Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Sustainability of water uses in managed hydrosystems: human- and climate-induced changes for the mid-21st century

This paper assesses the sustainability of planned water uses in mesoscale river basins under multiple climate change scenarios, and contributes to determining the possible causes of unsustainability. We propose an assessment grounded in real-world water management issues, with water management scenarios built in collaboration with local water agencies. Furthermore, we present an analysis through indicators that relate to management goals and present the implications of climate uncertainty for our results, furthering the significance of our study for water management. A modeling framework integrating hydro-climatic and human dynamics and accounting for interactions between resource and demand was applied in two basins of different scales and with contrasting water uses: the Herault (2500 km 2 , France) and the Ebro (85 000 km 2 , Spain) basins. Natural streamflow was evaluated using a conceptual hydrological model. A demand-driven reservoir management model was designed to account for streamflow regulations from the main dams. Human water demand was estimated from time series of demographic, socioeconomic and climatic data. Environmental flows were accounted for by defining streamflow thresholds under which withdrawals were strictly limited. Finally indicators comparing water availability to demand at strategic resource and demand nodes were computed. This framework was applied under different combinations of climatic and water use scenarios for the mid-21st to differentiate the impacts of climate- and human-induced changes on streamflow and water balance. Results showed that objective monthly environmental flows would be guaranteed in current climate conditions in both basins, yet in several areas this could imply limiting human water uses more than once every 5 years. The impact of the tested climate projections on both water availability and demand could question the water allocations and environmental requirements currently planned for the coming decades. Water shortages for human use could become more frequent and intense, and the pressure on water resources and aquatic ecosystems could intensify. Furthermore, the causes of unsustainability vary across sub-basins and scenarios, and in most areas results are highly dependent on the climate change scenario.

54 ENVIRONMENTAL SCIENCES↗

Interfacing Space Communications and Navigation Network Simulation with Distributed System Integration Laboratories (DSIL)

NASA's planned Lunar missions will involve multiple NASA centers where each participating center has a specific role and specialization. In this vision, the Constellation program (CxP)'s Distributed System Integration Laboratories (DSIL) architecture consist of multiple System Integration Labs (SILs), with simulators, emulators, testlabs and control centers interacting with each other over a broadband network to perform test and verification for mission scenarios. To support the end-to-end simulation and emulation effort of NASA' exploration initiatives, different NASA centers are interconnected to participate in distributed simulations. Currently, DSIL has interconnections among the following NASA centers: Johnson Space Center (JSC), Kennedy Space Center (KSC), Marshall Space Flight Center (MSFC) and Jet Propulsion Laboratory (JPL). Through interconnections and interactions among different NASA centers, critical resources and data can be shared, while independent simulations can be performed simultaneously at different NASA locations, to effectively utilize the simulation and emulation capabilities at each center. Furthermore, the development of DSIL can maximally leverage the existing project simulation and testing plans. In this work, we describe the specific role and development activities at JPL for Space Communications and Navigation Network (SCaN) simulator using the Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) tool to simulate communications effects among mission assets. Using MACHETE, different space network configurations among spacecrafts and ground systems of various parameter sets can be simulated. Data that is necessary for tracking, navigation, and guidance of spacecrafts such as Crew Exploration Vehicle (CEV), Crew Launch Vehicle (CLV), and Lunar Relay Satellite (LRS) and orbit calculation data are disseminated to different NASA centers and updated periodically using the High Level Architecture (HLA). In addition, the performance of DSIL under different traffic loads with different mix of data and priorities are evaluated.

Traffic Measuring and Monitoring↗

California-Wyoming Grid Integration Study: Phase 1—Economic Analysis

This study presents a comparative analysis of two different renewable energy options for the California energy market between 2017 and 2020: 12,000 GWh per year from new California in-state renewable energy resources; and 12,000 GWh per year from Wyoming wind delivered to the California marketplace. Either option would add to the California resources already existing or under construction, theoretically providing the last measure of power needed to meet (or to slightly exceed) the state's 33% renewable portfolio standard. Both options have discretely measurable differences in transmission costs, capital costs (due to the enabling of different generation portfolios), capacity values, and production costs. The purpose of this study is to compare and contrast the two different options to provide additional insight for future planning.

