Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

The Importance of Imaging in Radiation Oncology for National Clinical Trials Network Protocols

Imaging is essential in successfully executing radiation therapy (RT) in oncology clinical trials. As technically sophisticated diagnostic imaging and RT were incorporated into trials, quality assurance in the National Clinical Trials Network groups entered a new era promoting image acquisition and review. Most trials involving RT require pre- and post-therapy imaging for target validation and outcome assessment. The increasing real-time (before and during therapy) imaging and RT object reviews are to ensure compliance with trial objectives. Objects easily transmit digitally for review from anywhere in the world. Physician interpretation of imaging and image application to RT treatment plans is essential for optimal trial execution. Imaging and RT data sets are used to credential RT sites to confirm investigator and institutional ability to meet trial target volume delineation and delivery requirements. Real-time imaging and RT object reviews can be performed multiple times during a trial to assess response to therapy and application of RT objects. This process has matured into an effective data management mechanism. When necessary, site and study investigators review objects together through web media technologies to ensure the patient is enrolled on the appropriate trial and the intended RT is planned and executed in a trial-compliant manner. Real-time imaging review makes sure: (1) the patient is entered and eligible for the trial, (2) the patient meets trial-specific adaptive therapy requirements, if applicable, and (3) the intended RT is according to trial guidelines. This review ensures the study population is uniform and the results are believable and can be applied to clinical practice.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Computational Math Problems for a Clean Energy Future

Cutting edge computational mathematics are ubiquitous in renewable energy research. Problems in resilient and reliable electric grid operations, infrastructure planning, wind farm yaw control, and more demand sophisticated and scalable computational tools that enable the transition of renewable energy technologies from proof of concept to deployment into our energy system. The mission of the Computational Science Center at NREL is to lead the lab's efforts to solve energy challenges using high-performance computing (HPC), computational science, applied mathematics, scientific data management, visualization, and informatics. In this poster, we provide a short overview of three areas of computational mathematics research at NREL: wind power scenario generation for stochastic grid operations and infrastructure planning, improved rational function approximations for electromagnetic transients codes, and wind farm yaw control using a combination of the Alternating Direction Method of Multipliers (ADMM) and reinforcement learning (RL). Increasing penetrations of renewable energy into power grids motivate the investigation of new approaches to characterizing uncertainty for five-minute economic dispatch problems. Similarly, as the penetration of distributed energy resources on power grids increases, it becomes important to revisit our methods of modelling transient phenomena, i.e. electromagnetic transients programs. Finally, the combination of ADMM and RL for wind farm yaw control presented here can potentially increase the efficiency of the deployed distributed controllers by orders of magnitude.

ADMM↗

Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water resources planning for rivers draining into Mobile Bay

The application of remote sensing, automatic data processing, modeling and other aerospace related technologies to hydrological engineering and water resource management are discussed for the entire river drainage system which feeds the Mobile Bay estuary. The adaptation and implementation of existing mathematical modeling methods are investigated for the purpose of describing the behavior of Mobile Bay. Of particular importance are the interactions that system variables such as river flow rate, wind direction and speed, and tidal state have on the water movement and quality within the bay system.

April, G. C.↗

NASA's In-Space Technology Experiments Program - Status and plans

The Space Station Freedom constitutes a space facility uniquely suited to space technology-related R&D. Such test data as those involving fluids (power, thermal management, life support systems, and payload operations), space structures, and space materials, cannot be realistically obtained on the ground. The Space Station will also allow the validation of technologies that promise either higher performance or lower costs but which, if not validated in the necessary environment, could pose unacceptable program risks.

