A Mechanistic Reliability Assessment of RVACS and Metal Fuel Inherent Reactivity Feedbacks

GE Hitachi Nuclear Energy (GEH) and Argonne National Laboratory (Argonne) participated in a two year collaboration to modernize and update the probabilistic risk assessment (PRA) for the PRISM sodium fast reactor. At a high level, the primary outcome of the project was the development of a next-generation PRA that is intended to enable risk-informed prioritization of safety- and reliability-focused research and development. A central Argonne task during this project was a reliability assessment of passive safety systems, which included the Reactor Vessel Auxiliary Cooling System (RVACS) and the inherent reactivity feedbacks of the metal fuel core. Both systems were examined utilizing a methodology derived from the Reliability Method for Passive Safety Functions (RMPS), with an emphasis on developing success criteria based on mechanistic system modeling while also maintaining consistency with the Fuel Damage Categories (FDCs) of the mechanistic source term assessment. This paper provides an overview of the reliability analyses of both systems, including highlights of the FMEAs, the construction of best-estimate models, uncertain parameter screening and propagation, and the quantification of system failure probability. In particular, special focus is given to the methodologies to perform the analysis of uncertainty propagation and the determination of the likelihood of violating FDC limits. Additionally, important lessons learned are also reviewed, such as optimal sampling methodologies for the discovery of low likelihood failure events and strategies for the combined treatment of aleatory and epistemic uncertainties.

Grabaskas, David↗

Bayesian Modeling of Population Variability -- Practical Guidance and Pitfalls

With the advent of easy-to-use open-source software for Markov chain Monte Carlo (MCMC) simulation, hierarchical Bayesian analysis is gaining in popularity. This paper presents practical guidance for hierarchical Bayes analysis of typical problems in probabilistic safety assessment (PSA). The guidance is related to choosing parameterizations that accelerate convergence of the MCMC sampling and to illustrating the potential sensitivity of the results to the functional form chosen for the first-stage prior. This latter issue has significant ramifications because the mean of the average population variability curve (PVC) from hierarchical Bayes (or the mean of the point estimate distribution from empirical Bayes) can be very sensitive to this choice in cases where variability is large. Numerical examples are provided to illustrate the issues discussed.

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed MultiPphysics BestEestimate Plus Uncertainties (BEPU) Application Development of RELAP5-3D Perturbation Model

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes RELAP5-3D development activities for best estimated and uncertainty (BEPU) capability to support ongoing RISA Pathway pilot projects for risk informed uncertainty quantification applications. Work scope includes (1) development of initial perturbation model for selected closure laws and (2) testing of suitable probability distribution functions (PDF) for the selected correlations. Developed BEPU modules are tested with selected separate effect cases and compared with conventional thermal-hydraulics model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Is Biological Subtype Prognostic of Locoregional Recurrence Risk in Women With pT1-2N0 Breast Cancer Treated With Mastectomy?

