Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Hub and Spoke Modeling to support Agile Combat Employment

Here, the 2022 National Defense Strategy (NDS) shifts focus primarily to the People’s Republic of China (PRC) as the pacing challenge, with acknowledgement of the other threats. President Joe Biden introduced the updated version by stating the U.S. is living in a decisive decade. While the country does not know when the next conflict will happen, leadership believes it will happen soon and the DoD is preparing for this eventuality in the Indo-Pacific region by rethinking operations and concepts. Traditionally, large, fixed installations have been the primary means of operating and generating airpower for the United States Air Force (USAF). Additionally, the service has the capabilities to establish contingency locations based on two primary criteria: a runway and a water source. However, policies and strategy must be updated to create a more agile and dispersed force.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analysis and design of DC-link capacitor in cascaded H-bridge multilevel active front-end converter

Medium-voltage grid-tied systems often use a cascaded H-bridge multi-level active front-end. In this converter, dc link bus capacitors play an important role in stabilizing the converter and enabling both active and reactive power injections. The present work provides analytical expressions for the capacitor current, which are essential for optimizing system design (especially capacitor size vs. lifetime). Then, the expression is incorporated into the grid connected bidirectional power system model. Consequently, this work contributes to the guiding principles to choose accurate dc link capacitor ratings against grid-side power delivery requirements. DC-link capacitors come with an expiration date which is dependent on the operating power and voltage values. Lack of information about the lifetime of the dc-link capacitor creates uncertainty in the duration of online operation of the converter, thus increasing the probability of a contingency outage. The lifetime of the capacitor can range from only a few seconds of online operation of the station due to under-sizing, to a compromised quality of power flowing through other solid state devices which may not have been designed for the transients that are caused by over-sizing of the dc-link capacitor. A better estimate of the lifetime of these capacitors can help maximize usage and maintain scheduled outages more efficiently, without disruption in service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide to Current Limiting and Stability with Grid-Forming Inverters

The electric power grid is changing. For many decades, the synchronous generator - an electromechanical device invented in 1887 - has been the workhorse and backbone of power grids across the globe. Our entire infrastructure is built around it. But times change, and so does the power grid. Since the early 21st century, we have seen a gradual shift in modern power grids away from synchronous generators to ones dominated by power electronic inverter-based resources (IBRs). Sources such as photovoltaics, wind turbines, battery storage, fuel cells, and other technologies like high-voltage DC transmission interconnections all rely on an inverter to connect and interface with the grid. They are increasingly being installed on the grid to augment, or even replace, traditional energy sources. This change is a fundamental shift that brings tremendous technical challenges and questions: Can a power grid remain stable with many more inverter-based resources? How do we avoid more blackouts on the grid? How do we keep the grid secure and resilient during disturbances? After all, power electronic inverters are nothing like the big, rotating, iron-and-copper machines that the grid heavily relies on. Many of these questions can be answered by using grid-forming (GFM) inverters, yet many research challenges remain. This document explores GFM inverters and how they can help stabilize the future grid, especially during disturbances and contingencies. It summarizes a two-year research and development fellowship program at NREL. We point interested readers to more detailed works developed during the project along the way. Let's dive in

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-Simulation of PSS/E, OpenDSS, and PSCAD for Power Systems Stability Analysis With Inverter-Based Resources: Preprint

The increasing penetration of inverter-based resources (IBRs) is reshaping the dynamic behavior of power systems. IEEE standard 1547-2018 suggests that distributed energy resources (DERs) should provide grid services such as voltage and frequency supports. On the other hand, dynamic events caused by IBRs such as sub-synchronous oscillation have been reported. These developments necessitate improvement in the current modeling capabilities to better understand the interdependencies within power systems. These include interactions between transmission and distribution systems, among IBRs themselves, and between IBRs and conventional resources. In this paper, we present a co-simulation model integrating PSS/E, OpenDSS, and PSCAD to analyze IBR impacts on the stability of transmission and distribution systems. A key challenge in developing a co-simulation model is ensuring interoperability among different simulators (interfacing and data flow) while maintaining accurate results. Using the developed model, we simulate the impact of IBRs on power systems in two test cases: 1) fault ride through (FRT) capability during a generation trip contingency; 2) IBR-induced sub-synchronous oscillation. The results show the effectiveness of the co-simulation model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Impact of Storage Conditions on the Quality and Viability of Switchgrass as a Bioenergy Crop