Harris, Leonard A.↗

AGC-2 Irradiation Data Qualification (Final Report)

The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. The second Advanced Graphite Creep (AGC) experiment (AGC-2) began with Advanced Test Reactor (ATR) Cycle 149A on April 12, 2011, and ended with ATR Cycle 151B on May 5, 2012. The purpose of this report is to qualify AGC-2 irradiation monitoring data following INL Management and Control Procedure 2691, Data Qualification. Data that are Qualified meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Data that do not meet the requirements are Failed . Some data may not quite meet the requirements, but may still provide some useable information. These data are labeled as Trend . No Trend data were identified for the AGC-2 experiment. All thermocouples functioned throughout the AGC-2 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Formulation of detailed consumables management models for the development (preoperational) period of advanced space transportation system. Volume 1: Detailed requirements for the mission planning processor

Detailed requirements for the mission planning processor are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. A quasi top-down approach was applied to the design of the mission planning processor. Interface requirements, input/output, and data base concepts were considered before computational processing. Existing analytical models were investigated for applicability before new models were developed. The mission planning processor was designed for an interactive system using demand terminals for input/outputdisplay and interfacing with an updateable mission data bank. The control and support routines provide the user interface, peripheral data handling, program control, and support functions required by the mission planning processor for execution on an interactive system. A description, interface requirements, definition of internal variables, listing of input data, processing flow diagram, and listing of output data are presented for each routine.

Connelly, L. C.↗

Strategies for converting to a DBMS environment

The conversion to data base management systems processing techniques consists of three different strategies - one for each of the major stages in the development process. Each strategy was chosen for its approach in bringing about a smooth evolutionary type transition from one mode of operation to the next. The initial strategy of the indoctrination stage consisted of: (1) providing maximum access to current administrative data as soon as possible; (2) select and developing small prototype systems; (3) establishing a user information center as a central focal point for user training and assistance; and (4) developing a training program for programmers, management and ad hoc users in DBMS application and utilization. Security, the rate of the data dictionary, and data base tuning and capacity planning, and the development of a change of attitude in an automated office are issues meriting consideration.

Durban, D. M.↗

The Lunar Mapping and Modeling Project Update

The Lunar Mapping and Modeling Project (LMMP) is managing the development of a suite of lunar mapping and modeling tools and data products that support lunar exploration activities, including the planning, design, development, test, and operations associated with crewed and/or robotic operations on the lunar surface. In addition, LMMP should prove to be a convenient and useful tool for scientific analysis and for education and public outreach (E/PO) activities. LMMP will utilize data predominately from the Lunar Reconnaissance Orbiter, but also historical and international lunar mission data (e.g. Lunar Prospector, Clementine, Apollo, Lunar Orbiter, Kaguya, and Chandrayaan-1) as available and appropriate. LMMP will provide such products as image mosaics, DEMs, hazard assessment maps, temperature maps, lighting maps and models, gravity models, and resource maps. We are working closely with the LRO team to prevent duplication of efforts and ensure the highest quality data products. A beta version of the LMMP software was released for limited distribution in December 2009, with the public release of version 1 expected in the Fall of 2010.

Noble, S.↗

Complete Decoding and Reporting of Aviation Routine Weather Reports (METARs)