17 WIND ENERGY↗

Characterizing Sierra Nevada Snowpack Using Variable-Resolution CESM

The location, timing, and intermittency of precipitation in California make the state integrally reliant on winter-season snowpack accumulation to maintain its economic and agricultural livelihood. Of particular concern is that winter-season snowpack has shown a net decline across the western United States over the past 50 years, resulting in major uncertainty in water-resource management heading into the next century. Cutting-edge tools are available to help navigate and preemptively plan for these uncertainties. This paper uses a next-generation modeling technique-variable-resolution global climate modeling within the Community Earth System Model (VR-CESM)-at horizontal resolutions of 0.125° (14 km) and 0.25° (28 km). VR-CESM provides the means to include dynamically large-scale atmosphere-ocean drivers, to limit model bias, and to provide more accurate representations of regional topography while doing so in a more computationally efficient manner than can be achieved with conventional general circulation models. This paper validates VR-CESM at climatological and seasonal time scales for Sierra Nevada snowpack metrics by comparing them with the "Daymet," "Cal-Adapt," NARR, NCEP, and North American Land Data Assimilation System (NLDAS) reanalysis datasets, the MODIS remote sensing dataset, the SNOTEL observational dataset, a standard-practice global climate model (CESM), and a regional climate model (WRF Model) dataset. Overall, given California's complex terrain and intermittent precipitation and that both of the VR-CESM simulations were only constrained by prescribed sea surface temperatures and data on sea ice extent, a 0.68 centered Pearson product-moment correlation, a negative mean SWE bias of < 7 mm, an interquartile range well within the values exhibited in the reanalysis datasets, and a mean December-February extent of snow cover that is within 7% of the expected MODIS value together make apparent the efficacy of the VR-CESM framework.

54 ENVIRONMENTAL SCIENCES↗

Unified Universal Control and Coordination of Inverter-Based Resources, and Validation for a PV + Battery Hybrid Plant

As renewable energy deployment grows, hybrid power plants (HPPs) combining photovoltaic (PV) and battery systems must evolve to offer both energy and grid stability services. These systems typically include a mix of grid-following (GFL) and grid-forming (GFM) inverters, presenting unique coordination and control challenges. This Department of Energy–funded project developed and validated a Unified Universal Control and Coordination (UUCC) framework for such PV + battery hybrid plants, enabling seamless and stable operation, including ultrafast black start, autonomous synchronization, and robust frequency and voltage regulation, under different grid conditions. The project significantly advanced the understanding of inverter-based resource (IBR) control by developing and validating three complementary system-level approaches for hybrid GFL/GFM operation: 1. A combined Virtual Resistance (VR)-based GFL and Virtual Oscillator Control (VOC)-based GFM method, where each inverter type is governed by a specialized control strategy. Together, these achieve stable, fast-response coordination, eliminating inrush current and enabling smooth black start and grid synchronization across a wide range of grid strengths. 2. A Deadbeat-based UUCC strategy, which uses discrete-time, switching-cycle-level control for both GFL and GFM inverters. This approach replaces traditional PI/PLL control with a control parameter-free, high-bandwidth framework that supports stable LVRT and instantaneous synchronization under all conditions. 3. A benchmark comparison with Siemens’ commercial GFM microgrid controller, which provided a fast baseline platform. The commercial approach decoupled v & f control was implemented on a commercial microgrid controller.The baseline commercial benchmark helped highlight superior transient response and black start performance offered by the deadbeat and VOC approaches. These technical contributions offer substantial improvements over conventional inverter control schemes, which often rely on slow phase-locked loop (PLL)-based synchronization, require careful control parameters tuning, and prone to unstable in weak grids with GFL inverters and in stiff grid with GFM inverters therefore challenging for hybrid GFL+GFM under all grid conditions. The deadbeat-based UUCC framework enables simpler, faster, and more robust operation of hybrid IBR systems using wide-bandgap (WBG) devices such as SiC power semiconductors. The rapid expansion of hybrid distributed energy resources (DERs), including residential and commercial PV-BESS installations such as Tesla Powerwall, PV with vehicle-to-grid (V2G) capability, and other integrated configurations, presents complex operational challenges for medium-voltage radial distribution feeders. These networks are subject to frequent disturbances such as faults, switching operations, rapid reclosing sequences, and feeder reconfigurations, all of which introduce dynamic stress on IBRs. In addition, planned feeder segmentation and deliberate islanding for resilience will require DERs that can autonomously perform blackstart, establish voltage and frequency references, and resynchronize with the main grid. The advanced deadbeat-based UUCC control and blackstart functionalities developed in this project directly address these requirements, enabling decentralized and autonomous operation of inverter-dominated DERs in distribution systems under a wide range of fault and reconfiguration scenarios. From a public benefit perspective, these innovations enable more reliable and cost-effective integration of renewable energy into distribution networks. The ability to autonomously black start and stabilize grids under varying grid conditions support accelerates recovery from outages and support decentralized resilient energy systems. By reducing system complexity and improving performance, this project lays critical groundwork for future inverter-dominated power grids that are clean, reliable, and accessible to all.

