Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Cost analysis of water recovery systems

Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced life support subsystems for long range planning in support of earth orbital programs. Cost analysis are presented for five leading water reclamation systems; (1) RITE waste management-water system;(2) reverse osmosis system;(3) multifiltration system;(4) vapor compression system; and(5) closed air evaporation system with electrolytic pretreatment.

Yakut, M. M.↗

Automated array assembly

Manufacturing techniques are evaluated using expenses based on experience and studying basic cost factors for each step to evaluate expenses from a first-principles point of view. A formal cost accounting procedure is developed which is used throughout the study for cost comparisons. The first test of this procedure is a comparison of its predicted costs for array module manufacturing with costs from a study which is based on experience factors. A manufacturing cost estimate for array modules of $10/W is based on present-day manufacturing techniques, expenses, and materials costs.

Williams, B. F.↗

Application of composite materials to turbofan engine fan exit guide vanes

A program was conducted by NASA with the JT9D engine manufacturer to develop a lightweight, cost effective, composite material fan exit guide vane design having satisfactory structural durability for commerical engine use. Based on the results of a previous company supported program, eight graphite/epoxy and graphite-glass/epoxy guide vane designs were evaluated and four were selected for fabrication and testing. Two commercial fabricators each fabricated 13 vanes. Fatigue tests were used to qualify the selected design configurations under nominally dry, 38 C (100 F) and fully wet and 60 C (140 F) environmental conditions. Cost estimates for a production rate of 1000 vanes per month ranged from 1.7 to 2.6 times the cost of an all aluminum vane. This cost is 50 to 80 percent less than the initial program target cost ratio which was 3 times the cost of an aluminum vane. Application to the JT9D commercial engine is projected to provide a weight savings of 236 N (53 lb) per engine.

Smith, G. T.↗

Conceptual design of an orbital propellant transfer experiment. Volume 2: Study results

The OTV configurations, operations and requirements planned for the period from the 1980's to the 1990's were reviewed and a propellant transfer experiment was designed that would support the needs of these advanced OTV operational concepts. An overall integrated propellant management technology plan for all NASA centers was developed. The preliminary cost estimate (for planning purposes only) is $56.7 M, of which approximately $31.8 M is for shuttle user costs.

Drake, G. L.↗

Evaluation of propellant tank insulation concepts for low-thrust chemical propulsion systems

An analytical evaluation of cryogenic propellant tank insulations for liquid oxygen/liquid hydrogen low-thrust 2224N (500 lbf) propulsion systems (LTPS) was conducted. The insulation studied consisted of combinations of N2-purged foam and multilayer insulation (MLI) as well as He-purged MLI-only. Heat leak and payload performance predictions were made for three Shuttle-launched LTPS designed for Shuttle bay packaged payload densities of 56 kg/cu m, 40 kg/cu m and 24 kg/cu m. Foam/MLI insulations were found to increase LTPS payload delivery capability when compared with He-purged MLI-only. An additional benefit of foam/MLI was reduced operational complexity because Orbiter cargo bay N2 purge gas could be used for MLI purging. Maximum payload mass benefit occurred when an enhanced convection, rather than natural convection, heat transfer was specified for the insulation purge enclosure. The enhanced convection environment allowed minimum insulation thickness to be used for the foam/MLI interface temperature selected to correspond to the moisture dew point in the N2 purge gas. Experimental verification of foam/MLI benefits was recommended. A conservative program cost estimate for testing a MLI-foam insulated tank was 2.1 million dollars. It was noted this cost could be reduced significantly without increasing program risk.

