Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Repository”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Treatment of Irradiated Graphite to meet Acceptance Criteria for Waste Disposal: A New IAEA Collaborative Research Program - 12443

World-wide, more than 250,000 tonnes of irradiated graphite have arisen through commercial nuclear-power operations and from military production reactors. Whilst most nations responsible for the generation of this material have in mind repository disposal alongside other radwaste, the lack of progress in this regard has led in some cases to difficulties where, for example, the site of an existing graphite-moderated reactor is required for re-utilisation. In any case, graphite as a radwaste stream has unique chemical and physical properties which may lend itself to more radical and innovative treatment and disposal options, including the recovery of useful isotopes and also recycling within the nuclear industry. Such aspects are important in making the case for future graphite-moderated reactor options (for example, High-Temperature Reactors planned for simultaneous power production and high-grade heat sources for such applications as hydrogen production for road fuel). A number of initiatives have taken place since the mid 1990s aimed at exploring such alternative strategies and, more recently, improving technology offers new options at all stages of the dismantling and disposal process. A new IAEA Collaborative Research Program aims to build upon the work already done and the knowledge achieved, in order to identify the risks and uncertainties associated with alternative options for graphite disposal, along with cost comparisons, thus enabling individual Member States to have the best-available information at their disposal to configure their own programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The criticality safety program of the Swedish nuclear fuel and waste management Co (SKB)

SKB is co-owned by the owners of the Swedish nuclear power plants (NPP) and is responsible for the back-end of all Swedish spent nuclear fuel and radioactive waste from the Swedish nuclear program. The responsibility starts from when the fuel leaves the NPP and ends at the planned final repository. That means that SKB has the responsible for the safety at the intermediate pool storage (Clab), the encapsulation plant (Clink), the Spent Fuel Repository and the transportation between these sites. In March 2011 SKB applied to the Swedish Radiation Safety Authority (SSM) for a permit to build a final repository for spent fuel and an encapsulation plant (Clink). The application contained a criticality safety analysis for the canisters to be used in Clink and the copper canister to be used in the final repository. In 2012 SSM requested several complements to the criticality safety analysis in the application and about the same time they also required Clab to modernise the Safety Analysis Report. Our owners (the NPPs) had also requested SKB to take care of higher enrichments and higher burnup fuel. A prerequisite to meet this was extended Burnable Absorber credit (peak reactivity) and Burn-up credit. Up to this stage SKB had relied heavily on consultants to do criticality safety analysis and had no specific criticality safety program or methodology. However it was now evident to SKB that we needed to take an overall view on the criticality safety area and not only lift the quality of the actual criticality analysis but also to handle organisational and competence issues. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Use of generic and site-specific underground research laboratories to support siting, design, and safety assessment - 15417

Under the auspices of the International Atomic Energy Agency (IAEA), nationally developed underground research laboratories (URLs) and associated research institutions are being offered for use by other nations. These facilities form an Underground Research Facilities (URF) Network for training in and demonstration of waste disposal technologies and the sharing of knowledge and experience related to geologic repository development, research, and engineering. In order to achieve its objectives, the URF Network regularly sponsors workshops and training events related to the knowledge base that is transferable between existing URL programs and to nations with an interest in developing a new URL. Toward that end, a three-day workshop was held in Albuquerque, New Mexico in October 2014 to identify and compare the understanding of URF Network members on the place and role of generic and site-specific URLs in the overall, iterative geological disposal development process, including repository siting, design, and post-closure safety assessment. Attention was also given to the need for URLs in salt host rock, since there is currently no such facility in operation in the world. This paper describes some of the outcomes of the workshop in the context of the general timeline for repository development and the evolving role of research, development, and demonstration (RD and D) activities in URLs. Of particular interest is the relationship between technology maturity, as measured by technology readiness level (TRL), and the stages or milestones in the repository development timeline. The long history of RD and D in worldwide URLs (> 40 years) can be argued to be the primary reason that nuclear waste disposal systems are currently at a high level of maturity. One of the key recommendations from the workshop was that an international, easily accessible knowledge base should soon be established to avoid the loss of important experiences and information obtained from existing and closed URLs. It was also recognized that a new generic URL in salt host rock would provide a number of benefits, but one should not be initiated until a national program specifically decides to site its repository in salt. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The French Programme A development plan for a geological repository for high level and long-lived waste