With growing energy demands and climate concerns, advancements in bioenergy have become imperative. Biofuels promote energy independence, reduce fossil fuel reliance, and cut greenhouse gas emissions. Switchgrass (Panicum virgatumis) is an ideal bioenergy crop due to its ability to thrive on marginal lands unsuitable for food crops and its drought tolerance, rendering it a low-maintenance, high-yield option. In the bioenergy industry, energy crops are typically stored to facilitate supply chain management and ensure a continuous supply despite seasonal availability. However, the effective utilization of bioenergy crops is typically contingent upon addressing the challenges associated with biomass storage. These challenges include high moisture content that promotes biological degradation of the biomass leading to increased risk of pathogenic microbes, and chemical degradation that increases the ratio of inconvertible, inorganic materials. These issues lead to a reduction of feedstock value, diminishing the biomass-to-biofuel conversion efficacy, making switchgrass and other bioenergy crops less effective as fuel sources. This project aims to improve the storage of purpose-grown energy crops. Aerobic storage trials were conducted under varying moisture contents to stimulate real-world environmental exposure. Switchgrass samples were rewetted to 30% or 35% and stored in a bioreactor for approximately one month, or until cellular respiration ceased. Degradation indicators, such as dry matter loss, temperature changes, and cellular respiration, were measured throughout this process. Samples for compositional analysis, 16S, and ITS were taken at three different time points: before, during, and after storage, to monitor changes in biomass, microbial communities, and metabolites over time. Preliminary data indicate that dry matter loss is proportional to cellular respiration, with higher moisture content (35%) leading to higher temperatures and elevated dry matter loss. Compositional analysis and microbial community analysis are in progress. This research will provide a comprehensive understanding of storage, helping to identify stability factors in energy crops and improve best management practices for biomass producers.

09 - BIOMASS FUELS↗

Best practices: Organizational execution

This article, the fourth and final installment in the DOE–IDEA series, focuses on organizational execution and how strong management practices, teamwork, and preparedness contribute to successful district energy systems. It highlights case studies from Ashley Energy and Cornell University to illustrate effective operational strategies. Ashley Energy demonstrates the importance of emergency preparedness and rapid response. After a major flood disrupted its plant, the organization restored service in under 72 hours by relying on pre-established plans, vendor relationships, and trained staff. The case emphasizes proactive contingency planning, understanding insurance processes, and empowering skilled personnel to improvise during crises. Cornell University’s example highlights the role of collaboration and transparency in long-term success. Its district energy system benefits from strong data sharing, real-time energy monitoring, and active involvement of faculty and students in system planning and innovation. This culture of teamwork and data-driven decision-making supports sustainability goals and continuous system improvement. Overall, the article shows that effective organizational execution—through preparedness, collaboration, and data transparency—is essential for maintaining reliable, efficient, and sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Large-Scale Transport Model Uncertainty and Sensitivity Analysis: Distributed Sources in Complex Hydrogeologic Systems

The Underground Test Area (UGTA) Project of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is in the process of assessing and developing regulatory decision options based on modeling predictions of contaminant transport from underground testing of nuclear weapons at the Nevada Test Site (NTS). The UGTA Project is attempting to develop an effective modeling strategy that addresses and quantifies multiple components of uncertainty including natural variability, parameter uncertainty, conceptual/model uncertainty, and decision uncertainty in translating model results into regulatory requirements. The modeling task presents multiple unique challenges to the hydrological sciences as a result of the complex fractured and faulted hydrostratigraphy, the distributed locations of sources, the suite of reactive and non-reactive radionuclides, and uncertainty in conceptual models. Characterization of the hydrogeologic system is difficult and expensive because of deep groundwater in the arid desert setting and the large spatial setting of the NTS. Therefore, conceptual model uncertainty is partially addressed through the development of multiple alternative conceptual models of the hydrostratigraphic framework and multiple alternative models of recharge and discharge. Uncertainty in boundary conditions is assessed through development of alternative groundwater fluxes through multiple simulations using the regional groundwater flow model. Calibration of alternative models to heads and measured or inferred fluxes has not proven to provide clear measures of model quality. Therefore, model screening by comparison to independently-derived natural geochemical mixing targets through cluster analysis has also been invoked to evaluate differences between alternative conceptual models. Advancing multiple alternative flow models, sensitivity of transport predictions to parameter uncertainty is assessed through Monte Carlo simulations. The simulations are challenged by the distributed sources in each of the Corrective Action Units, by complex mass transfer processes, and by the size and complexity of the field-scale flow models. An efficient methodology utilizing particle tracking results and convolution integrals provides in situ concentrations appropriate for Monte Carlo analysis. Uncertainty in source releases and transport parameters including effective porosity, fracture apertures and spacing, matrix diffusion coefficients, sorption coefficients, and colloid load and mobility are considered. With the distributions of input uncertainties and output plume volumes, global analysis methods including stepwise regression, contingency table analysis, and classification tree analysis are used to develop sensitivity rankings of parameter uncertainties for each model considered, thus assisting a variety of decisions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Installation and Commissioning Automated Demand Response Systems