14 SOLAR ENERGY↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Medical Risk Estimates and Clinical Capability Needs for A Long Duration Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

W Thompson↗

Medical Risk Estimates and Clinical Capability Needs for a Late Artemis Mission

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. DISCUSSION: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for an extended duration Artemis mission of approximately 9 months, with phases including outbound transit, 3 months on the Lunar Gateway space station, 3 months on the Lunar surface with EVAs, 3 months on Gateway (simulating the return phase of a Mars mission), and transit back to Earth. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care –RTDC), and an estimate of crew time list due to medical conditions (Task Time Lost –TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk.

A Anderson↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

JISEA Annual Meeting: Clean Energy for Oil and Gas Topic Table

Presentation on clean energy for oil and gas topic discussion table at the 2022 JISEA annual meeting. Many refineries may have wind and solar resources and clean energy technology costs are declining. JISEA created an oil and gas consortium including Baker Hughes, Conoco Phillips, Extraction Oil & Gas, INGAA Foundation, and Kinder Morgan to explore potential pathways for integrating clean energy into oil and gas operations. This presentation goes over JISEA case studies that demonstrate reliable and affordable clean power for oil and gas operations. JISEA used the REopt Energy Planning Platform and evaluated several potential future scenarios.

clean energy↗

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Grid Architecture Mapping to Understand Transformation (GAMUT): Concept Definition

The electric power system is undergoing significant transformation driven by changes in the generation mix, increasing reliance on information and communication technologies, evolving customer expectations, and a dynamic cyber-physical environment. To address these challenges, substantial investments will be made over the next decade to create a flexible, affordable, secure, reliable, and resilient electric system. In response, the U.S. Department of Energy's Office of Electricity is developing knowledge management tools aimed at systematically documenting technology pilots and demonstration projects. This initiative seeks to improve understanding of operating contexts, planning steps, and integration requirements for innovative grid technologies. The Department of Energy project leverages Grid Architecture principles to collect and organize insights into the interdependencies, requirements, and capabilities of various grid solutions. By employing a systematic approach, the project aims to perform a feasibility study for the development of a software tool that will support stakeholders, including regulators, transmission and distribution system operators, distributed energy resources aggregators, and technology providers. By offering a systematic, software-based framework to document technologies, understand their benefits and impacts, and inform deployment strategies, the proposed Grid Architecture Mapping to Understand Transformation (GAMUT) Tool is intended to reduce costs, enhance decision-making, and facilitate scaling and effective deployment of new technologies. The feasibility study will evaluate the technical and financial viability of the GAMUT Tool, identifying stakeholder needs and assessing risks and mitigation strategies. Ultimately, the GAMUT team aims to develop an initial minimal viable product, followed by staged improvements, to aid in the modernization of the electric grid, contributing to a more sustainable and resilient energy future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Information Management System for the California State Water Resources Control Board (SWRCB)