Kramer, T.↗

Nuclear Thermal Propulsion Development Risks

There are clear advantages of development of a Nuclear Thermal Propulsion (NTP) for a crewed mission to Mars. NTP for in-space propulsion enables more ambitious space missions by providing high thrust at high specific impulse ((is) approximately 900 sec) that is 2 times the best theoretical performance possible for chemical rockets. Missions can be optimized for maximum payload capability to take more payload with reduced total mass to orbit; saving cost on reduction of the number of launch vehicles needed. Or missions can be optimized to minimize trip time significantly to reduce the deep space radiation exposure to the crew. NTR propulsion technology is a game changer for space exploration to Mars and beyond. However, 'NUCLEAR' is a word that is feared and vilified by some groups and the hostility towards development of any nuclear systems can meet great opposition by the public as well as from national leaders and people in authority. The public often associates the 'nuclear' word with weapons of mass destruction. The development NTP is at risk due to unwarranted public fears and clear honest communication of nuclear safety will be critical to the success of the development of the NTP technology. Reducing cost to NTP development is critical to its acceptance and funding. In the past, highly inflated cost estimates of a full-scale development nuclear engine due to Category I nuclear security requirements and costly regulatory requirements have put the NTP technology as a low priority. Innovative approaches utilizing low enriched uranium (LEU). Even though NTP can be a small source of radiation to the crew, NTP can facilitate significant reduction of crew exposure to solar and cosmic radiation by reducing trip times by 3-4 months. Current Human Mars Mission (HMM) trajectories with conventional propulsion systems and fuel-efficient transfer orbits exceed astronaut radiation exposure limits. Utilizing extra propellant from one additional SLS launch and available energy in the NTP fuel, HMM radiation exposure can be reduced significantly.

Kim, Tony↗

Spreadsheets in Team X: Preserving Order in an Inherently Chaotic Environment

JPL is NASA's prime center for deep space missions. In response to the need to reduce the cost and time to complete early concept studies and proposals JPL created the first concurrent engineering team in the aerospace industry: Team X. Started in 1995, Team X has carried out over 800 studies, dramatically reducing the time and cost involved, and has been the model for other concurrent engineering teams both within NASA and throughout the larger aerospace community. Since its inception, the software backbone of this highly successful design team - engaged in examining some of NASA's cutting edge concepts - has been the unassuming spreadsheet. Over the years the Team X spreadsheet-based tools have evolved from simple standalone engineering models into a networked spreadsheet intensive system with real time parameter updating. Recent new capabilities include stochastic cost estimation and a graphical drag and drop block diagram that automatically populates the related spreadsheet parameters of cost, mass and power. This paper describes how the spreadsheet functions within Team X: its history, architecture, current capabilities, enabling strengths and persistent weaknesses. In addition, the verification methods and institutional oversight that have evolved as the Team X products became increasingly critical to Laboratory success are also discussed.

concurrent engineering↗

Code eOMEGA - Decommissioning Costing of Nuclear Facilities Based on the ISDC - 17230

The paper is focused on the presentation of the development process, calculation procedure and main features of the eOMEGA code used for decommissioning costing of nuclear facilities. The methodology for decommissioning cost calculation implemented to the eOMEGA code is fully in line with the international recommendations, best practices and is completely based on the ISDC - The International Structure for Decommissioning Costing (ISDC) of Nuclear Installation. ISDC represents the standard and common platform for presenting the results of the cost estimates for decommissioning projects related to any type of nuclear facility. The main goal of the eOMEGA costing code is to provide the ISDC based flexible, open, modern and user-friendly tool for transparent and reliable decommissioning costing for any type of nuclear facility with any systems, structures and radiological situation at the end of the operational period. Moreover, the eOMEGA decommissioning costing code is intended to be one of the modules of the universal eOMEGA platform which should cover also the other activities within the back-end of nuclear power engineering e.g. decommissioning funding, back end of nuclear fuel cycle, site remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating Software-Development Costs With Greater Accuracy

COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.

Baker, Dan↗

Cost and Performance Baseline for Fossil Energy Plants Volume 1a: Bituminous Coal (PC) and Natural Gas to Electricity (Rev. 3)

This report presents the cost and performance results of pulverized coal (PC) and natural gas combined cycle (NGCC) plants, using a consistent technical and economic approach that reflects current market conditions. The primary value of this report lies not in the absolute accuracy of the capital cost estimates for the individual cases (estimated to be -15%/+30%), but in application of a consistent approach to allow meaningful comparisons of relative costs among the cases evaluated.

