Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power System Dynamics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Precise time dissemination and applications development on the Bonneville Power Administration system

The Bonneville Power Administration (BPA) uses IRIG-B transmitted over microwave as its primary system time dissemination. Problems with accuracy and reliability have led to ongoing research into better methods. BPA has also developed and deployed a unique fault locator which uses precise clocks synchronized by a pulse over microwaves. It automatically transmits the data to a central computer for analysis. A proposed system could combine fault location timing and time dissemination into a Global Position System (GPS) timing receiver and close the verification loop through a master station at the Dittmer Control Center. Such a system would have many advantages, including lower cost, higher reliability, and wider industry support. Test results indicate the GPS has sufficient accuracy and reliability for this and other current timing requirements including synchronous phase angle measurements. A phasor measurement system which provides phase angle has recently been tested with excellent results. Phase angle is a key parameter in power system control applications including dynamic braking, DC modulation, remedial action schemes, and system state estimation. Further research is required to determine the applications which can most effectively use real-time phase angle measurements and the best method to apply them.

K. E. Martin↗

Integrated Vehicle and Trajectory Design of Small Spacecraft with Electric Propulsion for Earth and Interplanetary Missions

This paper investigates the feasibility of Earth-transfer and interplanetary mission architectures for miniaturized spacecraft using emerging small solar electric propulsion technologies. Emerging small SEP thrusters offer significant advantages relative to existing technologies and will enable U-class systems to perform trajectory maneuvers with significant Delta V requirements. The approach in this paper is unique because it integrates trajectory design with vehicle sizing and accounts for the system and operational constraints of small U-class missions. The modeling framework includes integrated propulsion, orbit, energy, and external environment dynamics and systems-level power, energy, mass, and volume constraints. The trajectory simulation environment models orbit boosts in Earth orbit and flyby and capture trajectories to interplanetary destinations. A family of small spacecraft mission architectures are studied, including altitude and inclination transfers in Earth orbit and trajectories that escape Earth orbit and travel to interplanetary destinations such as Mercury, Venus, and Mars. Results are presented visually to show the trade-offs between competing performance objectives such as maximizing available mass and volume for payloads and minimizing transfer time. The results demonstrate the feasibility of using small spacecraft to perform significant Earth and interplanetary orbit transfers in less than one year with reasonable U-class mass, power, volume, and mission durations.

Spangelo, Sara↗

Development of a Dynamic Model and Control System for Load-Following Studies of Supercritical Pulverized Coal Power Plants

Traditional energy production plants are increasingly forced to cycle their load and operate under low-load conditions in response to growth in intermittent renewable generation. A plant-wide dynamic model of a supercritical pulverized coal (SCPC) power plant has been developed in the Aspen Plus Dynamics® (APD) software environment and the impact of advanced control strategies on the transient responses of the key variables to load-following operation and disturbances can be studied. Models of various key unit operations, such as the steam turbine, are developed in Aspen Custom Modeler® (ACM) and integrated in the APD environment. A coordinated control system (CCS) is developed above the regulatory control layer. Three control configurations are evaluated for the control of the main steam; the reheat steam temperature is also controlled. For studying servo control performance of the CCS, the load is decreased from 100% to 40% at a ramp rate of 3% load per min. The impact of a disturbance due to a change in the coal feed composition is also studied. The CCS is found to yield satisfactory performance for both servo control and disturbance rejection.

20 FOSSIL-FUELED POWER PLANTS↗

Integrating Learning and Physics based Computation for Fast Online Transient Analysis

In this work, a novel method that integrates learning and physics based computation is developed for greatly accelerating the simulation of full power system transient trajectories. To solve the dynamic algebraic equations, the method replaces the time-consuming dynamic computation for generator dynamics with trained predictors, while retaining the time-efficient algebraic computation of solving AC-power flow (PF) for power systems. In particular, a predictor is trained for each generator, and the system trajectories are computed by alternating steps of calling the predictors and solving AC-PF. The proposed method also allows fully parallelizable training strategies and a flexible trade-off between training time and testing accuracy. Comprehensive evaluations of the proposed method for transient/dynamic contingency analysis of the New York/New England 16-machine 68-bus power systems demonstrate excellent performance and significant acceleration of computation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Timescale Integrated Dynamic and Scheduling Model (MIDAS-Solar)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power system operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power systems steady-state and dynamic performance. This project helps meet and exceed the Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for electric grid planning and operation. This will be accomplished by developing temporally comprehensive, closed-loop simulation models that seamlessly simulate power systems operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). Both a multi-timescale grid model and an integrated PV model will be developed in this project to accurately study the impacts of PV variability and uncertainty on system reliability at multiple timescales. Using quasi-dynamic simulation methods and data-driven security assessment (DSA) criteria will allow the dynamic characteristics of PV to be fed forward into longer-timescale scheduling models for a complete understanding of the effect of short-term PV dynamics on bulk systems operations (e.g., reserve scheduling and deployment). Upon completion of the proposed model, this project will help operators accurately assess system reliability by deploying energy and reserve scheduling under critical contingency conditions and studying interactions among all types of essential reliability services provided by modern PV power plants.