Purpose: To examine locoregional and distant recurrence (LRR and DR) in women with pT1-2N0 breast cancer according to approximated subtype and clinicopathologic characteristics. Methods and Materials: Two independent datasets were pooled and analyzed. The study participants were 1994 patients with pT1-2N0M0 breast cancer, treated with mastectomy without radiation therapy. The patients were classified into 1 of 5 subtypes: luminal A (ER+ or PR+/HER 2−/grade 1-2, n=1202); luminal B (ER+ or PR+/HER 2−/grade 3, n=294); luminal HER 2 (ER+ or PR+/HER 2+, n=221); HER 2 (ER−/PR−/HER 2+, n=105) and triple-negative breast cancer (TNBC) (ER−/PR−/HER 2−, n=172). Results: The median follow-up time was 4.3 years. The 5-year Kaplan-Meier (KM) LRR were 1.8% in luminal A, 3.1% in luminal B, 1.7% in luminal HER 2, 1.9% in HER 2, and 1.9% in TNBC cohorts (P=.81). The 5-year KM DR was highest among women with TNBC: 1.8% in luminal A, 5.0% in luminal B, 2.4% in luminal HER 2, 1.1% in HER 2, and 9.6% in TNBC cohorts (P<.001). Among 172 women with TNBC, the 5-year KM LRR were 1.3% with clear margins versus 12.5% with close or positive margins (P=.04). On multivariable analysis, factors that conferred higher LRR risk were tumors >2 cm, lobular histology, and close/positive surgical margins. Conclusions: The 5-year risk of LRR in our pT1-2N0 cohort treated with mastectomy was generally low, with no significant differences observed between approximated subtypes. Among the subtypes, TNBC conferred the highest risk of DR and an elevated risk of LRR in the presence of positive or close margins. Our data suggest that although subtype alone cannot be used as the sole criterion to offer postmastectomy radiation therapy, it may reasonably be considered in conjunction with other clinicopathologic factors including tumor size, histology, and margin status. Larger cohorts and longer follow-up times are needed to define which women with node-negative disease have high postmastectomy LRR risks in contemporary practice.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Risk-Constrained Multi-Stage Decision Making Approach to the Architectural Analysis of Mars Missions

This paper presents a novel risk-constrained multi-stage decision making approach to the architectural analysis of planetary rover missions. In particular, focusing on a 2018 Mars rover concept, which was considered as part of a potential Mars Sample Return campaign, we model the entry, descent, and landing (EDL) phase and the rover traverse phase as four sequential decision-making stages. The problem is to find a sequence of divert and driving maneuvers so that the rover drive is minimized and the probability of a mission failure (e.g., due to a failed landing) is below a user specified bound. By solving this problem for several different values of the model parameters (e.g., divert authority), this approach enables rigorous, accurate and systematic trade-offs for the EDL system vs. the mobility system, and, more in general, cross-domain trade-offs for the different phases of a space mission. The overall optimization problem can be seen as a chance-constrained dynamic programming problem, with the additional complexity that 1) in some stages the disturbances do not have any probabilistic characterization, and 2) the state space is extremely large (i.e, hundreds of millions of states for trade-offs with high-resolution Martian maps). To this purpose, we solve the problem by performing an unconventional combination of average and minimax cost analysis and by leveraging high efficient computation tools from the image processing community. Preliminary trade-off results are presented.

entry, descent, and landing (EDL)↗

Re-evaluating probable maximum precipitation estimates: sensitivity to transposition domains and storm rotation using modern datasets

This study examines the sensitivity of Probable Maximum Precipitation (PMP) estimates to key methodological decisions embedded in the legacy approach adopted in the U.S. National Weather Service Hydrometeorological Reports No. 51 and No. 52. Although widely used for infrastructure design and risk regulation, fundamental aspects of PMP estimation—such as storm sample size, transposition domain, maximization procedures, and storm rotation—remain poorly constrained and lack formal guidance. Using the Red Rock watershed in Iowa as a case study, and leveraging the 2002–2023 NOAA Analysis of Record for Calibration (AORC) precipitation dataset, we systematically evaluate how each methodological choice, individually and in combination, influences PMP estimates. Our findings demonstrate that PMP is not a fixed physical upper bound but rather a modeling construct shaped heavily by user-defined assumptions. Notably, PMP values derived from modern gridded rainfall datasets can be substantially higher than the legacy estimate used in the original spillway design for Red Rock Dam. Decisions regarding storm sample size, domain extent, climatological window, and particularly storm rotation all contributed to higher PMP estimates. Storm rotation alone—a loosely constrained element in the current PMP practice—can amplify PMP by more than 25%. These results reveal the lack of standardized bounds in current PMP workflows and the need for systematic sensitivity and uncertainty analysis. As PMP estimation shifts toward probabilistic approaches, incorporating physically meaningful storm attributes will be key to developing more transparent, defensible methods for dam safety and climate-resilient infrastructure.

Probable maximum precipitation↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. In order to determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules and operational requirements are developed and then finalized.