On completion of the research required under the Waste Act of 30 December 1991, the 'Dossier 2005 Argile' submitted by ANDRA concluded that high-level and intermediate-level long-lived waste (HLW) geological disposal in the Callovo-Oxfordian clay formation is basically feasible. During 2005 this report received several assessments the conclusions of which were reported during January and February 2006: (i) the global scientific and technical report of the National Review Board (CNE), (ii) the opinion of the Nuclear Safety Authority (ASN), (iii) the report of the International Review Team conducted in the framework of an International Peer Review under the aegis of the Nuclear Energy Agency of the OECD at the request of Andra's supervisory ministries (Industry and Research). On the basis of all these elements, the results of other ways of research set up in 1991, and the reports of the public debate on management of radioactive waste, a Planning Act on sustainable waste management was publicised on 28 June 2006 (Act no. 2006-739). This Act stipulates that 'after surface storage, the ultimate radioactive waste that, for reasons of nuclear safety and radiological protection, cannot be disposed of above ground or at limited depth, shall be disposed of in a deep geological repository'. It also confers on ANDRA the task of 'conducting or contracting research and studies on storage and deep geological disposal and coordinating this research'. With regard to the reversible deep geological disposal, the Act states that 'appropriate studies and research shall be conducted for siting and designing a waste disposal facility so that on obtaining the study results, the licence application provided for can be examined in 2015, and if this licence is granted, the facility can be commissioned in 2025. The purpose of the development plan which main tasks are introduced in this paper is to present Andra's research and study strategy for meeting the objectives of the Planning Act concerning disposal of HLW. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

'A Good Decision Is Based On Information, Not On Numbers' - A Process For National Strategic Decision Making - 17203

Waste management decision making is the process used by waste owners to determine and justify choices in across the lifecycle of a waste (from the manner of generation or retrieval to final disposition). In the UK, waste owners in the nuclear industry are obligated, by their environmental permits and authorisations, to demonstrate the application of robust and well-underpinned decision making processes for waste management. This is captured through the requirement for waste owners to demonstrate the identification and implementation of Best Available Technique (BAT). The National Waste Programme (NWP), led by LLW Repository Ltd, is a UK wide programme which leads the implementation of the UK National Strategy for the management of solid LLW from the nuclear industry [1] and which aims to deliver a self-sustaining culture for optimised management of Low Level Waste (LLW) in the UK. Recognising the requirement on waste owners, the NWP has - in conjunction with appointed contractors - led the development and publication of national strategic optioneering studies (so-called national strategic BAT studies) to support waste owners. Recognising the benefits that this approach to optioneering and strategic decision making could have for other waste producers, this paper provides an overview of the process used for the development of the suite of national strategic BAT assessments for the NWP. It details: the main phases of the process, the key features of each process phase, the benefits of the approach and key learning from its deployment in practice. Note: The legislative regime in England and Wales requires the identification and application of BAT. There is an equivalent regime in Scotland known as Best Practicable Environmental Option (BPEO) and Best Practicable Means (BPM). The requirements are comparable across the two legislative regimes and, for the purposes of simplicity, the term BAT will be utilised in this paper. The approach and outcomes of the national strategic optioneering process described are applicable across the UK. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