01 COAL, LIGNITE, AND PEAT↗

Quantifying the Solar Energy Resource for Puerto Rico

After Hurricane Maria, multiple U.S. Department of Energy laboratories studied the state of the electric grid in Puerto Rico and analyzed grid resilience and grid integration of renewable energy. As part of the work done at the National Renewable Energy Laboratory, researchers created new solar resource data, conducted a technical potential and supply curve analysis, and studied the interannual variability of the solar resource. A new methodology was developed to downscale solar resource data from the National Solar Radiation Data Base (NSRDB) from a 4-km x 4-km spatial and 30-minute temporal resolution to a 2 km x 2 km and 5-minute resolution. This methodology primarily used simple physical principles to develop high-resolution cloud properties which were then used to compute solar radiation. The high-resolution datasets were validated against ground measurements and the error metrics were found to be similar to the original lower resolution dataset. Using 20 years of downscaled data from the NSRDB multi-year capacity factors for photovoltaics (PV) were developed for both single-axis tracking and fixed latitude-tilt configurations. Use of the multi-year data provides the ability to understand variability in capacity factors due to variability in weather over a long period of time. For Puerto Rico the coastal regions were found to have significant higher capacity factors than inland. Using land-use and terrain information a technical potential analysis was conducted for Puerto Rico. This analysis restricted single PV plant development to a maximum of 100 MW nameplate capacity. The nameplate capacity for each municipality were then determined. Based on our assumptions, 56 of the 78 total municipalities of Puerto Rico contain some level of solar capacity. Most of the interior municipalities did not have any capacity because of the geographic exclusions used in this study. The lowest capacity for a PV plant observed in a municipality was 10 MW. The maximum capacity within a county was 2,000 MW. Further a supply curve analysis was conducted by taking the results of the technical potential and quantifying system and transmission costs. The levelized cost of energy (LCOE) was calculated for each theoretical PV plant site, and the levelized cost of transmission was added to the LCOE to produce a total cost estimate for each site. The results of the supply curve analysis allow for a relative comparison of the cost for integrating new PV capacity into the grid. This analysis indicates that cheaper total LCOE sites tend to be larger in capacity. The total capacity in this study was found to be far beyond the maximum peak load for the island. However, this study does not consider the economic and market potential for development. The cumulative capacity presented in this study assumes that the best locations are developed first and ignores the complex decision paths for new power plant development. Therefore, this analysis can only be treated as illustrative. Finally this study investigates the impact of inter-annual variability of resource using a variety of metrices including probability of exceedance and variation in capacity factor and LCOE. This study demonstrates that the capacity factor or LCOE could vary by over 10% year to year. This clearly indicates the risks involved in using any particular year of data and clearly points to the use of multi-year data to reduce some of the risks related to variability in weather.

14 SOLAR ENERGY↗

West Coast Offshore Wind Transmission Study

As a primary federal investigation of the utility of transmission to support offshore wind emergence in the Western Interconnect, the West Coast Offshore Wind Transmission study evaluates five distinct West Coast-wide transmission scenarios and trades the economic benefits and costs of six development pathways from 2035 to 2050. In this time, 33 GW of OSW generation and supporting transmission are explored within the context of 350 additional GW of generation to support 100% clean electricity. Geospatial analysis informed plausible transmission topologies and cost estimates. All pathways to intraregional or interregional coordination transmission builds showed more than $\$$14 billion in present value cost savings, with a maximum of $\$$25 billion of savings in the interregional case. These savings are primarily driven by fuel costs and increased availability of power flows enabled by new transmission networks. Key considerations of clean, dispatchable generation options, geographic disaggregation of costs, system reliability reinforcements, resilience, and community values are also presented and discussed.

17 WIND ENERGY↗

Silicon solar photovoltaic power stations

Modular design of components and arrays, cost estimates for modules and support structures, and cost/performance analysis of a central solar photovoltaic power plant are discussed. Costs of collector/reflector arrays are judged the dominant element in the total capital investment. High-concentration solar tracking arrays are recommended as the most economic means for producing solar photovoltaic energy when solar cells costs are high ($500 per kW generated). Capital costs for power conditioning subsystem components are itemized and system busbar energy costs are discussed at length.