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pebble Bed Reactor Dust Production Model

The operation of pebble bed reactors, including fuel circulation, can generate graphite dust, which in turn could be a concern for internal components; and to the near field in the remote event of a break in the coolant circuits. The design of the reactor system must, therefore, take the dust into account and the operation must include contingencies for dust removal and for mitigation of potential releases. Such planning requires a proper assessment of the dust inventory. This paper presents a predictive model of dust generation in an operating pebble bed with recirculating fuel. In this preliminary work the production model is based on the use of the assumption of proportionality between the dust production and the normal force and distance traveled. The model developed in this work uses the slip distances and the inter-pebble forces computed by the authors’ PEBBLES. The code, based on the discrete element method, simulates the relevant static and kinetic friction interactions between the pebbles as well as the recirculation of the pebbles through the reactor vessel. The interaction between pebbles and walls of the reactor vat is treated using the same approach. The amount of dust produced is proportional to the wear coefficient for adhesive wear (taken from literature) and to the slip volume, the product of the contact area and the slip distance. The paper will compare the predicted volume with the measured production rates. The simulation tallies the dust production based on the location of creation. Two peak production zones from intra pebble forces are predicted within the bed. The first zone is located near the pebble inlet chute due to the speed of the dropping pebbles. The second peak zone occurs lower in the reactor with increased pebble contact force due to the weight of supported pebbles. This paper presents the first use of a Discrete Element Method simulation of pebble bed dust production.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Automated Demand Response Opportunities in Wastewater Treatment Facilities

Wastewater treatment is an energy intensive process which, together with water treatment, comprises about three percent of U.S. annual energy use. Yet, since wastewater treatment facilities are often peripheral to major electricity-using industries, they are frequently an overlooked area for automated demand response opportunities. Demand response is a set of actions taken to reduce electric loads when contingencies, such as emergencies or congestion, occur that threaten supply-demand balance, and/or market conditions occur that raise electric supply costs. Demand response programs are designed to improve the reliability of the electric grid and to lower the use of electricity during peak times to reduce the total system costs. Open automated demand response is a set of continuous, open communication signals and systems provided over the Internet to allow facilities to automate their demand response activities without the need for manual actions. Automated demand response strategies can be implemented as an enhanced use of upgraded equipment and facility control strategies installed as energy efficiency measures. Conversely, installation of controls to support automated demand response may result in improved energy efficiency through real-time access to operational data. This paper argues that the implementation of energy efficiency opportunities in wastewater treatment facilities creates a base for achieving successful demand reductions. This paper characterizes energy use and the state of demand response readiness in wastewater treatment facilities and outlines automated demand response opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Criticality Safety Controls and the Safety Basis at PFP