University Data Management Pilot Utilizing the Nuclear Research Data System

Background In 2022, the Office of Science and Technology Policy (OSTP) issued a memo that significantly reshaped the landscape of access to federally funded research. The memo mandated that all taxpayer-funded research be made available to the public without delay upon publication, without an embargo period, superseding the 2013 OSTP public access policy. This public access policy promotes transparency and the democratization of knowledge, ensuring that the fruits of scientific endeavors funded by federal agencies could be immediately accessed and built upon by scientists, educators, students, and the public at large. To implement the requirements of the OSTP guidance and DOE Public Access Plan, the Office of Nuclear Energy (NE) has implemented public access plan guidance and has identified several areas where better data management practices would further expand public access to important nuclear energy related scientific data, reports, and other technical products. Significant NE supported efforts are already underway for data management and public access to important nuclear energy related data.1 2 To address gaps in data management practices, and improve retention and accessibility of data, NE is actively exploring enhanced data management options utilizing its high-performance computing resources administered by its Nuclear Scientific User Facility Program. A newly piloted system, the Nuclear Research Data System (NRDS) acts as a portal for data collection and dissemination. Nuclear Energy University Program Research and Development Portfolio According to Web of Science, NEUP has produced 2,345 journal publication that have been cited more than 61,000 times3 and countless conference proceedings. These publications are publicly available through OSTI.gov and in the open literature. Additional scientific and technical products including project milestones that are not publications and NEUP project final reports are vetted through OSTI.gov and released once reviewed and approved by DOE. Since 2009, NEUP has awarded close to 1,000 different R&D projects in technical areas across the NE research programs. As of June 2023, 512 NEUP reports are publicly available on OSTI. The underlying data for projects is still held at universities, and data transfer, co-location, and dissemination has not occurred in a systematic way. NEUP data is currently accessible through myriad university-based data repositories, or through direct requests to PIs. The program identified this patchwork of repositories, or often lack of publicly available data, as a significant barrier to an organized, accessible, and comprehensive solution to sharing data with the larger nuclear energy community. Approach The goal of this pilot project is to establish a pathway to a consolidated long-term repository for NEUP project data. To accomplish this goal, the pilot strives to accomplish the following objectives: Establish data collection standards, including a standard set of required supplementary information to contextualize and support raw data files. Work with the HPC group collect and upload information and to modify the NRDS system, as needed, to support a standardized approach. Resolve potential barriers to successful roll out of an expanded data collection strategy, including modifying data management plan guidelines and establishing a document and data release process that accounts for potential intellectual property and/or export control concerns. Results Overall, the pilot was successful in collecting 8,982 raw and processes data files, 220 reports, 56 calibration files, and 5,931 other supplementary documents. Supplementary documents included experimental plans, methods, journal publications and conference proceedings, milestone reports, and final reports. Figure 2 shows the number of data sets and supplementary project information provided by each project. Projects has significantly different input, depending on experimental data produced and completeness of the datasets provided.

Data collection↗

Optimized Qualification of Legacy Waste for the Repository Konrad - 16629

The repository Konrad in Germany is planned for the acceptance of low level waste and intermediate level waste. The Wiederaufarbeitungsanlage Karlsruhe (WAK GmbH) has the assignment to decommission and dispose of the nuclear facilities on the site of the Karlsruhe Institute of Technology (KIT). The entire inventory of these installations as well as the existing waste materials stored in the interim storage of the HDB are planned to be sent to the repository Konrad and are therefore treated according to the respective acceptance criteria. These acceptance criteria were defined on the basis of safety considerations and first published as a draft in 1995. After full legal recognition in 2007 the acceptance criteria were revised in 2010 and 2014. All legacy waste treated prior to 1995 has to be re-qualified according to the current state of acceptance. The repository will not open for acceptance of waste materials until 2022. Up to now only a small amount of acceptable waste packages exist. Therefore WAK GmbH established a scheme to improve and accelerate the processes and to have 2 annual delivery capacities (5000 m{sup 3} in total) ready by the end of the decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transport of French PWR steam generators to very low level waste disposal - 15203

When considering the complexity of IAEA nuclear transport regulations, the transport of a Steam Generator (SG) in one un-packaged block from a dismantling plant to a nuclear waste disposal is a challenge. The choices made, the difficulties encountered and the feedback that has been learnt from it are described. The disposal of decommissioning waste requires taking into account not only the constraints of acceptance of the repository but also the specific constraints of transportation from the dismantling plant to the final disposal site. In France, these criteria and regulations are respectively under the supervision of the French National Radioactive Waste Management Agency (ANDRA) and the French Nuclear Safety Authority (ASN). In the course of the dismantling of the EDF PWR plant Chooz A, the four decontaminated SGs were shipped to the ANDRA Very Low Level Waste (VLLW) repository. After removal, the SGs were decontaminated, allowing them to attain the criteria of VLLW and thus be accepted by the ANDRA. However, to transport these decontaminated SGs as single un-packaged blocks, it was necessary to ensure compliance with the Surface Contaminated Object SCO-I regulation criteria. For this, transport safety files were written and surface contamination and radiation criteria checked. One of the four SGs had to be decontaminated again and another one had to be transported under special arrangement. Due to the exceptional nature of the transportation, specialized means of transport and stowage were also studied. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Irradiated Nuclear Fuel Management: Resource Versus Waste