Aviation Routine Weather Report (METAR) provides surface weather information at and around observation stations, including airport terminals. These weather observations are used by pilots for flight planning and by air traffic service providers for managing departure and arrival flights. The METARs are also an important source of weather data for Air Traffic Management (ATM) analysts and researchers at NASA and elsewhere. These researchers use METAR to correlate severe weather events with local or national air traffic actions that restrict air traffic, as one example. A METAR is made up of multiple groups of coded text, each with a specific standard coding format. These groups of coded text are located in two sections of a report: Body and Remarks. The coded text groups in a U.S. METAR are intended to follow the coding standards set by National Oceanic and Atmospheric Administration (NOAA). However, manual data entry and edits made by a human report observer may result in coded text elements that do not follow the standards, especially in the Remarks section. And contrary to the standards, some significant weather observations are noted only in the Remarks section and not in the Body section of the reports. While human readers can infer the intended meaning of non-standard coding of weather conditions, doing so with a computer program is far more challenging. However such programmatic pre-processing is necessary to enable efficient and faster database query when researchers need to perform any significant historical weather analysis. Therefore, to support such analysis, a computer algorithm was developed to identify groups of coded text anywhere in a report and to perform subsequent decoding in software. The algorithm considers common deviations from the standards and data entry mistakes made by observers. The implemented software code was tested to decode 12 million reports and the decoding process was able to completely interpret 99.93 of the reports. This document presents the deviations from the standards and the decoding algorithm. Storing all decoded data in a database allows users to quickly query a large amount of data and to perform data mining on the data. Users can specify complex query criteria not only on date or airport but also on weather condition. This document also describes the design of a database schema for storing the decoded data, and a Data Warehouse web application that allows users to perform reporting and analysis on the decoded data. Finally, this document presents a case study correlating dust storms reported in METARs from the Phoenix International airport with Ground Stops issued by Air Route Traffic Control Centers (ATCSCC). Blowing widespread dust is one of the weather conditions when dust storm occurs. By querying the database, 294 METARs were found to report blowing widespread dust at the Phoenix airport and 41 of them reported such condition only in the Remarks section of the reports. When METAR is a data source for an ATM research, it is important to include weather conditions not only from the Body section but also from the Remarks section of METARs.

METAR Decoder/Parser↗

Implementation and evaluation of a radiological field investigation for real property interests associated with the FUSRAP Maywood Site - 15611

Public streets, easements, and rights-of-way, collectively referred to as Real Property Interests (RPI), pose challenging and complex problems for the FUSRAP Maywood Project Team. RPIs are components of a multi-faceted objective to evaluate all remaining sources of contamination for which the Government is responsible under the Maywood Record of Decision. USACE designed and implemented a MARSSIM-based radiological investigation within sixteen potentially impacted RPIs. These RPIs were not completely addressed on their own or in conjunction with nearby property investigations or remediations. However, these RPIs were investigated based on the potential for or known impact of FMSS contamination as determined through both a historic data review of the transport mechanism (downstream waste deposition) and process knowledge obtained during Final Status Survey of proximal properties. The primary objectives of this investigation were to confirm the presence or absence of FUSRAP contamination within a given RPI, provide sufficient data to release an RPI if contamination was not encountered, and provide sufficient data for either design of an appropriate remedial solution or implementation of Land Use Controls when contamination was encountered. Of additional value, knowledge gained during the RPI investigations will allow the team to share useful radiological data with local officials and utility service providers. This information will support better, more informed decisions by all parties involved in situations such as emergency subsurface utility repairs, roadway improvement planning, or even natural disaster response. Finally, certain unexpected outcomes learned during the final data analysis may lead to refinement of the conceptual site model. Logistical lessons learned and challenges encountered during the Maywood investigation may also be helpful to stakeholders, planners, and managers of similar projects wishing to identify their own potential liability within public streets, easements, rights-of-way, and other types of RPIs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Vision for Coupling Operation of US Fusion Facilities with HPC Systems and the Implications for Workflows and Data Management

The operation of large US Department of Energy (DOE) research facilities, like the DIII-D National Fusion Facility, results in the collection of complex multi-dimensional scientific datasets, both experimental and model-generated. In the future, it is envisioned that integrated data analysis coupled with large-scale high performance computing (HPC) simulations will be used to improve experimental planning and operation. Practically, massive data sets from these simulations provide the physics basis for generation of both reduced semi-analytic and machine-learning-based models. Storage of both HPC simulation datasets (generated from US DOE leadership computing facilities) and experimental datasets presents significant challenges. In this paper, we present a vision for a DOE-wide data management workflow that integrates US DOE fusion facilities with leadership computing facilities. Data persistence and long-term availability beyond the length of allocated projects is essential, particularly for verification and recalibration of artificial intelligence and machine learning (AI/ML) models. Because these data sets are often generated and shared among hundreds of users across multiple leadership computing facility centers, they would benefit from cross-platform accessibility, persistent identifiers (e.g. DOI, or digital object identifier), and provenance tracking. Here, the ability to handle different data access patterns suggests that a combination of low cost, high latency (e.g. for storing ML training sets) and high cost, low latency systems (e.g. for real-time, integrated machine control feedback) may be needed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ENRESA's Spent Nuclear Fuel and Special Waste Database - 18115

