Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Reliability-Informed Life-Cycle Warranty Cost Analysis: A Case Study on a Transmission in Agricultural Equipment

In agricultural and industrial equipment, both new and remanufactured systems are often available for warranty coverage. In such cases, it may be challenging for equipment manufacturers to properly trade-off between the system reliability and the cost associated with a replacement option (e.g., replace with a new or remanufactured system). To address this problem, we present a reliability-informed life-cycle warranty cost (LCWC) analysis framework that enables equipment manufacturers to evaluate different warranty policies. These warranty policies differ in whether a new or remanufactured system is used for replacement in the case of product failure. The novelty of this LCWC analysis framework lies in its ability to incorporate real-world field reliability data into warranty policy assessment using probabilistic warranty cost models that consider multiple life cycles. First, the reliability functions for the new and remanufactured systems are built as the time-to-failure distributions that provide the best-fit to the field reliability data. Then, these reliability functions and their corresponding warranty policies are used to build the LCWC models according to the specific warranty terms. Finally, Monte Carlo simulation is used to propagate the time-to-failure uncertainty of each system, modeled by its reliability function, through each LCWC model to produce a probability distribution of the LCWC. The effectiveness of the proposed reliability-informed LCWC analysis framework is demonstrated with a real-world case study on a transmission used in some agricultural equipment.

agricultural equipment↗

Probabilistic fatigue methodology for six nines reliability

Fleet readiness and flight safety strongly depend on the degree of reliability that can be designed into rotorcraft flight critical components. The current U.S. Army fatigue life specification for new rotorcraft is the so-called six nines reliability, or a probability of failure of one in a million. The progress of a round robin which was established by the American Helicopter Society (AHS) Subcommittee for Fatigue and Damage Tolerance is reviewed to investigate reliability-based fatigue methodology. The participants in this cooperative effort are in the U.S. Army Aviation Systems Command (AVSCOM) and the rotorcraft industry. One phase of the joint activity examined fatigue reliability under uniquely defined conditions for which only one answer was correct. The other phases were set up to learn how the different industry methods in defining fatigue strength affected the mean fatigue life and reliability calculations. Hence, constant amplitude and spectrum fatigue test data were provided so that each participant could perform their standard fatigue life analysis. As a result of this round robin, the probabilistic logic which includes both fatigue strength and spectrum loading variability in developing a consistant reliability analysis was established. In this first study, the reliability analysis was limited to the linear cumulative damage approach. However, it is expected that superior fatigue life prediction methods will ultimately be developed through this open AHS forum. To that end, these preliminary results were useful in identifying some topics for additional study.

Everett, R. A., Jr.↗

The implementation and use of Ada on distributed systems with high reliability requirements

Performance analysis was begin on the Ada implementations. The goal is to supply the system designer with tools that will allow a rational decision to be made about whether a particular implementation can support a given application early in the design cycle. Primary activities were: analysis of the original approach to recovery in distributed Ada programs using the Advanced Transport Operating System (ATOPS) example; review and assessment of the original approach which was found to be capable of improvement; preparation and presentation of a paper at the 1987 Washington DC Ada Symposium; development of a refined approach to recovery that is presently being applied to the ATOPS example; and design and development of a performance assessment scheme for Ada programs based on a flexible user-driven benchmarking system.

Knight, J. C.↗

Lunar RFC Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated", these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development. When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Lunar Regenerative Fuel Cell (RFC) Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) Regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated," these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development.When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program’s subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) programs subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

reliability↗

Reliability Model Generator for fault-tolerant systems

This paper discusses an analysis tool, the Reliability Model Generator, that reasons from structural and functional system design specifications to generate a reliability model for the system under investigation. The resultant model defines a system state space sufficient to characterize the effects of single and multiple component failures. This model may then be examined by the analyst or used as input to an existing reliability evaluation tool, the Semi-Markov Unreliability Range Evaluator (SURE), to compute numeric bounds for system reliability (i.e., safety, mission success, availability, etc.). In defining the input to the Reliability Model Generator, a separation of the component function from structural specification is proposed to allow easy modification for analysis of alternative architectures. A hierarchical system description paradigm promotes multiple abstractions, thereby enabling analysis at all phases of the design process. The work described in this paper has been supported under NASA contract NAS1-10899, Integrated Airframe/Propulsion Control System Architecture (IAPSA II). IAPSA II promotes a system engineering methodology and supporting analytical tools to evaluate flight control architecture configuration alternatives during early phases of the design cycle when the cost and schedule impact of design revisions is minimal. Emphasis is placed on traceability to ensure that the requirements drive the resulting design.

