through an area of heavy forest with few reasonable options for increasing the line’s reliability. The substation in Glacier (also shown on figure below) serves over 1000 customers that are mostly residential but includes over 50 small businesses. The town has approximately 250 year-round residents, and a peak in visitors during the winter ski season when storms are also more likely to cause power outages. Figure 1: Proposed Microgrid in Glacier, WA Given the reliability challenges in Glacier, PSE is assessing the feasibility of a 2MW/4.4MWh battery energy storage system (BESS) that would allow for improved reliability. The BESS would also allow for the ability to investigate other applications for utility-scale energy 5 storage. This energy storage system is being considered for operation in “planned islanding” and “microgrid” mode. “Planned islanding” indicates use of the BESS to provide power to part or potentially all of the load in the town of Glacier during an outage. “Microgrid” indicates utilization (during an outage) of the BESS in parallel with Nooksack Falls Hydroelectric Power Plant, a small (nameplate 1.5 MW/2000 HP) hydro power plant less than 10 miles from the town of Glacier. Nooksack is a run-of river small hydro generation plant with a gross head of 226 ft. The site has a 5-foot diameter penstock which enters the powerhouse and goes into a pelton turbine with six runners on one shaft. It was originally constructed by Stone & Webster in 1906, which makes it the second oldest operating power generation facility in Western Washington. It was placed on the National Register of Historic places in December of 1988. The plant operated until 1997 when a fire destroyed the generator. The project continued operations in 2003 after the replacement of the generator and other updates.

13 HYDRO ENERGY↗

Hierarchical Model-Free Transactional Control of Building Loads to Support Grid Services

A transition from generation on demand to consumption on demand is one of the solutions to overcome the many limitations associated with the higher penetration of renewable energy sources. Such a transition, however, requires a considerable amount of load flexibility in the demand side. Demand response (DR) programs can reveal and utilize this demand flexibility by enabling the participation of a large number of grid-interactive efficient buildings (GEB). Existing approaches on DR require significant modelling or training efforts, are computationally expensive, and do not guarantee the satisfaction of end users. To address the aforementioned limitations, this software code considers a scalable hierarchical model-free transactional control approach that incorporates elements of virtual battery, game theory, and model-free control (MFC) mechanisms. The developed approach separates the control mechanism into upper and lower levels. The MFC modulates the flexible GEB in the lower level with guaranteed thermal comfort of end users in response to the optimal pricing and power signals determined in the upper layer using a Stackelberg game integrated with aggregate virtual battery constraints. Additionally, the usage of MFC necessitates less burdensome computational and communication requirements, thus, it is easily deployable even on small, embedded devices. This software code enables the use of residential and small-size commercial buildings to offer a potentially substantial source of ancillary grid services that are currently underutilized. A hierarchical, model-free transactive building control provides a smooth interface between the grid service requests of utilities and the reliable control required by participating buildings. Model-free control, which supports distributed control architecture, will be a more scalable solution that can be deployed in neighborhood-size systems as well as individual buildings. The proposed approach contributes to the body of knowledge on two main aspects. First, it couples the MFC with the game-theoretic control and proposes a scalable model-free transactive control approach. MFC does not require any modeling effort or model training for the various building loads. This is very beneficial since deriving an accurate model for every single unit participating in DR programs and obtaining all the parameters about the units (e.g., thermal coefficients, standby losses) are infeasible. Also, MFC is computationally efficient, easily deployable even on small, embedded devices, and can be implemented in real time. Second, it integrates the concept of virtual battery into DR via the Stackelberg game. The concept of virtual battery enables efficient coordination and aggregation of a large number of flexible GEB with guaranteed thermal comfort of end users.

Olama, Mohammed [Oak Ridge National Lab. (ORNL), O↗