Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Solar power satellite system definition study, phase 2. Part 1: Midterm briefing

An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.

Source record↗

The Automated Array Assembly Task of the Low-cost Silicon Solar Array Project, Phase 2

An advanced process sequence for manufacturing high efficiency solar cells and modules in a cost-effective manner is discussed. Emphasis is on process simplicity and minimizing consumed materials. The process sequence incorporates texture etching, plasma processes for damage removal and patterning, ion implantation, low pressure silicon nitride deposition, and plated metal. A reliable module design is presented. Specific process step developments are given. A detailed cost analysis was performed to indicate future areas of fruitful cost reduction effort. Recommendations for advanced investigations are included.

Coleman, M. G.↗

Solar power satellite system definition study. Volume 2, phase 1: Systems analyses tradeoffs.

A systems definition study of the solar power satellite system is presented. The satellite solar energy conversion and microwave power transmission systems are discussed. Space construction and support systems are examined including a series construction and equipment characteristics analysis. Space transportation for the satellite and the ground receiving station are assessed.

Source record↗

Solar power satellite system definition study, phase 2. Volume 2: Reference system description

System descriptions and cost estimates for the reference system of the solar power satellite program are presented. The reference system is divided into five principal elements: the solar power satellites; space construction and support; space and ground transportation; ground receiving stations; and operations control. The program scenario and non-recurring costs are briefly described.

Source record↗

Plume Characterization of a One-Millipound Solid Teflon Pulsed Plasma Thruster, Phase 2

Measurements of the pulsed plasma thruster (PPT) plume upstream mass flux were made in the Molecular Sink (MOLSINK) vacuum facility in order to minimize the plume-tank wall reflected mass flux. Using specially designed collimators on 4 rows of Quartz Crystal Microbalanced (QCMs) mounted on a support extending radially away from the plume axis, measurements were made of the mass flux originating in a thin slice of the PPT primary plume at an arbitrary dip angle with respect to the thruster axis. The measured and analytically corrected mass flux from particles reflected from the MOLSINK walls was substracted from the collimated QCM measurements to improve their accuracy. These data were then analytically summed over dip angle to estimate the total plume backflow upstream of the thruster nozzle. The results indicate that the PPT backflow is of order 10 to the minus 10th power g/square cm/pulse in the region from 38 to 86 cm from the PPT axis in the nozzle exit plane. This flux drops with the square of the radial distance from the PPT axis and is comparable to the backflow of an 8 cm ion thruster, which has performance characteristics similar to those of the PPT.

Rudolph, L. K.↗

SPS pilot signal design and power transponder analysis, volume 2, phase 3

The problem of pilot signal parameter optimization and the related problem of power transponder performance analysis for the Solar Power Satellite reference phase control system are addressed. Signal and interference models were established to enable specifications of the front end filters including both the notch filter and the antenna frequency response. A simulation program package was developed to be included in SOLARSIM to perform tradeoffs of system parameters based on minimizing the phase error for the pilot phase extraction. An analytical model that characterizes the overall power transponder operation was developed. From this model, the effects of different phase noise disturbance sources that contribute to phase variations at the output of the power transponders were studied and quantified. Results indicate that it is feasible to hold the antenna array phase error to less than one degree per power module for the type of disturbances modeled.

Lindsey, W. C.↗

Assessment of the risk due to release of carbon fiber in civil aircraft accidents, phase 2

The risk associated with the potential use of carbon fiber composite material in commercial jet aircraft is investigated. A simulation model developed to generate risk profiles for several airports is described. The risk profiles show the probability that the cost due to accidents in any year exceeds a given amount. The computer model simulates aircraft accidents with fire, release of fibers, their downwind transport and infiltration of buildings, equipment failures, and resulting ecomomic impact. The individual airport results were combined to yield the national risk profile.

Pocinki, L.↗

Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2

The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.

Source record↗

Phase 2: Array automated assembly task low cost silicon solar array project

Several microwave systems for use in solar cell fabrication were developed and experimentally tested. The first system used a standing wave rectangular waveguide horn applicator. Satisfactory results were achieved with this system for impedance matching and wafer surface heating uniformity. The second system utilized a resonant TM sub 011 mode cylindrical cavity but could not be employed due to its poor energy coupling efficiency. The third and fourth microwave systems utilized a circular waveguide operating in the TM sub 01 and TM sub 11 but had problems with impedance matching, efficiency, and field uniformity.

Jones, G. T.↗

Solar power satellite system definition study, volume 4, phase 2

Results of an overall evaluation of the solar power satellite concept are reported. Specific topics covered include: solid state sandwich configuration; parametric development of reliability design; power distribution system for solid state solar power satellites; multibeam transmission; GEO base system configuration; suppression of the heavy lift launch vehicle trajectory; conceptual design of an offshore space center facility; solar power satellite development and operations scenario; and microwave power transmission technology, advancement, development, and facility requirements.

Source record↗

Phase 2 of the array automated assembly task for the low cost solar array project

The process sequence for the fabrication of dendritic web silicon into solar panels was modified to include aluminum back surface field formation. Plasma etching was found to be a feasible technique for pre-diffusion cleaning of the web. Several contacting systems were studied. The total plated Pd-Ni system was not compatible with the process sequence; however, the evaporated TiPd-electroplated Cu system was shown stable under life testing. Ultrasonic bonding parameters were determined for various interconnect and contact metals but the yield of the process was not sufficiently high to use for module fabrication at this time. Over 400 solar cells were fabricated according to the modified sequence. No sub-process incompatibility was seen. These cells were used to fabricate four demonstration modules. A cost analysis of the modified process sequence resulted in a selling price of $0.75/peak watt.

Campbell, R. B.↗

Automated array assembly, phase 2

Tasks of scaling up the tandem junction cell (TJC) from 2 cm x 2 cm to 6.2 cm and the assembly of several modules using these large area TJC's are described. The scale-up of the TJC was based on using the existing process and doing the necessary design activities to increase the cell area to an acceptably large area. The design was carried out using available device models. The design was verified and sample large area TJCs were fabricated. Mechanical and process problems occurred causing a schedule slippage that resulted in contract expiration before enough large-area TJCs were fabricated to populate the sample tandem junction modules (TJM). A TJM design was carried out in which the module interconnects served to augment the current collecting buses on the cell. No sample TJMs were assembled due to a shortage of large-area TJCs.

Carbajal, B. G.↗

Coal desulfurization by low temperature chlorinolysis, phase 2

An engineering scale reactor system was constructed and operated for the evaluation of five high sulfur bituminous coals obtained from Kentucky, Ohio, and Illinois. Forty-four test runs were conducted under conditions of 100 by 200 mesh coal,solvents - methlychloroform and water, 60 to 130 C, 0 to 60 psig, 45 to 90 minutes, and gaseous chlorine flow rate of up to 24 SCFH. Sulfur removals demonstrated for the five coals were: maximum total sulfur removal of 46 to 89% (4 of 5 coals with methylchloroform) and 0 to 24% with water. In addition, an integrated continuous flow mini-pilot plant was designed and constructed for a nominal coal rate of 2 kilograms/hour which will be operated as part of the follow-on program. Equipment flow sheets and design drawings are included for both the batch and continuous flow mini-pilot plants.

Kalvinskas, J. J.↗