DeMott, Diana↗

Human Reliability Assessments: Using the Past (Shuttle) to Predict the Future (Orion)

NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. To determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators, and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules, and operational requirements are developed and then finalized.

DeMott, Diana L.↗

Probabilistic Risk Assessment for Astronaut Post Flight Bone Fracture

Introduction: Space flight potentially reduces the loading that bone can resist before fracture. This reduction in bone integrity may result from a combination of factors, the most common reported as reduction in astronaut BMD. Although evaluating the condition of bones continues to be a critical aspect of understanding space flight fracture risk, defining the loading regime, whether on earth, in microgravity, or in reduced gravity on a planetary surface, remains a significant component of estimating the fracture risks to astronauts. This presentation summarizes the concepts, development, and application of NASA's Bone Fracture Risk Module (BFxRM) to understanding pre-, post, and in mission astronaut bone fracture risk. The overview includes an assessment of contributing factors utilized in the BFxRM and illustrates how new information, such as biomechanics of space suit design or better understanding of post flight activities may influence astronaut fracture risk. Opportunities for the bone mineral research community to contribute to future model development are also discussed. Methods: To investigate the conditions in which spaceflight induced changes to bone plays a critical role in post-flight fracture probability, we implement a modified version of the NASA Bone Fracture Risk Model (BFxRM). Modifications included incorporation of variations in physiological characteristics, post-flight recovery rate, and variations in lateral fall conditions within the probabilistic simulation parameter space. The modeled fracture probability estimates for different loading scenarios at preflight and at 0 and 365 days post-flight time periods are compared. Results: For simple lateral side falls, mean post-flight fracture probability is elevated over mean preflight fracture probability due to spaceflight induced BMD loss and is not fully recovered at 365 days post-flight. In the case of more energetic falls, such as from elevated heights or with the addition of lateral movement, the contribution of space flight quality changes is much less clear, indicating more granular assessments, such as Finite Element modeling, may be needed to further assess the risks in these scenarios.

Risk Analysis↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

When Is the Simple Radiotoxicity Approach Useful for Advanced Fuel Cycle System Assessments Given the Existence of Complex Performance Dose Assessments?

Engineers often face the general question of which approximations are appropriate for a given analytical task. In particular, when is a simpler model useful if a more complex model also exists? This paper explores this question in the domain of radiotoxicity relative to geologic disposal performance dose assessments. Criterion 1 requires that the simpler approach, radiotoxicity, must be calculated correctly. The concept of ingestion radiotoxic inventories is analogous to the inventory of toxic chemicals in other industries. From a decision analysis perspective, it is also somewhat analogous to the nuclear reactor safety concept of “passive safety.” This paper explains some of the issues in calculating radiotoxicity, motivated by the author’s observations of errors in the literature: not accounting for radioactive progeny, misunderstanding natural “ore,” and focusing on transuranic (TRU) isotopes without adequate attention to actinide decay products. For example, Th/233U fuel cycles do have lower amounts of TRU isotopes than U/239Pu fuel cycles, but that does not necessarily mean lower long-term hazard. Criterion 2 requires that the uncertainties in the more complex approach, performance dose assessments, must raise issues for the assessments’ intended purposes—in which case, radiotoxic inventory may be of assistance until those issues are resolved. Performance dose assessments were developed for, and are legally the way to show, compliance with regulations, but the uncertainties are large. Less obvious is the degree to which dose assessments are applicable to other purposes—comparing fuel cycle options prior to site selection and showing the safety of a fuel cycle and waste management approach to the public. In the last sense especially, performance dose assessments are analogous to probabilistic risk assessments for nuclear reactor safety. The United States lacks a selected consensus site, selected fuel cycle approach (direct disposal versus recycling), and selected waste form. Thus, the paper does not intend to discuss all the issues with performance dose assessments but rather intends to focus on only those performance dose uncertainties that raise issues when comparing fuel cycles. Uncertainties associated with whether a generic geological environment is attractive or a specific location meets requirements are beyond the scope of this paper. Ingestion radiotoxicity correlates with heat, gamma, and inhalation radiotoxicity. Thus, options that are relatively high in ingestion radiotoxicity tend to be high in other parameters. Therefore, reduction in ingestion radiotoxicity means both that the potential source term for release is lower but also that one driving force for release (heat) is also lower. However, the most important time frames differ as heat is mainly an issue in decades and centuries after reactor discharge, but ingestion radiotoxicity is mainly an issue during longer time periods. Ingestion radiotoxicity points to the importance of actinides in long-term waste management, followed by specific fission products such as 99Tc, 129I, 93Zr, 135Cs, and 79Se.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Proactive Intelligence for Nuclear Nonproliferation