Catherine M McCann↗

Determining the Best-Fit FPGA for a Space Mission: An Analysis of Cost, SEU Sensitivity,and Reliability

This viewgraph presentation reviews the selection of the optimum Field Programmable Gate Arrays (FPGA) for space missions. Included in this review is a discussion on differentiating amongst various FPGAs, cost analysis of the various options, the investigation of radiation effects, an expansion of the evaluation criteria, and the application of the evaluation criteria to the selection process.

Berg, Melanie↗

Computing Reliabilities Of Ceramic Components Subject To Fracture

CARES calculates fast-fracture reliability or failure probability of macroscopically isotropic ceramic components. Program uses results from commercial structural-analysis program (MSC/NASTRAN or ANSYS) to evaluate reliability of component in presence of inherent surface- and/or volume-type flaws. Computes measure of reliability by use of finite-element mathematical model applicable to multiple materials in sense model made function of statistical characterizations of many ceramic materials. Reliability analysis uses element stress, temperature, area, and volume outputs, obtained from two-dimensional shell and three-dimensional solid isoparametric or axisymmetric finite elements. Written in FORTRAN 77.

Nemeth, N. N.↗

NASA Applications and Lessons Learned in Reliability Engineering

Since the Shuttle Challenger accident in 1986, communities across NASA have been developing and extensively using quantitative reliability and risk assessment methods in their decision making process. This paper discusses several reliability engineering applications that NASA has used over the year to support the design, development, and operation of critical space flight hardware. Specifically, the paper discusses several reliability engineering applications used by NASA in areas such as risk management, inspection policies, components upgrades, reliability growth, integrated failure analysis, and physics based probabilistic engineering analysis. In each of these areas, the paper provides a brief discussion of a case study to demonstrate the value added and the criticality of reliability engineering in supporting NASA project and program decisions to fly safely. Examples of these case studies discussed are reliability based life limit extension of Shuttle Space Main Engine (SSME) hardware, Reliability based inspection policies for Auxiliary Power Unit (APU) turbine disc, probabilistic structural engineering analysis for reliability prediction of the SSME alternate turbo-pump development, impact of ET foam reliability on the Space Shuttle System risk, and reliability based Space Shuttle upgrade for safety. Special attention is given in this paper to the physics based probabilistic engineering analysis applications and their critical role in evaluating the reliability of NASA development hardware including their potential use in a research and technology development environment.

Safie, Fayssal M.↗

A Synthetic Vision Preliminary Integrated Safety Analysis

This report documents efforts to analyze a sample of aviation safety programs, using the LMI-developed integrated safety analysis tool to determine the change in system risk resulting from Aviation Safety Program (AvSP) technology implementation. Specifically, we have worked to modify existing system safety tools to address the safety impact of synthetic vision (SV) technology. Safety metrics include reliability, availability, and resultant hazard. This analysis of SV technology is intended to be part of a larger effort to develop a model that is capable of "providing further support to the product design and development team as additional information becomes available". The reliability analysis portion of the effort is complete and is fully documented in this report. The simulation analysis is still underway; it will be documented in a subsequent report. The specific goal of this effort is to apply the integrated safety analysis to SV technology. This report also contains a brief discussion of data necessary to expand the human performance capability of the model, as well as a discussion of human behavior and its implications for system risk assessment in this modeling environment.

Hemm, Robert↗

Reliability and Probabilistic Risk Assessment - How They Play Together

Since the Space Shuttle Challenger accident in 1986, NASA has extensively used probabilistic analysis methods to assess, understand, and communicate the risk of space launch vehicles. Probabilistic Risk Assessment (PRA), used in the nuclear industry, is one of the probabilistic analysis methods NASA utilizes to assess Loss of Mission (LOM) and Loss of Crew (LOC) risk for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability distributions to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: 1) what can go wrong that would lead to loss or degraded performance (i.e., scenarios involving undesired consequences of interest), 2) how likely is it (probabilities), and 3) what is the severity of the degradation (consequences). Since the Challenger accident, PRA has been used in supporting decisions regarding safety upgrades for launch vehicles. Another area that was given a lot of emphasis at NASA after the Challenger accident is reliability engineering. Reliability engineering has been a critical design function at NASA since the early Apollo days. However, after the Challenger accident, quantitative reliability analysis and reliability predictions were given more scrutiny because of their importance in understanding failure mechanism and quantifying the probability of failure, which are key elements in resolving technical issues, performing design trades, and implementing design improvements. Although PRA and reliability are both probabilistic in nature and, in some cases, use the same tools, they are two different activities. Specifically, reliability engineering is a broad design discipline that deals with loss of function and helps understand failure mechanism and improve component and system design. PRA is a system scenario based risk assessment process intended to assess the risk scenarios that could lead to a major/top undesirable system event, and to identify those scenarios that are high-risk drivers. PRA output is critical to support risk informed decisions concerning system design. This paper describes the PRA process and the reliability engineering discipline in detail. It discusses their differences and similarities and how they work together as complementary analyses to support the design and risk assessment processes. Lessons learned, applications, and case studies in both areas are also discussed in the paper to demonstrate and explain these differences and similarities.