Management of irradiated fuel is an important component of commercial nuclear power production. Although it is broadly agreed that the disposition of some fraction of the fuel in geological repositories will be necessary, there is a range of options that can be considered that affect exactly what fraction of material will be disposed in that manner. Furthermore, until geological repositories are available to accept commercial irradiated fuel, these materials must be safely stored. Temporary storage of irradiated fuel has traditionally been conducted in storage pools, and this is still true for freshly discharged fuel. Criticality control technologies have led to greater efficiencies in packing of irradiated fuel into storage pools. With continued delays in establishing permanent repositories, utilities have begun to move some of the irradiated fuel inventory into dry storage. Fuel cycle options being considered worldwide include the once-through fuel cycle, limited recycle in which U and Pu are recycled back to power reactors as mixed oxide fuel, and advance partitioning and transmutation schemes designed to reduce the long term hazards associated with geological disposal from millions of years to a few hundred years. Each of these options introduces specific challenges in terms of the waste forms required to safely immobilize the hazardous components of irradiated fuel.

irradiated fuel management↗

Propagation of Isotopic Bias and Uncertainty to Criticality Safety Analyses of PWR Waste Packages

Burnup credit methodology is economically advantageous because significantly higher loading capacity may be achieved for spent nuclear fuel (SNF) casks based on this methodology as compared to the loading capacity based on a fresh fuel assumption. However, the criticality safety analysis for establishing the loading curve based on burnup credit becomes increasingly complex as more parameters accounting for spent fuel isotopic compositions are introduced to the safety analysis. The safety analysis requires validation of both depletion and criticality calculation methods. Validation of a neutronic-depletion code consists of quantifying the bias and the uncertainty associated with the bias in predicted SNF compositions caused by cross-section data uncertainty and by approximations in the calculational method. The validation is based on comparison between radiochemical assay (RCA) data and calculated isotopic concentrations for fuel samples representative of SNF inventory. The criticality analysis methodology for commercial SNF disposal allows burnup credit for 14 actinides and 15 fission product isotopes in SNF compositions. The neutronic-depletion method for disposal criticality analysis employing burnup credit is the two-dimensional (2-D) depletion sequence TRITON (Transport Rigor Implemented with Time-dependent Operation for Neutronic depletion)/NEWT (New ESC-based Weighting Transport code) and the 44GROUPNDF5 crosssection library in the Standardized Computer Analysis for Licensing Evaluation (SCALE 5.1) code system. The SCALE 44GROUPNDF5 cross section library is based on the Evaluated Nuclear Data File/B Version V (ENDF/B-V) library. The criticality calculation code for disposal criticality analysis employing burnup credit is General Monte Carlo N-Particle (MCNP) Transport Code. The purpose of this calculation report is to determine the bias on the calculated effective neutron multiplication factor, k{sub eff}, due to the bias and bias uncertainty associated with predicted spent fuel compositions (i.e., determine the penalty in reactivity due to isotopic composition bias and uncertainty) for use in disposal criticality analysis employing burnup credit. The method used in this calculation to propagate the isotopic bias and bias-uncertainty values to k{sub eff} is the Monte Carlo uncertainty sampling method. The development of this report is consistent with 'Test Plan for: Isotopic Validation for Postclosure Criticality of Commercial Spent Nuclear Fuel'. This calculation report has been developed in support of burnup credit activities for the proposed repository at Yucca Mountain, Nevada, and provides a methodology that can be applied to other criticality safety applications employing burnup credit.