A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

Heald, T. C.↗

Strategic Planning for Energy-Resilient Communities

Distributed energy resources (DERs) offer flexibility and community benefits in both blue- and black-sky conditions. Outside of a power disruption, they can provide significant cost savings and reduce grid stress during times of high demand. During a disruption to the central grid, these technologies can meet critical energy needs through the use of battery storage. However, communities must consider many planning and design dimensions and tradeoffs to integrate energy systems that meet financial and resilience goals. This presentation, given at the 2026 State Energy Conference of North Carolina, defines resilience in an energy context, discusses strategies and best practices for planning resilient energy systems and sites, including resilience hubs and microgrids, highlights NLR tools and capabilities for helping communities in this space, and features successful case studies in North Carolina related to energy resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Task-level control for autonomous robots

Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.

Simmons, Reid↗

Space facilities: Meeting future needs for research, development, and operations

The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

Source record↗

Integrated Medical Model Project - Overview and Summary of Historical Application

Introduction: The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project. Methods: Figure 1 [see document] illustrates the IMM modeling system and scenario process. As illustrated, the IMM computational architecture is based on Probabilistic Risk Assessment techniques. Nineteen assumptions and limitations define the IMM application domain. Scenario definitions include crew medical attributes and mission specific details. The IMM forecasts probabilities of loss of crew life (LOCL), evacuation (EVAC), quality time lost during the mission, number of medical resources utilized and the number and type of medical events by combining scenario information with in-flight, analog, and terrestrial medical information stored in the iMED. In addition, the metrics provide the integrated information necessary to estimate optimized in-flight medical kit contents under constraints of mass and volume or acceptable level of mission risk. Results and Conclusions: Historically, IMM simulations support Science and Technology planning, Exploration mission planning, and ISS program operations by supplying simulation support, iMED data information, and subject matter expertise to Crew Health and Safety and the HRP. Upcoming release of IMM version 4.0 seeks to provide enhanced functionality to increase the quality of risk decisions made using the IMM through a more accurate representation of the real world system.

Myers, J.↗

Report of a workshop on nuclear power growth and nonproliferation held at the Woodrow Wilson international center for scholars, Washington, DC, April 21, 2010

The workshop addressed the future of nuclear power and nonproliferation in light of global nuclear energy developments, changing US policy and growing concerns about nuclear proliferation and terrorism. The discussion reflected wide agreement on the need for nuclear power, the necessity of mitigating any proliferation and terrorism risks and support for international cooperation on solutions. There were considerable differences on the nature and extent of the risks of differing fuel cycle choices. There was some skepticism about the prospects for a global nuclear energy renaissance, but there was a recognition that nuclear power would expand somewhat in the decades ahead with some states expanding capacity dramatically (e.g., China) and at least a few new states developing nuclear power programs. It was also argued by some participants that under the right conditions, a genuine renaissance could occur some decades from now. The prospects for a dramatic growth in nuclear power will depend on the ability of governments and industry to address these concerns, including the effectiveness of, and the resources devoted to, plans to develop and implement technologies and approaches that strengthen nonproliferation, nuclear materials accountability and nuclear security Several participants noted that the United States will not be able to continue to lead global nonproliferation efforts and to shape the growth of nuclear power as well as the global environment and energy debates without a robust US nuclear energy program. Some participants argued that fully integrating nuclear energy growth and nonproliferation, proliferation resistance and physical protection objectives was possible. The growing consensus on these objectives and the growing concern about the potential impact of further proliferation on the industry was one reason for optimism. The Blue Ribbon commission led by Scowcroft and Hamilton was seen as going far beyond the need to find an alternative to Yucca Mountain, and the preeminent forum in the next years to address the back end of the fuel cycle and other issues. Some argued that addressing these issues is the critical missing element, or the final piece of the puzzle to ensure the benefits of nuclear power and to promote nonproliferation. In this context, many argued that R&D on closed as well as open fuel cycle options in order to ensure a suite of long-term options was essential.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