The project described in this paper leverages predictive models for proliferation detection in order to assess the complementary questions of capability and intent as they relate to the potential for nuclear weapon development. The ability to proactively assess the likelihood of a state to engage in nuclear power acquisition and development for non-peaceful purposes is one of the greatest challenges for analysts and policy makers working on proliferation detection and deterrence. Of further difficulty is determining whether a state is at risk to provide indirect support for proliferation via the relationship between industrial input/output and the legal framework of trade. In general, it is possible to gather evidence about precursor activities to the achieved nuclear potential of a state that function as indicators of the state's intent to acquire and develop capabilities to support nuclear weapons. Reasoning with these indicators to predict intent and capability to proliferate is of utmost importance to facilitate nuclear safeguards, e.g. through proactive implementation of countermeasures. Such a predictive reasoning task is difficult to perform without computational aid. While the need for a proactive and multi-perspective approach to proliferation detection is widely recognized, there is a lamentable lack of computational tools applied directly to the task. Applications of predictive modeling to the domain of nuclear nonproliferation are limited to physical/chemical properties of nuclear materials, such as nuclear weapons simulations and stockpile stewardship. The aim of this project is to address this gap by leveraging methods and data from different mission areas in support of proliferation detection and prevention in innovative ways. More specifically, the approach implemented in this project combines methods in information analysis and probabilistic evidentiary reasoning with expert knowledge from discipline areas germane to proliferation detection, and evidence extracted from relevant data sources, to assess alternative hypotheses about specific proliferation detection problems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bridging the Gap between Human Judgment and Automated Reasoning in Predictive Analytics

Events occur daily that impact the health, security and sustainable growth of our society. If we are to address the challenges that emerge from these events, anticipatory reasoning has to become an everyday activity. Strong advances have been made in using integrated modeling for analysis and decision making. However, a wider impact of predictive analytics is currently hindered by the lack of systematic methods for integrating predictive inferences from computer models with human judgment. In this paper, we present a predictive analytics approach that supports anticipatory analysis and decision-making through a concerted reasoning effort that interleaves human judgment and automated inferences. We describe a systematic methodology for integrating modeling algorithms within a serious gaming environment in which role-playing by human agents provides updates to model nodes and the ensuing model outcomes in turn influence the behavior of the human players. The approach ensures a strong functional partnership between human players and computer models while maintaining a high degree of independence and greatly facilitating the connection between model and game structures.

99 GENERAL AND MISCELLANEOUS↗

Data-Driven Transition Path Analysis Yields a Statistical Understanding of Sudden Stratospheric Warming Events in an Idealized Model