Radulescu, Georgeta↗

Underground nuclear energy complexes - technical and economic advantages

Underground nuclear power plant parks have been projected to be economically feasible compared to above ground instalIations. This paper includes a thorough cost analysis of the savings, compared to above ground facilities, resulting from in-place entombment (decommissioning) of facilities at the end of their life. reduced costs of security for the lifetime of the various facilities in the underground park. reduced transportation costs. and reduced costs in the operation of the waste storage complex (also underground). compared to the fair share of the costs of operating a national waste repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Preclosure Accident Consequence Analysis for the APM Conceptual Design - 18090

The Nuclear Waste Management Organization (NWMO) is implementing Adaptive Phased Management (APM), Canada's plan for the long-term management of used nuclear fuel. The APM approach encompasses centralized containment and isolation of the used fuel in a Deep Geological Repository (DGR) in a suitable rock formation, such as crystalline rock or sedimentary rock, in an informed and willing host. This paper describes a preliminary analysis of the potential dose consequences to the public under accident conditions associated with the operation of a DGR and related surface processing facilities. These results are for a generic site and considers exposure to a person standing at a potential fenceline location under conservative atmospheric conditions. Radiological dose consequences to the public were calculated for accidents identified in the preliminary hazard identification. The presence or absence of ventilation system HEPA filters was also considered in combination with specific accident scenarios. A Gaussian dispersion model considering the most stable atmospheric condition (Pasquill stability category F) was used to estimate the exposure of a member of the public in the direct plume path at the location of maximum airborne radionuclide concentrations. The public dose was calculated via the inhalation, air immersion and ground exposure pathways. For all accidents considered, the calculated public dose was low, up to about 0.8 mSv for a fall of an UFTP with container breach. The total dose to the public was also calculated at various distances from the Used Fuel Packaging Plant, Ventilation Shaft, and Main Shaft. For all accidents considered, the calculated dose to the public was low, below 1 mSv even at the minimum 100 m distance evaluated. Sensitivity cases were also carried out to determine the effect of stack release height, the effluent exit velocity, and the release orientation on the calculated minimum site boundary distance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility study for detection of fuel assemblies state inside sealed dry storage casks using external gamma flux measurements - 25445

The license for the storage of spent nuclear fuel assemblies in dry casks is limited to 40 years. In Germany, a site for a final repository of spent fuel is not yet available. Therefore, this license has to be renewed for prolonged storage period. Currently, there is no experience with dry cask storage worldwide that goes beyond a period of 40 years. Beside regulatory and security aspects, there are questions concerning the long-term integrity of the spent fuel assemblies as this is of relevance for final transportation and reloading to final waste repository casks. Once the cask is filled and sealed, the knowledge about the state of the fuel assemblies is limited. This study investigates the feasibility of using external gamma flux measurements to detect the state of the spent fuel assemblies inside the cask. Monte-Carlo simulations were performed to evaluate the gamma flux distribution outside the sidewall of a cask with all intact fuel assemblies and a cask with one damaged fuel assembly, mimicking a fuel assembly with expanded rods and fuel relocation. The evaluation was performed for different location of the damaged fuel assembly and different storage times. The results of the investigation showed that the intensity and the shape of the gamma flux outside the sidewall of the cask are sufficient to identify the damaged fuel assembly, in case it is located near the inner wall of the cask. The detection of the inner damaged fuel assemblies, however, is less feasible. Due to the self-shielding of the fuel assemblies, the gamma photons which come from the inner fuel assemblies stopped within the fuel basket and assemblies materials. The gamma photons which do survive the fuel assemblies self-shielding reach the inner cask wall with not enough energy to escape the shielding of the thick cast iron wall. In general, it can be concluded that the more the damaged fuel assembly is close to the cask inner walls and that the damage is in a large scale (i.e., significant fuel relocation), the more it can be detected by external gamma flux measurements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the extension of modern best-estimate plus uncertainy methodologies to future fast reactor and advanced fuel licensing - initial evaluation of issues