Chowaniec, C. R.↗

Hypergolic Propellant Destruction Evaluation Cost Benefit Analysis

At space vehicle launch sites such as Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS) and Kennedy Space Center (KSC), toxic vapors and hazardous liquid wastes result from the handling of commodities (hypergolic fuels and oxidizers), most notably from transfer operations where fuel and oxidizer are transferred from bulk storage tanks or transfer tankers to space launch vehicles. During commodity transfer at CCAFS and KSC, wet chemical scrubbers (typically containing four scrubbing towers) are used to neutralize fuel saturated vapors from vent systems on tanks and tanker trailers. For fuel vapors, a citric acid solution is used to scrub out most of the hydrazine. Operation of both the hypergolic fuel and oxidizer vapor scrubbers generates waste scrubber liquor. Currently, scrubber liquor from the fuel vapor scrubber is considered non-hazardous. The scrubber liquor is defined as spent citric acid scrubber solution; the solution contains complexed hydrazine I methylhydrazine and is used to neutralize nonspecification hypergolic fuel generated by CCAFS and KSC. This project is a collaborative effort between Air Force Space Command (AFSPC), Space and Missile Center (SMC), the CCAFS, and National Aeronautics and Space Administration (NASA) to evaluate microwave destruction technology for the treatment of non-specification hypergolic fuel generated at CCAFS and KSC. The project will capitalize on knowledge gained from microwave treatment work being accomplished by AFSPC and SMC at V AFB. This report focuses on the costs associated with the current non-specification hypergolic fuel neutralization process (Section 2.0) as well as the estimated costs of operating a mobile microwave unit to treat non-specification hypergolic fuel (Section 3.0), and compares the costs for each (Section 4.0).The purpose of this document is to assess the costs associated with waste hypergolic fuel. This document will report the costs associated with the current fuel neutralization process and also examine the costs of an alternative technology, microwave destruction of waste hypergolic fuel. The microwave destruction system is being designed as a mobile unit to treat non-specification hypergolic fuel at CCAFS and KSC.

Kessel, Kurt↗

Dynamic Radioisotope Power System (DRPS) Design Reference Mission (DRM) Lunar Rover

The Radioisotope Power Systems (RPS) Program tasked the Compass Team to evaluate use of Dynamic Radioisotope Power Systems (DRPS) for lunar science rovers. The object was to identify their advantages and challenges as well as to influence the technology developments with flight-type requirements. This was easily done by using the promising Volatiles Investigating Polar Exploration Rover (VIPER) solar- powered rover mission as a platform to ‘swap in’ a DRPS. The ‘pickup truck bed’ approach allowed both simplified installation and operation of the DRPS while keeping the forward lunar surface ‘blocked’ from the DRPS waste heat which could sublimate the icy surface. It was found that with the Stirling DRPS option the mass is within the planned VIPER lander capability and is very close to VIPER mass and size (the DRPS replaces large battery pack/solar arrays). The Stirling DRPS option produced ~300 Watts electrical (We) using six general purpose heat source (GPHS) bricks and eight Stirling convertors. Replacing the solar/battery power with radioisotope power allows a continuous presence (instead of 6 hours) in a permanently shadowed region (PSR) and over 18 months of operations with minimal science impact (rearward surface heating). It was also found that use of a dynamic system (instead of a thermoelectric system) reduces the heat impact on the science environment two-to-three times. The DRPS, along with a relay link (like Gateway), can provide continuous access to PSRs. The system was also found to be capable of roving for 8 hours per day with a range of over 500 km in 18 months. Preliminary cost estimates fit into a Class D mission but only assuming VIPER heritage and launch, lander, operations, nuclear specific costs [National Environmental Policy Act (NEPA), fueling, transport, Launch Services Program (LSP), etc.] and DRPS are not included.