14 SOLAR ENERGY↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASAs RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit 2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Development of Real-Time System Identification to Detect Abnormal Operations in a Gas Turbine Cycle

Here, we present a novel online system identification methodology for monitoring the performance of power systems. This methodology was demonstrated in a gas turbine recuperated power plant designed for a hybrid configuration. A 120-kW Garrett microturbine modified to test dynamic control strategies for hybrid power systems designed at the National Energy Technology Laboratory (NETL) was used to implement and validate this online system identification methodology. The main component of this methodology consists of an empirical transfer function model implemented in parallel to the turbine speed operation and the fuel control valve, which can monitor the process response of the gas turbine system while it is operating. During fully closed-loop operations or automated control, the output of the controller, fuel valve position, and the turbine speed measurements were fed for a given period of time to a recursive algorithm that determined the transfer function parameters during the nominal condition. After the new parameters were calculated, they were fed into the transfer function model for online prediction. The turbine speed measurement was compared against the transfer function prediction, and a control logic was implemented to capture when the system operated at nominal or abnormal conditions. To validate the ability to detect abnormal conditions during dynamic operations, drifting in the performance of the gas turbine system was evaluated. A leak in the turbomachinery working fluid was emulated by bleeding 10% of the airflow from the compressor discharge to the atmosphere, and electrical load steps were performed before and after the leak. This tool could detect the leak 7 s after it had occurred, which accounted for a fuel flow increase of approximately 15.8% to maintain the same load and constant turbine speed operations.

algorithms↗

The NASA Advanced Solar Dynamics Technology Program

The NASA Advanced Solar Dynamics Technology Program, aimed at developing power system technology for versatile, advanced, high-capacity spacecraft and surface power systems, is discussed. The goals of the program are to be achieved by pursuing high-risk but high-payoff technologies, namely, advanced solar concentrators, heat receivers, power conversion dynamic cycles, and radiators. The NASA program is discussed in terms of mission drivers, the technological goals for each of the system's major components, and program status.

Warshay, Marvin↗

Modeling and Control Design for a Turboelectric Single Aisle Aircraft Propulsion System

A nonlinear dynamic model with full flight envelope controller is developed for the propulsion system of a partially turboelectric single-aisle aircraft. The propulsion system model consists of two turbofan engines with a large percentage of power extraction, feeding an electric tail fan for boundary layer ingestion. The dynamic model is compared against an existing steady state design model. An electrical system model using a simple power flow approach is integrated into existing modeling tools used for dynamic simulation of the turbomachinery of the vehicle. In addition to the simple power flow model of the electrical system, a more detailed model is used for comparison at a key vehicle transient flight condition. The controller is a gain scheduled proportional-integral type that is examined throughout the flight envelope for performance metrics such as rise time and operability margins. Potential improvements in efficiency for the vehicle are explored by adjusting the power split between the energy used for thrust by the turbofans and that extracted to supply power to the tail fan. Finally, an operability study of the vehicle is conducted using a 900 nautical mile mission profile for a nominal vehicle configuration, a deteriorated propulsion system at the end of its operating life, and an optimized power schedule with improved efficiency.

Turboelectric↗

Kilopower Reactor Using Stirling TechnologY (KRUSTY) Nuclear Ground Test Results and Lessons Learned

The Kilopower nuclear ground testing nicknamed KRUSTY (Kilopower Reactor Using Stirling TechnologY) was completed at the Nevada Nuclear Security Site (NNSS) on March 21, 2018. This full scale nuclear demonstration verified the Kilopower reactor neutronics during startup, steady state, and transient operations in a space simulated environment. This was the first space reactor test completed for fission power systems in over 50 years and marked a turning point in NASA's nuclear program. The completed reactor power system design incorporated flight prototypic materials and full-scale components in an effort to study the reactor dynamics at full power and significantly reduce follow on risk of a future flight demonstration. This design provided a unique opportunity for the power system to simulate several nominal and off-nominal mission scenarios that allowed the designers to verify that the reactor dynamics could tolerate many worst case conditions regarding reactor stability and control. The dynamic changes imposed on the reactor validated the ability of the reactor to load follow the power conversion system and passively control the fuel temperature and overall system stability. With successful completion of the KRUSTY experiment, the NASA/DOE team will evaluate the lessons learned throughout the project and apply them towards a flight demonstration of a Kilopower reactor.