Abstract Atmospheric regime transitions are highly impactful as drivers of extreme weather events, but pose two formidable modeling challenges: predicting the next event (weather forecasting) and characterizing the statistics of events of a given severity (the risk climatology). Each event has a different duration and spatial structure, making it hard to define an objective “average event.” We argue here that transition path theory (TPT), a stochastic process framework, is an appropriate tool for the task. We demonstrate TPT’s capacities on a wave–mean flow model of sudden stratospheric warmings (SSWs) developed by Holton and Mass, which is idealized enough for transparent TPT analysis but complex enough to demonstrate computational scalability. Whereas a recent article (Finkel et al. 2021) studied near-term SSW predictability, the present article uses TPT to link predictability to long-term SSW frequency. This requires not only forecasting forward in time from an initial condition, but also backward in time to assess the probability of the initial conditions themselves. TPT enables one to condition the dynamics on the regime transition occurring, and thus visualize its physical drivers with a vector field called the reactive current . The reactive current shows that before an SSW, dissipation and stochastic forcing drive a slow decay of vortex strength at lower altitudes. The response of upper-level winds is late and sudden, occurring only after the transition is almost complete from a probabilistic point of view. This case study demonstrates that TPT quantities, visualized in a space of physically meaningful variables, can help one understand the dynamics of regime transitions.

Meteorology & Atmospheric Sciences↗

Reliability-Based Design Optimization of a Composite Airframe Component

A stochastic design optimization methodology (SDO) has been developed to design components of an airframe structure that can be made of metallic and composite materials. The design is obtained as a function of the risk level, or reliability, p. The design method treats uncertainties in load, strength, and material properties as distribution functions, which are defined with mean values and standard deviations. A design constraint or a failure mode is specified as a function of reliability p. Solution to stochastic optimization yields the weight of a structure as a function of reliability p. Optimum weight versus reliability p traced out an inverted-S-shaped graph. The center of the inverted-S graph corresponded to 50 percent (p = 0.5) probability of success. A heavy design with weight approaching infinity could be produced for a near-zero rate of failure that corresponds to unity for reliability p (or p = 1). Weight can be reduced to a small value for the most failure-prone design with a reliability that approaches zero (p = 0). Reliability can be changed for different components of an airframe structure. For example, the landing gear can be designed for a very high reliability, whereas it can be reduced to a small extent for a raked wingtip. The SDO capability is obtained by combining three codes: (1) The MSC/Nastran code was the deterministic analysis tool, (2) The fast probabilistic integrator, or the FPI module of the NESSUS software, was the probabilistic calculator, and (3) NASA Glenn Research Center s optimization testbed CometBoards became the optimizer. The SDO capability requires a finite element structural model, a material model, a load model, and a design model. The stochastic optimization concept is illustrated considering an academic example and a real-life raked wingtip structure of the Boeing 767-400 extended range airliner made of metallic and composite materials.

Patnaik, Surya N.↗

Medical Optimization Network for Space Telemedicine Resources

INTRODUCTION: Long-duration missions beyond low Earth orbit introduce new constraints to the space medical system such as the inability to evacuate to Earth, communication delays, and limitations in clinical skillsets. NASA recognizes the need to improve capabilities for autonomous care on such missions. As the medical system is developed, it is important to have an ability to evaluate the trade space of what resources will be most important. The Medical Optimization Network for Space Telemedicine Resources was developed for this reason, and is now a system to gauge the relative importance of medical resources in addressing medical conditions. METHODS: A list of medical conditions of potential concern for an exploration mission was referenced from the Integrated Medical Model, a probabilistic model designed to quantify in-flight medical risk. The diagnostic and treatment modalities required to address best and worst-case scenarios of each medical condition, at the terrestrial standard of care, were entered into a database. This list included tangible assets (e.g. medications) and intangible assets (e.g. clinical skills to perform a procedure). A team of physicians working within the Exploration Medical Capability Element of NASA's Human Research Program ranked each of the items listed according to its criticality. Data was then obtained from the IMM for the probability of occurrence of the medical conditions, including a breakdown of best case and worst case, during a Mars reference mission. The probability of occurrence information and criticality for each resource were taken into account during analytics performed using Tableau software. RESULTS: A database and weighting system to evaluate all the diagnostic and treatment modalities was created by combining the probability of condition occurrence data with the criticalities assigned by the physician team. DISCUSSION: Exploration Medical Capabilities research at NASA is focused on providing a medical system to support crew medical needs in the context of a Mars mission. MONSTR is a novel approach to performing a quantitative risk analysis that will assess the relative value of individual resources needed for the diagnosis and treatment of various medical conditions. It will provide the operational and research communities at NASA with information to support informed decisions regarding areas of research investment, future crew training, and medical supplies manifested as part of the exploration medical system.