Empresa Nacional de Residuos Radiactivos S.A. (ENRESA, by its initials in Spanish) Spent Nuclear Fuel (SNF) and Special Waste (SW) database development was initiated in a common effort between ENRESA and UNESA (the Spanish Association of the Electricity Industry) as a consequence of new regulatory requirements in the frame of radioactive waste management plans. Although these requirements were only mandatory for operators of nuclear power plants, ENRESA deemed necessary to have a centralized database which collected the data from the plant operators. The most relevant features of this database are: - The information collected covers not only the general characteristics of the SNF and SW but also the operation details needed for their characterization. - An application, named Gestion de Elementos Combustibles y Residuos Especiales (GECYRE, by its initials in Spanish) has been implemented for easing the queries and the generation of predefined reports. - An agile data transfer scheme, based on XML files, is used for an effective communication between ENRESA and the operators. The database is currently in production phase since 2014. During this phase it has demonstrated its effectiveness as an information repository to address the SNF and SW interim storage projects in Spain foreseen in the near future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OECD MCCI project long-term 2-D molten core concrete interaction test design report, Rev. 0. September 30, 2002.

The Melt Attack and Coolability Experiments (MACE) program at Argonne National Laboratory addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following two technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and (2) address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two objectives will demonstrate the efficacy of severe accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants. In terms of the first program objective, the Small-Scale Water Ingression and Crust Strength (SSWICS) test series has been initiated to provide fundamental information on the ability of water to ingress into cracks and fissures that form in the debris during quench, thereby augmenting the otherwise conduction-limited heat transfer process. A test plan for Melt Eruption Separate Effects Tests (MESET) has also been developed to provide information on the extent of crust growth and melt eruptions as a function of gas sparging rate under well-controlled experiment conditions. In terms of the second program objective, the project Management Board (MB) has approved startup activities required to carry out experiments to address remaining uncertainties related to long-term two-dimensional molten core-concrete interaction. In particular, for both wet and dry cavity conditions, there is uncertainty insofar as evaluating the lateral vs. axial power split during a core-concrete interaction due to a lack of experiment data. As a result, there are differences in the 2-D cavity erosion predicted by codes such as MELCOR, WECHSL, and COSACO. The first step towards generating this data is to produce a test plan for review by the Project Review Group (PRG). The purpose of this document is to provide this plan.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