Closing the fuel cycle is the major technical challenge to expanding nuclear energy to meet the world's need for benign, environmentally safe electrical power. Closing the fuel cycle means getting the maximum amount of energy possible out of uranium fuel while in turn minimizing the amount of high-level waste that must be stored. DOE's Advance Fuel Cycle Initiative (AFCI) program addresses this challenge by recycling the transuranic (TRU) isotopes contained in spent nuclear fuel; recycling, in turn, minimizes the amount of high-level waste that would require storage in repositories. Developing new fuels and the plants that burn them is a lengthy and expensive process, typically spanning a period of two decades from concept to final licensing. A unique challenge to meeting the AFCI objectives in this area is that the experimental database is seriously incomplete. As such, using a traditional, heavily empirical approach to develop and qualify fuels and plant operation over the operational conditions of a AFCI plant will be very challenging, if not impossible, within the expected schedule and budgetary constraints. To address this concern AFCI has launched an advanced modeling and simulation (M&S) approach to revolutionize fuel development and fast reactor design. This new approach is predicated upon transferring the recent advances in computational sciences and computer technologies into the development of these program elements. The licensing process that has historically been used by the NRC for fuels qualification is based upon using a large body of experimental work to qualify and license a new fuel. If a modeling and simulation approach with more directed experimentation is to be considered as an alternative approach for licensing, then a framework needs to be developed that can be agreed to with the NRC early in the developmental process. The use of modeling and simulation as a means of demonstrating that a design can meet NRC requirements is not new and has precedence in the NRC. The method is generically referred to as a 'Best Estimate plus Uncertainty' approach (BE+U), since the goal of the methodology is to compare the model value (best estimate) plus any uncertainty to a figure of merit like cladding temperature. The challenges for extending the BE+U (1) method for fuel qualification for an Advanced Reactor Fuel are driven by: schedule, the need for data, the data sufficiency, the identification of important phenomenon, the process of validation (with focus on the multi-scale model), and the need to produce and extended best estimate plus uncertainty methodology. This paper examines these issues an offers up a proposed set of methods that extend the current BE+U methodology address most if not all of these challenges.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydro-mechanical behavior of heated bentonite buffer for geologic disposal of high-level radioactive waste: A bench-scale X-ray computed tomography investigation

The behavior of heated bentonite buffer is critical for the security and long-term performance of a geological repository for high-level radioactive waste (HLW). While laboratory column experiments have been conducted to investigate compacted bentonite and coupled THMC (thermal-hydro-mechanical and chemical) processes for a moderate temperature range of up to 100 °C, data for a higher temperature range are limited. Understanding bentonite behavior and coupled THMC processes under higher temperatures (e.g., up to 200 °C) could allow for a more economic repository design and would expand the data and knowledge base for more reliable modeling. In this study, a bench-scale experiment was conducted in a compacted bentonite column experiencing both heating up to 200 °C in the center and hydration from a sand-clay boundary surrounding the column. During the experiment run for 1.5 years, frequent X-ray computed tomography (CT) scanning of bentonite provided insights into the spatiotemporal evolution of (1) hydration/dehydration, (2) clay swelling/shrinkage, (3) displacement, and (4) mineral precipitation. After the experiment, a comprehensive post-dismantling characterization of bentonite samples was conducted. Results showed that the bentonite hydration was axi-symmetrical despite the initial heterogeneity due to packing, confirming the ability of bentonite to seal fast flow/transport paths. Further, compared to a non-heated control experiment, the heated column showed greater CT density variations along the radial distance, indicating that homogenization of bentonite might be more difficult if a temperature gradient is maintained in the repository. Precipitation of an anhydrite layer occurred in the inner hot zone, pointing to potential concerns about salt precipitation causing canister corrosion. Ultimately, the experiments provided a high-resolution window into the strongly dynamic and coupled behavior of bentonite exposed to heating, hydration and swelling, which will be valuable for improving modeling of coupled processes, especially for the early state of a HLW repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The French Radioactive Waste Disposal System: Which Discussions for Which Decisions?