Shah, R. V.↗

INCORPORATING DYNAMIC 3D SIMULATION INTO PRA

Through continued advancement in computational resources, development that was previously done by trial and error production is now performed through computer simulation. These virtual physical representations have the potential to provide accurate and valid modeling results and are being used in many different technical fields. Risk assessment now has the opportunity to use 3D simulation to improve analysis results and insights, especially for external event analysis. By using simulations, the modeler only has to determine the likelihood of an event without having to also predict the results of that event. The 3D simulation automatically determines not only the outcome of the event, but when those failures occur. How can we effectively incorporate 3D simulation into traditional PRA? Most PRA plant modeling is made up of components with different failure modes, probabilities, and rates. Typically, these components are grouped into various systems and then are modeled together (in different combinations) as a “system” with logic structures to form fault trees. Applicable fault trees are combined through scenarios, typically represented by event tree models. Though this method gives us failure results for a given model, it has limitations when it comes to time-based dependencies or dependencies that are coupled to physical processes which may themselves be space- or time-dependent. Since, failures from a 3D simulation are naturally time related, they should be used in that manner. In our simulation approach, traditional static models are converted into an equivalent state diagram representation with start states, probabilistic driven movements between states and terminal states. As the state model is run repeatedly, it converges to the same results as the PRA model in cases where time-related factors are not important. In cases where timing considerations are important (e.g., when events are dependent upon each other), then the simulation approach will typically provide superior results and insights. We also couple the state model with the dynamic 3D simulation analysis representing events (such as flooding) to determine which (if any) components fail. Not only does the simulation take into account any failed items from the state model, but any failures caused by the simulation are incorporated back into the state model and factored into the overall results. Using this method we incorporate accurate 3D simulation results, eliminate static-based PRA issues, and have time ordered failure information.

3D Simulation↗

Dynamic Probabilistic Safety Assessment Studies for Advanced Reactor Using RAVEN

Probabilistic Safety Assessment (PSA) is used extensively to evaluate the risks associated with complex engineering systems like Nuclear Power Plants (NPPs). Current PSA models are based on the Event-Tree/Fault-Tree (ET/FT) methodology. ET and FT models are static and are based on Boolean logic approaches. In the past, concerns have been raised in the literature regarding the capability of the traditional static modelling approaches to adequately account for the impact of process, hardware, software, firmware and human interactions on the stochastic system behaviour. To overcome the limitations of the traditional approach to PSA, several dynamic PSA methodologies have been proposed. One of the dynamic PSA methodologies used for dynamic evaluations is Dynamic Event Tree (DET) framework which can be used to assess the impact of the parameter variability and scenario dynamics on the PSA model for the initiating event. The DET framework couples the stochastic model (number of component/trains that start on demand, operator action timing, etc.) with a Thermal-Hydraulic (TH) model of the plant. This paper explores the use of DET along with a case study on advanced reactor. The initiating event selected for the study was Class IV power supply failure event. The TH analysis considering uncertainty in various parameters was performed using RELAP5 and Reactor Analysis and Virtual control ENvironment (RAVEN) tool. Based on the uncertainty analysis, it is concluded that the peak clad temperatures (PCT) are within the limits in all the code runs implying a high-degree of safety margin. However, variation in time to reach the PCT was observed among the code runs and the mean time to reach the PCT was found to be around 8590sec (approximately 2.4 hours). Hence, sufficient time margin is available for human intervention and the operator might have a relatively stress-free state during such an accident scenario. Due to the static nature of the traditional PSA models, the safety margin available was lesser, whereas, with the help of dynamic PSA models, one can demonstrate that the actual available safety margin is more in the present case study and is valuable input from the design point of view.

99 GENERAL AND MISCELLANEOUS↗