Comment on "Beamstrahlung consideration in laser-plasma-accelerator-based linear colliders".
Abstract Not Provided
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
Abstract Not Provided
Purpose: Use of high density concrete for radiation shielding is increasing, trading cost for space savings associated with the reduced tenth value layer (TVL). Precise information on the attenuation properties of high-density concretes is not readily present in the literature. A simple approximation is to scale the TVLs from NCRP 151 according relative increase in density. Here we present measured TVLs for heavy concretes of various densities using a built-in shielding test port. Methods: Concrete densities tested range from 2.35 g cc{sup −1} (147 pcf) to 5.6 g cc{sup −1} (350 pcf). Measurements were taken using 6MV, 6FFF, and 10FFF on a Varian Truebeam linear accelerator. Field sizes of 4x4, 9x9 and 30x30 cm{sup 2} were measured. A PTW 31013 Farmer chamber with a buildup cap was positioned 5.5 m from isocenter along the beam CAX. Concrete thicknesses were incremented in 5 cm intervals. Comparison TVLs were determined by scaling the NCRP 151 TVLs by the density ratio between the sample and standard density. Results: The trend from the first to equilibrium TVL was an increase in thickness, compared with MC modeling, which predicted a decrease. Measured TVLs for 6 MV were reduced by as much as 8.9 cm for TVL{sub 1} and 3.4 cm for TVL{sub E} compared to values scaled from NCRP 151. There was 1–3 mm difference in TVL between measurements done at 4x4 versus 30x30 cm{sup 2}. TVL{sub 1} for 6FFF was 1.1 cm smaller than TVL{sub 1} for 6MV, but TVL{sub E} was consistent to within 4 mm. TVL{sub 1} and TVL{sub E} for 10FFF were reduced by 8.8 and 3.7 cm from scaled NCRP values, respectively. Conclusions: We have measured the TVL thicknesses for various concretes. Simple density scaling of the values in NCRP 151 is a conservatively safe approximation, but actual TVLs may be reduced enough to eliminate some of the expense of installation. Daniel Harrell and Jim Noller are employees of Shielding Construction Solutions, Inc, the shielding construction company that built the vault discussed in this abstract. Manjit Chopra is an employee of Universal Minerals International, Inc, the company that provided the aggregates for the high density concretes used in the vault construction.
Results are presented from numerical particle simulations of the transport and acceleration of a high-current tubular ion beam through one to five magnetically insulated accelerating gaps. The ion beam is neutralized by an accompanying electron beam. The possibility of transporting a high-current neutralized ion beam through five cusps is demonstrated. It is shown that the quality of the distribution function of a high-current ion beam at the exit from the accelerator can be substantially improved by optimizing the energy of the neutralizing electron beam. It is also shown that, by injecting additional high-current electron beams into the cusps, the accelerated ion beam can be made more monoenergetic and its divergence can be reduced.
The goal of this task was to provide reliable means, either via direct RF measurements and/or 3D simulations, of assessing the transverse impedance of an accelerating gap in a linear accelerator cell.
It has been proposed to use solid-state pulsed-power modules to power the new Scorpius accelerator. Since this highcurrent accelerator would have 360 gaps (more than five times the number of cells as present radiography LIAs), it is natural to be concerned about the beam-breakup (BBU) instability. Earlier calculations of this effect used a half-scale model of the accelerator to avoid the limitation to 200 gaps in the code. We have now updated the code to accommodate the extraordinary number of gaps in this proposed LIA. The results of these early simulations are presented here. They indicate that BBU can only be suppressed to the same level as in designs powered by conventional pulsed power, if the calculated cell impedance can truly be achieved in practice. The magnetic focusing field required for this is of the same order as the field required for a conventionally powered LIA only if the transverse impedance can indeed be constrained to the values obtained in some simulations of the cell.
This is for the IEEE ICOPS 2021 Virtual Conference, scheduled for September 12-16, 2021. Michael Weller will be giving a virtual talk. Website found here: http://ece-events.unm.edu/icops2021/index.html
As previously described, we have built a non-interceptive beam radius monitor that employs a diamagnetic loop. This device has been installed and tested with beam on the DARHT-I downstream transport. Installation details and sample test results are given in this report.
Conference: 14th International Particle Accelerator Conference Date: May 7th-12th, 2023 Location: Lido di Venezia, Italy Presenter: Evan R Scott
A possible application of the HTS (ReBCO) rapid-cycling dipole magnet [1] in the first stages of muon acceleration consisting of Recirculating Linear Accelerator (RLA) and followed-up first Rapid Cycling Synchrotron (RCS-1) is presented. The projected ReBCO magnet hysteresis loss is discussed in terms of the liquid helium coolant choice and the option with the striated ReBCO conductor for the further significant reduction of the hysteresis power loss.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Magnetospheric instabilities and transition to plasma turbulence in Hall current accelerators
Coherent oscillations and Hall currents observed in plasma accelerator with electrostatic probe
No abstract available
A calibration system and method utilizes acceleration of a mass to generate a force on the mass. An expected value of the force is calculated based on the magnitude and acceleration of the mass. A fixture is utilized to mount the mass to a force balance, and the force balance is calibrated to provide a reading consistent with the expected force determined for a given acceleration. The acceleration can be varied to provide different expected forces, and the force balance can be calibrated for different applied forces. The acceleration may result from linear acceleration of the mass or rotational movement of the mass.
We describe the operation and commissioning of the Jefferson Lab UV FEL using a CW SRF ERL driver. Based on the same 135 MeV linear accelerator as the Jefferson Lab 10 kW IR Upgrade FEL, the UV driver ERL uses a bypass geometry to provide transverse phase space control, bunch length compression, and nonlinear aberration compensation necessitating a unique set of commissioning and operational procedures. Additionally, a novel technique to initiate lasing is described. To meet these constraints and accommodate a challenging installation schedule, we adopted a staged commissioning plan with alternating installation and operation periods. This report addresses these issues and presents operational results from on-going beam operations.