2D Seismic Reflection Data across Central Illinois

In a continuing collaboration with the Midwest Geologic Sequestration Consortium (MGSC) on the Evaluation of the Carbon Sequestration Potential of the Cambro-Ordovician Strata of the Illinois and Michigan Basins project, Schlumberger Carbon Services and WesternGeco acquired two-dimensional (2D) seismic data in the Illinois Basin. This work included the design, acquisition and processing of approximately 125 miles of (2D) seismic reflection surveys running west to east in the central Illinois Basin. Schlumberger Carbon Services and WesternGeco oversaw the management of the field operations (including a pre-shoot planning, mobilization, acquisition and de-mobilization of the field personnel and equipment), procurement of the necessary permits to conduct the survey, post-shoot closure, processing of the raw data, and provided expert consultation as needed in the interpretation of the delivered product. Three 2D seismic lines were acquired across central Illinois during November and December 2010 and January 2011. Traversing the Illinois Basin, this 2D seismic survey was designed to image the stratigraphy of the Cambro-Ordovician sections and also to discern the basement topography. Prior to this survey, there were no regionally extensive 2D seismic data spanning this section of the Illinois Basin. Between the NW side of Morgan County and northwestern border of Douglas County, these seismic lines ran through very rural portions of the state. Starting in Morgan County, Line 101 was the longest at 93 miles in length and ended NE of Decatur, Illinois. Line 501 ran W-E from the Illinois Basin – Decatur Project (IBDP) site to northwestern Douglas County and was 25 miles in length. Line 601 was the shortest and ran N-S past the IBDP site and connected lines 101 and 501. All three lines are correlated to well logs at the IBDP site. Originally processed in 2011, the 2D seismic profiles exhibited a degradation of signal quality below ~400 millisecond (ms) which made interpretation of the Mt. Simon and Knox sections difficult. The data quality also gradually decreased moving westward across the state. To meet evolving project objectives, in 2012 the seismic data was re-processed using different techniques to enhance the signal quality thereby rendering a more coherent seismic profile for interpreters. It is believed that the seismic degradation could be caused by shallow natural gas deposits and Quaternary sediments (which include abandoned river and stream channels, former ponds, and swamps with peat deposits) that may have complicated or changed the seismic wavelet. Where previously limited by seismic coverage, the seismic profiles have provided valuable subsurface information across central Illinois. Some of the interpretations based on this survey included, but are not limited to: - Stratigraphy generally gently dips to the east from Morgan to Douglas County. - The Knox Supergroup roughly maintains its thickness. There is little evidence for faulting in the Knox. However, at least one resolvable fault penetrates the entire Knox section. - The Eau Claire Formation, the primary seal for the Mt. Simon Sandstone, appears to be continuous across the entire seismic profile. - The Mt. Simon Sandstone thins towards the western edge of the basin. As a result, the highly porous lowermost Mt. Simon section is absent in the western part of the state. - Overall basement dip is from west to east. - Basement topography shows evidence of basement highs with on-lapping patterns by Mt. Simon sediments. - There is evidence of faults within the lower Mt. Simon Sandstone and basement rock that are contemporaneous with Mt. Simon Sandstone deposition. These faults are not active and do not penetrate the Eau Claire Shale. It is believed that these faults are associated with a possible failed rifting event 750 to 560 million years ago during the breakup of the supercontinent Rodinia.

Smith, Valerie↗

BNL NCSP Succession Planning Efforts in FY 2020

This document fulfills a technical support element milestone (TS6:Q4) given in the Five-Year Plan. This document describes BNL succession planning efforts in FY-2020 for the Nuclear Data task area.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Final Draft of RACER Audit

This document describes the approach Waste and Environmental Services - Environmental Data and Analysis plans to take to resolve the issues presented in a recent audit of the WES-EDA Environmental Database relative to the RACER database. A majority of the issues discovered in the audit will be resolved in May 2011 when the WES-EDA Environmental Database, along with other LANL databases, are integrated and moved to a new vendor providing an Environmental Information Management (EIM) system that allows reporting capabilities for all users directly from the database. The EIM system will reside in a publicly accessible LANL cloud-based software system. When this transition occurs, the data quality, completeness, and access will change significantly. In the remainder of this document, this new structure will be referred to as the LANL Cloud System In general, our plan is to address the issues brought up in this audit in three ways: (1) Data quality issues such as units and detection status, which impinge upon data usability, will be resolved as soon possible so that data quality is maintained. (2) Issues requiring data cleanup, such as look up tables, legacy data, locations, codes, and significant data discrepancies, will be addressed as resources permit. (3) Issues associated with data feed problems will be eliminated by the LANL Cloud System, because there will be no data feed. As discussed in the paragraph above, in the future the data will reside in a publicly accessible system. Note that report writers may choose to convert, adapt, or simplify the information they receive officially through our data base, thereby introducing data discrepancies between the data base and the public report. It is not always possible to incorporate and/or correct these errors when they occur. Issues in the audit will be discussed in the order in which they are presented in the audit report. Clarifications will also be noted as the audit report was a draft document, at the time of this response.

AUDITS↗