With the implementation of DOE Order 420.1B, Facility Safety, and DOE-STD-3007-2007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities', a new requirement was imposed that all criticality safety controls be evaluated for inclusion in the facility Documented Safety Analysis (DSA) and that the evaluation process be documented in the site Criticality Safety Program Description Document (CSPDD). At the Hanford site in Washington State the CSPDD, HNF-31695, 'General Description of the FH Criticality Safety Program', requires each facility develop a linking document called a Criticality Control Review (CCR) to document performance of these evaluations. Chapter 5, Appendix 5B of HNF-7098, Criticality Safety Program, provided an example of a format for a CCR that could be used in lieu of each facility developing its own CCR. Since the Plutonium Finishing Plant (PFP) is presently undergoing Deactivation and Decommissioning (D&D), new procedures are being developed for cleanout of equipment and systems that have not been operated in years. Existing Criticality Safety Evaluations (CSE) are revised, or new ones written, to develop the controls required to support D&D activities. Other Hanford facilities, including PFP, had difficulty using the basic CCR out of HNF-7098 when first implemented. Interpretation of the new guidelines indicated that many of the controls needed to be elevated to TSR level controls. Criterion 2 of the standard, requiring that the consequence of a criticality be examined for establishing the classification of a control, was not addressed. Upon in-depth review by PFP Criticality Safety staff, it was not clear that the programmatic interpretation of criterion 8C could be applied at PFP. Therefore, the PFP Criticality Safety staff decided to write their own CCR. The PFP CCR provides additional guidance for the evaluation team to use by clarifying the evaluation criteria in DOE-STD-3007-2007. In reviewing documents used in classifying controls for Nuclear Safety, it was noted that DOE-HDBK-1188, 'Glossary of Environment, Health, and Safety Terms', defines an Administrative Control (AC) in terms that are different than typically used in Criticality Safety. As part of this CCR, a new term, Criticality Administrative Control (CAC) was defined to clarify the difference between an AC used for criticality safety and an AC used for nuclear safety. In Nuclear Safety terms, an AC is a provision relating to organization and management, procedures, recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility. A CAC was defined as an administrative control derived in a criticality safety analysis that is implemented to ensure double contingency. According to criterion 2 of Section IV, 'Linkage to the Documented Safety Analysis', of DOESTD-3007-2007, the consequence of a criticality should be examined for the purposes of classifying the significance of a control or component. HNF-PRO-700, 'Safety Basis Development', provides control selection criteria based on consequence and risk that may be used in the development of a Criticality Safety Evaluation (CSE) to establish the classification of a component as a design feature, as safety class or safety significant, i.e., an Engineered Safety Feature (ESF), or as equipment important to safety; or merely provides defense-in-depth. Similar logic is applied to the CACs. Criterion 8C of DOE-STD-3007-2007, as written, added to the confusion of using the basic CCR from HNF-7098. The PFP CCR attempts to clarify this criterion by revising it to say 'Programmatic commitments or general references to control philosophy (e.g., mass control or spacing control or concentration control as an overall control strategy for the process without specific quantification of individual limits) is included in the PFP DSA'. Table 1 shows the PFP methodology for evaluating CACs. This evaluation process has been in use since February of 2008 and has proven to be simple and effective. Each control identified in the applicable new/revised CSE is evaluated via the table. The results of this evaluation are documented in tables attached to the CCR as an appendix, for each CSE, to the base document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Adaptive Approach to Energy Security and Assurance

The North American power network has been called the world s largest, most complex machine. This network represents an enormous continent-wide investment, including over 15,000 generators in 10,000 power plants, and miles of transmission lines, distribution networks, and control systems. It has long been recognized that existing power-delivery systems are vulnerable to natural disasters and adversarial attack. The next generation of control systems must simultaneously protect against these disruptions while integrating new generation sources and maintaining active, automated control of the grid. The grid s interconnectedness needed to provide smart grid control also increases its vulnerability to interconnect-wide disruptions that are initiated locally. While strong centralized control is essential to reliable operations, this control requires multiple, high-data-rate, two-way communication links, a powerful central computing facility, and an elaborate operation-control center, all of which present vulnerabilities. It is clearly impossible to completely protect such a widespread and complex system. The key to maintaining the integrity of this network lies in the ability to identify its critical elements and to then effectively protect these elements. This identification and targeted protection will enable parts of the network to remain operational and even automatically reconfigure in the event of local failures or threats of failure, providing dependable continuity of service. The bold concept proposed here is the communication, predictive models and fast controls that eliminate the need to protect all components from emergent contingencies, but to reconfigure actively to maintain critical functions. The transformation from laboratory applications to larger than micro grid areas will require the next generation of energy technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safeguarding a NWS International Enrichment Center as an Enriched Uranium Store

The operational and regulatory singularities of a multilateral facility designed to provide enriched uranium to a consortium of members may engender a new sub-category of safeguard criteria for the International Atomic Energy Agency (IAEA). This paper introduces the contingency of monitoring such a facility as a uranium storage center with cylinders containing low-enriched uranium (LEU) as the principal, and perhaps only, material open to verification. Accountancy and verification techniques will be proffered together with disparate means for maintaining continuity of knowledge (CoK) on verified stock.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Trial Implementation of a Multihazard Risk Assessment Framework for High-Impact Low-Frequency Power Grid Events

The Pacific Northwest National Laboratory developed a risk framework for modeling high-impact, low-frequency power grid events to support risk-informed decisions. In this research article, we briefly recap the framework and demonstrate its implementation for seismic and geomagnetic hazards using a benchmark reliability test system. We describe integration of a collection of models implemented to perform hazard analysis, fragility evaluation, consequence estimation and post-event restoration. We demonstrate the value of the framework as a multi-hazard power grid risk assessment and management tool. The research will benefit transmission planners and emergency planners by improving their ability to maintain a resilient grid infrastructure against impacts from major events.

power grid, risk assessment, seismic hazard, dynam↗