Gibson, Marc A.↗

Wave Energy Converter Power Take-Off Modeling and Validation From Experimental Bench Tests

This article describes the implementation of a new numerical model of the power take-off system installed in the Monterey Bay Aquarium Research Institute wave energy converter, a device developed to provide power to various oceanic research missions. The simultaneous presence of hydraulic, pneumatic, and electrical subsystems in the power take-off system represents a significant challenge in forging an accurate model able to replicate the main dynamic characteristics of the system. The validation of the new numerical model is addressed by comparing simulations with the measurements obtained during a series of bench tests. Data from the bench tests show good agreement with the numerical model. The validated model provides deeper insights into the complex nonlinear dynamics of the power take-off system and will support further performance improvements in the future.

16 TIDAL AND WAVE POWER↗

Hybrid Modeling of Three-Phase Grid-Supporting Inverters for Dynamic Studies

Grid technologies connected by power electronic converter (PEC) interfaces continually implement grid support functions mandated by grid codes and standards. The transition to converter-based generation demands precise PEC models to assess system dynamics, which have been previously overlooked in conventional power systems. This study proposes a hybrid method for analyzing grid-connected three-phase PEC dynamics with the IEEE standard 1547-2018 Volt-VAr mode that combines physics and data-driven techniques. The physics model reflects the PEC’s internal behavior, whereas the data-driven modeling technique evaluates the grid-supporting capabilities of the smart PEC. The system identification approach is used to generate dynamic PEC models based on changing grid voltage and measured current injected into the grid by the PEC. In the Volt-VAr support mode, a detailed topological model including switches is utilized to compare the goodness-of-fit of the extracted hybrid dynamic model. The results demonstrate that the hybrid PEC model in the Volt-VAr mode accurately matches the dynamics with the topological model.

Subedi, Sunil↗

Operational Characteristics of an Accelerator Driven Fissile Solution System

Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system parameters, such as response times, will be quantified. A generalized linear systems analysis of steady-state operations will be performed to evaluate the level of stability of ADFS systems. This information should provide a basic understanding of typical ADFS system operational behavior, and facilitate the development of monitoring procedures and operator aids.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model, Design, and Control for Power Conversion in Wave Energy Converter System

Wave energy, if all been harvested along the U.S. coastline, can power around 65% of the energy consumption in U.S.. Comparing to other renewable energy sources like solar or wind, ocean wave can provide up to 90% of steady uptime. With the high energy density (2-3 kW/m 2 ), it can produce more energy with the same amount of installation area comparing to the energy density of wind turbine (0.6 kW/m 2 ) and solar panel(0.2 kW/m 2 ). The predictability of wave provides advantages like planning installation, power dispatching, and maintenance activities. Although with all these advantages, wave energy converter system is still in the research stage due to its high system cost per electricity production. One of the challenges that need to be solved is the irregularity from the wave motion that leads to high instantaneous peak power into the wave energy converter, which usually reaches up to 10 - 20 times of the average power. The high peak power will not only bring high mechanical/electrical stress but also result in an overrating design of the components in the system. Another obstacle that prevents the wave energy system from moving forward is the high testing cost from the validations in wave-energy-test sites or tank-test sites. A high-fidelity multi-disciplinary system model, including hydrodynamics, mechanical dynamics, electromagnetics, and power electronics, is needed to predict the behavior of the system and reduce the cost of design validation.

16 TIDAL AND WAVE POWER↗

Distribution System Segmented Model Simplification with Independent Dynamically Changing End-Use Loads

With more emerging technologies in power distribution systems, to support quasi-static time-series (QSTS) simulation over short time frames, accurately modeling the dynamic behavior of end-use load under various conditions is im- portant. However, time and cost can be a burden for the QSTS simulation of thousands of houses representing dynamic load behaviors on large distribution feeders. There are two main contributions of this paper in order to reduce the QSTS simulation complexity. First, the paper presents a method to stochasti- cally model the dynamic behavior of end-use load for QSTS simulations. Second, using the stochastically modeled load behavior as an input to a distribution sys- tem, and building on our previous QSTS simulation simplification/acceleration method that relies on uniform load behavior, this paper presents a segment substitution approach for the simplification of distribution system models with independent dynamically changing end-use loads. Our numerical results show that compared to GridLAB-D, a software tool that simulates end-use load be- havior through physical models, the proposed stochastic modeling approach achieved an 89.3% simulation time reduction for end-use loads, while accurately capturing the temporally changing total load behavior. Moreover, the QSTS simulation of a large test distribution system through OpenDSS showed that the proposed simplification method decreased the feeder simulation time by a factor of three at less than 0.3% voltage error. Compared to our previous method with independent dynamic loads, the voltage error is reduced by a factor of four.

Power distribution system modeling, stochastic pro↗