Safie, Fayssal↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology that was developed to allocate reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program's subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. Allocating is an iterative process; as systems moved beyond their conceptual and preliminary design phases this provided an opportunity for the reliability engineering team to reevaluate allocations based on updated designs and maintainability characteristics of the components. Trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper will discuss the value of modifying reliability and maintainability allocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Reliability-Informed Life Cycle Warranty Cost and Life Cycle Analysis of Newly Manufactured and Remanufactured Units

Standard life cycle techniques such as life cycle warranty cost (LCWC) analysis and life cycle analysis (LCA) are used to respectively quantify the relative economical and environmental advantages of remanufactured goods while simultaneously identifying avenues for improvement. In this paper, we contribute to the literature on life cycle studies by incorporating reliability into LCWC analysis and LCA with the goal of improving long-term/multiple life cycle decision making. We develop a branched power-law model to incorporate the physical degradation mechanisms leading to reduced reuse rates of system parts over multiple life cycles. We then follow a standard LCA protocol to quantify the difference between a new unit and its remanufactured version in terms of environmental impact items such as abiotic depletion potential, global warming potential, and energy consumption. We then devise four practical warranty policies that vary in the choice of replacement and/or provision for extended warranty. All possible replacement scenarios for multiple life cycles are explored for each policy and a mathematically rigorous framework is provided, where the reliability information is used to calculate probabilistic LCWC and life cycle impact items. This reliability-informed LCWC analysis and LCA framework enables design engineers to compare design options and warranty policies by quantifying both economical and environmental impacts to aid in decision making. Although the framework is presented in a general form applicable to any engineered system, we demonstrate the utility of this framework by using a case study of an infinitely variable transmission used in agricultural equipment.

42 ENGINEERING↗

Assessment of Stirling Technology Has Provided Critical Data Leading Toward Flight Readiness of the Stirling Converter

The NASA Glenn Research Center is supporting the development of a Stirling converter with the Department of Energy (DOE, Germantown, Maryland) for an advanced Stirling Radioisotope Power System (SRPS) to provide spacecraft onboard electric power for NASA space science missions. A key technology assessment completed by Glenn and DOE has led to the SRPS being identified as a high-efficiency power source for such deep space missions as the Europa Orbiter and the Solar Probe. In addition, the Stirling system is now being considered for unmanned Mars rovers, especially where mission profiles may exclude the use of photovoltaic power systems, such as exploration at high Martian latitudes or for missions of long duration. The SRPS efficiency of over 20 percent will reduce the required amount of radioisotope by more than a factor of 3 in comparison to current radioisotope thermoelectric generators. This significantly reduces radioisotope cost, radiological inventory, and system cost, and it provides efficient use of scarce radioisotope resources. In support of this technology assessment, Glenn conducted a series of independent evaluations and tests to determine the technology readiness of a 55-We Stirling converter developed by Stirling Technology Company (Kennewick, Washington) and DOE. Key areas evaluated by Glenn included: 1) Radiation tolerance of materials; 2) Random vibration testing of the Stirling converter in Glenn's Structural Dynamics Lab to simulate operation in the launch environment; 3) Electromagnetic interference and compatibility (EMI/EMC) of the converter operating in Glenn's EMI lab; Independent failure modes, effects, and criticality analysis, and life and reliability 4. Independent failure modes, effects, and criticality analysis, and life and reliability assessment; and 5) SRPS cost estimate. The data from these evaluations were presented to NASA Headquarters and the Jet Propulsion Laboratory mission office by a joint industry/Government team consisting of DOE, Glenn, and Lockheed Martin Astronautics. This team concluded that there are no technical reasons that would rule out using the Stirling converter for deep space missions. As a direct result of the successful testing at Glenn, the DOE/Stirling Technology Company 55-We Stirling converter has been baselined for the SRPS. Glenn is now continuing an in-house project to assist in developing the Stirling converter for readiness for space qualification and mission implementation. As part of this effort, the Stirling converter will be further characterized under launch environment random vibration testing, methods to reduce converter EMI will be developed, and an independent performance verification will be completed. Converter life assessment and permanent magnet aging characterization tasks are also underway. Substitute organic materials for the linear alternator and piston bearing coatings for use in a high-radiation environment have been identified and have now been incorporated in Stirling converters built by Stirling Technology Company for Glenn. Electromagnetic and thermal finite element analyses for the alternator are also being conducted.

Thieme, Lanny G.↗