DRPS↗

Trace Element Sampling and Partitioning Modeling to Estimate Wastewater Composition and Treatment Performance at Coal Generators

The coal combusted at coal-fired power plants (CFPPs) contains several trace elements that impact human heath if released to the environment. Effective combinations of air pollution control devices (APCDs) and water pollution control devices (WPCDs) are critical to reducing these impacts. This work sampled pulverized CFPPs owned and operated by Louisville Gas & Electricity – Kentucky Utilities (LGE-KU) during baseload and cycling conditions. Next, an open-source and easy-to-implement trace element partitioning model was developed using publicly available datasets, literature studies of trace element partitioning, and sampling data to estimate trace element partitioning in APCDs to the gas, liquid, and solid phases exiting CFPPs. These estimates of the liquid phase trace element concentration in FGD wastewater were then used to estimate trace element behavior in WPCDs and evaluate treated wastewater effluent concentrations for compliance with the Effluent Limitation Guidelines (ELG) for the Steam Electric Generating Sector. Finally, cost estimates were developed for established and emerging wastewater treatment trains to identify the most cost-effective approaches for ELG compliance.

01 COAL, LIGNITE, AND PEAT↗

Baseload Nitrate Salt Central Receiver Power Plant Design (Final Report)

The objectives of the work were to demonstrate that a 100 MWe central receiver plant, using nitrate salt as the receiver coolant, thermal storage medium, and heat transport fluid in the steam generator, can 1) operate, at full load, for 6,400 hours each year using only solar energy, and 2) satisfy the DOE levelized energy cost goal of $0.09/kWhe (real 2009 $). To achieve these objectives the work incorporated a large range of tasks relating to many different aspects of a molten salt tower plant. The first Phase of the project focused on developing a baseline design for a Molten Salt Tower and validating areas for improvement. Tasks included a market study, receiver design, heat exchanger design, preliminary heliostat design, solar field optimization, baseline system design including PFDs and P&IDs and detailed cost estimate. The baseline plant met the initial goal of less than $0.14/kWhe, and reinforced the need to reduce costs in several key areas to reach the overall $0.09/kWhe goal. The major improvements identified from Phase I were: 1) higher temperature salt to improve cycle efficiency and reduce storage requirements, 2) an improved receiver coating to increase the efficiency of the receiver, 3) a large receiver design to maximize storage and meet the baseload hours objective, and 4) lower cost heliostat field. The second Phase of the project looked at advancing the baseline tower with the identified improvements and included key prototypes. To validate increasing the standard solar salt temperature to 600 °C a dynamic test was conducted at Sandia. The results ultimately proved the hypothesis incorrect and showed high oxide production and corrosion rates. The results lead to further testing of systems to mitigate the oxide production to be able to increase the salt temperature for a commercial plant. Foster Wheeler worked on the receiver design in both Phase I and Phase II looking at both design and lowering costs utilizing commercial fossil boiler manufacturing. The cost and design goals for the project were met with this task, but the most interesting results had to do with defining the failure modes and looking at a “shakedown analysis” of the combined creep-fatigue failure. A separate task also looked at improving the absorber coatings on the receiver tubes that would improve the efficiency of the receiver. Significant progress was made on developing a novel paint with a high absorptivity that was on par with the current Pyromark, but shows additional potential to be optimized further. Although the coating did not meet the emissivity goals, preliminary testing the new paint shows potential to be much more durable, and potential to improve the receiver efficiency through a higher average absorptivity over the lifetime. Additional coatings were also designed and modeled results meet the project goals, but were not tested. Testing for low cycle fatigue of the full length receiver tubes was designed and constructed, but is still currently undergoing testing. A novel small heliostat was developed through an extensive brainstorming and down select. The concept was then detailed further with inputs from component testing and eventually a full prototype was built and tested. This task met or exceeded the accuracy and structure goals and also beat the cost goal. This provides a significant solar field costs savings for Abengoa that will be developed further to be used in future commercial plants. Ultimately the $0.09/kWhe (real 2009 $) and 6,400 hours goals of the project were met.

14 SOLAR ENERGY↗