Over the last 20 years or so, radioactive-waste management has undergone remarkable developments in France. The Law of 30 December 1991 prescribed that Parliament would convene once again at the end of a 15-year research period. In 2005, the government asked the National Commission on Public Debate to organise a public debate on radioactive-waste management. Hence, for the first time, such an event was held in accordance with a national policy and not on a specific project. The debate took place between 12 September 2005 and 13 January 2006. Although the debate remained mostly a discussion among experts and opposed most frequently pro-nuclear and anti-nuclear activists, it still provided an opportunity to define and clarify challenges. Following the public debate and in the light of the assessment of investigation results, Parliament adopted on 28 June 2006 a new Planning Act on the Management of Radioactive Waste, which applies to all radioactive residues, irrespective of their activity level, and prescribes specific procedures and deadlines, such as the commissioning of a disposal facility for radium-bearing and graphite waste by 2013 and of a deep geological repository for high-level and intermediate-level long-lived waste by 2025. In the latter case, the Planning Act renews the assessment system for Andra's studies and investigations by a committee of experts and by the OPECST over and above the review of the future licence application by the Nuclear Safety Authority. In addition, a new law will set up the reversibility conditions of the repository before the government may grant any authorisation. At the local level, the act reinforces the prerogatives of the Local Information and Oversight Committee, which is responsible for public information and consultation issues; furthermore, it prescribes that a public debate and a public inquiry be held as a prerequisite to the delivery of any authorisation. Hence, ANDRA is taking all necessary means in order to meet deadlines by involving communities as early as possible in the development process of the repository project. In its activities, the Agency relies on the CLIS and local elected officials, and particularly on mayors. It benefits from some experience in the field, since it has already commissioned two disposal facilities, both located in the Aube District, one in 1992 for low-level and intermediate-level short-lived waste (CSFMA), and the other in 2003 for very-low-level waste (CSTFA). Beyond statutory institutional deadlines, frequent information meetings in relevant local town halls have provided all the more opportunities to explain at length what the projects involved as they advanced. People need precise information in order to be reassured and to share it with their families and friends. It also appeared desirable to create as rapidly as possible the Local Information Committee (CLI) in order to organise a sound dialogue with local populations. Lastly, disposal facilities and disposal-facility projects are not independent from each other. The quality of the implementation and operation of disposal structures in surface facilities, such as the CSFMA and the CSTFA, represents an outstanding showcase for Andra's know-how and aims at reinforcing confidence in more ambitious projects, such as the deep geological repository. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site selection in Germany - Start of the evaluation of the site selection law - 15561

Since 2011 Germany is pursuing a phase out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high active heat producing waste from scratch. The consequence of this law is a delay of at least two decades to start operation of a final disposal site and additional costs of at least EUR 2.7 billion. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission includes representatives from the parliament, academia, civil society organizations, industry, the environmental organizations and trade unions and should forward its recommendations after a delay in starting the evaluation process now in 2016. The first author of this paper is member of the evaluation commission. The present law has to be reviewed within this time span. The site selection then might start after the next federal election in 2017 probably based on a new site selection law. This new site selection law will take into account or even follow the recommendations of the evaluation group. A new repository site should be according to the present law determined till 2031 and for this site the more detailed site investigation will take place followed by a detailed safety analysis, before the erection of the repository can start. Based on the present procedural steps it seems to be rather unlikely to determine a repository site till 2031. As shown in this publication, there will be a delay of at least 20 years compared to the schedule given in the site selection law until a repository site can be determined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Selection in Germany - Status of the Evaluation of the Site Selection Law - 16122

Since 2011 Germany is pursuing a phase out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high active heat producing waste from scratch. The consequence of this law is a delay of at least two decades to start operation of a final disposal site and additional costs of at least EUR 2.7 billion. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission includes representatives from the parliament, academia, civil society organizations, industry, the environmental organizations and trade unions and should forward its recommendations after a delay in starting the evaluation process now in summer 2016. The present law will then be reviewed. The site selection then might start after the next federal election in 2017 at the earliest probably based on a new site selection law. A new repository site should be determined till 2031 and for this site the more detailed site investigation will take place followed by a detailed safety analysis, before the erection of the repository can start. Based on the present procedural steps it seems to be rather unlikely to determine a repository site till 2031. As shown in the publication, there will be a delay of at least 20 years compared to the schedule given in the site selection law until a repository site can be determined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